Asset Creation Error
Dear All,
I have done the entire customization for Asset Accounting. Now when I try to create an asset using T-Code: AS01 I get an error saying " Data for asset view 1 is missing "
The Error further says as follows:
Data for asset view 1 is missing
Message no. AISBAUFBAU000
Diagnosis
Data inconsistency
Depreciation area 30 exists in company code NDPL. However, authorizations are not maintained for asset view 1 in the chart of depreciation of this company code for depreciation area 30.
Can anyone please help me in solving this error. Awaiting for valuable inputs.
Regards,
Amit
Hi All,
I figured the problem. Actually we had copied the client and had to activate the authorization using TCode: ANSICHT
Regards,
Amit
Similar Messages
-
Hi All
I have a requirement to start a workflow when an asset is created. I am using BUS1022. I have created and activated the linkage.
The entry in SWED exists for change doc: ANLA and the table ANLA
I have created a similar entry in SWEC for the event CREATED.
When i create an asset, the event does get triggered but there is an error., In SWEL it shows up as
Check FM with exception.
Receiver type :TS00001003
Message: Element FLAG_ANLAGE_BEARB is not available in the container
Check FM: AWFC_CHECK_ASSET_INCOMPLETE
Now I Have created the above mentioned element in my workflow and passed it the values in binding.
Where do i have to define this parameter? It is required in the parameters of the event---.
Thank youHi,
I am using other workflows like PR, PO, SO and too many WF templates, for those workflows also the event trace is not getting. But the workflows are getting triggered with out any problem.
Steps for event trace is SWELS for switch on the event trace and then executing the transaction (AS01) then after I am checking the event trace by using SWEL.
Can you pls advise the proper way for getting event trace, if I am not using the proper way.
Can any body explain the process for Asset creation.
Is there any equipment needs to be created before of after of Asset creation. I thougt, depends on this the CREATED event get triggers.
Thanks in adv.
Krish. -
Plant & business area validation in asset creation
Dear All,
Am working in a plant & business area validation which will fire the error msg when wrong plant is assigned at time of asset creation. Issue is for a company we have 19 business area and each business area assigned to various plant. In order to avoid the individual step for each business area, have merged two or more business area in pre-requiste section and correspondingly plant had been validated in check section. But when am inserting two check conditions, its not even working as per the logic, For ex :
Pre-Requiste :
( ANLA-BUKRS = '1300' AND ANLZ-GSBER = '1101' ) AND (
ANLA-BUKRS = '1300' AND ANLZ-GSBER = '1102' )
Check :
( ANLZ-WERKS = '1307' OR ANLZ-WERKS = '1308' OR ANLZ-WERKS = '1309' OR ANLZ-WERKS = '1304' ) AND
( ANLZ-WERKS = '1305' OR ANLZ-WERKS = '1306' ANLZ-WERKS = '1344' )
For the above condition system not validating as per business area since if we entering business area 1101 and entering the plant which related to 1102 business area, system not throwing the error msg where as if we put a single condition in a step its working fine.
Kindly suggest me how to overcome this by avoiding individual step creation for each business area.
Regards,
Balaji.cHi,
I have chnaged my validation in the following way as follows,
Pre-requiste :
Co code=XXXX
Check:
Business area = XXXX AND Plant = XXXX.
This condition is working fne for one business area, where as if i include more than one business area in the check section system not validating the condition, in a step its validating only one condition. Since 21 business area available for a co code its not feasible to create individual step.
Kindly suggest me is there any other alternative way to overcome this.
Regards,
Balaji.c -
Download Helper Screen Capture worked to capture video if the default "no audio" option is active. But, no audio. The "speakers" or "microphone" audio options are confusing....the audio to be captured is from the video, so what do you choose? With either "speakers" or "microphone" selected, the captured file has poor audio and no video. Re-capture efforts (speakers) get "Invalid capture file error" and "File Creation error- Unable to rename/copy audio file"
The paid upgrade of "Converter" doesn't work.
Instructive documentation - not very good.
Suggestions - Need time delay between initiation of "Record" and starting the video to be recorded.
Could use timer tracking of the record process.
Are there operating system limitations? (Have Windows XP Pro)That is an issue for the developer of that Download Helper.
-
User Exit / Badi / BTE for Asset creation A ?
Hi Experts,
I need User Exit / BADI / BTE for asset Creation.
After saving newly created Asset from As01 we need to send a mail to the person for whom the Asset is assigned.
i have tried all this.But no one is triggering after saving the As01 transaction.
Exit Name Description
AAPM0001 Integration of asset accounting and plant maintenance
AFAR0003 External changeover method
AFAR0004 Determination of proportional values for retirement
AINT0004 Change amount posted for certain areas
AINT0005 Dummy for extended syntax check. Do not use.
