Aseembly order entry in sales order--item schedule line--Procurement tab

Hi all,
i created a Sales order which includes BOM explosion under which i am trying to seek Assembly order no under Item -- schedule lines-- procurement tab.
currently i am not getting any such data in the particular screen at all.
can anyone suggest if any IMG activity is missing which needs to be configured for geeting the same(assembly order entry inside sales order screen.)
antipitaing replies.
-ujjwal

Hi
Just try once as below.
Do not create it as a BOM material first of all.
For the Main-item, change the Item category group in the Material master to "0001" and save.
Ensure the Item category assignment in VOV4 as
Order type + Item category group (e,g. 0001) -
> Item category (TAK).
Now, create the new order for the Main-item, manually add the sub-items in the sales order, specify the "Hgh level item number" (item number of the main item) > click enter > save.
Now, in VA02, check schedule line > Procurement tab.

Similar Messages

  • How to create planned order from the sales order for a processing item

    In the MTO sceanrio, assembly order is created directly from the sales order. I would like to create a planned order from the sales order.
    I tried the Planning strategy group 81 in the material master but it didnt work.
    Could you please let me know how to do it? Is it Schedule line config that controls whether planned order is created?
    Thanks
    Harish

    Narayana,
    Planning strategy 82 is the best & standard way of getting production order created on sale order create.
    just assign this strategy  in MRP 3 view under strategy group.
    If not then using sale order reqt type ( KMFA- Assembly with production order) & assigning this to your sale order item category is also another way to create prodcution order without using planning strategy in material master.
    Follow steps in SPRO-->Sales & dist --> basic functions >avail check &transfer of requirements> transfer reqts-->determination of reqt type using transaction
    Here you may select the item category you in sale orders & assign KMFA to your item category. this will then give option in sale order create to change reqt type to KFMA for assebly orders.
    If you need KFMA to be default assign it to Item cat/ MRP type ( PD) combo.
    Regards
    Ritesh

  • Free goods determined in Delivery over Order Quantity in Sales Order Item

    Hi Gurus,
    I've a problem about using free goods determination.
    First I created free goods master record with following information
    ZG1010012060075 From 100 PC -> Free good ZG1040012060075 2 PC
    Free goods Category = '2' (Exclusive)
    Free goods delivery control = 'E' (Delivery proportional to quantity in main item)
    Then I've created Sales Order with
    Item 10 ZG1010012060075 4,000 PC.
    Item 11 ZG1040012060075(Free good) has been automatically determined for 80 PC
    Then I've splitted Item 10 into 4 deliveries. The result of free goods determine in each delivery are as follow:
    Delivery#1)
    Item10 ZG1010012060075 = 1,176 PC
    Item20 ZG1040012060075 = 24 PC
    Delivery#2)
    Item10 ZG1010012060075 = 1,176 PC
    Item20 ZG1040012060075 = 24 PC
    Delivery#3)
    Item10 ZG1010012060075 = 1,176 PC
    Item20 ZG1040012060075 = 24 PC
    Delivery#4)
    Item10 ZG1010012060075 = 472 PC
    item20 ZG1040012060075 = 9 PC
    *Remark : Total quantity of 'ZG1040012060075'(free goods) = 92424+24 = 81 PC
    (Greater than 80 PC)*
    I think the system determined free goods in Delivery#4 correctly due to rounding up. But It might not be over the order quantity in Sales Order Item 11. Even though I've set the item category in delivery with Check overdelivery = 'B' (Situation rejected with an error message), the free goods are determined over order qty. BUT if I change delivery qty in delivery#4 Item20 from 9 PC -> 8 PC -> 9 PC, the error message occurred.
    My point is to fix the system not determine free goods in delivery items over order quantity in sales order item.
    Has anyone met this situation before? Do you have any idea about this issue?
    Best Regards,
    Prachya Lalitnorasate

    Dear Sai,
    Thank you for your advice, but it didn't solve my problem.
    I would like the system to determine free goods with proportional to main item AND In the last delivery main item delivered completely free goods must be determined equal to remaining open delivery item.
    Do you have any idea about configuration/customization?

  • Can not delete a Production Order is the Sales order item is rejected?

