Application full Life cycle

Can sombody pls. tell me the steps involved in full life cycle of an application or where I can read up this information.
null

Hi,
You can take help from following links. These are very useful links related ti planning :-
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00915d56-1e31-2a10-6785-e8b5c4114de3?QuickLink=index&overridelayout=true--- Over all steps for IP. It includes everything required for the implementation of IP.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0ac03a4-e46e-2910-f69d-ec5fbb050cbf?QuickLink=index&overridelayout=true--- Steps to create Planning Function.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0ac03a4-e46e-2910-f69d-ec5fbb050cbf?QuickLink=index&overridelayout=true --- For FOX Formula
Navesh

Similar Messages

  • Needing specifics for full life cycle SD project.

    Hello Gurus,
            will you please tell me the whole process and steps for a full life cycle SD project?  I need detail and specific information about that. please don't provide those general or overview info for that.  highly appreciate in advance.
    Many thanks.

    Hi Vansanth
    To know Pharma processes and associated configuration (do not think WM is there), this is the best link:
    http://help.sap.com/bp_bblibrary/600/BBlibrary_start.htm
    Best regards
    Ramki

  • Can more than 1 full life cycle implementations be done for a company?

    Hi there,
    Can anybody please tell me if its possible to do more than 1 full life cycle implementation for a company with multiple company codes? From my understanding, SAP life cycle is ASAP methodology, starting from project preparation to go-live. So if I'm implementing sap for 1 company code, I'll be completing 1 full life cycle implementaion. Now if i do the same for another company code, for the same parent company, will that be considered as 2 full life cycle implementation? Kindly help. I'm not so clear about this full life cycle implementation concept.
    Would really appreciate your gekp.
    Awaiting response,
    Fieona

    HI,
             Well I think It is possible but there are two cases.
    If the implementation is in some company code having same business as the company in which initially SAP was implemented and all the business processed are same then in that case it would be called Rollout. In rollout you would only create the Organizational data that is enter prise structure and master data for that company but there will be no new process configuration as all the running process are already there.
    How ever if you talk about the group lets say has two three completely different business for ex AUto mobile and Power and you implemented it initially in Automobile. Now you want to implement in Power generation sector then definately it would be a fresh implementation. In this case the most important is that you will prepare new BBP as all the business process are different. A complete new documentations, new master data , org elements and a different realization phase and testing phase would be there.
    Please correct If I am wrong.

  • Re: Life cycle in SAP BW

    Hi gurus,
    I am actually a newbie in looking for a job in SAP BW. Am more bent to put a 2-21/2 yrs experience since there's not place for freshers in UK industry, but most of the offers come saying either i should have a experience in full life cycle..could somebody explain how i could come over it
    Regards
    Sri

    Hi ,
        When they refer to the full life cycle its the ASAP methodology which SAP recommends to follow for all its projects.
    1.Project peparation.
    2.Business Blueprint.
    3.Realization.
    4.Fit-Gap Analysis
    5.Go-Live Phase.
        Normally in the first phase all the management guys will sit with in a discussion .
    In the second phase u will get a functional spec  n basing on that u will have a technical spec.
    In the third phase u will actually inplement the project and finally u after testing u will deploy it for production i.e. Go-live .
    U might fall under and get involved in the realization phase .
    If its a supporting project u will come into picture only after successful deployment.
    let us know if any queries .......
    Regards --- Kumar Sarvepalli ........ Honor points

  • SAP LIFE CYCLE

    what is SAP full life cycle

    SAP Full Life Cycle Implementation is
    ASAP Methodology
    start from requirement gathering to Go Live and Support.
    Go through this White paper
    http://www.ondemandgk.com/content/docs/whitepapers/OnDemand_Personal_Navigator_and_Solution_Manager.pdf
    <b>Reward if useful</b>

  • Error while executing transport in HANA's application life-cycle management

    Hi everyone,
    we're currently developing our HANA-based software and would like to use HANA's application life-cycle management: transporting our product from one system to another. Everything seems to be set up correctly: two different systems, correct privileges, a product comprising delivery units comprising packages as well as a transport route between the systems. However, the transport always fails with the following error (example for a transport of a single DU):
    [imdbhdb][HDB][2014.05.07 15:10.01.404][TransportService][0] Transport (delta) has been started for route ID: 1020 (Deliver Unit Transport)
    [hanaserver][HDB][2014.05.07 15:10.08.323][Other][0] Get end export timestamp for DU name: PERSISTENCE
    [hanaserver][HDB][2014.05.07 15:10.08.501][Other][12] Unable to retrieve end export timestamp: ReferenceError: assignment to undeclared variable errText
    [imdbhdb][HDB][2014.05.07 15:10.12.402][TransportService][0] There will be 1 delivery units which will be transported.
    [imdbhdb][HDB][2014.05.07 15:10.12.895][TransportService][12] Failed for DU: PERSISTENCE Vendor: LO Error: HTTP request failed. Status: 500. Error: Unable to retrieve end export time stamp.
    [imdbhdb][HDB][2014.05.07 15:10.12.917][TransportService][12] TransportServiceError: Error occurred while performing the transport.
    Does anyone know how to resolve this?
    Thanks so much in advance,
    Lukas

