Articles migration from SAP ECC5.0 to SAP ECC6.0..

Hi All,
When i am moving a variant article from SAP ECC5.0 to SAP ECC6.0 in PRD using T-code: BD10 Port type: LS .. that variant articles moving correctly with basic views, Listing view, but some field is missing of Generic articles like Generic article description picking MC reference articles and Product Hierarchy picking blank while Variant articles each and every moving correct. Regarding this issue i have talked with my ABAP consultant but till now dint resolved...
Pls help me.
Regards
Sanjeet Kumar Yadav

Hi All,
Anybody can help.. above query.
Regards,
Sanjeet Kumar

Similar Messages

  • Data migration from legacy system to SAP

    hi all,
      could you please post some docs on migration from legacy system to SAP system., also the problems faced while migration and best practices in data migration
    regards
    sridharan

    Hi ,
    I require few details from you.
    1. What ETL tool you are using, If Informatica, it already have PowerConnect to connect to SAP. So you can create source and Target Structure and also you can use RFC's to send data to R/3. Else, for other ETL tools, can you prepare RFC's or any other way to send data to R/3. let me know the tool.
    2. Does R/3 contains the master data tables? If yes, then try to use LSMW for Mass upload of data to tables.
    If your client don't want to use either of these options please elaborate, what is the case.
    Regards
    Aashish Sinha

  • How to UNLOCK  queues when data is migrated from legacy system to SAP syste

    Hi  All,
    I need some help regarding queues (SMQ2). XI is been used to migrate data from legacy system to SAP system. Sometimes the queue is getting locked. Once the queue is unlocked then the message is processed correctly. So, the incoming queues must be "unlocked" routinely so that they can process through the system. There is a standard report RSQIWKEX available that can be scheduled in SAP system to automatically unlock the queues. Before using the standard report RSDIWKEX, we made sure that we have added parameter MONITOR QRFC_RESTART_ALLOWED set to "1" in Integration Engine specific configuration (TCODE SXMB_ADM).We are unable to analyze the reason for locking of queues and how to avoid it. If the locking of the queues can not be avoided, is there any way to unlock the queues? We tried executing this report but were not successful in unlocking the queues. Please guide us in solving this issue. It would be really helpful if you can give us a direction in solving this problem.
    Thanks in Advance,
    Shwetha.

    Hi,
    Just check if the Queues are registered in Transaction SMQR.
    If its not, then register the Queue by pressing 'Register' Button
    Sharif.

  • Data Migration From Peoplesoft , JDEdwards To SAP.

    Hi,
    This is kiran here we are doing data Migration work from Peoplesoft And JDEdwards to SAP.in SAP side it involves Master data tables Related to Customer, Vendor, Material. and Meta data tables related to SD, MM, FI. We as SAP Consultant identified Fields from above tables and marked them as Required, Not required, And Mandatory. The Peoplesoft and JDEdwards flocks come up with the same from their side. Then we want map the Fields. as I am new to data Migration any body suggest me what are the steps involves in data Migration How to do Data Mapping in Migration Thanks in advance.
    Thanks
    Kiran.B

