Asigning business systems to tech sytems

How many technical systems be asigned to one business system...

Only 1
check this for more help.
http://help.sap.com/saphelp_nw2004s/helpdata/en/87/7277e8fba34421a45d97a41ec27381/frameset.htm
Sachin

Similar Messages

  • How to creat a Business System and Tech System in SLD for the DB2 DataBase?

    Hi,
    How to creat a Business System and Tech System in SLD for the DB2 DataBase?
    Joseph

    Hi,
    Technical System
    In SLD, click on technical landscape->New Technical System->WebAS ABAP.
    Business System.
    1.Goto Business Landscape->New Business System->Name the business system.
    2. Choose the technical system that needs to be attached->WebAS ABAP->Technical System Name.
    Go Through this links..
    TBIT41:
    https://websmp201.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT41&LANGUAGE=
    TBIT42:
    https://websmp206.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT42&LANGUAGE=
    TBIT43:
    http://www50.sap.com/useducation/curriculum/course.asp?cid=60161651
    TBIT44:
    https://websmp102.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT44
    Also try elearning.
    https://www.sdn.sap.com/irj/sdn/elearn
    Thanks,
    Satya Kumar

  • CIM_ERR_FAILED: while importing the Business System in quality sytem

    Hi Experts,
    I got error while importing the SLD (Business system) from Devolopement system to quality system.
    Business system is third party system.
    note i created business systemaaa(third party) using the quality system integration server and assign this to as target in the dev business system in transport tab.
    like i have Business system in DEV like this : BS_DEV(integration server is DEV) ( using this i was devloped the objects using this business system the like Communication channel,RD,ID,RA etc.)
    i was created  another business system:BS_QA(integration server is QA)
    the transport tab of the BS_DEV i puted the BS_QA as target.
    i used same technical systems,product,SWCV for the both Business systems
    but while importing the BS_QA i got the following error:
    CIM_ERR_FAILED: Instance referenced in role Antecedent of association SAP_BusinessSystemPath does not exist:
    BS_DEV not imported in quality is this is cause for this problem ?
    which one i need to import either BS_DEV or BS_QA to quality?
    thanks in Advance

    Hi,
         Check if CIM content versions are same in DEV and QA.If there is any version difference you might need to update CIM content if there is any inconsistencies in CIM content there are chances to get such kind of errors.
    Regatrds,
    Naveen.

  • 3rd party tech systems for multiple business systems...

    I think this might a very stupid question but still would like to post it..:).. In a 3parties involved scenario, can 1 technical system be assigned to multiple business systems , if all business systems refer to the same 3 party..or does each 3rp party business system needs its own technical system..
    Also I need to move only 1 product and the SWCV assigned to the product to QA..I do not want to export entire SLD..By exporting this single product and importing into the SLD of QA, I hope it will not overwrite the SLD components of the QA box but add this new product as delta.
    -Teresa

    Hi Teresa,
    >>>Also I need to move only 1 product and the SWCV assigned to the product to QA..I do not want to export entire SLD..By exporting this single product and importing into the SLD of QA, I hope it will not overwrite the SLD components of the QA box but add this new product as delta
    I believe you can only do an incremental export/import
    sld does not allow importing/exporting one product...
    Remember to do a backup of your QA SLD
    (from the SLD - administration)
    then if you make a mistake nothing will happen
    about the second question:
    <i>"Business systems, which name the logical receiver independently of technical properties. For example, a business system might be a client of an SAP system.
    Technical systems with which the hardware of the system is specified in more detail (server data, and so on)."</i>
    this should be possible not only for SAP systems
    Regards,
    michal
    Message was edited by: Michal Krawczyk