    Hi everyone,
    I am sorry I bothered you with this error. It was caused by me since I forgot to export a top-level file. This file must have defined a variable errText which other DUs depended on and could therefore not be activated.
    Now, the transport works perfectly well and I'm really happy with it.
    All the best
    Lukas

  • What is the average duration of 1 full SAP life cycle or 1 end-to-end implementation. How long does it take to prepare DEV, QAS and PRD?

    What is the average duration of 1 full SAP life cycle or 1 end-to-end implementation. How long does it take to prepare DEV, QAS and PRD in any company?

    Anand,
    let me start with saying that the question you ask may not help you to determine the duration of your project. As Ryan and others stated the duration of the project is highly dependent on the scope of the solution you are implementing, geographical scope, amount of modifications/enhancements, number of languages, number of users that need to be trained, amount of standard processes customer is able to re-use in the implementation and many other factors (like quality of implementation contractor you will chose and availability of customer and implementors resources). I can probably go on for another couple lines, but I guess you get the idea.
    With that out of the way let's talk about some example implementations that will give you an idea - Ryan did great job outlining what I would call traditional approach above. I have couple examples where customers leveraged innovative deployment strategies that are available today. In particular the project teams leveraged pre-packaged services like RDS, World Template or Best Practices as their baseline solution and they built from there. Second acceleration technique customers now leverage is the deployment in the SAP HANA Enterprise Cloud to accelerate the time to initial setup of the system and thus move from traditional blueprinting to scope validation exercise that further shortens the time. There are other acceleration techniques we see applied in some cases like use of iterative implementation of the delta requirements on top of the baseline solution.
    Let me offer few examples to illustrate what I explained above:
    ERP implementation at Schaidt Innovations with 3 months long deployment of ERP solution using ERP RDS as a baseline (you can view their testimonial here - Schaidt Innovations: SAP ERP on HANA in the cloud - YouTube)
    Customer in Asia with global template deployment that leveraged SAP ERP for Manufacturing with deployment to cloud and 9 countries rollout (Japan, Korea, China, Taiwan, Hong Kong, UK, Germany and US). The initial deployment took 4 months for first country and 2 months for rollout into the additional 8 countries - so total of 6 months. The original plan using traditional approach with full blueprint and heavy configuration was estimated to be more than double of the actual deployment time.
    There are many other examples where customers follow the assemble-to-order delivery model for their project and gain significant benefits doing so. I suggest you to review some of the recordings we did in 2013 about this approach and if you are member of ASUG review the Agile ASAP sessions we did for ASUG PM SIG.
    Link to webinars: SAP A2O Webinar Series Schedule
    Let me know if you have any questions.
    Jan

  • ADF application life cycle

    Hi,
    Can any one tell me how the life cycle of an application is taken care in ADF application?
    I have an ADF application. Once I logout of the application, and click internet browser 'Back' button to come to a page which needs the DB interaction, I need my application to go to 'Logout' page again and remain in there until I again login, because actually I am out of my application. But at present I do get the following error.
    javax.faces.el.EvaluationException: Error setting property 'form1' in bean of type..java.lang.NullPointerException
    I have the following code when I logout of the application.
    FacesContext ctx = FacesContext.getCurrentInstance();
    ExternalContext ectx = ctx.getExternalContext();
    HttpServletResponse response = (HttpServletResponse)ectx.getResponse();
    HttpSession session = (HttpSession)ectx.getSession(false);
    session.invalidate();
    response.sendRedirect("CRLIF001.jsp");
    ctx.responseComplete();
    return null;
    Is there any code that I need to write to fix this? Could any one please help me?
    Thanks,
    Venki

    Hi,
    actually it does what you tell it to do: It deletes the session and as such the form is not available. You may be able to use a servlet filter that checks the session ID and the user authentication. If you detect that the session has changed or the user isn't authenticated, you redirect him to the page you want
    Frank

