Any FM to calculate planned costs for a Maintenance plan

Hi all,
Is there any FM to calculate planned costs for an Maintenance plan.
I can use report RISTRA30(IP31). but i need to use for multiple multiple Mplans and different time frames. using SUBMIT to this report and getting data will lead to performance in my actual report.
Please do provide any FM's or any other pointers for the same.
warm regards,
Sumanth

Dear,
In maintenance plan you can speciefy - order type,task list type,task list group & counter.
when system automatically create service/maintenance order then system will determine plan cost, but for this you have to maintain planned price by t-code KP26.
And then you can see report by IP31
REGARDS,
Kapil
Edited by: Kapildev Farakte on Nov 17, 2009 10:38 AM

Similar Messages

  • Planned cost for int labour and non stockable material not visible

    Hey gurus,
    While creating an order with a material, ext service, non stock material, I am able to see the planned cost for materials in stock and ext services procured. But i'm not able to see the planned cost for non stock material and int labour. However i'm able to see the actual cost for all the items. I think I have missed some config. Please help.
    Regards,
    Abhishek

    Hi,
    As said by Pithan there is a problem in costing variant for planned cost which you have assigned to prder type at plant level.
    Problem underlies within valuation variant assigned to costing variant.PM01 is your costing variant here.Check diiferent heads within valuation variant for this costing variant.There under activities tab what is calculation parameter you have selected.If it is blank you will not get any internal activity cost.You need to select at least one from dropdown like cost from previous period or avaerage cost etc.Then you will get planned cost for internal activities.SAmething applies to non stock material.
    Check in OKP6 for all these and make sure that you have selected at least one cost calculation schema there for activities and material and external.
    Regds,
    atul

  • Planned cost for MTO

    Dear,
    Here in the company have the following situation:
    The system appropriates the planned cost for the production order when the process is MTO.
    Anyone know any way to settle the planned cost of the stock of free stuff and not the planning of the Order of production?
    thank,
    Sergio Navarrete

    Ajay,
    Here's an example:
    This material is the planned cost for the stock free: Process MTS.
    Standard Price 12,96
    In the same material (special stock) planned cost came with the Production Order Sales Order. MTO process.
    Standard Price 100,96
    Order 20232271
    So we can see that the cost calculated by the planned production order is very different from the planned cost of the same material for free stock.
    Question:
    You can make the system use the same cost of the planned free stock for stock of the particular process, such as material inventory value free, 12.96?
    thank,
    Sergio Navarrete

  • Planned cost for processing the component

    Hi All,
    How to see the planned cost for processing any component or finished product in SAP.
      I don't want actual cost for processing the component.
    Regards,
    Shailendra

    After releasing production order all primary and secondary costs get attached to the order.
    You can see planned cost in Tcode:CO02>>>>Goto>>>>>>>Costs>>>Analysis>>>under cost trend layput.
    Yogesh Thorat

  • Planned costs for production order

    Hi,
    I have a requirement where the actual costs and planned costs for a production order have to be displayed. I got the actual cost details from the table COEP.
    Please let me know if anyone knows the table which stores the Planned Costs / or any function modules which can be helpful.
    Thanks in advance.
    Neethu Mohan

    Hi ,
    Please refer the thread,
    How To get Planned Cost for a Production Order
    Best Regards.
    *Reward if it is helpful.

  • BAPI KPF6 POST PLAN COST FOR INTERNAL ORDER AND COST ELEMENT

    Hi all gurus,
    I would like to use in a custom report a BAPI/Function Module that help me to simulate KPF6 in order to post planning costs for internal order and cost element (layout 1-401).
    So the input should be:
    1) Version
    2) period from
    3) periodo to
    4) year
    5) internal order n.
    6) cost element n.
    7) value
    I found a lot of BAPI but don't know the correct one and how to use it (example how to fill the input value).
    Can anyone help me on that?
    Kind Regards

    In additio  to the previous I found the BAPI_COSTACTPLN_POSTPRIMCOST but don't know if it's the correct one and how to use it (some example fitting the my case will be very appreciated).
    If the quoted BAPI is correct.
    I tested it filling all fields as following:
    HEADERINFO:
    CO_AREA=FFCA
    FISC_YEAR=2008
    PERIOD_FROM=001
    PERIOD_TO=012
    DOC_HDR_TX='blank'
    INDEXSTRUCTURE:
    OBJECT_INDEX=000001
    VALUE_INDEX=000004 (hope this point at Interna Order)
    ATTRIB_INDEX=000000
    COOBJECT:
    OBJECT_INDEX=000001
    ORDERID=ZO53-08IMZ
    TOTVALUE:
    VALUE_INDEX=000004
    COST_ELEM=3224048
    FIX_VALUE= 200,0000
    DIST_KEY_FIX_VAL=2
    The Return table is set to 0. Nothing happens.....I suspect something related to indexstructure or index is wrong..
    Could anyone help me on that?
    Kind Regards

  • Planned costs for investment program

    I am having a problem configuring planned costs for inv program positions, which should reflect as the planned cost for the investment measure being created.
    Appropriation request is being used in the scenario to create measures automatically. these measures will require to have the same plan values as the position to which they are assigned.
    Please help.

