I created an approval process for a resource.
Whenever a request for a resource is generated for a user, the approval request is sent to a group based on user's location.
Steps:
-I created an approval process in which I added a task which sends the request to the appropriate group.
-An adapter is attached to this task which determines the group to which request is to be sent.
-I have added tcComplete adapter to the Standard Approval
However, after the request is approved by the approver(belonging to the above mentioned group), the resource does not get provisioned and the system validation is shown 'pending' - assigned to user 'xelsysadm'.
I am not able to figure out why the system validation is 'pending' and going to 'xelsysadm'.
Note that I am logged in as xelsysadm and the above pending 'system validation' task is present under 'Open Tasks' under 'To-Do-List'. Once I set the response from there as 'Complete', the resource is provisioned.

I tried provisioning another user, got the oim api error again:
INFO,18 May 2010 13:28:36,925,[XELLERATE.WEBAPP],Key not found in Custom Resource Bundle: newKey = GC.GCPROV.ADAPTER_OIMAPIERROR
DEBUG,18 May 2010 13:28:36,925,[XELLERATE.WEBAPP],Setting the response code as OIM API Error

Similar Messages

  • OIM System Validation Pending

    Hello All
    I have about 6k users stuck in system validation pending since I started an access policy but needed to go back and set the auto-save option. I can click the user forms and just hit save and everything goes through as it should, but I was wondering if there was a way to re-save all those users in that state so that they can be cleared from that state. I don't want to have to go through and do it all manually so a scheduled task or adapter would be helpful if it is available. Any help you guys can give would be appreciated.
    Nick

    I assume that the system validation is on a resource rather than on the user itself.
    I would write a scheduled task (skeleton: http://iamreflections.blogspot.com/2010/08/oim-howto-scheduled-tasks.html) that simply runs findUsers for each "problem user" and then call updateUser. I think you can do this without actually changing anything but if that doesn't work simply read and rewrite the same data into the same attribute.
    API guide for tcUserOperationsIntf: http://otndnld.oracle.co.jp/document/products/id_mgmt/idm_904/doc_cd/javadocs/operations/Thor/API/Operations/tcUserOperationsIntf.html
    Best regards
    /Martin

  • Approval process monitor status turn to "Initiated" instead of "Pending", so awe is not routed

    When I submit a transaction, after successful submission in approval process monitor the status has turn "Initiated" instead of "Pending". That's why it's showing "Not Routed" for the next approving person. So that worklist is not populated.
    Please suggest me to resolve this issue.
    Process Monitor as follows after submission:
    Separation Approval Process (Stage)
    Initiated (Monitor status)
    Approval Routing from Unit HR (Path)
    Not Routed    (Step)                                                    Not Routed      (Step)
    Multiple Approvers                                                     Multiple Approvers
    STATEHR ROLEUSER SEPARATION                              Central Hr
    (Userlist)                                                                        (Userlist)

    Looking at the error message "The Network Adapter could not establish the connection" , It appears hostname and port may be incorrect. Review the targets.xml under E:\oracle\product\10.2.0\db_1\SAP_solman_SDB\emd and
    emoms.properties under E:\oracle\product\10.2.0\db_1\SAP_solman_SDB\config folder to make sure host ( sap_solman) and port (1527) are correct.
    As far as setting the environment variables goes, you can go to control panel -> system -> advanced -> environment variables and set the ORACLE_HOME and ORACLE_SID
    -Ramesh

  • Error in Process-Please specify a valid account assignment error inBackend

    Hi Gurus,
    I am abaper and I am new to SRM technical.
    One Po is already there in SRM 4.0 and ERP with cost center and profit center replicated as it is. But my user is chaning the price of the PO in SRM.  It is showing as 'Error in Process'
    I check in backend error in portal and in rz20  'Please specify a valid account assignment' is error is coming.
    This is technical or functional issue.
    I checked in BBP_PD_PO_TRANSFER_EXEC, BBP_PO_INBOUND i find the error message as SE E181, But how can i rectify this error.
    when they changed the price for other pos it is replicating in backend but why for this po it is giving error, I checked all Cost center and profit center and all are fine...
    Please do the needful.
    Thanks,
    Kiran

    Hi,
    You said change of price in other POs is working fine. Only one PO goes into error.
    Is the cost center, profit center same as the ones in error PO ?
    If it's possible, can you also try this:
    - Create a PO in ERP directly using the same CC, Profit center as account assignment data
    - Check the other account assignment data that got defaulted (e.g. Business area etc) --> Verify whether this data is same in error PO also.
    - Could you create the PO successfully ?
    Best regards,
    Ramki

