Hi all
During posting any asset document the short text of the g/l of the asset doesn't appear instead the number of the asset appears.
how can i make the short text of the asset g/l appears????????????????

Friend,
Have you checked FS00, fourth tab, left to right? There was lenguage text. If you really did this, please open an SAP Message to report error.
Regards

Similar Messages

  • Uploading Short Text Attachments to Assets

    Hi,
    I need to develop a script for batch uploading short text attachments to Assets in Oracle Applications. I googled and find there are a number of API recommended but I'm not sure which one is better/correct, need only 1 of them or a combination of some of them.
    So far I found these API mentioned in blogs and posts:
    1. FND_ATTACHED_DOCUMENTS_PKG.Insert_Row
    2. FND_DOCUMENTS_PKG.Insert_Row
    3. FND_DOCUMENTS_PKG.Insert_tl_row
    4. OE_FND_ATTACHMENTS_PUB.CREATE_SHORT_TEXT_DOCUMENT and OE_FND_ATTACHMENTS_PUB.ADD_ATTACHMENT
    Can anyone share their experience of using API to upload attachments? Thanks a lot!
    Best Regards,
    klai
    Edited by: klai on Apr 18, 2013 10:31 AM
    Edited by: klai on Apr 18, 2013 10:32 AM

    Hussein Sawwan wrote:
    Please see the following links.
    http://oracleappsengineering.blogspot.ca/2010/04/attachments-api-fnddocumentspkg.html
    http://oraclemaniac.com/2012/01/07/attach-concurrent-program-output-to-the-apps-transaction/
    http://garethroberts.blogspot.ca/2007/08/document-attachments-private-stuff.html
    http://imdjkoch.wordpress.com/2010/09/02/attachment-in-oracle-application/
    You may also Google those APIs for a sample code.
    Thanks,
    HusseinThanks Hussein,
    I modified the script from the first link and successfully upload the short text. I just have 1 more question:
    After the upload, the short text is in view only status. Is there any parameter in the script I can change so after the upload the text attachment can be edible?
    Many thanks!
    Regards.
    klai
    Updated:
    I solved it now. I set the x_usage_type to 'O' then I can edit the text. Thanks!
    Edited by: klai on Apr 18, 2013 2:26 PM

  • Fixed asset error: 21151: error while posting asset document: '100000039'

    Hello Experts,
    How are you? We have a client who have encountered an error during fixed asset retirement thru scrappingu2026.In one retirement document, SAP did not assign an account in the account column but still the document was saved but with erroru2026On her next retirement document, she could no longer save her document and the error points to the last retirement document she has saved with error.  We have tried to cancel the document and its journal entry but still she could no longer retire assets  using scrapping.  All other retirement transaction using scrapping could not be saved.
    The client is using SAP B1 8.81 patch 5. 
    Thanks and best regards,
    Luz

    hi Luz Cornejo,
    please do check this SAP Note: [1246921|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361706E6F7465735F6E756D6265723D3030303132343639323126]
    regards,
    Fidel

  • Service Entry Sheet Short text in GR accounting document

    Hi All,
    Once we Accept the Service Entry sheet then a material document will be created in background.What ever text we are assigning in SHORT TEXT (ESLL - KTEXT1) will automatically appearing in Material document in "WHERE" tab TEXT field.
    I think this is a standard functionality in ECC 6.0.
    Whereas in previous versions the short text in the ESSR - TXZ01 field will appear in material document.
    We are using ECC 6.0 but the text is not appearing in GR.. Hence please advice what are the things to check to resolve the same?
    Thanks & Regards,

    Hi,
    there was no new development in the release 600 in this concern.
    In case of service based inv. verif. (EKPO-LEBRE) used in the PO item  the short text of the service item (ESLL-KTEXT1) should appear in the material document.
    If this indicator (EKPO-LEBRE) is not set then the text from SES           
    header (ESSR-TXZ01) is transferred to all GR document items and            
    FI document items.                                                         
    In the case when in the PO item  EKPO-LEBRE is NOT set so the text from the entry sheet header should be transfered into the material document.                                                                               
    Regards,
    Edit

  • Asset number belongs to Goods receipt material Document Number

    Hi,
      I Created the Goods Receipt thru Internal Order, and i created the Goods receipt.
    After creation of asset, is there any way to retrieve the
    asset number belongs to Goods receipt material Document Number.
    Regards,
    Kiran.

    hi,
    use tcode ME2K
    A.