  • Error while deleting the business system in SLD

    HI
    I am trying to delete the business system in SLD and encountering the following error .
    if some one has any idea as to why is this error occuring
    java.lang.NullPointerException at com.sap.sld.wd.businesssystem.BusinessSystem.removeXIIntegrationServer(BusinessSystem.java:497) at com.sap.sld.wd.businesssystem.wdp.InternalBusinessSystem.removeXIIntegrationServer(InternalBusinessSystem.java:474) at com.sap.sld.wd.businesssystem.BusinessSystemMainView.RemoveOk(BusinessSystemMainView.java:450) at com.sap.sld.wd.businesssystem.wdp.InternalBusinessSystemMainView.wdInvokeEventHandler(InternalBusinessSystemMainView.java:477) at com.sap.tc.webdynpro.progmodel.generation.DelegatingView.invokeEventHandler(DelegatingView.java:87) at com.sap.tc.webdynpro.clientserver.event.CustomEventProcessor.handleServerEvent(CustomEventProcessor.java:45) at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.doHandleServiceEvent(WindowPhaseModel.java:361) at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.processRequest(WindowPhaseModel.java:128) at com.sap.tc.webdynpro.clientserver.window.WebDynproWindow.processRequest(WebDynproWindow.java:330) at com.sap.tc.webdynpro.clientserver.window.WebDynproWindow.processPhaseLoop(WebDynproWindow.java:341) at com.sap.tc.webdynpro.clientserver.cal.AbstractClient.executeTasks(AbstractClient.java:152) at com.sap.tc.webdynpro.clientserver.session.ApplicationSession.doProcessing(ApplicationSession.java:297) at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessingStandalone(ClientSession.java:706) at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessing(ClientSession.java:660) at com.sap.tc.webdynpro.clientserver.session.ClientSession.doProcessing(ClientSession.java:228) at com.sap.tc.webdynpro.clientserver.session.RequestManager.doProcessing(RequestManager.java:152) at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doContent(DispatcherServlet.java:56) at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doPost(DispatcherServlet.java:47) at javax.servlet.http.HttpServlet.service(HttpServlet.java:760) at javax.servlet.http.HttpServlet.service(HttpServlet.java:853) at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.runServlet(HttpHandlerImpl.java:390) at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.handleRequest(HttpHandlerImpl.java:264) at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:347) at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:325) at com.sap.engine.services.httpserver.server.RequestAnalizer.invokeWebContainer(RequestAnalizer.java:887) at com.sap.engine.services.httpserver.server.RequestAnalizer.handle(RequestAnalizer.java:241) at com.sap.engine.services.httpserver.server.Client.handle(Client.java:92) at com.sap.engine.services.httpserver.server.Processor.request(Processor.java:148) at com.sap.engine.core.service630.context.cluster.session.ApplicationSessionMessageListener.process(ApplicationSessionMessageListener.java:33) at com.sap.engine.core.cluster.impl6.session.MessageRunner.run(MessageRunner.java:41) at com.sap.engine.core.thread.impl3.ActionObject.run(ActionObject.java:37) at java.security.AccessController.doPrivileged(Native Method) at com.sap.engine.core.thread.impl3.SingleThread.execute(SingleThread.java:100) at com.sap.engine.core.thread.impl3.SingleThread.run(SingleThread.java:170)
    Thanks
    Nikhil

    hi Nikhil,
    Null pointer errors are difficult to correct as is
    If you have imported the BS from some other system make sure the BS has been imported correctly without errors & any Tech systems attached to it exist.
    sachin.

  • About business system

    while creating a business system.
    there is the logical system name at step 2,
    there is the business system name at step 3.
    what do they feature respective and difference between logical system name and business system name?

    Hi,
    Business Sytem is the service  fro sender system or receiver system and Logical system is the system name where u want to send the data.
    suppose ur doing a snerio File to IDOC then that SAP Sytem logical system name SAP100 that sholud be given in Business system,if u dont give then data will not pass.
    Regards,
    Phani
    Reward Points if Helpful

  • PI 7.1 third-party business system and software component.

    Hi,
    I wish to know if it is possible to associate a third-party business system to a software version and therefore to a software component.
    This is importnat for me to know it applied to teh PI 7.1. I know that for abap and java this is possible.
    Any help will be well appreciated.
    Thanks in advance.
    Regards,
       Giovanni

    Hi,
    go to SLD.......go to Business system......click on new business system to create it.........then select your technical system for third party........then tell the sw component to be linked to the third party business system........then your third party business sytem will be linked to the sw component in PI7.1.
    Regards,
    Rajeev Gupta

  • Should i use Business system or Business service for a 3rd party file sys?

