Assembly Indicator in BOM Level

hi,
can any one let me known any function module to get the list of all materials at BOM
i,e if i give a material number i should get all the material including the assembly for materials.
or let me known where the assembly indicator will stored at table level
i have seen CS_BOM_EXPL_MAT_V2 function module which give all levels of the materials and gives the assembled
material also but
My requirement is for given date range, plant and material i should get materials including assemblies with the total quantity used  in that  given date range.
Regards,
R K.
Edited by: R K on Aug 12, 2010 2:17 PM

hi,
Thank you very much for effort in helping me on the issue,
I have already seen all the table in the list previously.
i closed the issue, using the fm CS_BOM_EXPL_MAT_V2 
after using the above fm we will get all the assembly materials
into table MATCAT and passed all those materials and date range to S026 table which gives
quantity day wise, collected those quantities material wise into another final table .
Regards,
R K

Similar Messages

  • Copying assembly indicator in BOM

    hI ,
    i AM COPYING A bom FROM ONE plant to other plant ..In first plant item is a sub-assembly with assemby indicator. When i am copying to other plant this indicator is not copying. Because of which i couldn't able to see its components.
    Regards
    Patnaik

    Patnaik,
    BOM Copy happens at single level only. When you are copying the BOM from one plant to another only the Header material BOM gets copied. You need to create/Copy the subassembly BOM for the new plant. Once this is done system would automatically activate the "Assembly Indicator" in the header level bom for subassembly components.
    Regards,
    Prasobh

  • Assembly indicator in BOM doesnu2019t consider BOM Usage

    In a business scenario we are using two types of BOM 1. Production BOM & 2. Engineering BOM.
    Letu2019s say for Material 'A' there is an engineering BOM & it consists of two components say 'B' & 'C'.
    Material 'C' has its own BOM but with usage "Production".
    Still in transaction CS03, when we display Engineering BOM (Usage: 2) for Material A.
    Assembly indicator for material 'C' is active though there is no engineering BOM for material 'C'.
    Is there is any condition for checking BOM usage for assembly indicator? Or what can be the solution to take into consider BOM usage.
    PP gurus please help.
    Many thanks in advance.

    Hi Sumedha
    BOM usage defines the area (such as engineering/design or production) where a BOM can be used.
    when ur material A is having C as component and C is having its own bom so it will show that in the system. bom usage is only for using the bom in diffrent area
    if u have an engineering/design BOM and if u want to use that in production that time it will give an error
    or massage that BOM usage is not as per requriement
    hope u got it
    regards
    Sachin

  • Table for Assembly indicator checkbox in BOM

    Please inform me about Table for Assembly indicator checkbox in BOM
    Field name--- STLKZ.
    If table is not there then how to find if this field is checked or Not checked  in development program

    Dear Mayuresh,
    There is no table where in you can get this information which has got an assembly of its won.
    Either you can use CS11,CS12 or CS13 for limited level explosion or else to identify for which
    components an assembly exists for itself.
    Or else at Functional module level.
    Regards
    Mangalraj.S

  • If a material reports to two higher level assemblies in the BOM /Is there a

    Hi, 
    If a material reports to two higher level assemblies in the BOM would creates two planned orders for it. Each of the orders has a different date?
    For example
    Z is final assembly
    In that Y is one assembly in that says X1material in level 2
    And the again same material X1 is reporting to Y in levels 5 so here my question is it would create two planned order with different dates?
    And
    Is there any report to see confirmed time to say machine time / labor time or shall we go for report.
    Thx....Srini

    Srini,
    CS15 can be usefull to check the usage of component in assemblies.
    if its used then more then once it can be easily located through this report.
    another concern what you expressed is not clear.
    But what i understand is same component is used at level 2 and level 4 of a BOM.
    assumption from the word levels is , X is used in  level 2 its used directly in BOM of Y and Y have some differnt component G which inturn again have X in it .
    so at both this levels if the dependent requirement is different, you can get 2 differnet orders use individual /collective indicvator for this material as individual .
    If your concern is for BOM position (Item Number) field in BOM then system will create a single plan order even if you set it for individual requirement in material master.here some work around can be possible by maintaining lead time offset IN BOM in item detail screen.
    check and come back
    Hope it helps you
    Regards
    Ritesh

  • How to find 'Assembly' indicator in a BOM explosion FM

    Hi experts,
    I need a function module to explode BOM for Materials which are having checked by Assebmly indicator.
    I tried fm : CS_BOM_EXPL_MAT_V2. But i didnt find a field for this indicator.
    Can any of you tell me how to find weather 'Assembly' indicator of a material is checked, using a FM. 
    Please !
    Thanx.
    Matt.

