Hi Expert,
I need help in terms of what all document has to be prepared for initial stage of project preparation.
This is for payroll project implementation, where no there HR module is impleted.
regard
Ashish

Hello Ashish,
For New project Implementations, we need to discuss with client about their requirements & according to that we need to create BPML Document followed by Business Blue Print & Key Data Structure & Configuration Document. Once you done with configuration after that you have to create User Manuals to teach/show client how SAP process will work after configuration of your module.
In addition to this, these are the basic documents which needs to maintain... in this it could + or - of documents according to project & company's requirement. i.e. Functional specs. or any other Document.
Hope this will make addition to your knowledge.
Regards.
Shalini

Similar Messages

  • Regarding Project Preparation , Requiremnts Gathering, User Training

    Hai
    Please send the documents for Project Preparation , Requirments Gathering, User Training Urgently to [email protected]
    regards
    andrea

    Hi Andreas ,
    The BW Project guidelines can be as follows ,
    Stages in BW project
    1 Project Preparation / Requirement Gathering
    2 Business Blueprint
    3 Realization
    4 Final Preparation
    5 GO Live & Support
    Project Preparation / Requirement Gathering
    Collect requirement thru interviews with Business teams /Core users / Information Leaders .
    Study & analyze KPI 's (key figures) of Business process .
    Identify the measurement criteria's (Characteristics).
    Understand the Drill down requirements if any.
    Understand the Business process data flow if any .
    Identify the needs for data staging layers in BW – (i.e need for ODS if any)
    Understand the system landscape .
    Prepare Final Requirements Documents in the form of Functional Specifications containing :
    Report Owners,
    Data flow ,
    KPI’s ,
    measurement criteria’s,
    Report format along with drilldown requirements .
    2 Business Blueprint
    Check Business content against the requirements
    Check for appropriate
    Info Objects - Key figures & Characters
    Check for Info cubes / ODS
    Check for data sources & identify fields in source system
    Identify Master data
    document all the information in a file – follow standard templates
    Prepare final solution
    Identify differences (Gaps) between Business Content & Functional
    specification. propose new solutions/Developments & changes if required at different levels such as Info Objects ,Info cube , Data source etc . Document the gaps & respective solutions proposed– follow standard templates
    Design & Documentation
    Design the ERD & MDM diagrams for each cube & related objects
    Design the primary keys/data fields for intermediate Storage in ODS
    Design the Data flow charts right from data source up to Cube .
    Consider the performance parameters while designing data models
    Prepare High level / Low level design documents for each data model.--- follow standard templates
    Identify the Roles & Authorizations required and Document it – follow standard templates
    final review of design with core BW users .
    Sign off the BBP documents
    3 Realization
    Check & Apply Latest Patches/Packages ...in BW & R/3 systems.
    Activate/Build & enhance the cubes/ODS as per data model designs...maintain the version documents .
    Identify & activate Info objects / Master data info sources / attributes ,prepare update rules
    Assign data sources .prepare transfer rules , prepare multi providers . prepare Info packages .
    perform the unit testing for data loads….both for master data & transaction data .
    develop & test the end user queries .
    Design the process chains ,schedule & test
    create authorizations / Roles …assign to users ..and test
    Apply necessary patches & Notes if any .
    freeze & release the final objects to quality systems
    perform quality tests .
    Re design if required . (document changes, maintain versions)
    4 Final Preparation
    Prepare the final check list of objects to be released .identify the dependencies & sequence of release
    perform Go Live checks as recommended by SAP in production system
    keep up to date Patch Levels in Production system
    Test for production scenarios in a pre-production system which is a replica of production system .
    Do not Encourage the changes at this stage .
    freeze the objects .
    5 GO Live & Support
    keep up to date Patch Levels
    Release the objects to production system
    Run the set ups in R/3 source system & Initialize Loads in BW
    Schedule Batch jobs in R/3 system (Delta loads)
    schedule the process chains in BW .
    Performance tuning – on going activity
    Enhancements - if any
    You can get some detailed information in the following link.
    http://sap.ittoolbox.com/documents/document.asp?i=3581
    Try to go to ASAP implementation roadmap.
    https://websmp103.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000420636&_SCENARIO=01100035870000000202
    Check the links below that gives you brief overview of the above steps .
    https://websmp201.sap-ag.de/asap
    http://www.geocities.com/santosh_karkhanis/ASAP/
    ASAP
    https://websmp201.sap-ag.de/asap
    http://www.geocities.com/santosh_karkhanis/ASAP/
    https://service.sap.com/roadmaps
    https://websmp104.sap-ag.de/bi
    ***Please reward if useful.**
    Hope these links helps you.
    Regards
    CSM Reddy

  • Difference between SOLMAN and ASAP Project Selector

    How different is SOLMAN from ASAP Project Selector as far as roadmaps for standard SAP Implementation methodologies are concerned? Does SOLMAN consist of questionnaires like is the case with ASAP Project Selector?