AISA0001 Assign Inventory Number
AIST0001 Exchange number range in master data maintenance
AIST0002 Customer fields in asset master
AMSP0002 Determine relationship type for two company codes
TRAN0001 User exit for asset transfer
Please suggest if anybody worked on this.
regards,
ImranHi,
Check out the following posts pertaining to similar topic.
Change Asset Workflow
Asset Management WORKFLOW
Regards
Sreekanth -
User Exit/BADI for AS01 ( Asset Creation )
Hi Xperts,
My requirement is during asset creation in AS01, after asset generated i want to send asset no, subno, asset creation date, int. order no to ztable.
Can anyone suggest user exit/BADI which suit this requirement.
I have gone through forum search, but not found suitable object.
Ram.Hi Ram,
Check out below Badi and Enhancement
BADI
IHSA_LIST_EDITING
ENHANCEMRNT
EXIT_SAPLAAPM_002
EXIT_SAPLAIST_001
EXIT_SAPLAIST_002
EXIT_SAPLAIST_003
THANKS & REGARDS
G.Vendhan
Edited by: vendhan g on Jul 24, 2009 12:33 PM -
Automatic Asset creation through Project settlement
Dear All,
We have one issues where in AS02 AUC Asset quantity is in display mode still we can find the quantity there.
Can any body help me about the Process of Auto Asset creation through Project settlement.
I need to know how system calculate the Quantity from the Project settlement. if such type of Process exist in SAP
Thanks
Abhijeet
Edited by: Abhijeet Patil on Oct 5, 2011 3:05 PM
Edited by: Abhijeet Patil on Oct 5, 2011 3:05 PMHi,
There is process in SAP where we can create AuC from Projects. We need to have an investement profile set up and the same needs to be used in the project. You will have the details in SAP Help documnetation for this.
Regards
Sreekanth -
Service Contracts Billing Schedule Creation Error
Hi,
I have a requirement of creating service contracts from back-end for which I am using the oks_contracts_pub.create_contract_header, create_service_line, and create_bill_schedule. I am creating my contracts with active status and renewal type of EVN (Header level), FUL(Line Level). My contract is of type subscription. The contract header and line are creating fine but the Bill schedule API is throwing an UNEXPECTED ERROR. The billing schedules need to be created based on accounting rule which can be quarterly or monthly. I have included the bill schedule code (hard coded values) for review. Any help is greatly appreciated.
Also the version I am working on is R12
________________________________________________CODE___________________________________________________________________
CREATE OR REPLACE PROCEDURE BILLING_SCHEDULE AS
l_strm_level_tbl OKS_BILL_SCH.STREAMLVL_TBL;
v_bill_qtrs NUMBER := 0;
v_bill_mths NUMBER := 0;
v_bill_days NUMBER := 0;
v_net_amount NUMBER := 468;
v_acct_rule_name VARCHAR2(50) := 'QUARTERLY';
v_amt_per_day NUMBER;
x_error_locator VARCHAR2(2000);
v_start_date DATE := '04-MAY-2010';
v_end_date DATE := '25-MAY-2010';
x_return_status VARCHAr2(3);
x_msg_count NUMBER;
x_msg_data VARCHAR2(2000);
v_billing_sequence NUMBER;
x_chr_id NUMBER := 17000;
x_line_id NUMBER := 223248604345353294444923586786456728480;
g_day_uom VARCHAR2(10) := 'DAY';
g_month_uom VARCHAR2(10) := 'MTH';
g_quarter_uom VARCHAR2(10) := 'QTR';
v_amt NUMBER;
v_invoicing_rule_id NUMBER := -2;
BEGIN
--Create Billing Schedule based on accounting rule
okc_context.set_okc_org_context;
MO_GLOBAL.INIT('OKS');
MO_GLOBAL.SET_POLICY_CONTEXT('S', 83);
v_bill_qtrs := 0;
v_bill_days := 0;
v_bill_mths := 0;
SELECT NVL(v_net_amount, 0)/(v_end_date - v_start_date)
INTO v_amt_per_day
FROM dual;
dbms_output.put_line('Calculated amt per day ' || v_amt_per_day);
IF v_acct_rule_name LIKE '%QUARTERLY%' THEN
--Quarterly billing schedule
SELECT FLOOR(MONTHS_BETWEEN( v_end_date,
v_start_date)/3),