    Hi Gurus
    My requirement is to send a file from 3rd party client system to SAP ECC system.
    I want to confugure a file sender CC to pickup the file and send it to ECC system thru proxy.
    Now, after going thru the SAP definitions of 3rd party Business system (if the system is present the landscape and technical details are available) and Business service (if system's technical details is not available because it is not present in the landscape. Only the interface details are available, for ex: external webservice), i am not sure which one to use.
    What is the use of using a 3rd Business system instead of using business service in my current situation?
    In both the cases, i can use a file sender CC and pickup the file from a folder using FTP protocol.
    What is the criteria based on which i need to take this decision?
    And finally, how are the system name & host name details, which we given during 3rd party technical system definition in SLD useful?
    Many Thanks
    Chandra

    Hi Chandra
    Its always preferred to use Business service for communication with systems outside the landscape. As it does not refer to any SLD components and safe to use on internet etc.
    What is the use of using a 3rd Business system instead of using business service in my current situation?
    If you want to use 3rd party system you need to define party based communication and it acts as a party in production environment. You can also create a Standalone sytem in SLD for your use. Standalone technical system mostly refers to standalone Java applications in landscape.
    n both the cases, i can use a file sender CC and pickup the file from a folder using FTP protocol.
    What is the criteria based on which i need to take this decision?
    If your communication is party based and the 3rd party you refer is a party for ERP then it make sense to use a third party communication and use party name as well.By this i mean business wise. Else its always good to use Business service.
    And finally, how are the system name & host name details, which we given during 3rd party technical system definition in SLD useful?
    To use this third party system you need to register products on TS else you will not be able to see any Interface etc while configuring in ID. you need to add all details to it in SLD.
    Thanks
    Gaurav

  • About ABAP Technical Systems and Business Systems

    Hi experts,
    I have an Integration scenary with XI and an R3 vía RFC. I've already created it in the development environment and when I'm going to transport to Consolidation and Production I find that the ABAP Business System related to the ABAP Technical System of the R3 have a different name from the development one.
    In the Integration Repository everything its OK because my scenario is developped on a third party system BS and TS. The problem is in the Directory because of the BS of the Message interfaces....
    I think that transport Directory  scenario with .tpt wont work. I'll probably have to develop it in each environment... What do you think?
    Regards
    Gonzalo

    This is what you need to do to move from Dev to QA.
    1. Go to Dev SLD and Export all your SWCV, Products, Technical and Business Systems. This is nothing but saving of the SLD objects as a CIM file on your local machine. You would also need to export the Technical And Business System poitning to your XI integration server .
    2. Go to the QA SLD and then import these objects exported in Step 1 in QA SLD
    3. Now, create the QA Tech and Business Systems in the QA SLD
    4. Go to the Dev Business systems imported on the QS SLD and you will have an option Transport Targets. In this map the Source Business System to the Target Business Systems.
    Make sure that all Dev Business Systems have the correspodning Transport Targets for the QA Business SYstems
    5. Now if you import the ID  objects in QA , the business systems name will be renamed automatically.
    Regards
    Bhavesh

  • How to make an entry in transport tab of business system in SLD

    Hi gurus,
    In PI, in SLD we maintain Business systems. In this business sytem if we go to have a detail look there is a Transport tab.
    What is this used for and how to make an entry here.
    I'm a basis person and i'm configuring XI for the first time. Kindly help.
    Regards,
    Priya

    1. Yes , you have to maintain target business system for the EACH BS in PROD system.
    2. Normally we do have 2 different sld one is explictly for production system. another one is for dev and QA system. Once u done creating all the systems needed for the project. we will copy all business from the dev server to production server. So production server will have all BS from Dev and  BS of production server.
    3. i am not sure about this. i dont have particular docuemnts . normally we assign target business system in transport tab. and in Intergration Directory we will export the business system from DEV and and import the business system in production system.
    Regards,
    Balaji
    Edited by: Balaji Pichaimuthu on May 19, 2010 9:06 AM

  • Unable to Define Business System in SLD.