    Hi Namrata
    1. How different is SOLMAN from ASAP Project Selector as far as roadmaps for standard SAP Implementation methodologies are concerned?
    A. The SOLMAN is a different tool altogether.  it is an enhancement to the ASAP Methodology for the latest versions of SAP.  In SOLMAN we will select the required business and its processes supplied by the SAP.  Whereas we need to change the necessary modifications to the required objects and do the enhancements to the default configurations.  In SOLMAN we need to define the landscape very initially.  If a project is implementing with SOLMAN, then each and every request should be routed through SOLMAN and stored in SOLMAN and also each and every requirement as well as all BPP should be kept in SOLMAN.  And configuration will also be done from SOLMAN itself, whereas earlier in ASAP methodology this doesn't exist.
    2. Does SOLMAN consist of questionnaires like is the case with ASAP Project Selector?
    A. SOLMAN will not consist any questionnaires like in ASAP project selector.  It is an extension to the ASAP methodology.  for preparing the as is study we need to follow the ASAP methodology, and for preparing the blueprint and configuration, we will use the SOLMAN.

  • Roles in Project preparation phase ?

    hii
    Some body explain me on their real time exeperiance of 1st phase implementation.??
    What will be the major roles and reponsibilities of MM consultant in 1st and second phase ???
    How we should do the AS-IS study in client place ????
    Some body explain me in depth and detailed of their own experiance in implementation project.
    And additionally ,as MM consultant where we shlould not be lack of knowledge for any implementationss??
    Thanks

    In project preparation phase, all the details of the projects are set, who will be the project manager from implementors side and from client side, then the whole team is selected of both sides, some times there are interviews of consultants as well from the client, where client desides which consultants they want for there implementation.
    Then usually sign up of the project is done and sometimes presentation on every module is given as well if sign up and project start has big difference in dates.
    Then in blueprint phase, for AS-IS, you MM consultant and powerusers from client sit down and you jott down all the current settings of the client, here its decides and researched how there current system is configured, and what necessary settings are required for SAP i.e. how many plants, how many purchase  organisations,groups, how many material groups, what number ranges master record will follow, how many document types for PR,PO,contract, which additional processes are required i.e. Framework order, source lists, which type of mrp, subcontract, consigment process etc.
    Once you get all the data in AS-IS, you create blueprint based on this information which will contain every info, i.e. how many plants will be created, what numbers, how many storage locations with names and numbers for each plant, how many purchase organisation with details, purchase groups, document types of prs, pos, with number ranges, release strategy, and total process flow in this documentation and what can and what cant be configured in SAP, thus the TO BE stage. Here client views your document and if there are any reservations they are pointed out, if any deletion addition is needed to the document they are notified to the consultants, necessary changes are made to the blueprint and this up/down in changes keeps on going, until the blueprint is signed.
    Same above described process happens for all other modules as well, and once all module blueprints are signed, then begins the realization phase. Usually the blueprint phase in 6 months implementation last for 2 months.
    Edited by: Afshad Irani on Aug 30, 2010 3:55 PM

  • Help needed ASAP -- Project file won't open

    Stuck in Africa right now (can't call telephone support).
    I am volunteering on a medical/dental trip and am in charge of the final nights video.
    Here is the problem.
    I am almost done with the video (15 minutes long -- full HD) and suddenly the when I click on the project from the project library it won't open.
    all the other projects open fine. Just this one project won't.
    when I click on it, the project library slides to the side, but behind it is another project library, but when I mouse over it plays the movie, but it is un-editable in this state.
    It was working great until this dreadful moment....
    I saw another post about deleting the thumbnails for an EVENT that was having problems. Can this be done with a PROJECT file?
    The big movie presentation/trip is in 12 hours....
    Can anyone help me???

    One time, after quitting IM and re-launching it later, my project disappeared from the project list.
    Apple Support told me to do this.
    1) quit IM
    2) with the finder, move the project out of the project directory
    3) launch IM
    4) quit IM
    5) with the finder, put the project back into the project directory
    6) launch IM
    My project re-appeared. He said these steps forces a project index to be rebuilt.
    Your symptoms are different but maybe the cure is the same --- good luck.

  • Need help asap, project due monday!

