Approver is a requester, can we bypass approval process?

Hello,
My questions is, lets say if I am the manager and I approve all the request raised by my team. In this case I put a request for a resource for one of my team members. Would it be possible in OIM to configure to bypass approval process because I dont want to put a request and then go back approve it.
Thanks
Mahesh

Hi
This is not available out of the box, you will need to write your own java code that will check if the requester is the target user's manager. If it is then return true in your code as the response, on true kick off (tasks to generate on responses tab) a task by name ("No Approval" with tcCompleteTask), if false (then kick off "Approve by Manager task).
you will have 3 tasks in your approval workflow:
1) Is Requester Target User's Manager (required for completion)
2) No Approval (Conditional)
3) Approve by manager (conditional)
the reason for having a task by the name of no approval is to indicate to the oim admins or any auditors that there was no approval required for this request as opposed to just having the task "Is Requester Target User's Mgr" show up in the approval details, because that may not be very intuitive to the admin/auditors or any one looking at it to know whether the approval workflow stalled or has it completed unless one looks at the response code generated by that task in the amdin gui.
Note: If multiple users are selected in the request you will in your code need to iterate through the loop to find out if all the users selected belong to the same mgr or no, if you encounter any one user who does not belong to the mgr, you should exit out of the loop and return "error" or some response code where in you using the api's auto reject the request.