  • CMC: Security: Life Cycle Manager (LCM) missing under "Appication" Security

    Hello there,
    I am trying to set up security for the Life Cycle Manager (LCM). LCM has been installed on the BO 3.1 DEV_System with version SP2, FP4, by another company.
    I am using the procedure described in the (my opinion very well written) article:
    http://wiki.sdn.sap.com/wiki/display/BOBJ/FromDEVtoQAtoPRODusingLifeCycleManager
    The problem is, in the CMC security, under "Application" ("Anwendung") security, I cant see the "life cycle manager",
    Hence, e.g. I cant grant access to "Application"->"Life Cycle Manager"->"Create Job". I am using an Admin user with full rights.
    The life cycle manager does show up however under "Content" ("Inhalt") security, but I guess this concerns other security settings bc granting access to all of "Content"->"Life Cycle Manager" and "Content"->"Life Cycle Manager Job" still didnt allow end-user to create jobs.
    Did anybody stumble accross the same or has an explanation or solution?
    I think this is either a installation or configuration issue (are there any additional settings after intallation needed in other places in order to display security "Application"->"Life Cycle Manager" security in CMC and be able to grant end-users the appropriate rights) ?
    Thanks a lot for your help!

    Hi there,
    thanks... meanwhile, I found a SAP note that describes exactly the problem:
    1443784
    Advice is to even delete the whole workfolders for all webapps (.../localhost/catalina/...) and deployfolder and after that, start tomcat again.
    This also seemed to deploy all the webapps again, also, date from the deployed files indicates they really got redeployed.
    But: Still the same behaviour, no LCM in CMC-Security under "Applications" .
    Since everything got deployed again guess already the files that are deployed are not containing the right information!
    Maybe, during installation, they didnt get updated somehow.
    So, guess only solution will be to completely uninstalling LCM, reinistall it and cross finger that this time, the files will get updated.
    I already tried uninstalling FP 2.4, reinstalled it, no improvement (although it says it is updating CMCApp and CMCAppAction during installation - maybe the necessary updates are already done during isntallation of SP0/SP1/SP2).
    When trying to uninstall SP2 after FP 2.4 is uninstalled, get an error "missing .dll" - it is a mess, but I will keep on fighting
    If anybody has a clue how to specifically change specific files under CMCApp and CMCActionApp directly (dont know if that is possible though...) so that LCM App is displayed correctly in CMC Security->Application , would also be an acceptable workaround .

  • Where in the MIDlet life-cycle should I create multiple forms with LWUIT ?

    Hi all,
    I must create two LWUIT forms in my application. Where should I create the two forms ? I created the first form in the startApp life-cycle method , and when I tried to create also the second form in the startApp method then there is a NullPointerException raised when running the application !
    So where , or how , should I create the second form ?
    Thank you very much indeed
    Edited by: andrianiaina on May 20, 2011 1:59 AM

    I think the problem here is that Arlhoolie wants all of the different TEBs to behave as if they were part of a single interaction that submits only ONE result to the quiz.  Using multiple TEBs in Captivate means that you have multiple scored objects and therefore multiple results being submitted to the quiz.
    If you want a single Success or Failure result submitted to the quiz based on the results from multiple interactive objects then there really is no simple way to do it.  But you could try using the Infosemantics Interactive Master widget to combine all the TEBs as slave objects that report to the Master Widget, which then reports a single score to the quiz based on the results from the slave objects.
    You can learn more about the Master widget here:
    http://www.infosemantics.com.au/adobe-captivate-widgets/interactive-master
    http://www.infosemantics.com.au/interactivemaster/help
    You can download a free trial version of the widget here:
    http://www.infosemantics.com.au/adobe-captivate-widgets/download-free-trial-widgets
    One caveat you should be aware of is that this widget is not HTML5 compatible.

  • Requirement of E-sourcing and e-CLM (contract life cycle management) in SRM

    Dear Experts,
    Does one need to install e-sourcing and eCLM (contract life cycle management) in SRM 7.0 to take the benefit of full functionality available in SRM 7.0?
    My understanding says that e-Sourcing and CLM are not must for SRM 7.0. They are basically available separately as on demand product who may not have SRM landscape.
    Any ideas shared will be highly appreciated.
    Reagrds,
    Ranjan

    Hi Ranjan -
    The answer is NO, you do not need E-Sourcing/CLM to install and work with the contract functionality in SRM 7.0.  These are completely different products / systems.  The contracts functionality in CLM is oriented toward contract authoring / qualitative information management about contracts, while the functionality in SRM is more oriented toward the quantitative contract information/execution of the contracts against orders.
    Hope this helps,
    Emily

  • Regarding SLCM (Student Life Cycle Management)

    Hi
    does any one working on Student Life Cycle Management(SLCM)
    can any one pls let me know what are the function modules present in the predefined business package and how to know what are the predefined functonalites given by sap.
    when i test the predefined Iviews i get an error for some of iview as student object id not found.
    can any one pls let me know about this
    Bye