  • How Assigned TO field will be updated in "start Approval process" Task Action

    I have created a reusable workflow in sharepoint designer. Am using “start Approval process“ Task Action. I have a question in “start Approval process“ Task Action.
    I have username field in the list.  I have created a task form field with name username in “start Approval process“ Task Action. I have assigned list username field to task field username field.
    I have entered a user details in list user name field for new list item. Once the workflow has been started for that item a mail has been sent to the user whose name I have entered in the list user name field. Task has been assigned to the user whose name
    I have entered in the list user name field.
    When I have checked start Approval process task a send mail activity is present (Email Task notification currentitem:Assigned TO) .
    I have not update Assigned To field explicitly.
    1. Where / how the Assigned TO field is getting updated ?
    2. Workflow Initiation and task creation will be done internally by the user who created the item in the list?
    Thanks

    Hi,
    According to your post, my understanding is that you had questions about the “start Approval process“ Task Action.
    When you add the “start Approval process“ Task Action, you need to to select the user who the task assign to.
    To assign the user whose name you have entered in the list user name field, you add action as below:
    After you select the user, the Assigned TO field is getting updated.
    In addition, workflow Initiation and task creation will be done internally by the user who created the item in the list.
    Thank you for your understanding.
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • Assigning Form to Approval Process

    Hi,
    Can anyone guide how can i assign a form (process or object) to the approval process which make the user details available to tha manager while approving his/her request.
    Regards
    Alabhya Goel

    Hi Nitesh,
    Creating object form and attaching with the resource object will give me the request details while approving the requests. but is there any way to attach the form with the approval process.
    whenever i try to attach a form i am gettign one error: "This SDK form can not be attached with the process."

  • Approver Details Not Visible After Changing the Approval Process

    Hi Gurus,
    This expense report belongs to an open approval task when an approval process has ended its validity date.
    After a new approval process is activated, all pending approval tasks experience the issue of approver details not showing.
    In order to reproduce following steps need to be done :
    1. Deactivate the current approval process and activate the new approval process.
    2. When the status of the recently deactivated approval process is "Ended With Open Tasks", go to the "Show Open Approval Tasks" to
    see the open approval tasks.
    3 Check the Cost Assignment area for expense report which is in the open approval tasks.
    3. Approver Details are available.
    4. The approver sees the expense report on his/her approval list.
    Once the approver approves, it doesn't go out of his/her approval list and the expense report is still pending for approval.
    To determine if the expense report has no other pending approval from anyone else, there should be the approver
    details but the issue is it doesn't show up.
    The expense report is also stuck on the approver's approval list even after approving.
    Workaround provided to the Customer:   Recall the ER and submit again for approval.
    But as per customer there should be a background job to refresh the expense report to reflect the approval details.
    And issue should not occur as explained on the point 4.
    Kindly suggest if anything is possible to improve the system behavior.
    Regards,
    Rahul Mishra

    Hi Rahul,
    Although we have a workaround, I believe a permanent solution has to be implemented.
    In cases when an expense report has more than one approver (for example there are 4 approvers) and the 3 approvers had already approved, I think it will not be good to recall the expense report and resubmit because the traveler will have to seek for approval again from all the approvers.
    Regards,
    Catherine Mapili

  • Approval Process in OIM

    Hi All,
    I am new to OIM. I tried creating an approval process for SUN Java System directory server.for this i create an task assignment adapter and added it to the Approval process. the problem here is that when i tried to assign the "Resource" through Requests tab on Admin interface to any user it goes to approver inbox but after approving the request user is not provisioned in the target resource.It shows nothing in the Resource profile page of the user also.
    Any pointer or help will be appreciated.

    Aaah....i think i was not able to explain my problem properly...let me explain you what i did...
    1. i have imported the connector for SUN java system directory server as explained on oracle site in Oracle by example.
    2. This connector have created the iPlanet user (provisioning) process for iPlanet User object name automatically having create process and no. of conditional processes (Disable user, enable user etc..).
    3. Now i wrote one Adapter having approval logic and attach it to one custom process of Approval type and assign it to iPlanet User as Object type. There is no table definition attached to it and when i tried to attach the available Form "UD_IPNT_USR" to it, it gives me some sdk error.
    After this i have tested the approval process in two ways...
    1. Through admin console (as xelsysadm), i have created a test user and assign this user to resource "iPlanet User" through Resource Profile combo tab. The user is successfulll provisioned with no approval required but i was expected that it should go to approver as per logic.
    2. In second scenerion, i assigned the resource through Request tab (Requests-->Resources-->Grant Resource). It goes to xelsysadm Pending approval items first and after this approval it goes to the other approver as per logic defined in adapter. After this approver approved the Request, it goes complete with no provisioning. I am wondering if i need to attach the Approval and Provision Process so that first it goes to approver and after approver approves it, gets automatically provisioned.
    Please look into the problem and suggest some solution. I am sure it should not be as tedious as i made it, but i don't have other option :(