    Hello everyone,
    I can not delete the production order as the Sales order line item is rejected.
    Does anybody know if any configuration change is required or any work around?
    Thank you,
    BG

    Hi,
    Could you pl. explain how the production order is created?
    Also did you try by choosing Function in the menu (CO02 transaction) & try to set deletion flag or Technically complete?
    If so did you get any error message ?
    Regards,
    Senthilkumar

  • Planned order MD11/Planned order MD02 for sale order

    hi
    How to identify a planned order ref to sale order created manually MD11 or created by MRP run MD02.
    is there any table entries plaaned order and transaction codes?
    i got two planned orders qty1 and qty5  from a client for same sale order item.
    what could be possibilites.
    -ashok

    Dear,
    Couple of check,
    1) Check  Lotsize ?
    2)Planning strategy?
    3)Individual /collective requirements indicator in MRP4 view?
    For MTO, you will get one Planned Orders per one requirement element.
    So, you are getting number of Planned Orders for FG?
    For MTS Scenarion, the Lot Size EX will work just like the Daily lotsize (TB).
    So, system will club all the requiremnts per day and propose the Planned Orders for 1 day requirements.
    You will get separate planned orders for the Next day.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Itu2019s showing confirmed qty more that order qty in sales order

    Dear Guru's
    I am working on production server issue; the issue is delivery has been created more that sales order qty.  When I am seeing sales Oder schedule lines itu2019s showing confirmed qty more that order qty in sales order what could be the reason can any help me on this.
    Regards
    DNR

    Hi DNR,
    first up, appreciate if you can use your real name instead of DNR , I'd love to see your actual name.
    Coming to the question, a deliery can be created more than the ordered quantity. And if you pick whats delivered - that can show as confirmed too..
    Standard SAP just throws a warning indicating this over delivery. And incase you want to prevent this happening - you can trigger an user exit to change this warning to error.
    Config is also possbile if you have setup your cust mat info record or sales order to check over delivery and set the item cateogry for delivery. You can go to t.code 0VLP( Zero VLP) select Over Delivery -  'B' for delivery item category.
    Regards
    Sadhu Kishore

  • Duplicate production order due to sales order on credit block

    Dear Experts !
    Need feedback on the following scenario:
    - Sales order is entered for material which is produced in-house specific to the sales order (ie customer's logo is on product).
    - Schedule line in sales order creates a production order specific to the sales order.
    - Customer runs into credit check a few days later and consequently the schedule line in the sales order is removed due to credit block, however the linked production order still remains and is produced by factory.
    - Sales order is released from credit check and a new schedule line is created resulting in another production order being released.
    Any ideas on how to prevent duplication of production order?
    Thanks in advance!
       -Alvin

    Hello,
    Apologies for the confusion, let me explain it a bit more.
    - Sales order is entered for material with planning strategy group of make-to-order, the schedule line initiates new production order for make-to-order material.
    - A few days later - the customer goes over credit limit or has overdue invoices, etc..
    - During background rescheduling (or any sales order change) the sales order gets a credit block due to static check.
    - Sales order block deleted schedule line in sales order, however the production order remains active.
    - Once the sales order is released from credit block, a new schedule line is created which initiates a new production order.
    - Duplicate production order is now being made in shop floor.
    I hope the above explains my scnario a little clearer.
    Thanks and regards,
    Alvin

  • Error while creating a production order from a sales order

    Hi
       Even though the product has BOM when i try to create order with a sales order reference it is showing a warning message " NO BOM FOUND" . How to correct this error .
    regards,
    PradeepM.

    Dear ,
    Goto -CS02-Enter FG -Goto Header -Staus Long Text -Check wether BOM status is set to 1 -Active .
    Check the usage of the BOM -Should  be 1-Production .
    Check wether BOM is locked and Deltion Flag set -Header Status Long txt tab
    Check the valididty of the BOM and Sales Order Schedule delivery date
    Try and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jul 6, 2010 9:03 AM
    Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM
    Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM

  • Sales Order Confirmation when sales order goes for Credit Block

    want Sales Order to be Confirmed , i e Schedule line Confirmation , when sales order goes for Credit Block
    How i can Achieve this?
    Even when set for Sales Document typpe credit check as 'D' and credit group as ;03; ie at Goods Issue still order is not getting confirmed.

    I am not sure, why you want schedule line to be confirmed for credit blocked sales orders. Re-confirm with the client.
    There are controls when defining delivery blocks.
    Goto IMG - Log.Execution-Shipping - Deliveries- Define delivery blocks( check menu path in system, may not be same as shown here).
    Select 01- credit block " untick" from "Confirmation" Column.
    Now test with & see how ti works.
    Regards,
    Reazuddin MD

  • Block creation of multiple prod. order against single sales order in CO08

    Hi All,
    We have a requirement of blocking the creation of multiple production order against single sales order in CO08 if the production order is already created for that item.
    How to achieve this?
    SmanS

    Hi,
    you need to check if any user exit is there which will check order haeder table for the said sales order if any Prod Order exist for the same and flag custome error whicle prod order save.
    Pls revert if you need any further information.