v_end_date - ADD_MONTHS(v_start_date, (FLOOR(MONTHS_BETWEEN(v_end_date, v_start_date)/3)*3))
INTO v_bill_qtrs,
v_bill_days
FROM dual;
dbms_output.put_line('Calculated the qtrs and days');
IF v_bill_qtrs > 0 THEN
SELECT (ADD_MONTHS(v_start_date, (FLOOR(MONTHS_BETWEEN(v_end_date, v_start_date)/3)*3)) - v_start_date)*v_amt_per_day
INTO v_amt
FROM dual;
dbms_output.put_line('Calculated qtr amt');
SELECT NVL(MAX(sequence_no), 0) + 1
INTO v_billing_sequence
FROM oks_stream_levels_b
WHERE dnz_chr_id = x_chr_id
AND cle_id = x_line_id;
--Populating the stream line variables
l_strm_level_tbl(v_billing_sequence).sequence_no := v_billing_sequence;
l_strm_level_tbl(v_billing_sequence).dnz_chr_id := x_chr_id;
-- l_strm_level_tbl(v_billing_sequence).id := x_line_id;
l_strm_level_tbl(v_billing_sequence).cle_id := x_line_id;
l_strm_level_tbl(v_billing_sequence).uom_code := g_quarter_uom;
l_strm_level_tbl(v_billing_sequence).uom_per_period := 1;
l_strm_level_tbl(v_billing_sequence).level_periods := v_bill_qtrs;
l_strm_level_tbl(v_billing_sequence).start_date := v_start_date;
l_strm_level_tbl(v_billing_sequence).end_date := v_end_date;
l_strm_level_tbl(v_billing_sequence).invoice_offset_days := NULL;
l_strm_level_tbl(v_billing_sequence).amount := v_amt/v_bill_qtrs;
l_strm_level_tbl(v_billing_sequence).level_amount := v_amt/v_bill_qtrs;
l_strm_level_tbl(v_billing_sequence).lines_detailed_yn := 'Y';
l_strm_level_tbl(v_billing_sequence).due_arr_yn := 'Y';
dbms_output.put_line('Before calling the Bill Sch API for QTR');
OKS_CONTRACTS_PUB.CREATE_BILL_SCHEDULE ( p_billing_sch=>'E',
p_strm_level_tbl=>l_strm_level_tbl,
p_invoice_rule_id=>v_invoicing_rule_id,
x_return_status=>x_return_status);
dbms_output.put_line('After calling the Bill Sch API for QTR');
IF x_return_status <> 'S' THEN
x_msg_count := 1;
dbms_output.put_line('Quarterly schedule creation error ' || x_msg_data);
---DBMS_TRANSACTION.ROLLBACK_SAVEPOINT('OKS_A');
-- RETURN;
END IF;
END IF;
IF v_bill_days > 0 THEN
SELECT NVL(MAX(sequence_no), 0) + 1
INTO v_billing_sequence
FROM oks_stream_levels_b
WHERE dnz_chr_id = x_chr_id
AND cle_id = x_line_id;
dbms_output.put_line('sequence '||v_billing_sequence);
--Populating the stream line variables
l_strm_level_tbl(v_billing_sequence).sequence_no := v_billing_sequence;
l_strm_level_tbl(v_billing_sequence).dnz_chr_id := x_chr_id;
--l_strm_level_tbl(v_billing_sequence).id := x_line_id;
l_strm_level_tbl(v_billing_sequence).cle_id := x_line_id;
l_strm_level_tbl(v_billing_sequence).uom_code := g_day_uom;
l_strm_level_tbl(v_billing_sequence).uom_per_period := v_bill_days;
l_strm_level_tbl(v_billing_sequence).level_periods := 1;
l_strm_level_tbl(v_billing_sequence).start_date := v_start_date;
l_strm_level_tbl(v_billing_sequence).end_date := v_end_date;
l_strm_level_tbl(v_billing_sequence).invoice_offset_days := NULL;
l_strm_level_tbl(v_billing_sequence).amount := v_net_amount;--v_amt_per_day*v_bill_days;
l_strm_level_tbl(v_billing_sequence).level_amount := v_net_amount;--v_amt_per_day*v_bill_days;
l_strm_level_tbl(v_billing_sequence).lines_detailed_yn := 'Y';
l_strm_level_tbl(v_billing_sequence).due_arr_yn := 'Y';
dbms_output.put_line('Before calling the Bill Sch API for QTR days');
OKS_CONTRACTS_PUB.CREATE_BILL_SCHEDULE ( p_billing_sch=>'E',
p_strm_level_tbl=>l_strm_level_tbl,
p_invoice_rule_id=>v_invoicing_rule_id,
x_return_status=>x_return_status);
dbms_output.put_line('After calling the Bill Sch API for QTR days ' || v_bill_days || ' ' || x_return_status);
IF x_return_status <> 'S' THEN
x_msg_count := 1;
dbms_output.put_line('Day schedule, for quarterly accounting rule, creation error ' || x_msg_data);
--DBMS_TRANSACTION.ROLLBACK_SAVEPOINT('OKS_A');
--RETURN;
END IF;
END IF;
ELSE
--Monthly billing schedule
SELECT FLOOR(MONTHS_BETWEEN( v_end_date,
v_start_date)),