Similar Messages

  • Approved invoices can not be edited  - Approval process

    Hi Experts -
    I have recently raised an incident with SAP about Approval process - the complete message and support reply is as follows - but i believe we need a change in the approval process - if the approval required is only one but you have defined two people (Either or OR) in the approver list - the system should allow the document to be edited if one of the approvers reject it.
    please let me know and i believe we need  a change in design - unless otherwise a solid reason is given to justify the existing design
    10.07.2009 10:32 Description (English) by SRS Manian
         We have created approval procedure for all the invoices which are entered into the system., The
    'Accts' user enters the invoice into the system - the invoice comes for approval to 'Manager' user.
    When the Manager opens the invoice via Alert window - he/she wants to modify certain information
    (lines as well as Sales person) and approve it.
    The invoice which gets opened from the alert window - does not allow the user 'Manager' to modify at
    all. All the information on the invoice are greyed out.
    The system should allow the user 'Manager' to modify the information. Since the manager has full
    authorization to the system.
    10.07.2009 10:35 Info to Reporter by SAP
         Dear Partner/Customer,
    We have received your inquiry and are currently processing it.
    You will be contacted with a solution or an update as soon as possible.
    For further details regarding the phase your message is in at the
    moment please refer to:
    http://service.sap.com/%7Esapidb/011000358700000575782007E
    Kind regards,
    SAP Business One Product Support
    10.07.2009 10:59 Reply to Reporter by SAP
         Dear Manian,
    Thank you for contacting us.
    When the originator sends the document for manager's approval, note that the at that stage, the document is still in the 'Approval Process'. This is because the system is waiting for the 'Manager' to 'Approve or Reject' the document. Hence, looking at the Document, it is still in 'Draft - Pending' Status.
    When the document is in 'Draft-Pending' Status, the document is not available for editing, because the system considers that it is still in the waiting process. In your case, the manager cannot edit t he document.
    To amend the document, an action is required from the approver either to reject it first. Once rejected, it can be amended and re-sent for approval.
    I have checked our knowledge base and noted that there is an article which describes the approval process. Please refer to the Expert on Phone Wiki Article (March 2009) with title: Why a draft documen t in an approval process cannot be modified by the originator?
    The link will provide the explanation:
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageid=88735894
    I have also attached Notes 1321234 and 1111431 for your reference.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    10.07.2009 11:59 Reply to Support Center  by SRS Manian
         Thanks for the reply. The scenario is when the Manager receives the
    document for approval, he wanted to edit and add it. Your reply (and
    documentations) states that it needs to be rejected first before it is
    available for editing. When it is gets rejected - the person who
    orignated the document gets an alert and he can edit it. Here the
    Manager must get an alert so that he can edit the Rejected document.
    When the 'manager' rejects the document, and goes back to the alert
    window to open the document - it is still greyed out !!
    How does the 'manager' reject the document and edits it ?
    regards
    Manian 
    10.07.2009 12:11 Reply to Reporter by SAP
         Dear Manian,
    If after the Manager rejects it and still the document is not editable (greyed out), it means that the document may still be in the 'Approval Process'. When it is greyed out, what is the status of the document in the header? Does it say 'Rejected' or 'Pending'?
    If it is still in 'Pending' mode, please verify the number of 'Approvers' set in the 'Stages' tab of the 'Approval Template - Setup' window. If there is more than one user listed as 'Approver', and o nly 1 approval is required, the system provides an opportunity to other 'Approvers' to approve or reject the document. If in your case, the number of approvers is 2, and manager 'rejected' it, the sys tem still keeps the document in Pending status as it waits for another approver's decision to reject or approve it.
    Also, verify the number of 'Approvals' required. If the number of 'Approvers' who have not rendered their decision is greater than or equal to the 'Approvals' required (e.g. approvers - 2, required ap provals - 2) the system keeps the document within the approval process. This is to allow the other 'Approvers' to decide on the document.
    I hope this clarifies the behaviour. If you can provide us a step by step screenshot of the issue, this may help us to provide a more accurate response.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    10.07.2009 12:28 Reply to Support Center  by SRS Manian
         Hi:
    The status of the document in the Header says 'Pending' and the status
    below the document number says 'Suspended' - it is not showing as 'Draft'
    Regards
    Manian 
    10.07.2009 12:42 Call to Customer / Partner by SAP
         Performed on: 10.07.2009 10:41:59 (UK)
    Contact person: SRS Manian
    Status of discussion: Customer not reached
    Subject:
    Called the partner but currently engaged on another line.
    Would like to hold a webex. 
    10.07.2009 12:42 Reply to Reporter by SAP
         Dear Manian,
    I'm trying to call you but there was no response on your mobile.
    When the header says 'Pending', then it means the document is still within the approval process. Please check the Approval Template and see the number of approvers and the number of approvals require d.
    The number of approvals and approvers may be greater than 1. In this case, the system waits for other approvers to approve or reject the document. Once all the approvers have rejected the document, th en the document will be released and available for editing.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    10.07.2009 18:11 Reply to Support Center  by SRS Manian
         Hi:
    Thanks for the reply - i tried this and found out the following:
    1 - In the approval templates - we had mentioned number of approvals
    required as '1'.
    2 - in the number of approvers - we had mentioned two users
    Though the template requires only one approvals (Either or OR) the system
    expects both of them to approve or reject -
    Can u please let me why is this behaving like this - or is this is the
    way it is designed ? - if this is the way it is designed - i beleive it
    is wrong - weneed to give a solution to the customer
    regards
    Manian 
    11.07.2009 05:52 Reply to Reporter by SAP
         Dear Manian,
    Thank you for the information. The behaviour is a current system definition documented as per Note 1321234. I have attached the said Note for your reference. When only 1 approval is required and there are 2 or more persons are allowed to approve the document, the document does not get automatically rejected when 1 person 'rejects' it. The system waits for other approvers to render their decision b ecause a person may still approve or reject the document.
    The design is not an application error. If you would like to change this design, please post your requirement in our SAP Business One Product Development Collaboration
    forum. You can find the forum in this link:
    /community [original link is broken]
    The forum is beingmoderated by members of the Solution Management team specialized in certain areas, according to the folder you are in. Partners can impact the design of specific features by posting suggestions and feedback at this forum. Kindly refer to Note 1028874 which describes more on the above process.
    As the request will be handled through another process, we kindly request that this support message be closed.
    Thank you for your understanding.
    Best regards,
    Lorna Real
    Support Consultant
    SAP Product Support for SAP Business One
    SAP Ireland 
    11.07.2009 09:02 Reply to Support Center  by SRS Manian
         Hi Thanks for the reply - however, the solution given doesnot address the
    problem we are beingfaced with our client
    Is there a Development Request we can raise so that this problem is
    addressed in future
    I am going ahead and confirming this Message though
    regards
    Manian 
    11.07.2009 10:04 Reply to Reporter by SAP
         Dear Manian,
    Thanks for the information. I understand the customer's requirement. As previously mentioned, please log a development request in this link:
    /community [original link is broken] This is from Note 1028874.
    Unfortunately,we at the support centre does not have access to the list of development requests. Hence, kindly follow the process in Note 1028874.
    I'm sending the message back to your side for confirmation.
    Best regards,
    Lorna Real
    Support Consultant
    Product Support for SAP Business One
    SAP Ireland 
    SAP Notes           
    Number     Short text
    0001035200
    Issue can be solved via existing documentation
    0001111431
    Deleting rejected draft documents.
    0001167635
    Maintenance Policy (L)
    0001321234
    Status of a document rejected within the Approval Process.