    Hi Kiran,
    Good... Check out the following documentation and links
    Migrating from one ERP solution to another is a very complex undertaking. I don't think I would start with comparing data structures. It would be better to understand the business flows you have currently with any unique customizations and determine how these could be implemented in your target ERP. Once this is in place, you can determine the necessary data unload/reload to seed your target system.
    A real configuration of an ERP system will only happen when there is real data in the system. The mapping of legacy system data to a new ERP is a long difficult process, and choices must be made as to what data gets moved and what gets left behind. The only way to verify what you need to actually run in the new ERP environment is to migrate the data over to the ERP development and test environments and test it. The only way to get a smooth transition to a new ERP is to develop processes as automatic as possible to migrate the data from the old system to the new.
    Data loading is not a project that can be done after everything else is ready. Just defining the data in the legacy system is a huge horrible task. Actually mapping it to one of the ERP system schemas is a lesson in pain that must be experienced to be believed.
    The scope of a data migration project is usually a fairly large development process with a lot of proprietary code written to extract legacy data, transform and load the data into the ERP system. This process is usually called ETL (extract, transform, load.)
    How is data put into the ERP?
    There is usually a painfully slow data import facility with most ERP systems. Mashing data into the usually undocumented table schema is also an option, but must be carefully researched. Getting the data out of the legacy systems is usually left to the company buying the ERP. These export - import processes can be complex and slow, sometimes specialized ETL tools can help, sometimes it is easier to use what ever your programmers are familiar with, tools such as C, shell or perl.
    An interesting thing to note is that many bugs and quirks of the old systems will be found when the data is mapped and examined. I am always amazed at what data I find in a legacy system, usually the data has no relational integrity , note that it does not have much more integrity once it is placed in an ERP system so accurate and clean data going in helps to create a system that can work.
    The Business Analysts (BAs) that are good understand the importance of data migration and have an organized plan to migrate the data, allocate resources, give detailed data maps to the migrators (or help create the maps) and give space estimates to the DBAs. Bad BAs can totally fubar the ERP implementation. If the BAs and management cannot fathom that old data must be mapped to the new system, RUN AWAY. The project will fail.
    Check these links
    http://pdf.me.uk/informatica/AAHN/INFDI11.pdf
    http://researchcenter.line56.com/search/keyword/line56/Edwards%20Sap%20Migration%20Solutions/Edwards%20Sap%20Migration%20Solutions
    http://resources.crmbuyer.com/search/keyword/crmbuyer/Scm%20Data%20Migration%20On%20Peoplesoft%20Peoplesoft%20Data%20Migration/Scm%20Data%20Migration%20On%20Peoplesoft%20Peoplesoft%20Data%20Migration
    Good Luck and Thanks
    AK

  • Difference between SAP ECC5.0 and ECC6.0

    Dear Experts,
    Can anybody please explain the difference between SAP version ECC5.0 and ECC6.0 ?
    Thanks in Advance

    Hi Vijay,
    Solution Browser would give the differences (Features):
    http://solutionbrowser.erp.sap.fmpmedia.com/ Give source and target versions.
    Release Info:
    ECC 6.0:
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    ECC 5.0:
    http://help.sap.com/saphelp_erp2004/helpdata/en/c6/feda40ebccb533e10000000a155106/frameset.htm
    You can find the difference in release notes of each SAP version.
    Here are the links.
    http://help.sap.com/saphelp_47x200/helpdata/en/fc/e3003deddfae4de10000000a114084/frameset.htm
    http://help.sap.com/saphelp_scm50/helpdata/en/28/b34c40cc538437e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    Reg,
    Ashok
    Assign points if useful.

  • Migration from oracle to standard sap bw components

    client using an oracle based corporate data warehouse management wants to migrate for sap bw. they are now using oracle for central reporting system.
    what kind of extraction has to be used?
    is table from oracle warehouse has to be converted to other any format(for extraction)? if yes what format is preferrable?

    Hi,
    Oracle data base tables can extracted in SAP BW by using DB Connect and staged in SAP BW objects for reporting.
    You may refer SAP library or various available artcles on DB Connect for details.
    I hope it will help.
    THanks,
    S

  • Document access: migrating from ERP database to SAP doc server

    We have some documents created via Easy DMS stored in our ERP database and wish to now use SAP Document Server.
    For the legacy documents in ERP database, will I be able to still view and edit them, or do I need to migrate all of them to the SAP Document Server?
    Thanks, Vla

    In simple terms... here we go
    Before BO acquisition by SAP,
    SAP BI :  SAP BW ( for all ETL tasks) + BEX Query ( For Reporting purpose )
    After BO acquisition :
    SAP BI : SAP BW  ( for al ETL tasks ) + BEX Query + Business Objects
    Now SAP is trying to use BO as reporting solution for all SAP BI projects.
    If you are looking for Business Objects history : [Click here|http://xpert4ms.com/viewtopic.php?f=11&t=142]
    Best Regards
    Gowtham
    [My site|www.xpert4ms.com]

  • Question: Migration from Tibco BW to SAP XI

    I have been actively involved in TIBCO BW projects as project co-ordinator for the past year. Now i am thinking of shifting into SAP XI. I am assuming that SAP XI has the same underlying concept as TIBCO BW. Is my assumption correct? If yes then how hard would it be for me to transfer from Tibco to SAP XI. Please provide appopriate justifications for your answers.
    Thanks

    Hi,
      Its very tough to generlize like i remember my present case wherein we upgraded Webmethods landscape and we decided to reuse the existing mapping sheets, that was one Point.
    Now it depends on the EAI tool existing in your case for reuseability.
    Then,reusing the 3rd party files in intregation,
    Re: XI ABAP Proxy problem
    One similar thread i remember was,
    SAP XI versus BizTalk
    a discussion on xi and other middleware.
    Plus intregation with webservices, RFID etc.(If needed in your case).
    I know this is not a specific answer that i have given you, but sharing my thoughts.
    Anirban.