    Hi All,
    We configured SLD host on EPDEV system (EP System based on Only Web as Java).
    We have diffrent system for PI. At the time of PI installation I mentioned SLD Host as EP system.
    In PI am facing some problem while executing SLDCHECK, output as "No Business System defined for PI Technical system"
    In EP SLD HOST, By using wizard I am trying to add PI as a technical system, In in first step, I selected Web as ABAP, after that next two steps its ok, In Installed product step, I added installed pucts and saved then it giving me error of "CIM_ERROR_ALREADY_EXISTS".
    Then I canceled the wizard and came on main screen, I found two technical systems for PI SID as below.
    1. PI Web as ABAP
    2. PI Web as Java
    I checked the installed products for both PI Technical Systems then I found,
    1. PI Web as ABAP there is no installed product and when I tried to add new Installed product then itu2019s again showing the same CIM_ERROR.
    2. PI Web as Java its showing all installed products for Java, so I am able to create business system for this technical system.
    But I am unable to create busyness system for PI Web as ABAP system because no installed products in the list.
    So can you please tell me how to resolve this problem. I tried to delete all PI technical systems and recreate ones again. It gets delete but at the time of recreation again the same CIM error I am getting.
    Is this problem because of my EP is only based on Java??
    Can I switch SLD HOST to my PI system as this is ABAP+JAVA? If possible its no big problem for me because its new implementation and only PI DEV and EP DEV two systems are there in this SLD group.
    Please reply with your good experience skills.
    Regards,
    Jay

    So can you please tell me how to resolve this problem. I tried to delete all PI technical systems and recreate ones again. It gets delete but at the time of recreation again the same CIM error I am getting.
    Is this problem because of my EP is only based on Java?? 
    You need to import SLD with latest cimsap & cr content to reflect ABAP & JAva systems provided by SAP....
    Can I switch SLD HOST to my PI system as this is ABAP+JAVA? If possible its no big problem for me because its new implementation and only PI DEV and EP DEV two systems are there in this SLD group. 
    You can have SLD on EP or XI.. Technically it donse't matter. But as PI relies heavily on SLD, i would recommend the SLD to be moved to PI & EP sytem pointing to PI-SLD..
    How to repoint SLD... Check SLD Installation guides...
    -Siva Maranani

  • No interfaces listed for ECC Business System in PI 7.1 for intrf. Detrm

    Hi all,
    I have come across this situation earlier, did some settings in SLD ..tech system...(Don rembr it nw....)
    I am not able to see the list of interfaces for an ECC Bus.System during Interface determination,
    I manually have to key in the name of the BAPI instead of the values appearing in the value list....
    I am sure that the is something missing while havin created the BS and TS in the SLD,
    Can someone guide me what my approach would be.
    Replies much appreciated. Thanks

    Hi
    Please assign the software component(Product) in which you have imported your BAPI in IR to your
    Business System in SLD.
    Then you can see all the interfaces of that software component in your Business System(ECC) in ID.
    So just add the software component to your Business System in SLD then you can get the interface in
    ID.
    Check the following link for the same issue.
    Re: No interface Idoc in Business system Receiver
    Thanks
    Prasad Nemalikanti

  • ABAP proxy client call PI with new client 120 in old business system

    Hi all
    We have a requirement to call PI from ABAP client proxy in synchronous mode via a CRM client 120.
    CRM client 100 is already configured in the Business system talked above but now we need the same business system to be configured for client 120 as well.
    My question is If we go to the SLD and
    |-> Click on Business System
    |-> Add new client 120
    Will it work or we need to do some extra configuration for communication channel.
    Also please let me know how to configure Integration Directory for sender agreement, Receiver Agreement and the communication channel.
    Thanks in Advance.