  • Approval Process doesn't work correctly

    Hi,
    I developed custom request template for self-request provisioning for resource with child table data. Also I deployed custom Request Dataset only with child attribute field definition for this resource:
    <request-data-set
    xmlns = "http://www.oracle.com/schema/oim/request"
    xmlns:xsi = "http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation = "http://www.oracle.com/schema/oim/request"
    name = "ProvisionResourceHP"
    entity = "HP"
    operation = "PROVISION">
    <AttributeReference
    available-in-bulk = "true"
    length = "100"
    widget = "text"
    type = "String"
    attr-ref = "UD_HP_ROLES"
    name = "Roles">
         <AttributeReference
         lookup-code = "Lookup.HP.AppRoleList"
    available-in-bulk = "true"
    required = "false"
         length = "100"
    widget = "lookup"
         type = "String"
         attr-ref = "AppRole"
         name = "AppRole"
              primary="true"/>
    </AttributeReference>
    </request-data-set>
    When this request approved by all participants of the approval process, Resource do not in provisioned status! In the resource history only - System Validation status Pending!!!

    I resolved this issue but not complitly. I checked Auto Save Form check box on Process Form and its worked.
    But I do not need Auto Save, because on child table attrubute i don't have any prepop adapter so it always been unpopulated during direct provisioning....
    How to solve this new issue???

  • OIM 11g Approval Process

    Hi Expert/All,
    May I have assistance regarding the OIM 11g?
    Currently, I already create one approval (only 1 level approval) for some resource in OIM 11g, then I'm continue to test the resource with two below way:
    1. If I'm try to add "New Resource" directly by xelsysadm via manage user menu (without approval process), the provisioning process was successfully creating new account in the target system.
    2. The wierd is if I'm try to test Self-service request by user, after approval by last level approval, then there is no provisioning activity by OIM system, it is like OIM do nothing. The request status is show "Obtaining Template Approval" and history approval is complete by manager user (only 1 level approval)
    My question is, does it still required any configuration for completing the provisioning process after the approval process?
    Thanks,
    Ricky R

    Hi Kevin,
    Thanks for the information, but it still do nothing, OIM did not continue the provisioning account to target system event I already assign SYSTEM ADMINISTRATOR roles to the user and manager. How I can trace this logs? currently I'm just look at the oim_server1.log at <OIM_DOMAIN>/severs/oim_server1/logs. Is there any other log file can we use to trace the app server logs?
    Thanks,
    Ricky R

