Are Gantt charts supported in JRC?

<p>
According to the Crystal Reports XI release notes from 2004, JRC does not support Gantt charts.  Is there a version of JRC that does support Gantt charts.  If not, what do I need to do to display a report with a Gantt chart?
</p>
<p>
(Currently, the report looks fine in the designer, but on the web, there's a blank space where the chart should be.)
</p>

Last I checked, the newest JRC - that comes with Crystal Reports for Eclipse - supported all chart types except Stock Charts.
Look to your left for the CR4E link.
If you have Crystal Reports XI, then CR4E won't be a separate purchase - the same keycode should work.
Sincerely,
Ted Ueda

Similar Messages

  • Does GANTT Chart supported in OBI??

    Hi, i wanna ask if GANTT Chart supported in OBI?
    Thanks...

    Hi...
    Yes Gantt Chart is possible in OBI. Go to following link you will find the solution of your problem.
    http://oraclebizint.wordpress.com/2007/12/06/oracle-bi-ee-101332-marquee-images-and-gantt-charts/
    tell me if it works....

  • Gantt Chart support in BI Beans

    I am trying to identify as to what is the name of the BI Bean that renders a gantt chart. Is it a graph or some other bean? If it is a graph BI Bean then what is the graph type (must be some bar graph but I am looking for the exact name)?

    There is no gnatt chart supplied with BI Beans. Is might be planned for a future release but I have not seen any plans.
    Keith Laker
    Data Warehouse Solution Architect
    Oracle EMEA Consulting
    BI Blog : http://oraclebi.blogspot.com
    DM Blog : http://oracledmt.blogspot.com

  • Resource details are not getting displayed in gantt chart -- R12 instance

    Hi All,
    we are working on a scenarior in R12 instance.
    when we run a resource constraint plan and navigate to Gantt chart the complete application is getting hanged and it is not Displaying any resource details.
    Before 2 days we were able to view the Gantt chart and resource details were populating properly.
    Resource Avalability and usage is correct.
    Thanks,
    Vasudha

    Hi
    In R12 Gantt chart is enhanced to show resource gantt in 3 different view. Res units view,resource hours view and res availability view.
    Please do the following and see if it works.
    On work bench go to Tools , preferences > set gantt chart preferences. even if u want to leave them as default, uncheck something save., and check again and save.
    Let me know if it works.
    Tnx
    Partha

  • When printing Gantt chart, some of the bars are not appearing in it

    When printing Gantt chart, some of the bars are not appearing in it
    I have added print tag in xml of chart mode-multiple pages.
    <print mode="MultiPage" print_all_columns="true" />
    For printing, I right ckicked on chart and clicked on Print chart..
    Edited by: Sheetal on Mar 29, 2012 2:46 AM
    Edited by: Sheetal on Mar 29, 2012 2:51 AM
    Edited by: Sheetal on Mar 29, 2012 2:56 AM

    Sheetal,
    Did you ever find a reason as to why the bars were not printing? I'm experiencing the same problem with Apex 4.1.1. Only the first part prints. Here is the print tag:
    <print mode="MultiPage" print_all_columns="true" columns_on_every_page="2" fit_timescale_to_end_of_page="false">
    I've changed some of these settings to no avail.
    -Seth.

  • I need a software for timeline tracking for a project such as a Gantt chart that is MS and Mac compatible. Any suggestions are appreciated.

    I am looking for a software product for Project management to create a timeline or Gantt chart. Any suggestions are appreciated.

    http://lmgtfy.com/?q=mac+project+management+software

  • Category names are not coming in Gantt chart

    Hi all
    I have a Gantt chart where I am displaying customer name in category axis. But instead of coming those names I am getting category1,category2.. in category axis.Please help.
    Regards
    Sunit

    Hi,
        I think for 4.6 C <fn> must be declared as an internal table and the field names should be given as records and not as one single record.
       the fieldnames internal table should contain records as :
       Field1
       Field2 ....  and not as Field1 Field2 ....
    Regards,
    Srini.