  • Migration from Other middleware to SAP XI

    Hi XI Gurus
    Have anybody worked on a scenorio in which they removed the existing middleware and used SAP XI.
    If yes, what care we need to take to implement this scenorio
    Regards
    Madhan Doraikannan

    Hi,
      Its very tough to generlize like i remember my present case wherein we upgraded Webmethods landscape and we decided to reuse the existing mapping sheets, that was one Point.
    Now it depends on the EAI tool existing in your case for reuseability.
    Then,reusing the 3rd party files in intregation,
    Re: XI ABAP Proxy problem
    One similar thread i remember was,
    SAP XI versus BizTalk
    a discussion on xi and other middleware.
    Plus intregation with webservices, RFID etc.(If needed in your case).
    I know this is not a specific answer that i have given you, but sharing my thoughts.
    Anirban.

  • Articles Migration from Nokia to Microsoft

    Hi Friends,
    I have written many Wiki Articles in
    Nokia Developer Community. Now for the last few days I see that they have put a message on the Wiki Home Page stating that.
    Please note that as of October 24, 2014, the Nokia Developer Wiki will no longer be accepting user contributions, including new entries, edits and comments, as we begin transitioning to our new home, in the Windows Phone Development Wiki. We plan to move over the majority of the existing entries over the next few weeks. Thanks for all your past and future contributions.
    Now when I go to the
    Microsoft TechNet I don't see my articles.
    Where do I see my articles in the Microsoft Wiki.
    Please guide me.
    Thanks & Regards
    Somnath

    Thanks Richard,
    I see that few of my articles are been migrated to Microsoft TechNet
    I was wondering how could I see all my articles in one place, like I have in
    Nokia Developer Sandbox
    Could you please help me in this case.
    Also I see that few of my articles are being translated to other languages also, but there the creator name has been changed at the bottom of the article page.
    For eg.
    Windows Phone: Video Playback with MediaElement in Windows Phone    (My Article)
    Windows Phone: 使用MediaElement播放电影 (zh-CN) (Translated)
    Thanks
    Somnath

  • Does theJ2EE migration kit support migrating from Oracle9 iAS?

    Hi,
    We currently have an application based on Oracle9 iAS.
    1) Does the J2EE migration kit support migrating from Oracle J2EE to SAP J2EE?
    2) If the answer is NO and since the documentation doesn't mention Oracle, I am wondering if SAP is planning on including support for migrating from Oracle too?
    Regards,
    Tobi

    Hello Anirban,
    what kind of projects are you trying to migrate to NWDS?
    The Migration Kit (Plug-In) in its surrent version supports migration of projects from IBM, JBoss, BEA to SAP - on the same Java EE technology stack level! If you want to migrate SAP 6.40 (J2EE 1.3) projects to SAP CE (Java EE 5), there is a support in the SAP NWDS to do that. You can start importing your "old" projects by saying "migrate projects" in the import statement of the IDE.
    Try it out!
    In case you should encouner difficulties, shoot me a mail!
    Cheers, Goran