    Hi Gordon - thanks for the reply - i am sorry i never realized that the message i raised could be messed up like this - the following is a clear message with some paragraphs:
    Hi Experts - I have recently raised an incident with SAP about Approval process - the complete message and support reply is as follows - but i believe we need a change in the approval process - if the approval required is only one but you have defined two people (Either or OR) in the approver list - the system should allow the document to be edited if one of the approvers reject it. please let me know and i believe we need a change in design - unless otherwise a solid reason is given to justify the existing design
    SRS Manian We have created approval procedure for all the invoices which are entered into the system., The 'Accts' user enters the invoice into the system - the invoice comes for approval to 'Manager' user. When the Manager opens the invoice via Alert window - he/she wants to modify certain information (lines as well as Sales person) and approve it. The invoice which gets opened from the alert window - does not allow the user 'Manager' to modify at all. All the information on the invoice are greyed out. The system should allow the user 'Manager' to modify the information. Since the manager has full authorization to the system.
    Reply to Reporter by SAP Dear Manian,
    Thank you for contacting us. When the originator sends the document for manager's approval, note that the at that stage, the document is still in the 'Approval Process'. This is because the system is waiting for the 'Manager' to 'Approve or Reject' the document. Hence, looking at the Document, it is still in 'Draft - Pending' Status. When the document is in 'Draft-Pending' Status, the document is not available for editing, because the system considers that it is still in the waiting process. In your case, the manager cannot edit t he document. To amend the document, an action is required from the approver either to reject it first. Once rejected, it can be amended and re-sent for approval. I have checked our knowledge base and noted that there is an article which describes the approval process. Please refer to the Expert on Phone Wiki Article (March 2009) with title: Why a draft documen t in an approval process cannot be modified by the originator? The link will provide the explanation:
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageid=88735894
    I have also attached Notes 1321234 and 1111431 for your reference. Best regards, Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland 10.07.2009 11:59
    Reply to Support Center by SRS Manian
    Thanks for the reply.
    The scenario is when the Manager receives the document for approval, he wanted to edit and add it. Your reply (and documentations) states that it needs to be rejected first before it is available for editing. When it is gets rejected - the person who orignated the document gets an alert and he can edit it. Here the Manager must get an alert so that he can edit the Rejected document. When the 'manager' rejects the document, and goes back to the alert window to open the document - it is still greyed out !! How does the 'manager' reject the document and edits it ? regards Manian
    Reply to Reporter by SAP
    Dear Manian, If after the Manager rejects it and still the document is not editable (greyed out), it means that the document may still be in the 'Approval Process'. When it is greyed out, what is the status of the document in the header? Does it say 'Rejected' or 'Pending'? If it is still in 'Pending' mode, please verify the number of 'Approvers' set in the 'Stages' tab of the 'Approval Template - Setup' window. If there is more than one user listed as 'Approver', and o nly 1 approval is required, the system provides an opportunity to other 'Approvers' to approve or reject the document. If in your case, the number of approvers is 2, and manager 'rejected' it, the sys tem still keeps the document in Pending status as it waits for another approver's decision to reject or approve it. Also, verify the number of 'Approvals' required. If the number of 'Approvers' who have not rendered their decision is greater than or equal to the 'Approvals' required (e.g. approvers - 2, required ap provals - 2) the system keeps the document within the approval process. This is to allow the other 'Approvers' to decide on the document. I hope this clarifies the behaviour. If you can provide us a step by step screenshot of the issue, this may help us to provide a more accurate response.
    Best regards,
    Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland
    Reply to Support Center by SRS Manian
    Hi: The status of the document in the Header says 'Pending' and the status below the document number says 'Suspended' - it is not showing as 'Draft'
    Regards
    Manian 10.07.2009 12:42
    Reply to Reporter by SAP
    Dear Manian,
    I'm trying to call you but there was no response on your mobile. When the header says 'Pending', then it means the document is still within the approval process. Please check the Approval Template and see the number of approvers and the number of approvals require d. The number of approvals and approvers may be greater than 1. In this case, the system waits for other approvers to approve or reject the document. Once all the approvers have rejected the document, th en the document will be released and available for editing.
    Best regards,
    Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland
    Reply to Support Center by SRS Manian
    Hi: Thanks for the reply - i tried this and found out the following: 1 - In the approval templates - we had mentioned number of approvals required as '1'. 2 - in the number of approvers - we had mentioned two users Though the template requires only one approvals (Either or OR) the system expects both of them to approve or reject - Can u please let me why is this behaving like this - or is this is the way it is designed ? - if this is the way it is designed - i beleive it is wrong - weneed to give a solution to the customer
    regards
    Manian
    Reply to Reporter by SAP
    Dear Manian,
    Thank you for the information. The behaviour is a current system definition documented as per Note 1321234. I have attached the said Note for your reference. When only 1 approval is required and there are 2 or more persons are allowed to approve the document, the document does not get automatically rejected when 1 person 'rejects' it. The system waits for other approvers to render their decision because a person may still approve or reject the document.
    The design is not an application error. If you would like to change this design, please post your requirement in our SAP Business One Product  Development Collaboration forum.
    You can find the forum in this link:
    /community [original link is broken]
    The forum is being moderated by members of the Solution Management team specialized in certain areas, according to the folder you are in. Partners can impact the design of specific features by posting suggestions and feedback at this forum.
    Kindly refer to Note 1028874 which describes more on the above process.
    As the request will be handled through another process, we kindly request that this support message be closed. Thank you for your understanding.
    Best regards,
    Lorna Real Support Consultant SAP Product Support for SAP Business One SAP Ireland
    Reply to Support Center by SRS Manian
    Hi Thanks for the reply - however, the solution given does not address the problem we are being faced with our client Is there a Development Request we can raise so that this problem is addressed in future I am going ahead and confirming this Message though
    regards
    Manian
    Reply to Reporter by SAP Dear Manian,
    Thanks for the information. I understand the customer's requirement. As previously mentioned, please log a development request in this link:
    /community [original link is broken]
    This is from Note 1028874.
    Unfortunately, we at the support centre does not have access to the list of development requests. Hence, kindly follow the process in Note 1028874. I'm sending the message back to your side for confirmation.
    Best regards,
    Lorna Real Support Consultant Product Support for SAP Business One SAP Ireland