  • Turning Off Gantt Charts in MS Project For PDF Gen

    hi
    we have run into a problem when printing Gantt charts with PDF Gen. They can be extremely slow and on following up with Support they have confirmed that this is an issue with Distiller and there is no fix soon. So to get around the issue we tried disabling Gannt charts in MS Project by un-checking Bars and shapes in Gantt views in 3-D' (Tools > Options, View tab) in MS Project
    Now we're finding LC does not always pick up the setting. What we have noticed is that sometimes when printing to PDF with the same file, on the same server via PDF Gen, Gantt charts will appear, and sometimes not. Occasionally, the MS Project file when printing Gantt charts will stall in the Adobe Printer Queue, LC will then start to get Stuck Threads in Weblogic, and basically become unstable.
    Upon further investigation we saw that LC will use the WINPROJ.exe if it is running to do the conversion, or start a new WINPROJ.exe process if none is running. Sometimes while starting the process we get the Gantt chart setting picked up, and sometimes not, and there is no particular pattern.
    We did a lot of digging with PROCMON to see if we could find if LC was picking up a Windows Registry entry for MS Project perhaps with a different user which did not have the Gannt chart turned off, but could not find one. Our conclusion was that sometimes LC has submitted the job before WINPROJ.exe is fully loaded and somehow the No Gantt charts option gets lost, though this is speculation based on observation of behaviour.
    Anyone know what is going on?

    Hi,
    We will get this issue reproduced in-house and see if we can provide a patch to address this problem. Prima facie this does not appear to be a bug in the product; rather it appears that MS Project might be "forgetting" this setting in some cases, or a similar setting (inside the file that is being converted) might override the application-wide setting.
    We will try to see if we can forcibly set this flag (through MS Project COM APIs) each time a MS Project file gets converted. If this works, we might be able to provide a patch.
    Meanwhile, can you let me know exactly what version of MS Office (with the service pack details, if any) that you are using?
    Regards,
    Amit Batra
    Engineering Manager,
    Adobe LiveCycle Enterprise Suite

  • Gantt Chart in P6 Analytics - OBIEE

    If you search the web, Oracle KB etc. you may find that Gantt Charts are not supported currently in Analytics. There is however a way to create a basic gantt in OBIEE.
    Step 1: Create a new analysis using the 'Activity' Subject Area.
    Step 2: In the Criteria tab, add the following columns:
    > Project Name (Project/General)
    > Year Name; Or Month Name, depending on your preferred starting timescale.
    > Total Float (Activity/Durations)
    > # of Projects (Fact - Primavera - Activity)
    Step 3: Edit Formula of Total FLoat as AVG("Durations - (Activity)"."Total Float") so that the float rolls up from activity level to the project level.
    Step 4: Create conditional formats on the '# of Projects' field (Column Properties/Conditional Format)
    >Con Format 1 - Add Format when '# of Projects' is NOT NULL, then use background color as GREEN.
    >Con Format 2 - Add Format when 'AVG(Total Float) is LESS THAN 0.00, then use background color as RED.
    Step 5: Now view results.
    Step 6: Create Pivot Table View.
    Step 7: Edit the Pivot Table view.
    Step 8: Move the fields into the Pivot parts as follows:
    >Rows: 'Project Name'
    >Columns: 'Year Name; Month Name' whichever you picked.
    >Measures: '# of Projects'
    >Excluded: 'AVG(Total Float)
    Step 9: Click Done at the top of the page to conclude the compound edit complete.
    Step 10: Brag that you created a Gantt in P6 Analytics; maybe even remove the '# of Projects' numbers by changing the format, or look at using '# of Activities' in it's place.

    Cautionary Note+:
    '# of Projects' in the Presentation and Logical Layers of the RPD take values from the W_Activity_Spread_F ---> 'count(distinct Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PROJECT_WID)' in the Physical tables. This means it takes counts from data like All Dates; Baseline Data; Units; Durations etc.
    The only issue with this is that all values in a project's date calculations are included. If you have Programme Managers imposing stupid 'Must Finish By' dates earlier than the 'Scheduled Finish' for example, you will notice that you OBI Gantt doesn't look like you P6 Gantt as there will be 'Project Counts' earlier than your P6 Gantts. In this example it will be because the 'Late Remaining Start' dates will be before the 'Project Planned Start' dates. It happens.