  • Approved invoices can not be edited  - Approval process

    Hi Experts -
    I have recently raised an incident with SAP about Approval process - the complete message and support reply is as follows - but i believe we need a change in the approval process - if the approval required is only one but you have defined two people (Either or OR) in the approver list - the system should allow the document to be edited if one of the approvers reject it.
    please let me know and i believe we need  a change in design - unless otherwise a solid reason is given to justify the existing design
    10.07.2009 10:32 Description (English) by SRS Manian
         We have created approval procedure for all the invoices which are entered into the system., The
    'Accts' user enters the invoice into the system - the invoice comes for approval to 'Manager' user.
    When the Manager opens the invoice via Alert window - he/she wants to modify certain information
    (lines as well as Sales person) and approve it.
    The invoice which gets opened from the alert window - does not allow the user 'Manager' to modify at
    all. All the information on the invoice are greyed out.
    The system should allow the user 'Manager' to modify the information. Since the manager has full
    authorization to the system.
    10.07.2009 10:35 Info to Reporter by SAP
         Dear Partner/Customer,
    We have received your inquiry and are currently processing it.
    You will be contacted with a solution or an update as soon as possible.
    For further details regarding the phase your message is in at the
    moment please refer to:
    http://service.sap.com/%7Esapidb/011000358700000575782007E
    Kind regards,
    SAP Business One Product Support
    10.07.2009 10:59 Reply to Reporter by SAP
         Dear Manian,
    Thank you for contacting us.
    When the originator sends the document for manager's approval, note that the at that stage, the document is still in the 'Approval Process'. This is because the system is waiting for the 'Manager' to 'Approve or Reject' the document. Hence, looking at the Document, it is still in 'Draft - Pending' Status.
    When the document is in 'Draft-Pending' Status, the document is not available for editing, because the system considers that it is still in the waiting process. In your case, the manager cannot edit t he document.
    To amend the document, an action is required from the approver either to reject it first. Once rejected, it can be amended and re-sent for approval.
    I have checked our knowledge base and noted that there is an article which describes the approval process. Please refer to the Expert on Phone Wiki Article (March 2009) with title: Why a draft documen t in an approval process cannot be modified by the originator?
    The link will provide the explanation:
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageid=88735894
    I have also attached Notes 1321234 and 1111431 for your reference.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    10.07.2009 11:59 Reply to Support Center  by SRS Manian
         Thanks for the reply. The scenario is when the Manager receives the
    document for approval, he wanted to edit and add it. Your reply (and
    documentations) states that it needs to be rejected first before it is
    available for editing. When it is gets rejected - the person who
    orignated the document gets an alert and he can edit it. Here the
    Manager must get an alert so that he can edit the Rejected document.
    When the 'manager' rejects the document, and goes back to the alert
    window to open the document - it is still greyed out !!
    How does the 'manager' reject the document and edits it ?
    regards
    Manian 
    10.07.2009 12:11 Reply to Reporter by SAP
         Dear Manian,
    If after the Manager rejects it and still the document is not editable (greyed out), it means that the document may still be in the 'Approval Process'. When it is greyed out, what is the status of the document in the header? Does it say 'Rejected' or 'Pending'?
    If it is still in 'Pending' mode, please verify the number of 'Approvers' set in the 'Stages' tab of the 'Approval Template - Setup' window. If there is more than one user listed as 'Approver', and o nly 1 approval is required, the system provides an opportunity to other 'Approvers' to approve or reject the document. If in your case, the number of approvers is 2, and manager 'rejected' it, the sys tem still keeps the document in Pending status as it waits for another approver's decision to reject or approve it.
    Also, verify the number of 'Approvals' required. If the number of 'Approvers' who have not rendered their decision is greater than or equal to the 'Approvals' required (e.g. approvers - 2, required ap provals - 2) the system keeps the document within the approval process. This is to allow the other 'Approvers' to decide on the document.
    I hope this clarifies the behaviour. If you can provide us a step by step screenshot of the issue, this may help us to provide a more accurate response.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    10.07.2009 12:28 Reply to Support Center  by SRS Manian
         Hi:
    The status of the document in the Header says 'Pending' and the status
    below the document number says 'Suspended' - it is not showing as 'Draft'
    Regards
    Manian 
    10.07.2009 12:42 Call to Customer / Partner by SAP
         Performed on: 10.07.2009 10:41:59 (UK)
    Contact person: SRS Manian
    Status of discussion: Customer not reached
    Subject:
    Called the partner but currently engaged on another line.
    Would like to hold a webex. 
    10.07.2009 12:42 Reply to Reporter by SAP
         Dear Manian,
    I'm trying to call you but there was no response on your mobile.
    When the header says 'Pending', then it means the document is still within the approval process. Please check the Approval Template and see the number of approvers and the number of approvals require d.
    The number of approvals and approvers may be greater than 1. In this case, the system waits for other approvers to approve or reject the document. Once all the approvers have rejected the document, th en the document will be released and available for editing.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    10.07.2009 18:11 Reply to Support Center  by SRS Manian
         Hi:
    Thanks for the reply - i tried this and found out the following:
    1 - In the approval templates - we had mentioned number of approvals
    required as '1'.
    2 - in the number of approvers - we had mentioned two users
    Though the template requires only one approvals (Either or OR) the system
    expects both of them to approve or reject -
    Can u please let me why is this behaving like this - or is this is the
    way it is designed ? - if this is the way it is designed - i beleive it
    is wrong - weneed to give a solution to the customer
    regards
    Manian 
    11.07.2009 05:52 Reply to Reporter by SAP
         Dear Manian,
    Thank you for the information. The behaviour is a current system definition documented as per Note 1321234. I have attached the said Note for your reference. When only 1 approval is required and there are 2 or more persons are allowed to approve the document, the document does not get automatically rejected when 1 person 'rejects' it. The system waits for other approvers to render their decision b ecause a person may still approve or reject the document.
    The design is not an application error. If you would like to change this design, please post your requirement in our SAP Business One Product Development Collaboration
    forum. You can find the forum in this link:
    /community [original link is broken]
    The forum is beingmoderated by members of the Solution Management team specialized in certain areas, according to the folder you are in. Partners can impact the design of specific features by posting suggestions and feedback at this forum. Kindly refer to Note 1028874 which describes more on the above process.
    As the request will be handled through another process, we kindly request that this support message be closed.
    Thank you for your understanding.
    Best regards,
    Lorna Real
    Support Consultant
    SAP Product Support for SAP Business One
    SAP Ireland 
    11.07.2009 09:02 Reply to Support Center  by SRS Manian
         Hi Thanks for the reply - however, the solution given doesnot address the
    problem we are beingfaced with our client
    Is there a Development Request we can raise so that this problem is
    addressed in future
    I am going ahead and confirming this Message though
    regards
    Manian 
    11.07.2009 10:04 Reply to Reporter by SAP
         Dear Manian,
    Thanks for the information. I understand the customer's requirement. As previously mentioned, please log a development request in this link:
    /community [original link is broken] This is from Note 1028874.
    Unfortunately,we at the support centre does not have access to the list of development requests. Hence, kindly follow the process in Note 1028874.
    I'm sending the message back to your side for confirmation.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    SAP Notes           
    Number     Short text
    0001035200
    Issue can be solved via existing documentation
    0001111431
    Deleting rejected draft documents.
    0001167635
    Maintenance Policy (L)
    0001321234
    Status of a document rejected within the Approval Process.