    Hey everyone,
    I'm a college student and I have a final project due on monday.
    I'm running into a MAJOR issue which I've never had before.  I know this is probably a noobie issue but any help would be fantastic.
    I have text on it's own layer, typed it directly into flash, there are two text fields on this layer.  I created at motion tween to move the text from the center of my stage to the top of my stage at about halfway on my scene1 timeline and then it sticks there til the end of that scene.  My issue is, my text will display and animate when I run the timeline in flash.  But when I hit CTRL Enter for the preview, it's no where to be found.  I've even tried embedding the text to see if that would help!  Kinda freakin' out here, so any help would be great.  Does anyone know why this is happening?
    I'm using Flash Professional CS5 with an ActionScript 3.0 file.
    Kindest Regards,
    Dingo

    post a link to your .fla and i'll take a look

  • Need help asap, project due on monday!

    Hey everyone,
    I'm a college student and I have a final project due on monday. 
    I'm running into a MAJOR issue which I've never had before.
    I have text on it's own layer, typed it directly into flash, there are two text fields on this layer.  I created at motion tween to move the text from the center of my stage to the top of my stage at about halfway on my scene1 timeline and then it sticks there til the end of that scene.  My issue is, my text will display and animate when I run the timeline in flash.  But when I hit CTRL Enter for the preview, it's no where to be found.  I've even tried embedding the text to see if that would help!  Kinda freakin' out here, so any help would be great.  Does anyone know why this is happening? 
    I'm using Flash Professional CS5 with an ActionScript 3.0 file.
    Kindest Regards,
    Dingo

    Hey everyone,
    I'm a college student and I have a final project due on monday. 
    I'm running into a MAJOR issue which I've never had before.
    I have text on it's own layer, typed it directly into flash, there are two text fields on this layer.  I created at motion tween to move the text from the center of my stage to the top of my stage at about halfway on my scene1 timeline and then it sticks there til the end of that scene.  My issue is, my text will display and animate when I run the timeline in flash.  But when I hit CTRL Enter for the preview, it's no where to be found.  I've even tried embedding the text to see if that would help!  Kinda freakin' out here, so any help would be great.  Does anyone know why this is happening? 
    I'm using Flash Professional CS5 with an ActionScript 3.0 file.
    Kindest Regards,
    Dingo

  • Help regding... Checking system landscape during the Project Preparation

    Hello All,
    While I was creating a project using SolMan, I came across the "System Landscape --> Systems" tab, where I found an option to check the system landscape by clicking on the "System Landscape" button.
    By clicking on that button I was able to check whether a valid logical component is assigned to various systems like ECC, CRM, KW, etc. Initially I just had an ECC system alone in the system landscape. Hence was able to see a logical component being assigned under the ECC system.
    But after some time, when I checked the system landscape using the same "System Landscape" button in the "System Landscape-->Systems" tab, I was not able to find the logical component that has been assigned to the ECC System.
    But the RFC is still enabled and I was able to navigate to the ECC system from SolMan.
    Am I missing something? What is this "System Landscape" button for? Please provide me some insight into this issue.
    Thanks a lot in advance.
    best rgds,
    Alagammai.

    Hi,
        The error "CASLExec" is an error reported by HP support assistant software, uninstall the HP support assistant by clicking on start search --> programs and features--> Uninstall progrmam, Update the latest version of HP support by clicking on the link
    http://h71036.www7.hp.com/hho/us/en/pclc/articles/hp-support-assistant.html?lang=en&cc=us
    Please try the steps mentioned in the below link for Windows 7 Service Pack 1installation error code issue.
    http://windows.microsoft.com/en-US/windows7/troubleshoot-problems-installing-service-pack
    Thank You.

  • SAP HR- Project Preparation- ECC6

    Hi Gurus,
    Please can you help.
    My company already have ecc5, and now want to upgrade to Ecc6.
    What issues do I have to look into for this? technical and business minded.
    Will the be anything to consider, discuss, change?
    I am a junior, and have been giving the oportunity to start on this. I need all the help I can get.
    Many Thanks

    Hi Janesh,
    You need to take business transaction codes from business and test in the ECC 6.0 TST client.
    do unit test and integration test, if every thing goes right then u r basis will upgrade to ecc 6.0
    Surya

  • Project Preparation

    Does anyone have information or can refer me to somewhere
    that i can learn about best practices when beginning a Flash
    Animation Presentation? It seems my work has been utilizing me more
    and more to create 1-2 minute sales/advertising Flash animations
    for the company. So i'm wanting to learn how to properly plan out
    the work-flow, when i should use After Effects, how to incorporate
    animations, transitions, etc. Any help in the right direction is
    greatly appreciated. Thanks!