  • Migrating from SBS 2011 to Windows Server 2012R2 Standard with 365

    Im looking to move SBS 2011 to Server 2012R2 standard and with a 365 migration as well.
    Im thinking
    BPA for AD (health check)
    Add the Server2012R2 as a DC
    Ensure replication
    Move DHCP
    Change DNS
    Now this is where I get lost, now Im lost to use either dirsync or add essentials service, I have gone for standard and 30 cals with the option  as I have 28 users and the essentials service would make everything quite nice for remote access and backups
    etc....  however I don't know whether to just use dirsync with password replication instead ?
    Currently Im aiming towards getting the dc up and running then enabling essentials on the dc but I dont know how it will effect SBS and having essentials on the same network and sync'ing people to the cloud ? So Should I use DirSync on a different server
    instead to sync up to azure ?
    Finally with 365 I have only ever done a migration involving an export of pst's from an exchange box and then on a new domain with new pc's and reimport the pst's on the user accounts in outlook.
    However I have read when migrating to 365 was using exchange 2010 there was a application
    to move everything across however you needed an ssl cert iirc ? so I dont know how it works now since the nice new dashboard upgrade (assuming the tool has been updated like dirsync)
    along with the above how does AD now know where exahcnge if you use the migration app with an ssl cert and is it a case of still running the 365 config tool to configure each user to look at their mail in the
    cloud ? Also is it a good idea to enable essentials from the start of the 2012r2 dc for replication top 365 or to use dirsync ?
    then finally when replications is all good start transferring the FSMO roles over to the new DC and demote and remove the SBS server
    I have seen (below) but i dont think it covers this scenario and I cant be the only person in this situation =\ ?
    http://blogs.technet.com/b/infratalks/archive/2012/09/07/transition-from-small-business-server-to-standard-windows-server.aspx
    http://social.technet.microsoft.com/Forums/en-US/f552ef12-07a9-4f7a-bf5e-24500c3e1dc3/migrate-sbs-2011-to-server-2012-standard?forum=smallbusinessserver
    http://social.technet.microsoft.com/Forums/en-US/e1d4b09f-8857-4ef6-9a80-6a906e76b688/how-to-migrate-sbs-2011-to-standard-2012-server?forum=smallbusinessserver

    Hi,
    Would you please let us know current situation of this issue? If any update, please feel free to let us know.
    à
    Currently Im aiming towards getting the dc up and running then enabling essentials on the dc but I dont know how it will effect SBS and having essentials on the same network
    and sync'ing people to the cloud?
    I’m a little confused with the description. Did you mean that set up DC (Windows Server 2012 Standard) and
    then install the Windows Server Essentials Experience role? If so, when you migrate, please refer to the article:
    Migrate from Previous Versions to Windows Server 2012 R2 Essentials or Windows Server Essentials Experience
    Regarding to migrate Exchange to Office 365, please refer to following articles.
    Migrate
    All Mailboxes to the Cloud with a Cutover Exchange Migration
    Step-By-Step:
    Migrating from Exchange 2007 to Office 365
    Please Note: Since the web site is not hosted by Microsoft, the link may change without notice. Microsoft
    does not guarantee the accuracy of this information.
    Meanwhile, there is an additional article that you can refer to:
    Manage Office 365 in Windows Server Essentials. It may help us to understand Office 365 in Server Essentials clearly.
    If anything I misunderstand, please don’t hesitate to let me know.
    Hope this helps.
    Best regards,
    Justin Gu

  • SAP extract to Excel changed after migration from ECC5 to ECC6

    Hi everyone,
    This issue is about getting a proper table when displaying SAP reports in Excel.  When extracting to Excel, the data base is presented with summary yellow lines whereas we would rather have a regular table without subtotal. This issue appeared when the system was migrated from ECC5 to ECC6. Please notice that one of the user has currently a proper display. Do you know which parameter shall we change?
    Thanks!
    Stan B.

    There are some default setting in the parameters,
    Like
    RPO0 - User Settings
    From FI transactions you can change ti your default settings
    Have a look to:
    FIT_ALVC     X     FI Line Items: ALV Grid Control
    With KSB1 I see it direct without sub totals and saving.
    Click on spreatsheet
    Select All Available formats
    Select EXCEL (In Existing XXL Format)

  • Data migration from ECC5.0 to ECC6.0

    Hi All,
    Is there a standard SAP utility to migrate the data from ECC5.0 to ECC6.0? Assumption is that all the standard fields and the transactions are same. Good example for this case is standard material master, Purchase order, purchase info record etc.
    Currently I am planning to extract the data from source system (using custom program or table download etc...) and upload the data into target system (using LSMW, eCATT, BDC etc...).
    Is there a standard way to load the data into target system without extraction and upload? Please let me know.
    Thanks
    Nagarajan