    Hi Gordon - thanks for the reply - i am sorry i never realized that the message i raised could be messed up like this - the following is a clear message with some paragraphs:
    Hi Experts - I have recently raised an incident with SAP about Approval process - the complete message and support reply is as follows - but i believe we need a change in the approval process - if the approval required is only one but you have defined two people (Either or OR) in the approver list - the system should allow the document to be edited if one of the approvers reject it. please let me know and i believe we need a change in design - unless otherwise a solid reason is given to justify the existing design
    SRS Manian We have created approval procedure for all the invoices which are entered into the system., The 'Accts' user enters the invoice into the system - the invoice comes for approval to 'Manager' user. When the Manager opens the invoice via Alert window - he/she wants to modify certain information (lines as well as Sales person) and approve it. The invoice which gets opened from the alert window - does not allow the user 'Manager' to modify at all. All the information on the invoice are greyed out. The system should allow the user 'Manager' to modify the information. Since the manager has full authorization to the system.
    Reply to Reporter by SAP Dear Manian,
    Thank you for contacting us. When the originator sends the document for manager's approval, note that the at that stage, the document is still in the 'Approval Process'. This is because the system is waiting for the 'Manager' to 'Approve or Reject' the document. Hence, looking at the Document, it is still in 'Draft - Pending' Status. When the document is in 'Draft-Pending' Status, the document is not available for editing, because the system considers that it is still in the waiting process. In your case, the manager cannot edit t he document. To amend the document, an action is required from the approver either to reject it first. Once rejected, it can be amended and re-sent for approval. I have checked our knowledge base and noted that there is an article which describes the approval process. Please refer to the Expert on Phone Wiki Article (March 2009) with title: Why a draft documen t in an approval process cannot be modified by the originator? The link will provide the explanation:
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageid=88735894
    I have also attached Notes 1321234 and 1111431 for your reference. Best regards, Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland 10.07.2009 11:59
    Reply to Support Center by SRS Manian
    Thanks for the reply.
    The scenario is when the Manager receives the document for approval, he wanted to edit and add it. Your reply (and documentations) states that it needs to be rejected first before it is available for editing. When it is gets rejected - the person who orignated the document gets an alert and he can edit it. Here the Manager must get an alert so that he can edit the Rejected document. When the 'manager' rejects the document, and goes back to the alert window to open the document - it is still greyed out !! How does the 'manager' reject the document and edits it ? regards Manian
    Reply to Reporter by SAP
    Dear Manian, If after the Manager rejects it and still the document is not editable (greyed out), it means that the document may still be in the 'Approval Process'. When it is greyed out, what is the status of the document in the header? Does it say 'Rejected' or 'Pending'? If it is still in 'Pending' mode, please verify the number of 'Approvers' set in the 'Stages' tab of the 'Approval Template - Setup' window. If there is more than one user listed as 'Approver', and o nly 1 approval is required, the system provides an opportunity to other 'Approvers' to approve or reject the document. If in your case, the number of approvers is 2, and manager 'rejected' it, the sys tem still keeps the document in Pending status as it waits for another approver's decision to reject or approve it. Also, verify the number of 'Approvals' required. If the number of 'Approvers' who have not rendered their decision is greater than or equal to the 'Approvals' required (e.g. approvers - 2, required ap provals - 2) the system keeps the document within the approval process. This is to allow the other 'Approvers' to decide on the document. I hope this clarifies the behaviour. If you can provide us a step by step screenshot of the issue, this may help us to provide a more accurate response.
    Best regards,
    Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland
    Reply to Support Center by SRS Manian
    Hi: The status of the document in the Header says 'Pending' and the status below the document number says 'Suspended' - it is not showing as 'Draft'
    Regards
    Manian 10.07.2009 12:42
    Reply to Reporter by SAP
    Dear Manian,
    I'm trying to call you but there was no response on your mobile. When the header says 'Pending', then it means the document is still within the approval process. Please check the Approval Template and see the number of approvers and the number of approvals require d. The number of approvals and approvers may be greater than 1. In this case, the system waits for other approvers to approve or reject the document. Once all the approvers have rejected the document, th en the document will be released and available for editing.
    Best regards,
    Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland
    Reply to Support Center by SRS Manian
    Hi: Thanks for the reply - i tried this and found out the following: 1 - In the approval templates - we had mentioned number of approvals required as '1'. 2 - in the number of approvers - we had mentioned two users Though the template requires only one approvals (Either or OR) the system expects both of them to approve or reject - Can u please let me why is this behaving like this - or is this is the way it is designed ? - if this is the way it is designed - i beleive it is wrong - weneed to give a solution to the customer
    regards
    Manian
    Reply to Reporter by SAP
    Dear Manian,
    Thank you for the information. The behaviour is a current system definition documented as per Note 1321234. I have attached the said Note for your reference. When only 1 approval is required and there are 2 or more persons are allowed to approve the document, the document does not get automatically rejected when 1 person 'rejects' it. The system waits for other approvers to render their decision because a person may still approve or reject the document.
    The design is not an application error. If you would like to change this design, please post your requirement in our SAP Business One Product  Development Collaboration forum.
    You can find the forum in this link:
    /community [original link is broken]
    The forum is being moderated by members of the Solution Management team specialized in certain areas, according to the folder you are in. Partners can impact the design of specific features by posting suggestions and feedback at this forum.
    Kindly refer to Note 1028874 which describes more on the above process.
    As the request will be handled through another process, we kindly request that this support message be closed. Thank you for your understanding.
    Best regards,
    Lorna Real Support Consultant SAP Product Support for SAP Business One SAP Ireland
    Reply to Support Center by SRS Manian
    Hi Thanks for the reply - however, the solution given does not address the problem we are being faced with our client Is there a Development Request we can raise so that this problem is addressed in future I am going ahead and confirming this Message though
    regards
    Manian
    Reply to Reporter by SAP Dear Manian,
    Thanks for the information. I understand the customer's requirement. As previously mentioned, please log a development request in this link:
    /community [original link is broken]
    This is from Note 1028874.
    Unfortunately, we at the support centre does not have access to the list of development requests. Hence, kindly follow the process in Note 1028874. I'm sending the message back to your side for confirmation.
    Best regards,
    Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland

  • Approval process (Release strategy of scheduling agreement)

    Hi,
    Recently we are trying to implement the approval process of scheduling agreements.
    Client requirement is when ever there is a change in price irrespective of the following
    1. Retrospective price change in any line item
    2. Current price change in any line item
    3. Future price updation in SA in any line item
    4. New addition of line item
    the system should trigger the release process (i.e. Approval process).
    Our idea is to design the approval process based on document type and net value of SA.  Based on which trigger should happened.  But when we test it we find the following issues.
    1. Trigger is not happening for future date price change or price for new period as the net value of SA is based on validity time.
    Becuase the net value change will happen only on that onwards..
    Also we are not using any cumulative pallned values in agreements.
    Any can suggest the best solution to over come this..or Any user exit is avaliable to handle this issue.
    regards,
    K.Sundaresan.

    Below are the (changed) item fields :
    Purchasing Document Item Change Date   AEDAT
    Item Delivery Date   EINDT
    Schedule Line is "Fixed  "FIXKZ
    Below are the (changed) header fields :
    Release Indicator: Purchasing Document  FRGKE
    Release status  FRGZU
    Purchasing document processing state PROCSTAT
    Item and header changes have same "Change document number " and transaction code "ME38" , this happened only in some cases,Rel Strategy is on  document type level ,I am also confused on this .
      Please assist  on this