    FLASH itself was too overwhelming for me...so, I started out
    using Swish for
    a few years just to get the idea together...
    Now, I am starting to get it.
    "split67" <[email protected]> wrote in
    message
    news:ff2pn1$jj5$[email protected]..
    > Does anyone have information or can refer me to
    somewhere that i can learn
    > about best practices when beginning a Flash Animation
    Presentation? It
    > seems my
    > work has been utilizing me more and more to create 1-2
    minute
    > sales/advertising
    > Flash animations for the company. So i'm wanting to
    learn how to properly
    > plan
    > out the work-flow, when i should use After Effects, how
    to incorporate
    > animations, transitions, etc. Any help in the right
    direction is greatly
    > appreciated. Thanks!
    >

  • ASAP doccuments for SAP BW Implimentation

    Hi,All!
               I am new to the job.pls send the SAP BW I mplementation doccuments to the mail ID give3n below.
        Mail ID : [email protected]
      Thanks & Regards
          Sneha.

    hi
    Accelerated SAP (ASAP)
    Project preparation:
    intial stuff -- Do a conceptual review after this phase
    Requirements gathering
    Business blueprint:
    Functional spec-- Do a design review after this phase
    Realization : Develop; Do a configuration review after this phase
    Final Preparation :QA and Other final stuff before moving to production, Do a performance Review after this phase
    GoLive and support : to production and supprot
    AcceleratedSAP (ASAP) Roadmaps
    The ASAP Roadmaps provide you with proven, practical, comprehensive, repeatable, and rich implementation methodologies that enable speedy, focused implementation of SAP Solutions. ASAP Roadmaps cover the most important aspects and phases of a SAP solutions implementation, enhancements, or upgrade following the AcceleratedSAP (ASAP) principles.
    The roadmaps are available for browsing and offline use on this site and also delivered as standard component of SAP Solution Manager - the implementation and operations platform.
    ASAP Roadmaps
    Deliver transparent, proven approach helping the project team to reduce implementation time, costs and risks throug efficient implementation process
    Achieve better results by leveraging the experiences of other successful projects
    Knowledge management - use the Implementation Roadmap for SAP Solutions to gather knowledge on how to organize and run your implementation projects
    Benefits
    Provide proven, practical and cost-effective project implementation approach. Flexible, scalable and tailorable to meet Project and Customer needs.
    Leverage SAPs vast experience in the implementation, upgrade and operations of its Solutions as well as industry recognized best practices for effective Business Solutions.
    Extends across all aspects of the solution life-cycle; from strategic reviews and analysis, to design, implementation, training and post project support.
    Is scalable and can be tailored to meet customer and project specific requirements and constraints.
    Supports different project types (single-site, multi-site, template, prototype, upgrade, evaluation, etc.)
    Has been developed over many years to deliver cost-effective and successful implementation and is being continually enriched with content based on the experiences gained in implementing SAP Solutions

  • ASAP for BW

    Hi gurus
    Would you pl advise me the ASAP methodology for BW . If possible pl advise the no.of members required for an ideal project and their roles in BW implementation.
    Thanks in advance

    HI
    Accelerated SAP (ASAP)
    Project preparation:
    intial stuff -- Do a conceptual review after this phase
    Requirements gathering
    Business blueprint:
    Functional spec-- Do a design review after this phase
    Realization : Develop; Do a configuration review after this phase
    Final Preparation :QA and Other final stuff before moving to production, Do a performance Review after this phase
    GoLive and support : to production and supprot
    AcceleratedSAP (ASAP) Roadmaps
    The ASAP Roadmaps provide you with proven, practical, comprehensive, repeatable, and rich implementation methodologies that enable speedy, focused implementation of SAP Solutions. ASAP Roadmaps cover the most important aspects and phases of a SAP solutions implementation, enhancements, or upgrade following the AcceleratedSAP (ASAP) principles.
    The roadmaps are available for browsing and offline use on this site and also delivered as standard component of SAP Solution Manager - the implementation and operations platform.
    ASAP Roadmaps
    Deliver transparent, proven approach helping the project team to reduce implementation time, costs and risks throug efficient implementation process
    Achieve better results by leveraging the experiences of other successful projects
    Knowledge management - use the Implementation Roadmap for SAP Solutions to gather knowledge on how to organize and run your implementation projects
    Benefits
    Provide proven, practical and cost-effective project implementation approach. Flexible, scalable and tailorable to meet Project and Customer needs.
    Leverage SAPs vast experience in the implementation, upgrade and operations of its Solutions as well as industry recognized best practices for effective Business Solutions.
    Extends across all aspects of the solution life-cycle; from strategic reviews and analysis, to design, implementation, training and post project support.
    Is scalable and can be tailored to meet customer and project specific requirements and constraints.
    Supports different project types (single-site, multi-site, template, prototype, upgrade, evaluation, etc.)
    Has been developed over many years to deliver cost-effective and successful implementation and is being continually enriched with content based on the experiences gained in implementing SAP Solutions
    i sent to some documents to ur id
    Regards,
    A.M.S