    The Measure is the cost collector through which spending will be controlled & measured, which is a key integration object with IM.
    WBS Elements are the collectors associated with PS, whereas IO’s are cost collectors found in the CO module.
    The Measure is always assigned to the lowest program position within IM. Program Position is found on Investment Program Hierarchy at its lowest level which may relate to a capital project or project component.
    Hence accordingly the appropriation request serves as a tool to plan the spending and which is therefore upon approval becomes the Measure for the IO or WBS.

  • Planned cost for Results Analysis

    Dear Friends,
    SAP reads line items from COSS and COSP to determine the planned cost for result analysis.  What line items does it consider while summing up the planned cost.  I wish to reconcile the planned cost as considered in result analysis.
    I am considering the line items from COSS and COSP where
    Value type = 1 or 11
    Beltyp = 1
    Version = 0
    Business Transaction ????
    What values should I put for business transation ?    Or is there a SAP standard report which matches with the planned cost value of result analysis.
    Standard report S_ALR**** does not always match with the planned cost value in result analysis.  These reports read values from RPSCO table which is a summary table.  
    Regards
    Jayesh.

    After releasing production order all primary and secondary costs get attached to the order.
    You can see planned cost in Tcode:CO02>>>>Goto>>>>>>>Costs>>>Analysis>>>under cost trend layput.
    Yogesh Thorat

  • More than one Planning plant for a maintenance plant.?

    hi Friends, can we have more than one Planning plant for a maintenance plant.Is there any advantage or disadvantage of this condition.?

    Hi,
         You can have Maintenance Planning Plant & Maintenance Plant in any of the follwing ratios, i.e., 1:1 / 1:n / n:1. Actually in Maintenance, there can be electrical & mechanical maintenance.
              In the case of 1:1 relation, all the maintenance activities (Electrical & Mechanical) will be planned by single Maintenance Planning Plant for single Maintenance Plant.
            In case of 1:n, single maintenance planning plant will do the plaaning of maintenance activities for all the maintenance plants.
          In case of n:1, electrical activity will be planned by one Maintenance planning plant & mechanical activities by another planning plant for a single Maintenance plant.
          Defining Maintenance planning plant & maintenance plant in different relations will help us in generating different kind of reports.
    I am looking forward your reply.
    Regards,
    Maheswaran.

  • Plan cost in Plant maintenance order

    Hello,
          I need to show plan cost in plant maintenance order on the report. It appears in the cost tab (overview tab inside the cost tab). Please let me know if you know any function module.
    Regards,
    Eswar.

    Try
    CALL FUNCTION 'PM_WORKORDER_PLAN_COSTS_SET'  
    Standred program is using this FM and it has table " PMCO "<b>
    include = LCOIHF2Y</b>
    Hope this’ll give you idea!!
    <b>P.S award the points.</b>
    Good luck
    Thanks
    Saquib Khan
    "Some are wise and some are otherwise"<b></b>

  • FM to find out schedule calls and their statuses for a Maintenance plan

    Hi,
    Please let me know if there is any FM to find out all schedule calls and their statuses for a Maintenance plan.
    Regards,
    Vimal

    Hi Vimal
    Below function module will serve your purpose.
    ZPM_GET_SCHEDULING_STATUS
    Regards
    Anil Kumar

  • How to look for New start Called call for a Maintenance plan

    Hi,
    I need to find out all calls for a maintenance plan of scheduling type- 'New Start' and Status- 'Called'. How to find this using tables.
    For 'New Start' scheduling type probably table field and value is MHIS-TERMA = 'N'. There are different statuse in this table but I am not able to identify the status 'called'. Also what is the field MHIS-ZAEHL(Maintenance package number) for?
    Thanks,
    Vimal

    Taken from the standard IP10 program:
    * possible status combinations
    * TSABR - Scheduling status: planned date called
    * TSVBT - Scheduling status: call outstanding
    * TSENQ - Scheduling status: call horizon not reached
    * TSENM - Scheduling status: stopped manually
    * TSTAT - Sceduling status
    * TSABR   TSVBT   TSENQ   TSENM   TSTAT
    *   X       -       -       -       A     called with order
    *   X       -       -       -       -     called without order
    *   -       X       X       -       -     on hold (TSENQ), due (TSVBT)
    *   -       X       X       -       F     on hold, due and fixed
    *   X       -       -       -       X     skipped
    *   -       X       X       X       -     blocked
    *   -       X       X       X       F     blocked
    *   X       -       -       -       -     LRMDT <> 0, completed

  • Plan cost for activity element

    My internal activity can calculate plan cost from a workcenter properly , but while I append a activity element(internal) and add the same worcenter and data the activity element does not calculate plan cost , but if I confirm the activity element it gives actual cost.
    What possibly be the problem could any one tell me? is there any setting seperately for activity element?