  • Request Approval Process exception in OIM 11g

    Hi,
    We have upgraded oim 9.1 to oim 11.1.1.5 and we did not have any request approvals in oim 9.1.
    Now we are using oim 11g to develop request approval process. We have tried to raise a request for "Provisioning Resource" - Application Access and "Assign Role" - Business Role Request in OIM 11g environment. Both the Requests are failing with the same exception as below,
    Error:
    IAM-2050014:An error occurred while initiating approvals for request oracle.iam.platform.workflowservice.exception.IAMWorkflowException: Tasklist mapping failed for workflowdefinition: default/DefaultRequestApproval!1.0 due to javax.naming.NamingException: String index out of range: -1. The corresponding error message is {1}.
    Any idea on the above error?
    Thanks!!

    you can follow these videos to see if you can get a basic manager approval working for a self request resource.
    http://www.youtube.com/watch?v=KCA_cxKsi_o&feature=channel_video_title

  • 2 Approval Process in Single Request - 11g

    Hi All,
    I have a requirment for calling two different approval process. Once the first approval process finish the second approval process should trigger. I have created two different approval workflow and have tested individually. Now I am looking for an answer of how to call the second approval process once the first finish for the same request.

    user11274881 wrote:
    Hi All,
    I have a requirment for calling two different approval process. Once the first approval process finish the second approval process should trigger. I have created two different approval workflow and have tested individually. Now I am looking for an answer of how to call the second approval process once the first finish for the same request.Can't you attach one to the template level and the other one to the request level or one at request level and another at operation level. This would ensure that your approval processes would run in serial manner for a single request.
    HTH,
    BB

  • Can a Approval process manually invoked from a jsp!!!