  • Issue in Pop-up behaviour within Gantt chart

    We use Jdeveloper 11.1.2.0 in creating multiple type of applications. We are stuck with one issue in Pop-up behavior in Gantt chart and needed your help. Any help in this will be highly appreciated. It seems that this was the known issue in 11.1.1.4 but not sure if this is resolved in current release of 11.1.2.0.
    Jdev Version: 11.1.2.0
    Control Used: Panel Tabbed, Gantt Chart (Project), ADF Popups and Dialog
    Scenario: We are having Panel Tab. One tab is having Gantt chart whereas second tab is having read-only Table. Gantt chart has pop-up window (Along with Dialog), which opens up on hovering one of the column.
    Issue: Gantt Chart and Popup works fine but pop-up gives error (Region not valid) when we click on second Tab and come back to the Gantt chart tab. Screenshots are attached for your reference.
    PS: I can see know issue at this link but did not see this in current release known issues.
    http://www.oracle.com/technetwork/developer-tools/jdev/relnotes-14-jan-11-261400.html#dvt2
    Many Thanks.
    Regards,
    Sachin G

    OK, I did't realise you were using adf faces.
    Quoting the Oracle WebCenter Framework documentation:
    "17.5.2.3 Oracle ADF Faces Guidelines
    The Oracle ADF faces guidelines are as follows:
    * Oracle ADF Faces client side implementation is not supported. One weakness of JSR 168 and WSRP 1.0 is that they do not account for portlets using client-side programming techniques, such as Ajax or hidden frames, for partial page rendering. As a result, all Oracle ADF Faces facilities that rely on client-side programming techniques do not work. These facilities include the following:
    o Oracle ADF Faces partial page refresh (PPR) facility
    o The client-rendered aspect of Oracle ADF Faces rich client components
    o Oracle ADF popups, <af:popup>, which fail to work because of their reliance on the PPR facility
    o The Oracle ADF Faces SelectText, SelectDate, and SelectColor components, which use visual assist popups
    To avoid breaking existing applications, the popup is disabled when used in Oracle ADF Faces pages exposed as a portlet. Thus, functionally speaking, these components are equivalent to InputText."
    So guess that just won't work.

  • Steps to create Resource gantt chart with hourly ranges

    Does anyone have an example of how to customize the default built APEX/Anychart resource gantt charts to handle a 12 hour range showing resources? I have tried going through a sample provided by anychart tech support, but the xml file seems to have different set of entries.
    What I have is a set of rows for resources in a shop over a 12 hr shift that I need to show. I have a standard resource gannt working, but I need to customize some of the xml settings to see the date/time ranges..
    Any help would be a blessing!!
    Thank you,
    Tony Miller
    Webster, TX

    I could post it up on Oracle's hosted site, but I am NOT seeing much help where ever it is located.. I also believe in helping up here because I can and It helps me....
    Thank you,
    Tony Miller
    Webster, TX
    On the road of life...There are 'windshields', and there are 'bugs'
    (splat!)
    "Squeegees Wanted"
    If this question is answered, please mark the thread as closed and assign points where earned..

  • Gantt Chart "Headers"

    I'm trying to replicate and Excel spreadsheet "schedule"
    in P6. In the "Gantt chart" portion of the spreadsheet
    each column is a day. Where I'm running into trouble is
    under the date in row 1, the initials of the shift
    supervisor on duty are listed in rows 2 (1st shift) and 3
    (2nd).
    Thur 23-Oct<br
    />ML
    DP
    I'm looking
    for any ideas on how to get something similar in there
    without the cumbersome steps of manually creating a
    curtain and text field. I have a feeling I know the answer
    but any ideas would be appreciated. Thanks!