v_end_date - ADD_MONTHS(v_start_date, FLOOR(MONTHS_BETWEEN(v_end_date, v_start_date)))
INTO v_bill_mths,
v_bill_days
FROM dual;
dbms_output.put_line('Calculated the mths and days');
IF v_bill_mths > 0 THEN
SELECT (ADD_MONTHS(v_start_date,FLOOR(MONTHS_BETWEEN(v_end_date, v_start_date))) - v_start_date)*v_amt_per_day
INTO v_amt
FROM dual;
dbms_output.put_line('Calculated the mths amt');
SELECT NVL(MAX(sequence_no), 0) + 1
INTO v_billing_sequence
FROM oks_stream_levels_b
WHERE dnz_chr_id = x_chr_id
AND cle_id = x_line_id;
--Populating the stream line variables
l_strm_level_tbl(v_billing_sequence).sequence_no := v_billing_sequence;
l_strm_level_tbl(v_billing_sequence).dnz_chr_id := x_chr_id;
--l_strm_level_tbl(v_billing_sequence).id := x_line_id;
l_strm_level_tbl(v_billing_sequence).cle_id := x_line_id;
l_strm_level_tbl(v_billing_sequence).uom_code := g_month_uom;
l_strm_level_tbl(v_billing_sequence).uom_per_period := 1;
l_strm_level_tbl(v_billing_sequence).level_periods := v_bill_mths;
l_strm_level_tbl(v_billing_sequence).start_date := v_start_date;
l_strm_level_tbl(v_billing_sequence).end_date := v_end_date;
l_strm_level_tbl(v_billing_sequence).invoice_offset_days := NULL;
l_strm_level_tbl(v_billing_sequence).amount := v_amt/v_bill_mths;
l_strm_level_tbl(v_billing_sequence).level_amount := v_amt/v_bill_mths;
l_strm_level_tbl(v_billing_sequence).lines_detailed_yn := 'Y';
l_strm_level_tbl(v_billing_sequence).due_arr_yn := 'Y';
dbms_output.put_line('Before calling the Bill Sch API for MTHS');
OKS_CONTRACTS_PUB.CREATE_BILL_SCHEDULE ( p_billing_sch=>'E',
p_strm_level_tbl=>l_strm_level_tbl,
p_invoice_rule_id=>v_invoicing_rule_id,
x_return_status=>x_return_status);
dbms_output.put_line('After calling the Bill Sch API for MTHS');
IF x_return_status <> 'S' THEN
x_msg_count := 1;
dbms_output.put_line('Monthly schedule creation error ' || x_msg_data);
--DBMS_TRANSACTION.ROLLBACK_SAVEPOINT('OKS_A');
--RETURN;
END IF;
END IF;
IF v_bill_days > 0 THEN
SELECT NVL(MAX(sequence_no), 0) + 1
INTO v_billing_sequence
FROM oks_stream_levels_b
WHERE dnz_chr_id = x_chr_id
AND cle_id = x_line_id;
--Populating the stream line variables
l_strm_level_tbl(v_billing_sequence).sequence_no := v_billing_sequence;
l_strm_level_tbl(v_billing_sequence).dnz_chr_id := x_chr_id;
--l_strm_level_tbl(v_billing_sequence).id := x_line_id;
l_strm_level_tbl(v_billing_sequence).cle_id := x_line_id;
l_strm_level_tbl(v_billing_sequence).uom_code := g_day_uom;
l_strm_level_tbl(v_billing_sequence).uom_per_period := v_bill_days;
l_strm_level_tbl(v_billing_sequence).level_periods := 1;
l_strm_level_tbl(v_billing_sequence).start_date := v_start_date;
l_strm_level_tbl(v_billing_sequence).end_date := v_end_date;
l_strm_level_tbl(v_billing_sequence).invoice_offset_days := NULL;
l_strm_level_tbl(v_billing_sequence).amount := v_amt_per_day*v_bill_days;
l_strm_level_tbl(v_billing_sequence).level_amount := v_amt_per_day*v_bill_days;
l_strm_level_tbl(v_billing_sequence).lines_detailed_yn := 'Y';
l_strm_level_tbl(v_billing_sequence).due_arr_yn := 'Y';
dbms_output.put_line('Before calling the Bill Sch API for MTH days');
OKS_CONTRACTS_PUB.CREATE_BILL_SCHEDULE ( p_billing_sch=>'E',
p_strm_level_tbl=>l_strm_level_tbl,
p_invoice_rule_id=>v_invoicing_rule_id,
x_return_status=>x_return_status);
dbms_output.put_line('After calling the Bill Sch API for MTH days');
IF x_return_status <> 'S' THEN
x_msg_count := 1;
dbms_output.put_line('Day schedule, for monthly accounting rule, creation error ' || x_msg_data);
--DBMS_TRANSACTION.ROLLBACK_SAVEPOINT('OKS_A');
--RETURN;
END IF;
END IF;
END IF;
COMMIT;
EXCEPTION
when others then
dbms_output.put_line('Error ' || sqlerrm);
END;
Thanks,
Yash.Hi There,
I have a similar requirement to create rental service contracts and create billing schedules.