    Hi everyone,
    I have attached new jsp to the left menu of xelsysadm. In this jsp user will fill up information. on submit i should invoke an approval process once its approved i will make changes on Target system.
    Can this be done through API. What would be the approach!!
    Thanks,
    murli

    Here is a sample to create a request
         public long createResourceRequestForUser(String resourceName, String userId, boolean addResource)throws OIMServiceException
              logger.debug("Entering createResourceRequestForUser") ;
              long reqKey=-1, usrKey=-1, objKey=-1;
              tcUserOperationsIntf oimUserUtility = null ;
              tcRequestOperationsIntf oimRequestUtility = null;
              tcObjectOperationsIntf oimObjectUtility = null;
              try {
                   oimUserUtility = (tcUserOperationsIntf) oimUtilityFactory.getUtility
                                                           ("Thor.API.Operations.tcUserOperationsIntf");
                   usrKey = getUserKeyByUserId(userId, oimUserUtility);
                   oimObjectUtility = (tcObjectOperationsIntf) oimUtilityFactory.getUtility
                                                           (Thor.API.Operations.tcObjectOperationsIntf");
                   Hashtable objHash = new Hashtable();
                   objHash.put("Objects.Name", resourceName);
                   tcResultSet objSet = oimObjectUtility.findObjects(objHash);
                   objKey = objSet.getLongValue("Objects.Key");
                   logger.info("Object Key for the resource " + resourceName +" is " + objKey) ;
                   oimRequestUtility = (tcRequestOperationsIntf) oimUtilityFactory.getUtility
                                                           (Thor.API.Operations.tcRequestOperationsIntf");
                   HashMap reqMap = new HashMap();
                   reqMap.put("Requests.Target Type", "U");
                   reqMap.put("Requests.Type", "U");
                   //Check whether the resource is for revoke or grant for the service
                   if(addResource==true)
                        reqMap.put("Requests.Object Request Type", "Add");
                        logger.info("Creating request to provision resource "+ resourceName + " for user "+ userId) ;
                   else
                        reqMap.put("Requests.Object Request Type", "Revoke");
                        logger.info("Creating request to revoke resource "+ resourceName + " for user "+ userId) ;
                   //Create the request
                   reqKey = oimRequestUtility.createRequest(reqMap);
                   logger.info("New request created with request id "+reqKey) ;
                   //Adding user to be provisioned for resource object
                   oimRequestUtility.addRequestUser(reqKey, usrKey);
                   logger.info("Adding user for which the resource is to be provisioned or revoked") ;
                   //Adding Object to be provisioned
                   oimRequestUtility.addRequestObject(reqKey, objKey, false);
                   logger.info("Adding Object to be provisioned or revoked ") ;
                   oimRequestUtility.completeRequestCreation(reqKey);
                   logger.info("Completed and submitted the request ") ;
              }catch(Exception e)
                   tcae.printStackTrace();
                   logger.error("Error in resource request for the user "+userId + " :"+e.getMessage()) ;
                   throw new OIMServiceException(tcae.getErrorCode() + ":" + e.getMessage()) ;
              } finally {
                   if(oimUserUtility != null){
                        oimUserUtility.close() ;
                   if(oimObjectUtility != null){
                        oimObjectUtility.close() ;
                   if(oimRequestUtility != null){
                        oimRequestUtility.close() ;
              logger.debug("Leaving createResourceRequestForUser") ;
              return reqKey;
         }

  • How to create Request programmatically to trigger Approval Process

    My scenario is dificult... I need to start Approval Process when the user want to assign AD Resource to other user without Request service. So I want to create Request programmatically from Event Handler to start Approval Process for Provision Resource request type.
    Is this right Way?