  • Make short text field in Purchase order creation only display..

    Sir,
    Yeah my requirement is quite unusual, but such is the situation.
    I want to make the short text field in purchase order creation "only disply". what is happening is that user while creating PO is able to change the text of material in short text column. I want to make it only for display.
    Can it done on document type level, since for service type, and Text type of account assignment cat, only text field is filled up. so how to do it.
    Please assist...
    Rahul

    Dear Rahul,
    If you want to have the short text display only for standard item but not service item, you may check below customizing.
    Transaction SPRO:
    MM-PUR-PO
    -> Define screen layout at document level
    Field Selection group: Basic Data, Item
    Field Selection Key:  PT0F Standard item purchase order
    Field: Short text -> set as display
    Hope this help.
    Ian Wong Loke Foong

  • Short Text/Material Description in PRs and POs

    Hi Freinds
    My client has a requirement that except for Item cat. D for all others the text feild should be greyed out and Material no. is mandatory. How to go about in customising.
    Regards

    First you need to define Z* doc type & in the Allowed Item Categories only allow "D".
    and create new field selection key and assign it to Z* doc type..
    and for  Standard Doc type in in the Allowed Item Categories remove "D", then Pls do as below
    Spro>Materials Management>Purchasing>Purchase Order>Define Document Types
    Here check the "Field Selection Key" against the PO doc type
    (ex: Standard NB doc type the "Field Selection Key" would be "NBF")
    Then go to
    Spro>Materials Management>Purchasing>Purchase Order>Define Screen Layout at Document Level
    Select the " Field Selection Key" of ur doc type..Just Double click on that
    then click on "Basic Data, Item", there you can see the "Short text" field..
    and make it Display.
    You need to use Z* doc type for Services , there you can enter short text.
    and for Standard the Short text will be in Display mode.

  • Asset history report for bunch of assets

    Hi,
    I have created an asset through the following steps
    Internal Order KO01
    Budgeting T Code KO22
    Release of Internal Order  KO02
    Creation of AUC  AS01
    Creation of PO  ME21N
    Now when I see the report AW01N for this asset, everything is available on the asset history sheet.  Likewise I need such a report where I can pull out for bunch of assets with the above history informtion like IO No, PO No etc against those assets.
    I have some 500 assets for which IO no and PO no I need against each asset.
    Please tell me the standard asset report for this.
    Regards,
    babjee

    Hi babjee,
    I think you have to use for this an internal order report (line item report?. On the internal orders all information is avaiable. I think this is the reason that you use internal orders!
    On the internal order you collect all the posting and the AUC is a cost collector for short term and when you settle it to the Final asset this is the endpoint.
    I don't have seen that the information  from KO22, KO02, ME21N are direct available in AW01N
    Paul

  • Short text in the PO

    HI,
    Is there any way to make short text uneditable in purchase order userwise? is there any setting in the spro?
    Thanks,
    Arati.

    Hi,
    If your main purpose is to restrict users in changing the material description, then you can do it through field selection key (Field label: Material description) for PO document type.  If you use tcode me21n for creation of PO, then do the setting for field selection key ME21N or if you want to control it using PO document type, then do it for the respective field selection key which is assigned to PO document type.
    Regards,

  • Material short text difference

    Hi Gurus,
    my client has created a Po having 2 line items with the same material no. (packing material)
    the short text of the material is differ for the one line item.the confusion is how it will happens coz.. the material code is same for the both line items.it should be the same.
    I checked in the item changes of the Po.. but no data is appearing regarding the short text changes
    please help me how to find out the route cause of the issue..
    regards
    subbu

    Hi,
    It is possible to change the Material Description while creating PO (ME21N), which will not get recorded as changes for that document. User might have changed during PO creation (in ME21N).
    Or check whether 2nd line item has been added later in PO, in change mode and check Material master changes in MM04. It might also happen that before adding 2nd line item in PO, somebody would have chnaged material description in MM02.