    ALE Customizing
    1)     IMG > Application Link Enabling (ALE) > Sending and Receiving  >  logical systems > Define Logical System:  name it XXXXXX
    2)     IMG > Application Link Enabling (ALE) > Sending and Receiving  >  Systems in Network > Asynchronous Processing > Assigning Ports > Define Port: name it XXXXXX   Description:  Files for Migration to YYY
    The port need to be defined beneath FILE
    The IDOC record types for SAP Release 4.x need to be selected
    A physical directory is needed.  One must be able to map this directory with the Windows explorer to copy the file to the network or local drive.
    Function module: EDI_PATH_CREATE_CLIENT_DOCNUM
    In order to prevent unprocessed files being overwritten, you use function modules which generate file or directory names dynamically, that is to say, at runtime.
    3)     IMG > Application Link Enabling (ALE) > Modelling and Implementing Business Processes > Cross-Application Settings > Global Organizational Units > Cross-System Company Codes
    a)     Cross-System Company Codes
    b) Assign Cross-System Company Code to Chart of Accounts
    c) Assign Company Code to Cross-System Company Code
    Cross-system company codes are used in the distribution in financial accounting. There is exactly one central system for each cross-system company code in the distributed environment. One company code has to be assigned to this cross-system company code on each system involved in the distribution.
    When sending an IDoc with company code-dependent data, the company code is replaced with the cross-system company code in all company code fields.
    4)     IMG > Application Link Enabling (ALE) > Modelling and Implementing Business Processes > Maintain Distribution Model and Distribute Views
    Here we need a distribution model
         Structure: model view (call it XXXXXX)
                   Sending system (AAAAAA)
                        Receiving system  (XXXXXX)
    5)     IMG > Application Link Enabling (ALE) > Modelling and Implementing Business Processes > Predefined ALE Business Processes > Logistics > Master Data Distribution > Proposal for distribution model: Customer and vendor masters
    (Beside of customers and vendors, we need to add the message type BOMMAT for material bill of materials and MATMAS for material master to to the distribution model, probably manually in step 4. Depending on further requests for automatic migration the one or other message type may need to be added later )
    6)     IMG > Application Link Enabling (ALE) > Modelling and Implementing Business Processes > Partner Profiles and Time of Processing > Maintain Partner Profile Manually
    Partner profile type/Partner type: LS  logical system
    Partner profile/Partner number: XXXXXX
    Details at Post Processing agent
    Typ: US user
    Agent: JJJJJ
    Lang: EN
    Outbound parameters
    Message type:     ADDR2MAS
                   ADR3MAS
                   ADRMAS
                   MATMAS
                   CREMAS
                   DEBMAS
    Details per message type like this:
    Receiver port: XXXXXXX Output mode: Collect Idocs and Do not start subsystem
    IDOC type:      for     ADDR2MAS   use      ADR2MAS02
                   ADR3MAS          ADR3MAS02
                   ADRMAS          ADRMAS02
                   MATMAS          MATMAS03
                   CREMAS          CREMAS03
                   DEBMAS          DEBMAS05
    Activate syntax check
    7)     Authorization needed to execute Transactions:
    BD12 Send Customers
    BD14 Send vendors
    BD10 Send material
    BD30 Send bill of material
    Depending on future migration requests for other objects we may need some more.

  • Testing of SAP BW system after migration from OS Unix to windows

    Hi Experts,
    I am working on a project wherein testing of BW system is required after migration from OS Unix to Windows.
    If any one has done same set of activities in past or has any idea of this, please share all major test steps required after migration.
    Thanks in advance.
    Regards,
    Neeraj