    If you talk of request, you will have to use RequestService. You can use code to work with the RequestService to create the request and the approval for you.
    -Bikash

  • Oracle EAM Work Request Sequential Approval process

    Can anyone confirm Oracle has standard functionality of sequentinal apprvoal process for eAM Work request.
    Our current Oracle eAM project has requirement of multiple approver for Work request. Multiple approver means sequential approval process. After first approver approves it should go to second approval and continues.
    I know Oracle eAM Work order has sequential approval process, but i want to know the same funcionality available for Oracle eAM work request as well. If Oracle has the functionality please provide the details. If Oracle doesnt have the functionality please let me know if this can be achived using Customization.
    We are using Oracle R12 version.
    Edited by: user13591749 on May 20, 2013 11:08 AM

    Hello,
    Work Requests do NOT use AME. Only 1-level approval is possible with Standard Functionality; NOT multi-level
    Work Request Approval needs :
    1. Oracle Workflow
    2. Department Approver functionality
    Here are the steps:-
    1. Go to EAM parameters window. Under Work Request region uncheck the Auto Approve flag.
    2. Define Primary Department Approver (Setup > Department Approver)
    hope it helps...
    =================================================================
    Also,
    • There is an AME transaction type and a workflow for EAM WO Completion.
    • Not dependent on EAM Parameter : Enable workflow for work orders.
    Regards
    Shridhar

  • Approval Process configuration in Change Request Management

    Hello Gurus
    We are currently configuring Change request management. We successfully activated charm, we are now working on approval process of change request management.
    I am following the following sim for the approval process configuration:
    https://websmp105.sap-ag.de/~sapidb/011000358700002931432006E.sim
    Can any one please assist us by guiding us on the following things?
    1. From BASIS point of view we have assigned roles to each user as employee e.g. developer charm (SAP_SOAM*) role to developer user\employee in solution manager, still when we are creating tickets then we cant see the options like “in development”, “in process” etc
    2. We are going forward with the default settings can any one tell us if we need to do something extra to get all those options activated like “in process”, “in development” etc
    I am in mid of these configuration settings; please assist me asap if possible.
    Thanks in advance,
    Regards,
    Sharmishtha

    Hello
    Thanks for your reply,
    I have used BP to create and process change request. Only confused with the standard process and where to look for the change documents, thats the reason i couldnt see the requests and change their status.
    I just want to know if you have customized any thing in to the standard configuration, say for e.g. if you want to add your own actions like in maintenance cycle after requests been released in development if you want to import automatically in QA which happens in case of Urgent corrections. What I need to do if I have to do such settings or change it in my standard configuration.
    How can I change this standard configuration? Anyone has done such kind of customization?
    Thanks for your help and more help on this topic will be appreciated.
    Regards
    Sharmishtha

  • Workflow Approval Process: 1)How to insert Custom Data into Windows Workflow database? 2)In workflow Approval Process while creating new request ,how to insert our custom data like approvers ,requester,object info into WF DB?

    hi ,
    here the description about my question.
    1)i am working on windows workflow,we need to implement approval process for my project.
    2)we have multiple approvers for one request,requester,created object information.
    3)now i want to insert and retrieve, created instance information from windows workflow
    database.with all following details 
    i)Workflow instaceId,
    ii)current state of work flow(idle,complete,pending)
    iii)approvers information.
    iv)requester information.
    v)created object information.
    here some of the links, which i am trying for solution:
    https://wf.codeplex.com/wikipage?title=Tracking%20states%20with%20WorkflowApplication[^]
    https://msdn.microsoft.com/en-us/library/ee622977(v=vs.110).aspx[^]
    please answer to my question. if you want to send any examples send me to my email address.
    [email protected]

    Hi,
    According to your description, it seems that your main issue is about customID paramerter in workflow approval prcess.
    About this, please refer to the two samples:
    http://blog.petegoo.com/2010/08/22/workflow-4-email-approval-sample/
    http://cgeers.com/2010/04/10/windows-workflow-in-asp-net/
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Can we have Approval Process at Opporunity Level?-

    Hi,
    Can we have Approval Process at Opportunity level instead of at Quote Level?If so,Please help me on this.
    Thanks in advance.
    Regards
    Raju

    After reading your other posts, there seems to be a lot of disconnect in the Sales Process! You have to play a little devils advocate here and push back the business to reconsider the Oracle's best business practices!
    What is the Approval Process for? And, what are the conditions that drives an approval?

  • How can I manage a vendor approval process in SAP?

