Archive sales order BOM for archived sales order.

hi,
i have a very strange situation.
i have few sales order BOMS to archive, we have VC (variant config) in place.
now while trying to archive the BOMS i get the error message that "the sales order doesn't exists in the database or archived".
i checked in the SD tables, and it seems that sales orders are archived. now how to archive those order BOMS????
kindly give your inputs.
Best regards,
Maulin

Hi Mr. Maulinmunshi,
As per my understanding, you can't archive the BOMs with making the sales order visible in system.
Try to check the order in T-code SARI.
Talk to your basis team and get back those sales order in the system
Hope this helps.
Regards,
MT

Similar Messages

  • How to Find Out The Production Order Number For The Sales Order Line Items

    Hi All,
    I want to know the number of production orders for each sales order line item. I know the sales order number .Can anyone tell me how the tables can be linked to get all the production order numbers for each sales order line item.

    I think it depends on your configuration. But check fields KDAUF and KDPOS in table AUFK.  or in table AFPO.
    Regards,
    Rich HEilman

  • Route not determing automatically at sales order level for some sales order

    Dear All ,
    Route not determing automatically at sales order level  for some sales orders.We are using automatic route determination without wt group,eventhough we have configured the required settings
    I have checked all the forums but didn't find any solution for the same.
    Looking for your inputs .
    Thanks inadvance
    Regards
    Venkat

    Hi
    1. Copare the Routes which are Automatically determined and which are not automatically determined
    2. Have you mainted this route to be RELEVANT FOR TRANSPORTATION without this check route will not get picked up.
    SPRO > Logistic General > Shipping > Basic Shipping Function > Routes > Define Routes > Define Routes and stages > Select the Route and check for it's settings > CHECK MARK Relevant for Transport. Without this check the route will not get picked up as of my understanding.
    Thanks
    RB

  • New order type for a purchase order similar tu UB.

    Hi,
    I would like to know if it is possible to create a new order type for a purchase order. This new order type should work as a UB order type but "plant" and "storage location" should be indicated by default and shouldn't be changed.
    How should I proceed?
    Thanks in advance.
    Luis.

    The problem is that If I specify default values for each user (plant and storage location) It will always propose these values when using different order types. This can't be.
    Isn't there any other solution in standard sap?
    Edited by: LUIS ÁLVAREZ on Apr 26, 2010 11:25 AM

  • Order BOM explosion in sales order

    Hi,
    Is it possible to explode order BOMS in sales order. If so how.
    Intially we are creating sales order. Then we are creating order BOMS. When i open the sales order after creation of order BOMs, order BOM should be exloded enable us to dispatch in staggared lots.
    regards,
    N. Laxman

    Hi,
    1) For the BOM to be exploded in the sales document the following customizing setting is required.
    A) If the item category group is ERLA the item category of the BOM is TAQ, in the definition of which we have to specify the value A (Explode single level BOM) in the structure scope.
    B) If the item category group is LUMF the item category of the BOM item is TAP in the definition of which we have to specify the value A in the field structure scope.
    Regards,
    Sheik

  • Sales Order BOM-Cost of Sales issue

    Dear Gurus
    Standard Sales Order BOM supports either Pricing Inventory control, Delivery at Header level (Item category group ERLA) or All these at Component level ( Item category group LUMF).
    I have a scenario where in Header is Intangible and Relevent for Pricing only. However Down the level parts are relevent for Delivery and Inventory control.
    I am exploding the Sales Order BOM with Item category group ERLA. However When I do Billing only for Header I do not get Cost of Sales as there is no Cost in Header. I cannot bring Down the level components in Billing as these are not Billing relevent.
    Just To Clarify it more these are Cost is not posted in COPA as Protability analysis documents are only generated with Billing.
    Regards,
    Neeraj Srivastava
    Looking for your valuable inputs How the Cost of Sales can be achieved.
    Regards,
    Neeraj Srivastava
    Edited by: NEERAJ SRIVASTAVA on Jun 5, 2008 5:15 PM

    Hi,
    just try to use BELOW Function moduleS
    CABM_READ_BOM
    CABM_READ_BOM_HEAD            
    CABM_READ_BOM_ITEM            
    These are function Modules ( BOM link to Sales order)
                        OR
    See the function Group CKDI to view more function modules that have relation between BOM and Sales order
    Thanks
    Ramesh

  • Open Order Quantity for open sales orders

    Is there a standard SAP Report that gives the open order quantity for every open sales order.   "Open" is defined as any order quantity that has not shipped.  Delivery creation is not the same as shipment.   VA05 Report does not contain enough information to calculate the open order quantity for an ERP-based backlog report.