  • Link a Purchase order to a sales order

    I am looking for a way to link a specific Purchase order to a Sales Order so that when the Purchase Order is received the items are allocated to that specific Sales Order and another sales person cannot sell the murchasedise.  I know you can create a po from a sales order but it seems like when the po is copied to a goods receipt, anyone can invoice those items on a different sales order/ a/r invoice?
    Thanks,
    Don Shields

    Hi Don,
    What you are looking for is more of a hard allocation of Items to a SO.  This functionality does not exist in B1 today.
    If you want to manually create some processes and validation for this, it could be done. 
    1.  Use Batch numbers management for items and linking a Batch to a SO and use the same Batch number in the Goods Receipt.
    I have provided an ellaborate solution for this on this forum last year
    You may check this thread in the meanwhile
    Suda! Again to restriction of items from PO based on SO

  • Cost analysis through Purchase Order created from Sales Order

    Hi Experts,
    This is the scenario: There is an Item No. which is not stocked in warehouse and is purchased only when customers ask for it. The cost of the sales order line having this item is calculated by the Purchase Order line on which the item is there. (The PO have items for other Sales Orders as well. And, Sales Orders have multiple item types) The Sales Order have the PO no. against it and Purchase Order has SO no. against the line. This is all done using MS Access and Sage Accounts. Lots of free typing and manual cost analysis involved.
    I have gathered from this forum that we can create Purchase Order from the Sales Order. The Document No. information can be pulled from one another using Formatted Search. Can we do the accounting and cost analysis as well?
    Please let me know if I have not made myself clear.
    Thank you in advance and kind regards.
    IC
    Edited by: iancameron03 on Sep 20, 2011 4:35 PM

    Hi Ian,
    I concur with Faraz, it is better if you use procurement document facility in doing back to back transaction from SO to PO.
    However, in your case, I'm afraid you can't analyze the gross profit and recording the accounting related activity as your request using standard SAP B1 function.
    As for gross profit case:
    Since you're actually using workaround in order to evade all hassles in maintaining all item master data related to this case, you create just one item code called S1 right?
    SO DocEntry - SO Line # - Item Code - Item Name - Quantity - Price
    1001 - 0 - S1 - Table - 2 - 100
    1001 - 1 - S1 - Chair - 8 - 25
    1001 - 2 - S1 - Cloth - 3 - 10
    PO # - PO Line # - PO BaseEntry (SO DocEntry)  - PO BaseLine (SO Line #) - Item Code - Item Name - Quantity - Price
    2001 - 0 - 1001 - 0 - S1 - 2 - 100
    2001 - 1 - 1001 - 1 - S1 - 8 - 25
    2001 - 2 - 1001 - 2 - S1 - 3 - 10
    Note that standard B1 gross profit calculation is that system will compare selling price for each item with item cost / certain price list of each respective item. However, in your case, you put all item as a single item master. Thus, system couldn't compare Table to Table, Chair to Chair, Cloth to Cloth since the item cost for these 3 items will be the same, the price list for these 3 items will also be the same since it is actually only one master data. Of course you could update the gross profit calculation manually for each SO, but to be honest it seems rather weird to do this manually.
    So, in order to simulate the gross profit calculation, you need to create a custom query and comparing PO line no with SO line no.
    As far as accounting related recording concern, I'm afraid you can't do it
    1. SO 1 : Item Table - Selling price 130 ; Item Chair - Selling price 30
    2. PO 1 (linked to SO 1) : Item Table - Purchase price 100 ; Item Chair - Purchase price 25
    3. SO 2 : Item Table - Selling price 150 ; Item Chair - Selling price 40
    4. PO 2 (linked to SO 2) : Item Table - Purchase price 110 ; Item Chair - Purchase price 30
    Correct me if I'm wrong, you want to record accounting wise that CoGS of Delivery based on SO 1 is 100 for Table and 25 for Chair, isn't it? No matter what costing method you use, you can't achieve this.
    If you use moving average, system will average both Table and Chair cost price, since it is actually one item master data. Even if you distinguish each item as a master data, system will average the cost price for Table and Cloth by the time GR for PO 1 and PO 2 occurred.
    Example (order by sequence of event):
    1. GR based on PO 1 - Table - Purchase price = 100, therefore Item cost = 100
    2. GR based on PO 2 - Table - Purchase price = 110, therefore Item cost = 105 (considering quantity only one for both PO)
    3. Delivery based on SO 1 - Table - CoGS incurred will be 105, not 100
    To certain extent, same thing could be said with FIFO costing method
    1. GR based on PO 1 - Table - Purchase price = 100 (qty 1)
    2. GR based on PO 2 - Table - Purchase price = 110 (qty 1)
    3. Delivery based on SO 1 - Table - CoGS incurred will be 100 (qty 1)
    4. Delivery based on SO 2 - Table - CoGS incurred will be 110 (qty 1)
    At first glance, it seems right since the CoGS for SO 1 is 100, tied up with purchase price for PO 1. And CoGS for SO 2 is 110, tied up with purchase price for PO 2. But we're using assumption here, we're assuming the sequence of Goods Receipt of PO and Delivery of SO occurred in the very same sequence as the issuance of SO and PO.
    1. GR based on PO 1 - Table - Purchase price = 100 (qty 1)
    2. GR based on PO 2 - Table - Purchase price = 110 (qty 1)
    3. Delivery based on SO 2 - Table - CoGS incurred will be 100 (qty 1)
    4. Delivery based on SO 1 - Table - CoGS incurred will be 110 (qty 1)
    If above scenario / sequence that happened, you will get the wrong figure of gross profit since the Delivery of SO 2 will take the item cost based on GR of PO 1. Since we're actually talking about real life business process, who can guarantee that above scenario wouldn't happen? It is possible that you send goods to customer who ordered late in real life, too much possibility that it is better for you to mitigate such result.
    My suggestion would be that you record the accounting transaction based on standard business process, no need to really capture the actual cost and actual gross profit for certain SO and PO. Too complicated, and the software itself doesn't cater this kind of requirement. Best thing you could do only create custom query for gross profit simulation calculation, but for very accurate accounting recording, IMO you should forget it. Hope this help.
    Best Regards,
    Hendry Wijaya