Can you please pass on your functional docs so that i can refer to them.
Thanks,
Raidu -
Request creation error for mitigation control workflow
Dear Expert,
I had activiate the workflow from RAR to CUP on Mitigated User assignment, I had completed following customizing:
1)RAR->configaration->Workflow
2)CUP->configaration->initiator, stage, path.
but when I created mitigated user assignments in RAR, after click "Submit", error popup: "Request creation error"
can some one help?
thanks!Dear,
the log is below:
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 1:33:16 PM com.virsa.cc.common.SAPAdapter serverExceptionOccurred
INFO: Exception in Server YYY:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Thu May 20 13:33:16 CST 2010.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 3600 seconds.
Could not start server: Connect to SAP gateway failed
Connect parameters: TPNAME=YYY GWHOST=visoil01 GWSERV=SAPGW00
ERROR service 'SAPGW00' unknown
TIME Thu May 20 13:33:16 2010
RELEASE 701
COMPONENT NI (network interface)
VERSION 38
RC -3
MODULE niuxi.c
LINE 1732
DETAIL NiPGetServByName2: service 'SAPGW00' not found
SYSTEM CALL getservbyname_r
COUNTER 375
May 20, 2010 2:10:50 PM com.virsa.cc.workflow.bo.WorkflowBO submit
INFO: END POOINT URL: http://9.186.143.129:50100/AEWFRequestSubmissionService_5_2/Config1?style=document
May 20, 2010 2:10:50 PM com.virsa.cc.workflow.bo.WorkflowBO submit
INFO: before submit:
May 20, 2010 2:10:50 PM com.virsa.cc.workflow.bo.WorkflowBO submit
INFO: wftype: MITIOBJ reqid: GRC01
May 20, 2010 2:10:50 PM com.virsa.cc.rulearchitect.dao.dto.MitObjDTO getObjContext
FINEST: validfrom: 2010-05-20 validto: 2011-05-20
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: MITREFNO
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: MOMITREFNO
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: CT01
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: RISKID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: MORISKID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: ZC02
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: LANG
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: LANG
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: EN
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: MONITORID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: MONITORID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: GRC01
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: Integer
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: STATUS
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: MOSTATUS
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: 0
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: DATE
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: VALIDFROM
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: VALIDFROM
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: 05/20/2010
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: DATE
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: VALIDTO
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: VALIDTO
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: 05/20/2011
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: BU ID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: BUID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: null
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: Approver ID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: MOAPPROVERID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: null
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: OBJTYPE
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: OBJTYPE
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: U
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Data Type: String
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Descripton: OBJID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Name: OBJID
May 20, 2010 2:10:50 PM com.virsa.cc.xsys.aewf.SubmitAEWorkflow setProcessContext
INFO: Value: 207471
May 20, 2010 2:10:50 PM com.virsa.cc.workflow.bo.WorkflowBO submit
INFO: Return code: 2010 Message: com.virsa.ae.core.ObjectNotFoundException: Invalid Priority Value : MO_HIGH workflow id: null Status: null
May 20, 2010 2:10:50 PM com.virsa.cc.workflow.bo.WorkflowBO submit
WARNING: 2010: null -
Delivery Note to Subcontract creation error "Essential transfer parameters
Hi
I am facing issue in return delivey
Delivery Note to Subcontract creation error "Essential transfer parameters are missing in record:000001".
Could you please let me know the casue of this error and where exactly i can see error.
Regards
vikcyHi Vicky,
Check If the Customer number(Plant) has been maintained in the vendor master record control data and the vendor should also be maintained in the customer master data. Once you maintain this system determines the shipping point based on the customer master and the shipping data missing. Kindly try delivering after maintaining these and let me know If you need any more information on this.
Regards
Ram Pedarla -
Child creation Error on vms HELP
Hi,
Iam trying to execute a file from withing a java program on VMS This is my code
public class BAMBOE {
public static void main(String[] args) {
BamboeRunner boe = new BamboeRunner();
boe.start();
import java.io.*;
public class BamboeRunner extends Thread implements Runnable {
public void run() {
try {
Process process = Runtime.getRuntime().exec("@SIMPEL");
process.waitFor();
return ;
catch (Exception e) {
e.printStackTrace();
return ;
}But I keep getting the following error:
java.io.IOException: Child creation error: error 100052
VMS error code: error 100052
at java.lang.UNIXProcess.<init>(Compiled Code)
at java.lang.Runtime.exec(Compiled Code)
at java.lang.Runtime.exec(Compiled Code)
at BamboeRunner.run(Compiled Code)Anybody that can help me fix this problem please??I've managed to get somewhere with this...