    Try VA05 schedule lines standar variant...include status fields and both ordered qty and confirmed qty. In SAP standard system order status, status A means open orders fully (Nothing shipped, everything opened). Status B means in process orders (Partially processed - shipped). Status C means complete orders (Nothing opened). As there is no delivered qty in VA05,  you need to download to excel the file and calculate the difference between both qty fields for each A and B status. That is a way to get the missing qty to be delivered or open qty as you stated.
    Hope it helps.
    Jorge Fernandez

  • Automatic production order creation for remaining sales order quantity

    Hi All,
    My requirement is to create automatic production order for a particular material when the available quantity ( Stock in MD04) is less than the sales order / Delivery quantity.Automatic production order should only be created for deficit quantity.
    For example if i have stock of material A 100. I have recieved a sales order for 120 pieces. Now automatic production order should be created for 20 pieces only.
    Any inputs/ suggestions, please let me know.
    Thanks in advance !!
    regards
    Pawan.

    Hi Pawan
    In Material Master MM01 / MM02, you need to maintain 20 in MRP3 --> Planning --> Strategy Group.
    If you maintain this, items can be produced only against sale order you are creating.
    Dont forget to reward if this helps you.
    Regards
    G. Lakshmipathi

  • Process order required for each sales order without mrp run

    Hi, it is mto scenario. wants system to create a process order for each sales order without running mrp. please advise is it possible? if possible please guide what settings need to be done. Thabk you.

    HI
    You can create production order with reference  to sales order using t code CO08.
    Check and revert
    Regards
    Anupam Sharma

  • Change the order type for a sales document already created

    Hi gurus,
    please let me know if there is any possibility for changing the order type for sales document (sales order) already created,
    thank you

    Hi,
    Rambabu is correct. Check the  alternate sales document types which your current sales document type is having in VOV8 transaction. You can have the current sales document type replaced with the assigned alternate sales document type 1 or alternate sales document type 2 during run time in the during creation  or change mode  subject to the current sales order is not having any subsequent document. Re-pricing will happen accordingly and all the things of order will get redetermined.
    Hope this explains.

  • How can we pick WBS BOM for a Subcontrat order

    Hi,
    We are using WBS BOM instead of Material BOM for our projects.We also use Subcontract order scenerio.
    Where we wnat to pick WBS BOM.
    Can any one sujjest how to pick WBS BOM.
    Regards,
    somiraghu

    As per Standard SAP the stock should be unresrticted stock for Subcontracting process.It should not be a special stock.

  • Selection of BOM for a purchase order based on Vendor

    Hello Gurus,
    We have one material which when ordered from two different vendors should have different components. To make this simple and easy for person creating Purchase Order how should it be implemented?
    How should we create BOM that it automatically picks up the right components when a Vendor is chosen in the Purchase Order? We don't want to create two different materials and different BOMs under it. As it is for same product. Please give guidance on this.
    Thanks
    Regards
    Sreepati Hari

    Hi Hari,
    Read the below SAP documentation for the mode of selection of BOM:
    - Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls. The lot size range and area of validity of the BOM apply.
    - Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according to the setting BOM via dates.
    - Selection by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    - Selection only by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    If no production version is found, no production orders or process orders can be created.
    So based on the above you can clearly understand that it is not possible to have BOM's tied to the Vendor. What you can do as a work around is, i.e. before creating the sub-contracting PO :
    1. Change the lot size to ensure the BOM you want gets picked
    2. Change the validity dates
    3. Change the status of the BOM in header, i.e. make the BOM which you do not want as Inactive
    4. As mentioned by you, have different materials & BOM for them.
    Hope the above helps.
    Regards,
    Vivek

  • Minimum order qty for Stock transport orders

    Hello
    I wonder if there is any way to make the following fields from the Sales org 1 view in the material master to apply on Stock transport orders (ME21N, with subsequent delivery created in VL10B):
    Minimum order qty
    Minimum delivery qty
    Delivery unit
    As of now in our system, it only works for Sales orders and related deliveries. But not for Stock transport orders with a supplying plant.
    Also, if there is any other way to implement minimum order qty funcitonality and delivery for Stock transport orders, pls advice.
    Thanks,
    OT

    Hello
    We are in an intracompany business case. The supplying and recieving plant are in the same company.
    The situation is as follows: we are planning all replenishment manually without any involvement of MRP.
    What we would like to achieve is the same functionality as of the minimum order/delivery quantities material master fields in the material master.
    So when the planner creates the stock transfer order, he keys in supplying plant, material and quantity manually, then the warning message about the minimum order qty should appear.
    So far I have not found any way to do this. Any ideas are greatfully received.
    BR,
    OT

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Want report to display Sales Life Cycle for Particular Sales Area

    Hi all,
    What are the select-options,parameters and tables for the report sales life cycle for a particular sales area and if possible send me the code for the same.
    Thanks in advance
    Santosh R

    Hi Sandy,
    You would probably be better to post this in Crystal Reports Design forum category.
    You could add a unjion into the data source so that it always returns a dummy row for each category.
    Regards
    Alan

Maybe you are looking for