    Hi Neeraj,
    I will paste the list we used for our upgrade from 3.1 to 7.0. I removed some company specific details. Sorry for the "lay-out", it is copied from excel, this messes up the whole message.
    best regards, André.
    Preparation     PHASE 1
    Review New Functionality     Review BW section on SAPNet for latest information on new release
    Confirm Upgrade Timing (First Sat)    
    GUI Upgrade     Install GUI's for Upgrade Test persons
    "Check Prerequisites     -Operating System
    -SAP Kernel
    -DBMS
    -Disk space
    -R/3 plugin
    -BW software version and SP
    Citrix.."
    "Check Compatibility Reqs with other systems     APO
    ECC6.0"
    Check Compatibility Reqs with 3rd party software     ?
    "Test Team 2004s Delta Training     To
    have idea on new functionality
    not have confusion if looks different.."
    "End User Communication: upgraded system and changes     e.g. right vs left click
    - send out communication twice"
    End User Communication: several "look and feel" sessions  NOTE: incorporate WISBECH !!!    
    Setup Portal connected to BW QA for testing once upgraded     Setup Portal connected to BW DEV for testing once upgraded
    Check best go live date - based on assuption 2 days needed    
    Determine test set  - based on input BS / KU    
    Estimate resources Business for testing    
    BluePrint     PHASE 2
    Check/CleanUp Development Objects     Check all open and not-released developments for release prior to upgrade
    Prepare System Setup     Prepare (if needed) flat-files for test loads
    Check OSS for release notes on objects     Each functional area should check out OSS for release notes on objects (for changes etcu2026, new functionality)
    "Prepare (detail) list of objects to be tested     Complete list of objects to be tested, special attention to custom/non-standard programs, enhancements. List of:
    - extractors
    - process chains
    - reports"
    "Setup delta mechanisms (create transaction data)     BackEnd Test: Financial Extraction and load, process chains
    u2022tbd
    u2022
    u2022 "
    Verification / creation of process chains     Check existence of to-be-tested process chains; if none, create 'sample' process chains
    Realization     PHASE 3
    Prior to Upgrade: Install any necessary frontend software    
    Prior to Upgrade: Install any necessary frontend software (end-users)    
    Prior to Upgrade: Complete any extraction - suspend V3 and scheduled BW jobs    
    Create Sandbox    
    Connect Sandbox to external systems (connections/BDLS)    
    Pre-upgrade steps    
    Perform Upgrade of BW     
    Check connection with R/3/APO    
    Perform system backup    
    "BackEnd Test: Logistics extraction and load, process chains
    u2022 Z_example_CHAIN
    u2022 2lis_03_BF and 2lis_03_BX     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    "BackEnd Test: Sales Extraction and load, process chains
    u2022 Z_SALES_1
    u2022 all lis extractors:
    u2022 12_vcitm
    u2022 13_vditm
    u2022 11_vaitm
    u2022 11_vahdr
    u2022 11_v_ssl
    u2022 11_vasti
    u2022 12_vcscl
    u2022 selection of z-extractors
         Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    "BackEnd Test: Financial Extraction and load, process chains
    u2022 0FI_GL_4
    u2022 NOTE: no further extractors are chosen for testing
    u2022 tbd     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    "BackEnd Test: Master Data... Extraction and load, process chains     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    "BackEnd Test: Zxxx Extraction and load, process chains
    u2022 Z_TRANSACTION_DATA
    u2022 Zxxx
    u2022 Zyyy     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    "BackEnd Test: Plant Maintenance Extraction and load, process chains     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    BackEnd Test: PP Extraction and load, process chains     Test: load from Zxxx
    "BackEnd Test: Purchasing Extraction and load, process chains     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    "BackEnd Test: APO Extraction and load, process chains
    u2022 ZAPOxxx
    u2022 ZAPOyyy
    u2022 others can be tested, but were not included in de testset     Test:
    - Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
    - Delta extraction"
    BackEnd Test: Regular Schedule - Production    
    BackEnd Test: Flat file upload     Test: 2 types from server and PC
    BackEnd Test: Test Admin Workbench: creation of objects, change existing     Test the Admin Workbench: creation of infoobjects, change infoobject, create/change hierarchy, create cube,u2026
    BackEnd Test: Test Bex: creation of queries (kf etc...); change existing     Creation of new query/ change query, create condition, calculated/restricted kf, variables,..
    BackEnd Test: Issue handling    
    Development box issue fixing - on forehand     apply fixes based on issues BWQ
    FrontEnd Test: Run Logistics Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run Sales Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run Supply Chain Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run Financial Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run Controling Reports     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run Master Data and Special Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run PM Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run Purchasing Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Run APO Reports (log results in Reports tab)     Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
    FrontEnd Test: Issue handling    
    FrontEnd Test: Make before image of reports - Production     Run reports; save of before image to compare once upgraded
    FrontEnd Test: Run All Reports - Production     Run reports, execute various navigation steps, compare with 'before image' taken in prevous step
    Test Security     Test security with various end-user roles/IDS other than BW developer (usually has * ALL)
    Test Portal integration     Test portal with various end-user roles/IDS other than BW developer (usually has * ALL)
    Edited by: A. Nagelhout on Feb 12, 2010 10:50 AM
    Edited by: A. Nagelhout on Feb 12, 2010 10:50 AM
    Edited by: A. Nagelhout on Feb 12, 2010 10:52 AM
    Edited by: A. Nagelhout on Feb 12, 2010 10:52 AM

Maybe you are looking for