I've got it to work by having the system command I want to run in a com file and specifying the full path to that file in the exec method without the '@'...
e.g.
Process proc = Runtime.getRuntime.exec("ppoi_dev:[user.dba_ppoi.matt.proc]proc.com");
where the file
ppoi_dev:[user.dba_ppoi.matt.proc]proc.com
contains
$ dir
When I run this I can get the output from the dir command by reading from the InputStream of the Process object.
Have fun. -
Hi all, i have tried to define a new VIP on my ORACLE 11gR2 RAC cluster, in order to manage third-party component by using ORACLE Clusterware.
I have used the info written on the ORACLE manual "Oracle Clusterware Administration and Deployment Guide E10717-04" at page 5-15.
I have executed the command "/u01/app/grid/bin/appvipcfg create -network=1 -ip=xx.xxx.xxx.140 -vipname=appsVIP -user=root", as the manual says, from root user.
My environment is AIX 6.1.
Unfortunately, i get an error (reported following) but i am not able to solve it.
Please, may you help me?
Thanks
Marco
CUSTOM VIP CREATION ERROR
[nodo01][]>/u01/app/grid/bin/appvipcfg create -network=1 -ip=xx.xxx.xxx.140 -vipname=appsVIP -user=root
Production Copyright 2007, 2008, Oracle.All rights reserved
2010-05-31 18:39:54: Creating Resource Type
2010-05-31 18:39:54: Executing cmd: /u01/app/grid/bin/crsctl add type app.appvip.type -basetype cluster_resource -file
/u01/app/grid/crs/template/appvip.type
2010-05-31 18:39:55: Create the Resource
2010-05-31 18:39:55: Executing cmd: /u01/app/grid/bin/crsctl add resource appsVIP -type app.appvip.type -attr
USR_ORA_VIP=xx.xxx.xxx.,START_DEPENDENCIES=hard(ora.net1.network)
pullup(ora.net1.network),STOP_DEPENDENCIES=hard(ora.net1.network),ACL='owner:root:rwx,pgrp:root:r-x,other::r--,user:root:r-x'
CRS-0247: User name or group name is invalid
CRS-4000: Command Add failed, or completed with errors.
Command return code of 1 (256) from command: /u01/app/grid/bin/crsctl add resource appsVIP -type app.appvip.type -attr
USR_ORA_VIP=xx.xxx.xxx.,START_DEPENDENCIES=hard(ora.net1.network)
pullup(ora.net1.network),STOP_DEPENDENCIES=hard(ora.net1.network),ACL='owner:root:rwx,pgrp:root:r-x,other::r--,user:root:r-x'
2010-05-31 18:39:56: ###### Begin Error Stack Trace ######
2010-05-31 18:39:56: Package File Line Calling
2010-05-31 18:39:56: --------------- -------------------- ---- ----------
2010-05-31 18:39:56: 1: crsconfig_lib crsconfig_lib.pm 7474 crsconfig_lib::error
2010-05-31 18:39:56: 2: main appvipcfg.pl 241 crsconfig_lib::system_cmd
2010-05-31 18:39:56: 3: main appvipcfg.pl 93 main::config
2010-05-31 18:39:56: 4: main appvipcfg.pl 74 main::process_arguments
2010-05-31 18:39:56: ####### End Error Stack Trace #####
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hi,
On Solaris 10 and Oracle Grid Infrastructure 11.2.0.2 did the following. Posting this as it might be useful to someone else. Installed Grid Infrastructure as oracle.
As root:
# ${GRID_HOME}/bin/appvipcfg create -network=1 -ip=<vip_address> -vipname=<vip_name> -user=root
In the above command, if you are wondering what -network=1 is, got useful info from "Oracle GoldenGate high availability using Oracle Clusterware" white paper at http://www.oracle.com/technetwork/middleware/goldengate/overview/ha-goldengate-whitepaper-128197.pdf
As per the white paper, if you do
crsctl status resource -p | egrep -i 'network|subnet' | egrep -i 'name|subnet'
output will look something like this:
NAME=ora.net1.network
USR_ORA_SUBNET=10.2.0.0
net1 in NAME indicates this is network 1, and second line indicates the subnet on which the vip will be created.
# ${GRID_HOME}/bin/crsctl setperm resource <vip_name> -u user:oracle:r-x
I did the following as oracle:
Oracle_Prompt> ${GRID_HOME}/bin/crsctl start resource <vip_name>
If you want to relocate this vip to other node in the cluster:
Oracle_Prompt> ${GRID_HOME}/bin/crsctl relocate resource <vip_name> -s <source_node> -n <target_node>
Hope this helps.