    Hi
    Thanks. I am using CJ20N and then selecting the activity element I am following the path edit>cost>Plan/actual
    When I try to recaulutate the cost by edit>cost>update cost then I get generic error :
    "Object was not costed
    Message no. CK060
    Diagnosis
    The system could not find any entries that are relevant to costing.
    System Response
    The system did not cost the object.
    Procedure
    Check whether the following objects should be flagged as relevant to costing:
    Items in the BOM
    Display BOM
    Operations in the routing
    Control key in the routing
    1. Look at the message log.
    2. Check whether a quantity was specified in the confirmation."
    But while calculate cost for an internal activity it is calculating cost.

  • How to calculate fixed cost for by-product in costing run?

    Dear,
    We want to have some fixed cost calculated for by-product B in costing run.
    Our current practise,  we only calculate the delivery cost as variable cost for this by-product B in the costing run for B. The by-product B is a component in the BOM of finish product A.
    However, we need some fixed cost to be countered in for by-product B, which can be by controlled by us.
    Any thought?
    Thank you all in advance.
    Christina.

    Dear,
    You have to maintain  BOM Usage-Costing-6 i.e., Costing BOM with all your required  Fixed Cost related Material components and assign it  in the by-product Material Master to include the Fixed Cost in by-product Standard Cost Estimate.  Based on this setting, system will calculate Standard Cost Estimate with this Fixed Cost and display in the related reports.
    Regards
    appalas

  • Function modules or BAPI for posting plan costs for WBS Element

    Hi all,
    Does anyone know, whether there exists a function module or BAPI for posting plan costs to a WBS Element? K_COSTS_PLAN_PS does not work, because RKP1 is not allowed.
    Greetings

    check
    BAPI_COSTACTPLN_POSTACTINPUT   Activity Input Planning: Posting                
    BAPI_COSTACTPLN_POSTACTOUTPUT  Activity/Price Planning: Posting                
    BAPI_COSTACTPLN_POSTKEYFIGURE  Stat. Key Figure Planning: Postings             
    BAPI_COSTACTPLN_POSTPRIMCOST   Primary Cost Planning: Postings                 
    BAPI_PDTRANSCO_POSTPRIMCOST    Transfer of Planning Data: Post Primary Costs   
    K40C                           CO Actual Postings, Manual                      
    BAPI_ACC_PRIMARY_COSTS_POST    Accounting: Post Primary Costs                  
    BAPI_COPAACTUALS_POSTCOSTDATA  BAPI Operating Concern: Post Costing-Based Actua
    BAPI_PRIM_COST_CHECK_AND_POST  Primary Costs: Formal Parameter Check           
    S@meer

Maybe you are looking for

  • Screen not responding correctly.

    Has anyone else had issues with their screen not responding correctly.Mine is typing wrong charaters or none at all. I've updated to the latest ios. restored, reset and everything else I can think of. The phone is less than 6 months old.

  • Problem with functioning Generic Delta

    Hi Expert ! I Have Created a Generic Delta and has Scheduled the Delta Load By Means of Process Chain In BI Side. Although it is showing Green(OK) status for the respected Request at PSA(saying No Data Exists FOR PSA) and ODS Lavel but no data is loa

  • How to block a particular UOM in SRM?

    Hi All, We have integrated SRM with Baan through XI. For a particular company code in Baan, we have not maintained the UOM 'CARD'. I checked in txn. CUNI in SRM system and UOM 'CARD' is there, but it is not specific to any company code. When user is

  • TextEdit - Save preset for Find & Replace?

    Hey, all! Quick question... is there any way to save a preset for a Find & Replace function in the native TextEdit app in Mac OS?  I do a routine F&R using a long "Insert Pattern" (I haven't had time to learn Regular Expressions yet in order to use a

  • Create a Flex UI for WikiMedia site

    Hi guy, I just look at some example of what Flex can do and I really like to cool UI it provides. I am wondering, is possible to make a Flex UI to replace the HTML front end of Wiki Site. I mean building up a UI with Flex for a Wikimedia site? Is it