  • OIM: Error while deploying Custom Approval Process for Self-Register

    While deploying the Custom Approval Process for Self-Register, i am getting the following error in scac.log file
    Nov 16, 2011 2:48:58 PM oracle.fabric.common.wsdl.SchemaManager isIncrementalBuildSupported
    INFO: XMLSchema incremental build enabled.
    Nov 16, 2011 2:48:58 PM com.collaxa.cube.CubeLogger info
    INFO: validating "ApprovalProcess.bpel" ...
    oracle.jrf.UnknownPlatformException: JRF is unable to determine the current application server platform.
         at oracle.jrf.ServerPlatformSupportFactory.getInstance(ServerPlatformSupportFactory.java:79)
         at oracle.integration.platform.blocks.WLSPlatformConfigurationProvider.<clinit>(WLSPlatformConfigurationProvider.java:44)
         at oracle.integration.platform.blocks.FabricConfigManager.<clinit>(FabricConfigManager.java:155)
         at oracle.integration.platform.blocks.xpath.FabricXPathFunctionResolver.loadXpathFunctions(FabricXPathFunctionResolver.java:271)
         at oracle.integration.platform.blocks.xpath.FabricXPathFunctionResolver.loadXPathConfigFile(FabricXPathFunctionResolver.java:153)
         at oracle.integration.platform.blocks.xpath.FabricXPathFunctionResolver.init(FabricXPathFunctionResolver.java:51)
         at com.collaxa.cube.xml.xpath.BPELXPathFunctionNameResolver.loadFabricXpathFunctions(BPELXPathFunctionNameResolver.java:57)
         at com.collaxa.cube.xml.xpath.BPELXPathFunctionNameResolver.<init>(BPELXPathFunctionNameResolver.java:48)
         at com.collaxa.cube.xml.xpath.BPELXPathFunctionNameResolver.<clinit>(BPELXPathFunctionNameResolver.java:44)
         at com.collaxa.cube.lang.compiler.bpel.XPathExprValidatorVisitor.<init>(XPathExprValidatorVisitor.java:122)
         at com.collaxa.cube.lang.compiler.bpel.AssignValidator.<init>(AssignValidator.java:89)
         at com.collaxa.cube.lang.compiler.bpel.BpelParser.<init>(BpelParser.java:452)
         at com.collaxa.cube.lang.compiler.bpel.BPELValidator.validate(BPELValidator.java:60)
         at com.collaxa.cube.lang.compiler.BPEL1Processor.validate(BPEL1Processor.java:329)
         at com.collaxa.cube.lang.compiler.BPEL1Processor.process(BPEL1Processor.java:153)
         at com.collaxa.cube.lang.compiler.CubeParserHelper.compile(CubeParserHelper.java:47)
         at oracle.fabric.bpel.bpelc.BPELComponentValidator.validate(BPELComponentValidator.java:40)
         at oracle.soa.scac.ValidateComposite.validateComponentTypeServicesReferences(ValidateComposite.java:1117)
         at oracle.soa.scac.ValidateComposite.doValidation(ValidateComposite.java:500)
         at oracle.soa.scac.ValidateComposite.run(ValidateComposite.java:150)
         at oracle.soa.scac.ValidateComposite.main(ValidateComposite.java:135)
    Nov 16, 2011 2:49:00 PM CubeProcessGenerator compile
    WARNING: classpath is: D:\JDev11g\Middleware\jdeveloper\jdev\extensions\oracle.sca.modeler.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\fabric-runtime.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.mgmt_11.1.1\soa-infra-mgmt.jar;D:\JDev11g\Middleware\oracle_common\modules\oracle.fabriccommon_11.1.1\fabric-common.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\orabpel.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.mediator_11.1.1\mediator_client.jar;D:\JDev11g\Middleware\oracle_common\modules\oracle.mds_11.1.1\mdsrt.jar;D:\OIMPS1\Middleware\oracle_common\modules\oracle.jps_11.1.1\jps-manifest.jar;;D:\OIMPS1\Middleware\Oracle_IDM1\server\workflows\new-workflow\process-template\SelfRegistrationApprovalApp\SelfRegistrationApproval\SCA-INF\classes;D:\OIMPS1\Middleware\Oracle_IDM1\server\workflows\new-workflow\process-template\SelfRegistrationApprovalApp\SelfRegistrationApproval\SCA-INF\classes;D:\OIMPS1\Middleware\Oracle_IDM1\server\workflows\new-workflow\process-template\SelfRegistrationApprovalApp\SelfRegistrationApproval\SCA-INF\gen-classes;D:\OIMPS1\Middleware\Oracle_IDM1\server\workflows\new-workflow\process-template\SelfRegistrationApprovalApp\SelfRegistrationApproval\SCA-INF\lib\oimclient.jar;D:\JDev11g\Middleware\oracle_common\modules\commonj.sdo_2.1.0.jar;D:\JDev11g\Middleware\oracle_common\modules\oracle.fabriccommon_11.1.1\fabric-common.jar;D:\JDev11g\Middleware\oracle_common\modules\oracle.xdk_11.1.0\xmlparserv2.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\bpel1-1-xbeans.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\orabpel-common.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\orabpel.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\bpel_coherence_config.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\orabpel-exts.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\thirdparty.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\bpm-analytics.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\orabpel-thirdparty.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\wsif-binding.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\orabpel-validator.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\monitor-rt-xbean.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.bpel_11.1.1\oracle.soa.bpmn.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\user-patch.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.thirdparty.jar;D:\JDev11g\Middleware\jdeveloper\uddi\lib\oracle.soa.uddi.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\bpm-infra.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\testfwk-xbeans.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\fabric-ext.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\soa-infra-scheduler.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\xmlunit-1.1.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\fabric-runtime.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\soa-infra-tools.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\soa-xpath-exts.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\oracle-soa-client-api.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.wls.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\fabric-client.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\fabric-runtime-ext-was.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\fabric-runtime-ext-wls.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.fabric_11.1.1\oracle.soa.fabric.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.workflow_11.1.1\bpm-services.jar;D:\JDev11g\Middleware\jdeveloper\soa\modules\oracle.soa.ext_11.1.1\classes
    In scac_out.xml file following is the error message
    <Fault>
    <severity>error</severity>
    <loc>/ns:composite</loc>
    <line/>
    <col/>
    <file/>
    <msg>
    <![CDATA[SCAC-50012]]>
    </msg>
    </Fault>