Thanks,
Moorthy.
帖子经 Moorthy Rekapalli编辑过 -
News creation error in Km Repository
hi,
There is a Km repository in portal Km content.
When I tried to create a news in its sub folders using the sap demo news template it gives an error 'creation error'.But I am able to create news with the same template in other folders in root.Please help me to solve this issue.
Thanks in advance,
jesmi.Hi Jesmi,
Create your contents under /root/documents. Contents created using XML forms builder can be saved only under /root/documents and not /root itself.
To access the repository, use Explorer menu under Content Management role. I believe that you are accessing it using KM Content menu under Content Admin role.
Hope it helps,
Shankar -
Hi!
I ran into the following problem when referencing the public parts of
an external j2ee library project stored in the NWDI. Specifically I would
like to reference an API part for having a correct build path during development.
Unfortunately I can create this reference but afterwards the NWDS tells
me that it requires to rebuild the ejb-jar.xml and the ejb-j2ee-engine.xml.
This automated refactoring leaves me with two 'empty' files, having all
my ejb definitions removed.
I tried to define new stateless ejbs by creating them via the context menu
and ran into the error 'Not able to create Session Bean'. In order to find out
what happened, I checked the .log file of the NWDS in my workspace folder
and found the following lines:
com.tssap.j2ee.ui.ejb.external.EjbCreationException: Creation error of EJB
at com.tssap.j2ee.ui.ejb.external.EjbFactory.createSessionBean(EjbFactory.java:304)
at com.tssap.j2ee.ui.ejb.external.EjbFactory.createSessionBean(EjbFactory.java:91)
at com.tssap.j2ee.ui.perspective.core.action.CreateEjbInPackageActionProvider$CreateStatelessSessionBeanInPackageAction.run(CreateEjbInPackageActionProvider.java:468)
at com.tssap.selena.model.extension.action.SelenaActionCollector$GenericElementActionWrapper.run(SelenaActionCollector.java:224)
at com.tssap.util.ui.menu.MenuFactory$MuSiAction.saveRunAction(MenuFactory.java:1425)
at com.tssap.util.ui.menu.MenuFactory$MuSiAction.run(MenuFactory.java:1407)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction.processInternal(MenuFactory.java:616)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction.access$100(MenuFactory.java:586)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction$BusyProcessWorker.run(MenuFactory.java:716)
at org.eclipse.swt.custom.BusyIndicator.showWhile(BusyIndicator.java:69)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction.process(MenuFactory.java:610)
at com.tssap.util.ui.menu.internal.MenuListenerFactory$ProcessAdapter.widgetSelected(MenuListenerFactory.java:172)
at org.eclipse.swt.widgets.TypedListener.handleEvent(TypedListener.java:89)
at org.eclipse.swt.widgets.EventTable.sendEvent(EventTable.java:81)
at org.eclipse.swt.widgets.Widget.sendEvent(Widget.java:840)
at org.eclipse.swt.widgets.Display.runDeferredEvents(Display.java:2022)
at org.eclipse.swt.widgets.Display.readAndDispatch(Display.java:1729)
at org.eclipse.ui.internal.Workbench.runEventLoop(Workbench.java:1402)
at org.eclipse.ui.internal.Workbench.run(Workbench.java:1385)
at com.tssap.util.startup.WBLauncher.run(WBLauncher.java:79)
at org.eclipse.core.internal.boot.InternalBootLoader.run(InternalBootLoader.java:858)
at org.eclipse.core.boot.BootLoader.run(BootLoader.java:461)
at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:39)
at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25)
at java.lang.reflect.Method.invoke(Method.java:324)
at com.sap.ide.eclipse.startup.Main.basicRun(Main.java:291)
at com.sap.ide.eclipse.startup.Main.run(Main.java:789)
at com.sap.ide.eclipse.startup.Main.main(Main.java:607)
Nested exception -
com.tssap.j2ee.model.J2eeCreateException: Creation error of EJB
at com.tssap.j2ee.model.ejb.impl.EjbProject.createSessionBean(EjbProject.java:155)
at com.tssap.j2ee.model.ejb.impl.EjbModule.createSessionBean(EjbModule.java:385)
at com.tssap.j2ee.ui.ejb.wizard.internal.CreationFactorySemanticAPI.createEJB(CreationFactorySemanticAPI.java:115)
at com.tssap.j2ee.ui.ejb.wizard.internal.CreationFactorySemanticAPI.createSessionBean(CreationFactorySemanticAPI.java:55)
at com.tssap.j2ee.ui.ejb.external.EjbFactory.createSessionBean(EjbFactory.java:301)
at com.tssap.j2ee.ui.ejb.external.EjbFactory.createSessionBean(EjbFactory.java:91)
at com.tssap.j2ee.ui.perspective.core.action.CreateEjbInPackageActionProvider$CreateStatelessSessionBeanInPackageAction.run(CreateEjbInPackageActionProvider.java:468)
at com.tssap.selena.model.extension.action.SelenaActionCollector$GenericElementActionWrapper.run(SelenaActionCollector.java:224)