    Please guide With regards to vendor approval Process & also share if u have case study

    HI
    Use me61 transaction code.
    If you are talking about the approval of vendor such as prototype sample, ppap sample and regular supply, and if this is your flow, then, by activating the profile in the quality info record for each material / vendor combination, the functionality can be made use of. Check whether this meets your requirement.
    All The Best
    Do reward Points

  • Can we disable Archive step in Approval process

    Guys,
    I wanted to know if I can disable Archive step in the Approval process. Right now the issue is I do not want the people to Archive the document by mistake.
    1) Is there a way to disable the Archive step?
    2) Or is there atleast a way to restrict it based on roles?
    Please help me.
    Thanks a lot,
    Deepak

    Hi,
    you cannot configure anything on the Approval process.
    If you want to change something you need either modify the standard (if you get the source code) or develop your own process.
    The only things you can try, if remove or restrict UI commands.
    There are several UI command groups involved.
    For example there is the StatemanagementMassGroup with the command statemanagement_archive_mass inside. This you could remove, so that in the layout sets where this group is used, the archive command is gone (e.g. AdminExplorer menu)
    But the StatemanagementGroup command group is just a java class and references no commands. So you cannot get rid of the single archive command from the resource context menu. But maybe it is enough for you to remove the whole command group and do approval actions only from a mass menu.
    I guess thats the only thing without developing which can be done here.
    Regards,
    Sascha

  • Can an educational institution that is not accredited use these wonderful tools? I would hope Apple makes this approval process as individual for the educational institutions as they are for the individual student's learn needs and qualifications.ing

    I would hope Apple makes this iTunes U approval process as individual for the educational institutions as they are for the individual student's learn needs and qualifications. Can an educational institution that is not accredited use these wonderful tools?

    I see that Common Sense Meda offers courses.  I don't believe they are an accredited educational institution.  Approval may be on a case by case basis so Apple can control the experience.  I hope it's open.
    I'm more concerned that Apple is excluding accredited educational institutions in many countries.

  • CUP open request can not be cancelled

    GRC AC 5.3 SP 10 CUP
    There are some old open CUP requests for super user access. I need to cancel them.
    When I try to cancel a request from config - request - administration - it gives me a message that "failed to cancel follwing request".
    Also if I click on the request number to see detail then it gives message - "Request Approval Screen is not displayed because Request Status has changed" and it does not show the request detail and remains in the same list of requests screen.
    If I click on a closed request number - in next screen, it shows the same message but I can see detail request.
    Recently We upgarded GRC to SP10 from SP4. Previously I cancelled CUP requests this way.

    Hi Pal
    The request can be cancelled by the approver of the request. You can however cancel the request as an administrator in the configuration section in CUP.

  • Approval process - 2 users in stage

    Dear all,
    Question about the approval process.
    I have a stage where 2 users can approve, but only one is required
    It works fine when they approve document. As soon as one user approve, the originator user receive alert and can create the document.
    However when they want not to approve , the system ask for both user to not approve the request before changing the status of the request from pending to rejected and sending the alert to the user.
    If only one say no, the status remains pending, and an action of the second user is required to make the system change the status.
    Why to approve, only one is required, and to reject, both are required? is there a way to have the same process in approval than in reject ?
    Thank you
    Sébastien

    Dear Sébastien,
    This is in the initial design of this process. We can do nothing about it.
    You may post a DRQ here http://forums.sdn.sap.com/forum.jspa?forumID=265 or on Idea Place for this request.
    Thanks,
    Gordon

Maybe you are looking for

  • How can I create an executable with Flex Builder 3?

    I'm working with Flex Builder 3 right now and I've run my head into a brick wall. Here's the situation: I'm creating a standalone application (runs in its own window, not in a web page) and I want to run it on a computer that does not have Flex Build

  • How to delete the duplicate cards in ALUI

    Hi, How to delete the duplicate cards in knowledge directory Thanks & Regards Dheeraj Edited by: dheeraj on Sep 17, 2008 2:31 PM

  • Replace text in pdf files by sript

    Hi, I have a huge number of pdf files. There is a phone number in which has to be changed. Is there a way to do this using a script or any other kind of automation? Thanks.

  • How to create alert when some record are deleted

    HI to all, i am new to alert having req like if salary is deleted in the HRMS form then alert has to fired. how to do it. pls help.

  • WF for PO change

    Hi ,      We are into Ecc6.0.Our requirment is when a PO is created a mail should be triggered to the manager for approval.Again if the same PO is changed then a mail should be triggered to the same manager with some extra info.So i assigned a event