  • Product cost by sales order with Valuated Sales order stock

    Hi Gurus,
    I am working on Poduct cost by Sales Order with Valuated stock. but i have doubt ragarding to Cost estimation.
    1.In sales order scenario also Standard Cost estiamtion (CK11n and CK24) and Marking, Releasing is Mandatory? if not how can we estimate the cost?
    2. If we are estimating the cost by using Standard Cost estimate, when can we estimate the cost?
                can anybody please give me the steps which we are following in Poduct cost by Sales Order with Valuated stock from starting to end Settlement
    Thanks&Regards
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

  • Purchase order to create sales order and delivery

    Hello all,
    I am planning to create sales order and since i require customer Purchase order to create sales order, i am also planning to create purchase order.
    My question is who should i mention as vendor or who would be the vendor when i create a purchase order that would be used to create sales order.
    should it be the customer who orders the material or should it be the plant from which the material is going to be supplied.
    and also in the line item for the field "plant", should i enter the supplying plant or should i enter the ship to plant.
    Thanks,
    Maxx

    The moment you mention 'Vendor', the SAP synonym for it is 'Supplier' hence it would be the supplier (and not customer), that is the plant from which the marerial is supplied. Hence your vendor in customer PO will be the supplying plant.
    The 'Plant' in the line item in case of PO will be the receiving plant (the customer's Plant).
    I hope this answers your doubt.
    Amit G

  • Create purchase order automatically from Sales order.

    Hi,
    I have ticked  Create purchase order automatically check box in item category TAS and TAB but still not able to generate Purchase Order automatically.???
    any clue.
    thanks/ashu

    You need to have your prerequisites in place for the automated creation of the purchase requisition before the purchase order can be raised:
    You may already have done this, but check that your material has the purchasing information on it (trxn MM02, purchasing tab), that a purchasing information record exists for that material and vendor in that purchasing org (trxn ME12), check that a source list exists as well (trxn ME02). If you have created the source list or purchasing info record after the sales order has been created then you will need to go into trxn ME56 to assign them manually. That should release the PO to be created.
    In standard 3rd party, the PO is created using ME59 (prog RM06BB20), which can be run as a batch job.
    Jon

Maybe you are looking for

  • How do I decrease the file size of my After Effects video without losing the quality?

    I made a video that was 7 minutes and 11 seconds long for my brothers wedding. The quality is really good but the file size is 1.52 GB and I would rather have that be in the megabytes so that I can send it to family members. It does not have to be so

  • Ipad Calendar does not sync with Icloud.

    Followed Apple trouble shooting guide for this problem. Contacts sync to Cloud OK. Not Notes. Also, checked with my other Ipad's settings and they match. Only prob was Time Zone hangs -under Date/Time.

  • After effects CS3 crashes when importing file

    system specs are as follows Operating System: Windows XP Professional (5.1, Build 2600) Service Pack 2 (2600.xpsp_sp2_qfe.061219-0311) Language: English (Regional Setting: English) System Manufacturer: Dell Inc. System Model: Dell DM051 BIOS: Phoenix

  • Employee Photo Upload Error!

    Hi Experts: I'm getting an error while trying to display (Using Display All Fascimiles) the Employee Photo assigned to the Personnel No: Message: "Error while opening document with HTML control; DP_ERROR_GENERAL" Has anyone faced this error earlier..

  • Need to find if Images applied clipping path(detect Edges)

    Hi Scripters, How to find Images applied with clipping path(detect Edges) in Indesign document. Could anybody please share a code/script with me. Yours, Jerome