at com.tssap.util.ui.menu.MenuFactory$MuSiAction.saveRunAction(MenuFactory.java:1425)
at com.tssap.util.ui.menu.MenuFactory$MuSiAction.run(MenuFactory.java:1407)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction.processInternal(MenuFactory.java:616)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction.access$100(MenuFactory.java:586)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction$BusyProcessWorker.run(MenuFactory.java:716)
at org.eclipse.swt.custom.BusyIndicator.showWhile(BusyIndicator.java:69)
at com.tssap.util.ui.menu.MenuFactory$DelegateAction.process(MenuFactory.java:610)
at com.tssap.util.ui.menu.internal.MenuListenerFactory$ProcessAdapter.widgetSelected(MenuListenerFactory.java:172)
at org.eclipse.swt.widgets.TypedListener.handleEvent(TypedListener.java:89)
at org.eclipse.swt.widgets.EventTable.sendEvent(EventTable.java:81)
at org.eclipse.swt.widgets.Widget.sendEvent(Widget.java:840)
at org.eclipse.swt.widgets.Display.runDeferredEvents(Display.java:2022)
at org.eclipse.swt.widgets.Display.readAndDispatch(Display.java:1729)
at org.eclipse.ui.internal.Workbench.runEventLoop(Workbench.java:1402)
at org.eclipse.ui.internal.Workbench.run(Workbench.java:1385)
at com.tssap.util.startup.WBLauncher.run(WBLauncher.java:79)
at org.eclipse.core.internal.boot.InternalBootLoader.run(InternalBootLoader.java:858)
at org.eclipse.core.boot.BootLoader.run(BootLoader.java:461)
at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:39)
at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25)
at java.lang.reflect.Method.invoke(Method.java:324)
at com.sap.ide.eclipse.startup.Main.basicRun(Main.java:291)
at com.sap.ide.eclipse.startup.Main.run(Main.java:789)
at com.sap.ide.eclipse.startup.Main.main(Main.java:607)
Does anyone has been confronted with such an error before and could give
me a hint about how to solve this problem.
Kind regards,
Christian KreutzfeldtI resolved the problem myself by creating a new library project where I added
the libraries stepwise until building the referencing project failed. The library
project contains the hibernate framework which includes a file named jboss-j2ee.jar.
In some way or another this conflicts with the NWDS which leads to failures
when updating the ejb-jar.xml and ejb-j2ee-engine.xml files. -
Thread creation error: Not enough storage is available to process this command
Two user in my company have this problem, I have already used the solution on the community but would come back after 2 to 3 weeks. They all have the message "Thread creation error: Not enough storage is available to process this command". I tried increase the virtual memory to 4Gb, update one client to the latest, reset IRPStackSize, delete temp folder. one client is 7.5.XX with windows 7 and another is 6.20.0.104 with Windows XP,My machine is also 6.20 with windows 7 but I dont have this problem.
Version previous to 7.6 worked fine. After update I have got this message and mostly of Skype GUI turns black or vanishes. No possibility of making more than one call before crash, It is amazing that a thread started about two weeks ago has no technical answer, at least. What do I do with my credits and my appointments? Throw them away?
Maybe you are looking for
-
Can anything be done to ensure/improve iCloud mail reliability in sending/receiving?
The tl;dr version of my question: is there anything I can do from an end-user perspective to improve the odds that my iCloud mail messages will be properly delivered to others, or incoming mail properly received by me? I like iCloud, but this is some
-
Unable to add new field in custom webadi
Dear Gurus, I need to add new column to the existing webadi.The existing custom webadi interface is based on a plsql package.I added the new argument to the plsql package procedure and also added the new attribute to the interface.When i try to test
-
How do I open PDF files on a website from my MacBook Air?
I get only a blank page when I click on a pdf file on a website. (I am able to open in Safari with a right click.) I downloaded the PDF Viewer, but it didn't help. I went to TOOLS to disable blocking extensions, but none were listed.
-
Web template changes are not saved.
Hello Experts, I making a small change to an existing Web Template namely changing the tab page 1 to tab page 2 and vice versa. I could see the message Changes are saved but at the end web template is same like as it was. Any idea why changes are no
-
How to insert a Carriage Return + Line Feed inside a TextView UI element ?
Hello All, Does anyone know how can I achieve the above scenario ? I have a string variable that collects and appeneds text messages from various BAPI calls. At the end of the process, the contents of this variable will be mapped to a textview. Pro