  • What is the duration of ASAP methadalogy for project

    HI Everybody ,
    Once we start our implementation project in SAP EP,by using standard methadology called ASAP.
    Then I want to know ,how much time we will take to complete all 5 phases,and in each phase what is the primary role for SAP EP Developer as team member.
    Thanks,
    vinay

    Hi Vinay,
    SAP EP Developer will be involved in Realization, Final Preparation and GO live and support phases.
    In the project preparation and business blueprint he will not be involved. It will be the basis team and Portal administrator who will be involved.
    Regards
    Arun

  • SAP BI Project ASAP Methodology

    Hi Experts
    Correct me if i was wrong,With regrads to the steps followed in ASAP Methodology
    1)Requirements Gathering
    2)GAP Analysis
    3) FUNCTIONAL SPECIFICATIONS DOCs
    4) Technical Specificaion Docs
    5) Build
    6) Test
    7) Golive

    Here are the steps in the ASAP Methodology:
    Project Preparation
    Project team identified and mobilized
    Project standards defined
    Project work environment setup
    Blueprint
    Business processes defined and documented
    Business requirements defined
    Gap Analysis
    Business Blueprint document created and published
    Realization
    Functional Specification documents, including data mappings and data requirements, created and published
    Configuration
    Technical Specification documents created and published
    Development
    Unit Testing
    Mock data migration or ETL
    Final Preparation
    Integration Testing
    System Testing
    User Acceptance Testing
    End-User Training
    Final mock data migration or ETL
    Knowledge transfer
    Go-Live and Support
    Data migration or ETL
    Application made available to general end-user population
    Post-Implementation (Warranty) Support by development team
    Turnover to Production Support team for steady-state support

  • IMovie11 "preparing project"

    Hi,
    When I export my iMovie project 11 (about 1 hour recording) to folder (movies) iMac - OS X Lion 10.7.5, iMovie starts "preparing the project" (this is the way I learned when I want to export video for my Pro miDVD). However, iMovie spends on average 5 hours. It's a long time! My videos in HD with Sony's mini-cassette, are performed by a Canon Vixia HV30 - HDV.
    Why does it take so long this "project preparation"?
    Thanks,
    Gionei

    Thanks for the reply.
    I figured out the issue and it was with iDVD and that, unlike iMovie HD, which integrates with iDVD, iMovie '08 and '09 do not, so iMovie now has to export the completely rendered movie before iDVD can use it. Also, when you Share the movie with iDVD, it defaults the new iDVD project to you user folder, and then imports the entire iMovie video into the iDVD project. So, that is why all my system HDD space was disappearing.
    So, I guess the best thing to do, if I use iMovie to create the video, is export the final movie to the scratch drive, and then create a new iDVD project (saved to the Scratch drive) and then drag the exported movie into iDVD.
    My only problem with this method is that my chapter marks get lost on the export (same as XML). Is there an option to export a movie and maintain the chapters in the video (a la FCP export)?
    The main reason I am using iMovie is that I am walking through others that only have iMovie to work with, so using FCP is not an option.
    Thanks.

Maybe you are looking for

  • How to use the eventing and databag with a WAS 6.20 ?

    How to use the eventing and databag with a WAS 6.20 ? Is what there is a good guide for these services? Thank's

  • Adding Cell in a row in Smart Form

    Hi All, Can anybody please tell how to add a cell in the row of a table in smart forms. Thanks

  • Installation of 1310's

    I hope this is in the right area, so here it goes. I am trying to layout an access point install consisting of Aironet 1310's. It is for a warehouse location and it is at 0 degrees all the time so it was a good choice considering there broad temperat

  • Using ACS for change control

    I'd like to set up ACS server (integrated with Windows Active Directory) for router and switch so that all network administrator could use their active directory account to access network devices… and all activities will be logged on to ACS server. C

  • Cant install EAX console on Audigy 1 Platinum

    - Whenever im trying to install the EAX Console from the?SB Audigy Series Support Pack 3.6 (/09/2009) i get a "Error I-00" and the message "CTEngine cannont be installed". Any ideas how i could fix that and get the EAX effects running again? Im using