    Hi Naina ,
    We have a requirement to call PI from ABAP client proxy in synchronous mode via a CRM client 120.
    CRM client 100 is already configured in the Business system talked above but now we need the same business system to be configured for client 120 as well.
    My question is If we go to the SLD and
    |-> Click on Business System
    |-> Add new client 120
    > hope the technical entry of CRM is already in SLD . So you just need to make a business system entry . point the business sytem to the technical system entry with the right client here 120 .
    Will it work or we need to do some extra configuration for communication channel.
    > since sender is client proxy you don't need to do anything in case of receiver proxy you will be needing reciver communication channel of XI adapter type .
    for proxy based communication your application system(other than PI/XI) should be able to make a proxy call to XI or receive a call from XI .for this purpose you need to make some settings at R/3( or CRM level)
    For this check blog  : /people/vijaya.kumari2/blog/2006/01/26/how-do-you-activate-abap-proxies
    Abap proxies ( Client and Server proxies)
    Other steps i.e Interface determination/receiver determination are as usual .
    Regards ,

  • Connect one Business system with two Integration Server

    Hello,
    Can we able to connect one Business System with two Integration Server?
    I have one Business system (ECC 6.0 with the client 900) and it is already connected with PI 7.0 system.Can I able to connect the same sytem (with same client) with PI7.1?
    I want to do the HTTP Connection for ABAP Proxy for this two XI system with one business Sytem ?
    Is this possible ?Is there any work around solution there?
    Thanks.

    Hello ,
    This document describes about connecting with Two PI7.1 system using Application Server 7.1 and Application Server 7.0 SP14  .
    I want to connect same ECC system via abap proxy with two different PI system .One is PI7.0 and another one is PI7.1 system.
    Is this possible if i use Application Server 7.1 or Application Server 7.0 SP14  ?
    Thanks.
    Lakshmi
    Edited by: Muthulakshmi Pandi on Apr 16, 2009 11:48 PM
    Edited by: Muthulakshmi Pandi on Apr 17, 2009 12:21 AM

  • Configure Role of Business System " as Central Integration Server , PI

    Hi Experts,
    I am running transaction code IDX5 in my xi system it is showing as "system is not a central integration server unable to start the program ".In SXMB_ADM role of business system need to configured .If we need to configure how to do this .
    Regards
    Praveen

    Hi Praveen,
    For configuration of integration server please go to SXMB_ADM>In configuration choose Integration engine configuration->And add one runtime parameter IS_URL...and specify the role  of business system as  Integration server and specify the corresponding Integration server i.e dest://httpdestination. This destination is RFC destination that should be created in PI sytem of type 'H 'which contains the target host as host name of PI system and path prefix as  '/sap/xi/engine?type=entry'.
    Thanks & Regards,
    Priyanka Anagani

Maybe you are looking for

  • Bridge Freezes While Running Firefox

    Has any one else experienced the same problem? Bridge CS3 will freeze up if Firefox 3.0.15 is running at the same time. It seems to me that Firefox conflicts significantly with Adobe CS3 such as Bridge and Photoshop. If I force quit Firefox, Bridge a

  • Performance problem in XI

    We are getting very slow response in XI production server. We are running XI version 3.0 on oracle database version 9.2.0.5.0. HP-Unix version 11 is the platform of our operating system. In this system, we have 8GB RAM. Even when no users are logon t

  • How can i download the Gotham font family fort AI?

    How can i download the Gotham font family fort AI? I can not find Gotham in the Font Styles.

  • Scaled data output from AI Read floats to maximum after switching relay

    Relay turns off motor. Sensor data read from MAX remains normal, same data read with AI READ jumps to negative value then floats to maximum value over >10 seconds. I am using LabVIEW 7.1 with an SCXI-1000. Re-running AI Config and AI Start resets the

  • ORA 01840 SELECT INTO

    HI, Would someone please look at this code? For all the changes I made it still returns the same error above. If I can not use the TYPE TABLE ... would be great. The select statement is going return several values with the same date (sysdate-1). I am