    Hi,
    I have run into the same problem with SOA 11.1.1.5 version. In my case after fixing the following two errors it seems to work fine.
    If you have followed the guide, there must be some errors:
    First the java code if copied then contains an extra enter value:
    Instead of:
    "try {
    System.out.println("Prototype for invoking an OIM API from a SOA Composite");
    System.out.println("RTM Usecase: Self Registration Approval by Organization
    Administrator");"
    Use the following:
    "try {
    System.out.println("Prototype for invoking an OIM API from a SOA Composite");
    System.out.println("RTM Usecase: Self Registration Approval by Organization Administrator");"
    The other error is that you should not use <BEAHOME>/oracle_common/modules/oracle.jps_11.1.1/jps-manifest.jar, but the <BEAHOME>/oracle_common/modules/oracle.jps_11.1.1/jps-api.jar in jdeveloper. After these the deployment to the application server works fine for me.

  • Error during approval Process flow in Process controlled workflow

    Hello Experts,
    We are in SRM 7.0 classic scenario using Process controlled workflow.WE recently connected a new backend R/3 system to our SRM system i.e we now have 2 R/3 backend system connected to SRM system
    It is regarding the two new additional account assignment categories that came into picture when we connected the new R/3 backend system to our SRM system, i.e. Asset and Network.
    There seems to be some problem with the approval workflow for those SHC, that have such Acc *** Cats.
    Please find below my obeservations:
    - if you have just one line item in the SHC, and this item is either booked on Asset or on Network, than everything goes fine. After the Acc *** approval, the PR is created in R/3
    - if you have SC with a mix between an "old" Acc *** Cat (Cost Centre, WBS and Order) and one of the "new" Acc *** Cats, than the workflow is not working as required --- the manager, that is responsible for the accounting approval of the two positions (e.g Cost Centre and Asset) gets only one work item in his approval overview --- in that work item, the two positions are there, but the Asset one is grayed out --- so, the Manager approves only the Cost Centre positions and than the SC is no longer with the approver --- if you observe the SC now from the requisitioner point of view, the status of the line items in the approval process overview of both(!) lines is "approved", but the overall status of the SC is still "in approval"
    Can you all experts plz let us know why this is happening and how this can be resolved?
    Any pointers will be highly appreciated.
    Thanks & Regards,
    RKS

    Hi,
    What is Resp. Resolver Name and Decision Type in your Process Level Definition? Did you create custom agent BADI implementation?
    Regards,
    Masa

  • Approval process - 2 users in stage

    Dear all,
    Question about the approval process.
    I have a stage where 2 users can approve, but only one is required
    It works fine when they approve document. As soon as one user approve, the originator user receive alert and can create the document.
    However when they want not to approve , the system ask for both user to not approve the request before changing the status of the request from pending to rejected and sending the alert to the user.
    If only one say no, the status remains pending, and an action of the second user is required to make the system change the status.
    Why to approve, only one is required, and to reject, both are required? is there a way to have the same process in approval than in reject ?
    Thank you
    Sébastien

    Dear Sébastien,
    This is in the initial design of this process. We can do nothing about it.
    You may post a DRQ here http://forums.sdn.sap.com/forum.jspa?forumID=265 or on Idea Place for this request.
    Thanks,
    Gordon

Maybe you are looking for

  • Error VLD-0917 (unknown error)  while deploying FACT table

    Hi, I keep getting this error while trying to deploy a FACT table: VLD-0917: An unknown error occured while generating <fact table name>. An unknown error occurred while generating <fact table name>. Error details: java.lang.NullPointerException. Do

  • Can no longer save Nikon .NEF files in Photoshop cc 2014

    Hi I am hoping someone can help.   I was using a PC running Windows 7 64-bit and using LR, PS and Bridge to sort and edit Nikon files. This worked fine up to November of last year when I lost PC etc due to house fire. In the interim period I've been

  • Getting to next JSP from Servlet

    I am getting a 404 when I try to redirect from my servlet to an error page. The code that I am testing is.... catch (SQLException es) LOG.error("Unexpected error in Login.createUser.Error message = " + es); session.setAttribute(Constants.MESSAGE, es.

  • Safari in iPad not deleting all previous history?

    Even after clearing history, cookies, etc, previously visited sites show when I type in the address bar. How to fix this?

  • Socket Exception Invalid argument create on Windows service in process mode

    Please help , Iam getting SocketException Error on connecting with mysql using jdbc also when connect to Activemq jms. Strange thing is this is only happening on Windows Server(2008) and when i run the application as Windows service with 'jvm' (in-pr