    Ok Fine
    I have some points to share thise issue with u
    first thing is , iam using wrong application for the requirement.
    and even i use wrong apps some thing result should be show, as i said the error i got
    we raised an sap Oss for this, they provided the solution as stating that we are using the apps which are specific to the advisor but not for the students specially.
    So if u want to use those apps for student purpose we need to get that student object and pass in our application.
    for this purpose we need an abaper help who is well versed in the coding part.
    just modify the code of required application where u fetch the object id (BY Coding) in ithe intialization method,
    then the appication works fine
    this is the solution i got and all my apps are working fine now.
    Thanxs
    sandeep

  • Content Life Cycle Management - Portal or NW Client.

    Hello GRC PC Experts,
    Kindly let us know whether Content Life Cycle Management is compatible on  Portal as front end.
    Or whether CLM is only compatible with NW Client.
    Please let us know.
    Thanks and regards
    Babu

    Hi,
    You need to integrate the system with portal
    system administration - system configuration and then add system.
    If you have sso then it is better.
    Then create new iview using templetes and then use SAP bsp iview templete and then select the system and then give the application name and start page of your BSP application.
    Thanks and Regards,
    gopal

  • Designing issue in Adobe Life Cycle in interactive form

    Hi,
      My design in Adobe Life Cycle is like,I have to show one image in left corner of the page and giving header and footer
    by using Static Text from Library.I have created the designing and running this application ,it is running fine.But my requirement is i have  to show 50 pages and each page should have same header and footer.How can i do it ?
    And how i will break the pages in to 50 pages.
    Thanks & Regards
    Muna

    Open the PDF file
    Click Ctrl+D (which opens up properties diaglo box)
    Switch to Security Tab
    Change security method to No Security
    If it asks for password - provide the password
    Click Save
    Try to re-open the PDF to ensure that it does not ask you to enter password
    now open the PDF file using LC Designer
    HTH
    --Santosh
    http://about.me/nskumar

  • How to invoke adobe life cycle webservice using c++ (how to pass blob structure as argument)

    We already wrote sample code (.NET C#) to access livecycle webservice(this convert the input file into pdf file) using below link from adobe
    http://livedocs.adobe.com/livecycle/8.2/programLC/programmer/help/wwhelp/wwhimpl/common/ht ml/wwhelp.htm?context=sdkHelp&file=000088.html
    We want to write c++ client to invoke adobe life cycle webservice. I have sample code to invoke the given webservice using plain c++ but I am stuck up with 'how to pass BLOB structure as argument to CreatePDF() method' and
    plus 'how to get ouput as mapItem[]' . Is the code to convert to pdf works fine with .NET and java only? Not with c++ or VB?

    In this case the LiveCycle services are exposed as web services that can be consumed by any application language that can interact with web services. While the sample published are for c# and Java there is no reason that other web service aware languages (C++, Perl, etc) wouldn't work.
    I'm not a Microsoft C++ expert, but as far as I understand all you need to do is create a web reference and then have your C++ classes interact via the generated proxy classes. The syntax will be different, but the concept is the same

Maybe you are looking for

  • [VHD][BOOT][UEFI] Boot Windows 8 From a VHD Drive On a GPT Disk Using UEFI BIOS

    I had been dual booting two copies of Windows 8 prior to getting a new rig without any issues. Once I installed Windows 8.1 I can no longer boot a VHD from the GPT partitioned drive.  My PC specifications  Intel i7-4770k ASUS SABERTOOTH Z87 16GB KING

  • IDVD Project Size Stuck @ 4.54 GB

    I created an iDVD project using Magic iDVD and the Pass Through theme (6.0 theme). These are the contents: (1) a main menu movie of 6 MB and a 30-second soundtrack (not the same soundtrack as the movie) (2) 3 submenus with still photos and a 30-secon

  • Asynchronous Coupling with Pools in one Process

    Hi everybody, i try to  call a BPM Pool (POOL_B) by another BPM Pool (POOL_A) within the same process but unfortunately without success. This are my steps: a) for my START Event (Pool_B) i created a new Message Trigger with a Asynchron Service Interf

  • Selecting activities from afvc table by network number

    hi friends' i am trying to get a list of activities from afvc table but the network number is in a diferent table (afko) the joint field is "AUFPL" what is the easy way to get the list thanks best reguards

  • "Could not sign in. Please check your network connection and try again"

    When trying to set up my daughter's iPod Touch Face Time, the same message comes up, "could not sign in. please check your network connection and try again". The wi-Fi is working (Safari & email works) and we're not behind a firewall. My daughter's A