    Hi,
    U can find it in another way by using Table MARC,
    if the value of SOBSL field is 50 in MARC then its an assembly.
    Hope it helps!!
    Regards,
    Pavan

  • Operation Pull supply type at Item/BOM level is defaulted to Assembly Pull in WIP

    Hi All,
    I have an Item for which supply type is operation pull at item and BOM level, However when I create a WIP job and use this item its supply type is defaulting as Assembly Pull.
    Could you please helpe me on this.
    Regards,

    Sandeep Gandhi, Independent Consultant wrote:
    It takes the supply type from the org item record.
    Can you double check the supply type on org item?I am also seeing the same behaviour..
    I did check at item level too..
    Please advise
    Thanks
    Mahendra

  • BOM assembly indicator

    Dear Gurus
    Please tell me, In which table I can find assembly indicator with related to a BOM.
    Thanks & Best Regards
    Charith

    Hi Rupesh,
    Use FM  CS_BOM_EXPL_MAT_V2 with input as given below.
    CAPID - PP01
    DATUV -System date
    EMENG - Quantity as 1
    MKTLS = X
    MEHRS = X
    MTNRV = Parent Material Number
    SVWVO = X
    WERKS = Plant
    From the output internal table STB get the Field XTLTY. If XTLTY = M, then consider that as Assembly. Apart from this you can also use the Internal table MATCAT. All the Materials MATNR in this table MATCAT are nothing but assemblies.
    Hope its clear.
    Thanks & Regards,
    Ramagiri

  • Supply Area-BOM Level by Level

    Hi Folks,
    I am having a problem in fetching the Supply area when a Component is having many sub-assemblies.
    To be in detail,
    I am fetching the  DISTINCT Production Order(AUFNR) from MSEG w.r.t to MBLNR and MJAHR.
    Then w.r.t to this AUFNR I am fetching the BOM category(STLTY) and BOM (STLNR).
    Then w.r.to this STLTY and STLNR I am fetching the Supply area(PRVBE).
    If the supply area is maintained at this level,then fine.If this BOM is having many sub-Assemblies and the supply area is maintained at a different level then we need to explode that BOM step by step and fetch the Supply Area.
    To be precise CS11 gives the Supply Area according to the BOM Level by Level.I just wanna fetch the Supply Area as per that.Do anyone here has an idea about how this functionality can be achieved.
    I am trying to find by debugging CS11,any valuable inputs from experts here will be helpful.
    Thanks,
    K.Kiran.

    Prabhu,
    CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
              EXPORTING
                    CAPID                        = 'PI01'
                    DATUV                       =  v_aufld
                    MKTLS                       = 'X'
                    MEHRS                      = 'X'
                    MTNRV                      = wa_afko-plnbez
                    STLAL                       = wa_afko-stlal
                    STLAN                       = wa_afko-stlan
                    STPST                       =  0
                    SVWVO                     = 'X'
                    WERKS                     = wa_afko-werks
                    VRSVO                      = 'X'
                TABLES
                      stb                           = bom_exp
                EXCEPTIONS
                       ALT_NOT_FOUND               = 1
                       CALL_INVALID                    = 2
                       MATERIAL_NOT_FOUND     = 3
                       MISSING_AUTHORIZATION  = 4
                       NO_BOM_FOUND                = 5
                       NO_PLANT_DATA                = 6
                       NO_SUITABLE_BOM_FOUND      = 7
                       CONVERSION_ERROR               = 8
                       OTHERS                                     = 9.
    Got it.We missed out DATUV,MEHRS fields while executing.
    Thanks,
    K.Kiran.