    Hello bostnbird33,
    Your
    question would be answered best by our Support Team.
    Please contact Support at the following link:
    http://www.primavera.com/customer/support.asp <br
    />
    Have a great day,
    Saryn

  • Gantt Chart Shows Months With Nothing in it Requiring User to Scroll to Dates

    I have a task list with a filtered list of dates that all fall in October yet the Gantt chart starts in April. Thus a user has to scroll all the way over to the far right to see any of the active tasks in the list. Is there a solution for this? Am I missing
    some basic setting? I also don't see the "You are here" date line. I am on SharePoint 2013 0365.
    Thanks!
    e

    Hi ,
    You can click the ribbon button "Zoom Out" under list tab to show a larger time increment on the time scale, then it should show the whole task bar and status without scrolling to the right.
    Thanks,
    Daniel Yang
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you havefeedback for TechNet Subscriber Support, contact
    [email protected]
    Daniel Yang
    TechNet Community Support

  • Error 500--Internal Server Error in a Project Gantt Chart portlet

    Hi All
    I am getting Error 500--Internal Server Error in a Project Gantt Chart portlet of Corporate Dashboard.
    We have recently installed the Primavera EPPM 8.1, here are the steps we followed to setup the Primavera EPPM 8.1
    1) We have created the database schemas by using automatic database setup(by clicking on dbsetup.bat on the media files)
    2) Installed Weblogic server 11gR1(10.3.4)
    3)Created web logic domain as admin server
    4) Installed P6 Web access and deployed on weblogic domain
    5)Made changes to setEnvDomain file of weblogic domain to increase the Java Heap size and to locate the location of p6.war file
    6)Reastred the weblogic domain
    Now we can access the Primavera but in one of the portlet we are getting Error 500--Internal Server Error.
    Please le me know if I miss any thing while installing or should I modify P6 configuration settings through p6 admin confiuration console.
    Also it would be greatful if any one provide me th best practice to setup Primavera EPPM 8.1.
    Thanks & Best Regards
    Pradeep

    Hello Pradeep
    please delete a folder called fmwconfig in the path yourdomain\config\ for a folder called fmwconfig
    restart P6 and try again

  • How to build a gantt chart with BI Publisher

    Hi everybody, I need to create a gantt chart with BI Publisher. I had a look to the document "Getting Gantty" from the blog:
    http://blogs.oracle.com/xmlpublisher/2008/01/getting_gantty.html
    but I don't understand in which way:
    1. build the data template in order to replicate the XML code in the article
    2. build and link the yellow bar which dynamically increases its length according to the meeting duration
    Anybody already tried to implement something similar ? I didn't still found a real example about how to do it......
    I need a help, please
    Thanks in Advance
    Alex

    Yes that is the only option which we can stop a running report in BI Publisher
    I suspect you'll need to ask your DBA to kill the session.
    However, if you have DBA privileges yourself, you can do this by a few methods, some of which are described here:
    http://www.oracle-base.com/articles/misc/KillingOracleSessions.php
    Mark if helps,
    Thanks,

Maybe you are looking for

  • How to import metadata from Address Book on external hard drive to new laptop running OSX 10.8.3?

    My old MacBook died a painful death.  I retrieved the hard drive and have it in a portable enclosure that has a USB connection.  I can see the old Address Book on it, but when I transfered the Address Book application to my new MacBook Pro running OS

  • CC field in mail sending through work-flow

    Hi All, I have one issue. I want to send mail through work-flow using sendmail activity. I can able to send mail also...but for the same mail i want to keep one more person as CC or BCC.. Is there any feature available in work-flow to keep a person i

  • Oracle Database and SQLData Interface

    HI, I am facing a typical problem while using the SQLData Type. Its that. I have a table in db with a column numeric(2). and a UDT with the same..as above.. To pass the data from Java to Oracle. I am using. WriteSQL method of the SQLData Interface an

  • Need help with photo placement & sizing in iPhoto Calendar

    Hi, I am in the process of creating a photo calendar for my wife for Xmas in iPhoto. Initially I just dragged and dropped most of the photos into the layouts I selected without any cropping or anything figuring that they would print out on the calend

  • Using decode in count

    hi everyone, Please help me in writing query with decode to count something like following: select md_date, count(*) all_qty, count(decode,'A',*) A_QTY FROM ABC WHERE MD_DATE BETWEEN :START_DATE AND :END_DATE GROUP BY MD_DATE tHANKS AND REGARDS, aHON