  • Best way to recreate all live assets in SAP and scrap current assets

    We have a situation where we have to recreate all  (15000) our assets as new assets. We will have to create new assets, provide new acquisition value and new useful life and start depreciating them from scratch. Also we will have to dispose all the current assets.
    What is the best way to accomplish this:-
    1)     I was thinking to write a BDC program for AS01 transaction to create new assets and in the text field, give a reference to old assets. 
    For Balances transfer, use transaction FB01 or F-91.
    *2)     Use BDC to map transaction AS91 and add in value there.  Although this is not transferring from legacy data but only in SAP. Will these current assets be considered as legacy data.   Is this transaction feasible to use.* 
    Also, what transaction can I use for mass asset data scrapping of current assets
    Thanks,
    Tanya
    Edited by: Tanya321 on Jul 6, 2009 7:33 PM

    Tanya,
    You can do a mass retirement of assets. Please check out this link.
    http://help.sap.com/saphelp_erp2004/helpdata/en/4f/71ece8448011d189f00000e81ddfac/content.htm
    For mass creation of assets you can use the LSMW tool.
    Regards,

  • Creation of short text and long text?

    Hi,
    We create short text by using oe_fnd_attachments_pub.create_short_text_document and oe_fnd_attachments_pub.add_attachment API and to create long text we use fnd_documents_pkg.insert_row .
    Why is it that we have different approaches for creation of short text and long text?
    I know that oe_fnd_attachments_pub.add_attachment is used to attach a short text to some entity,but then why we dont do the same for long text?
    Please lemme knw urgently ...
    Thanks and Regards
    Amar

    Thanks for the help,
    I looked into the document and i got to know few things as to how short and long text are created, but can u tell when the records are inserted into fnd_attached_documents, because i can see that records are inserted into fnd_attached_short_text and fnd_attached_long_text, fnd_documents but i dont see any insertion into fnd_attached_documents, can u lemme knw how and when it is done?

  • Restriction of Change in Short Text in PR

    Dear Expert,
    We are using single PR type for generation purchase requisition for material as well service.
    In this, while making PR for material user has to select material code; while for making service PR user has to write short text and they are assigning Service code in service tab.
    Now problem is, in material PR user is selecting material code and write material description (manually).
    We want to restrict manual description in short text for material PR.
    Thanks in Advance..
    With Warm Regards,
    Dipen Shroff

    Hi,
    With same Doc type, you can't achieve your purpose, better to create 2 separate doc type for this purpose though you use same number range for your purpose, Also I think there should be no limitation for this, As a consultant you have to convince your client as per the requirement, also it is standard practice to have different doc. types for material & service.
    Do the configuration in SPRO -> Material Management -> Purchasing - > Purchase requisition -> Define Screen layout for documents, Select the field section groups which are relevant to your document types.
    Select the relevant field selection group, go to the detailed button. double click on basic data, item. In the screen which pops out, you can make Material description as a display field
    You can find the PR Document types from the below path,
    SPRO->Material Management -> Purchasing - > Purchase requisition -> Define document types.

  • Transfer of Service master short text  from PR to PO

    Hi All,
    We have a scenario where we use Generic service number to order one time services. Based on the requirement we keep on changing the short text (description) of the service master in PO or Purchasing requisition. The issue is - Short text on generic service master is changed in PR but it is keep on reverting to original short text as in service master while converting PR to PO. . 
    For Example :
    Service master - Code - 100001 - Description - "Generic Corp Miscellaneous Services"
    I created a PR, included service no 100001 and changed the description of short text to - "Fixing tiles at foyer". Now when I converted PR to Purchase order service description should transfer to PO. But it is showing as 'Generic Corp Miscellaneous Services'. After investigation I found it is coming from the Contract that is linked with the PR as source of supply. And if I removed the Contract from the source of supply short text transfers from PR to PO. So Contract get precedence over PR.
    The requirement is - short text of service master should transfer from PR even when source of supply is Contract. It means always transfer short text from PR to PO not from contract. Is there any user exit/ config or change to ABAP code is required.
    Any help is greatly appreciated.

    Hi
    If you have document management system active in your system and if it the document type of documnet (which you created in CV01N) has link object PO and PR. Surely it will be transafred from PO to PR. But if you have added document in service object in Me52N then it will never go to PO automatically.
    Thanks and Regards
    Antony

  • Avoid users can change Short Text of Material Id in Purchase Requisitions

    Hi
    We have a problem with purchase requisitions.
    Users create a purchase requisition. In the field material,   type the ID of the Material but then, change the description in Short Text, for example Material 1000 is a Bearing, and the user can change this description for  Nut for example, causing problems and confusion in the following steps.
    We want that if the user use Material ID can´t change the Short Text
    Thank You  very much
    Sergio

    Hi,
    You can control this via tcode OLME. go to Purchase Requisitions and then 'Define Screen Layout at Document Level'.  Select appropriate field selection key (NBB if using standard one), go to basic data, item and maintain required settings.

Maybe you are looking for