  • Table field for Assembly indicator

    Hi,
    What is the table in which the assembly indicator (BOM) is getting stored?
    Regards,
    Charumathi.B

    Hi,
    Check table STPO and field is STKKZ.
    You can check out this link for BOM related tables-
    http://www.sap-basis-abap.com/sappp007.htm
    Regards,
    Sujit

  • Stock at BOM level

    Dear all ,
    I have a bOm for FG containing 45 components , can i check the stock at all BOM levels in SAP ?
    Creating Varient and getting stock in MB52 is ok but every time for new assembly i can not create varient .
    Whr can i get Stock at BOM level ?
    Regards

    hi
    i don't think so we have this option,
    better way is go with your idea
    -ashok

  • Profitability Reporting at Package (BOM) level

    How do other companies address this issue:
    We sell product solutions (packages) consisting of one or more components and for logistics purposes need to process at component level in sales order, delivery, material doc etc.  However from a finance, marketing and customer perspective the product being sold is the sum of the components and so we want to measure profitability at this level.  However costs get posted to FI accounting documents at component level whilst revenue is posted at BOM level.  The package is entered as a BOM in the sales order and are normally fixed components e.g. as below:
                                                       Revenue      Cost
    Package:       DT100                     2000
    Component:     A100                                        100
                            B200                                           50
                            C300                                           50
    Profit= 2000-(1005050) = 1800
    Ideally I need to get a posting that shows the related product package for the component cost otherwise I have to do clever reporting to look back to original sales documents to find related product package to link component costs to.  Does CO-PA assist here or can I just do it in FI accounting in some way.  I also considered using the product hierarchy i.e. the product hierarchy for both component (cost) and product package (revenue) is the product hierarchy for the product package.
    Much appreciate any insights. 
    Happy Xmas and best wishes for New Year

    Have u defined item description in foreign langauge in item master data ?
    Edited by: Jeyakanthan A on Jun 18, 2009 12:50 PM

  • Subcontracting multiple BoM levels for Project Stock

    Hi,
    We are an engineer / make-to-order manufacturer, so we use a lot of "individual" type materials (instead of collective).  We are trying to subcontract several BoM levels of work to different vendors, and we are seeing many false requirements.
    So we have something like this (this is all in project / wbs element stock):
    Make hereSubcontract Requisition
    Make hereRaw material
    Subcontract Purchase OrderMake here
    Raw material
    Raw material
    Make hereRaw material
    The subcontracting items are driving additional false MRP requirements (planned orders and purchase requisitions) for all the raw materials under them.
    I figured out how to fix the subcontract on level 3 by transferring the HALB material from project stock to unrestricted stock (411Q), then transferring it to subcontract stock (541) (Is there a better way to do this?  Now I can't see my project-specific stock line for that item).  But, while that purchase order is still open, there's nothing I can transfer to make the extra, false requirements disappear.  Also, I am getting an MRP exception telling me to cancel the PO because it doesn't see the dependent requirement for the subcontract requisition above it.
    Does this question make sense?  How can we fix it?  I need to get that subcontract requisition to see that its material will come from the subcontract purchase order.
    Thanks!
    Timothy

    Hi All,
    Any thoughts or ideas?
    Thanks very much,
    Timothy

  • Can 119 phantom asslys at one bom level  create problem in product costing

    I am going through a scenario where there r 119 phantom assemlies at one bom level. Can this create problem in product costing? It has been told to me by somebody that there can not be more than 99 phantom asslys at one level of bom? Is that true? My problem is that when i am doing product costing it is showing error-" too many dummies at bom level". Is this related to no. of phantom asslys at one bom level?

    HI bala,
    all the materials are costing relevent. I thik this problem is releteted with no. of phantom assemlies allowed at one bom level.
    I had 119 phantom assemlies at bom level 3 of a varient material. At that time it gives me abap runtime error during product costing.
    Now I have removed special procurment key 50 from material master of 20 number of phantom asslys. so now there r now 99 phantom assemlies at bom level 3.
    I have taken costing run and its not giving error.
    so i reached to conclusion that statndard limit of no. of phantom assemlies at one bom level can not exeed 99.
    Now customer requires 119 phantom assleys at this level 3 of bom.
    So can u suggest me whether i should contact sap to increase this limit for this perticular case?
    will they solve my problem or there is any other solution to this?
    please reply.
    nitin

  • Fixing indicator for BOM explosion marked by default

    Hello Experts,
    I'm in a repetitive manufacturing scenario and I want to know if it is possible to generate planned orders with Fixing indicator for BOM explosion marked by default. Does anybody know if it can be done??

    Hello Laura
    As far as I know, this is not possible to do using customizing, however, you can do that using BAdI
    MD_PLDORD_CHANGE.
    Check the following document for more details about the BAdIs available for MRP:
    BAdIs for MRP
    BR
    Caetano

Maybe you are looking for