Asset GR & GI Problem

Hi all
I have created an asset PO for 1 computer by assigning A as a Account assignment Category.
I have given the asset number and order number(single assignement) in accout assigment tab to which 1 computer is to be issued.
I made GR for 1 computer in MIGO with 101 mvmt type also captured excise invoice.
When I tried to post the excise invoice, I checked for Part 1 updation under part 1tab here I found that 1 computer Receipt is happened in 1st line, the same is issued in 2nd line AND THE PROBLEM IS AGAIN THE SAME 1 COMPUTER IS ISSUED IN 3RD AND 4TH LINE.
IN TOTAL
GR - 1 NO
GI - 3 NOS
SHORTAGE - 2 NOS
I posted it and while I see the updated RG23C regiter for part 1
I found 1 receipt qty, then 3 issue qty and finally in Total quantity in Stock i found 2.000- (that is -2). How it is happening and how to rectify this.
Pls help.
INFO: Only one material document is generated for the receipt and all issues. Also unable to track it in MM stock report as it is non-valuated material.
Regards
Srini

Hi
SAP PDF Document link.
Here u can get a doc related to Asset.
http://help.sap.com/printdocu/core/Print46c/en/Data/Index_en.htm
Regards
Ram

Similar Messages

  • Asset Accounting implementastion problem

    Hi sap Friends,
    At the Time of create Asset master i have faced in the below problem.please help to my friends.
    Customizing inconsistency - missing/incorrect entry in table T093B
    Message no. AY159
    Diagnosis
    There is a Customizing inconsistency.
    Chart of depreciation 1000 contains the real depreciation area 30.
    In table T093B, the entry for company code 1001 and depreciation area 30 is missing or incorrect.
    System Response
    The transaction cannot be processed.
    Procedure
    Contact your system administrator.
    Using transaction SE16, check table T093B for company code 1001 and depreciation area 30.  See whether
    1. there is no entry for them, or
    2. there is an entry, in which the field ABGJA has the value '0000.'
    In the second case, you can try to remove the assignment of company code 1001 / depreciation area 30, and then enter it again.

    Hi.
    Pls check note 872284:
    Summary
    Symptom
    The following error message AY159 appears in user-defined transactions: Customizing inconsistency  missing/incorrect entry in table T093B.
    Reason and Prerequisites
    This happens because depreciation areas can be maintained in the FIAA, which causes the above-mentioned inconsistency of the FIAA control table. The following happens when you maintain depreciation areas:
    - at least 2 new areas are added, for example IAS and USGAAP
    - the second area is added on the basis of the first area added (Copy button in the IMG)
    As a result, the chart of depreciation is updated (Table T093), but only the first depreciation area (Table T093B) is updated for the company codes affected.
    Solution
    Implement the following workaround to save time: Remove the incorrect depreciation area (the second area, as described under Cause, for which there is then no entry in the control table T093B), save the change and add no more than one depreciation area
    or
    use the Copy button to add depreciation areas only on the basis of existing areas
    or
    copy the (in process) correction to the IMG.

  • Importing Assets and Timeline problem

    Hello I have just purchased and installed Encore DVD 2.0 (inside Production Studio), so I am a novice. I have several movies/ shows/ etc. I created by using the Record TV in the Media Center Edition 2005 software. I've converted the DVR-MS file type to Mpeg2 using Roxio Easy Media Creator 7.0/VideoWave 7.0.
    Using Encore DVD 2.0 I tried Importing MPEG2 file using Import as --> Assets and Timeline. It looked like the importing was moving along the progress bar reaching approx. 3/4 point. Then it restarts the importing process again reaching the 3/4 point again stopping with a popup box appears with the text message, "Stream Requested Does Not Exist". When I click the "Ok" button the importing process stops. What can I do to get Encore DVD 2.0 to work properly? Am I doing anything wrong?
    My Computer is a HP Digital Entertainment Center Z555 using XP Media Edition Center 2005.
    Intel Pentium 4 processor 530j with HT technology
    2.5 Giga PC3200 DDR Memory
    NVIDIA GeForce 6600 PCI-Express graphics card
    250GB 7200rpm Serial ATA hard drive

    As far as I'm aware, Nero is just fine as long as you don't create DVD-Video with it, as there was a bug with this when it seemed to not set the correct start sectors for the IFO & BUP files.
    It's just fine for burning from ISO images, and for all other tasks though.
    And that bug may well have been squashed by now.
    Lots of people use Nero with no troubles at all - it's not my personal choice, but that means nothing.
    It's certainly far superior to Roxio.
    I'm actually quite surprised that Roxio & Nero are actually playing nice on the same system!
    The only possible other "Gotcha" with Nero is the packet writing utility. Do not install this - it can and does interfere with burning DVD, as Packet writing works by helpfully "looking" at your burner(s) on a regular basis to "see" if there is any blank media inserted, and it will offer to format this & use it as a drag n drop type writing utility. It's called "InCD", and if already present should be uninstalled.
    There is a list of stuff that is known to cause problems - some occasional, some constant - with DVD authoring at
    Neil Wilkes, "Things and Software to avoid when authoring for DVD-V" #, 13 Feb 2006 6:43 am
    Additionally, the utilities included with Nero are generally of a much better standard than those with Roxio.
    Nero Recode, for example, has been praised in many forums.
    There are a lot of users who swear by Nero, whereas there are a lot who swear
    i at
    Roxio!
    Hope this helps.

  • Asset no range problem

    hiii all
    i am facing a problem relating to asset configuration. i am rechecking the asset configuration over all. i checked the chart of depriciation is attached to the co code. but when i am check the  "define number range interval" under the asset class, when i am putting the co code in no range, the msg shows..... "co code does nor exist". but i can create asset master date through as01. why the msg shows like this. please resolve.
    regards
    rajesh

    Hello
    Please check the companoy code does not exsit is for your company code or not
    Also check all the basic settings has been done for the company code or not
    Please check the table BKPF whether any entries exist or not
    If the problem still exist let us know the compleate erreo information with error message number
    Thanks
    Kameshwar Rao

  • Asset report layout problem (S_ALR_87015066, S_ALR_87015065 )

    Hi SAP Gurus,
    I have a problem with Standard Asset reports S_ALR_87015066, S_ALR_87015065 in saving the layout. I need to save a layout and executed at all times to the user.
    Please let me know is there any config settings to do this.
    Thanks in Advance...
    Best Regards,
    Chandra.

    Hi
    I got the solution and found this configuration in SPRO.
    SPRO>IMG>Project systems>Information systems> technical report projects --> define profiles in displayed fields.
    Add the desired fields from the pop up and transport it.
    In IMG, WBS elements overview, in the pop up some of the fields are not displayed such as created by,capital code and RISK.
    But it is displayed in the PS-wbs element overview (s_alr_87015066) report pop up( try to add after executing report).
    Does anyone faced similar situation or any one have thoughts on this.
    Thanks in Advance..
    Best Regards,
    Chandra.

  • Asset under construction problem

    Hi friends
    At the time transfering asset from Auc to fixed asset i am geeting a problem.  i am using the tcode AIBU.  the Error message is "Balance in transction currency"  Any body can help me.

    Hi,
    1) First of all please check wether in transaction AIAB, you are using the  same asset as sender/receiver. If so, please set a final asset different from the sender.                                                                               
    2) Further, please check the notes 300273 and 327088 and make sure that transfer variant definition is correct for the settlement.                                                                               
    You can do this in the following IMG path:                               
    SPRO -> Financial Accounting -> Asset Accounting -> transactions -> Intercompany asset transfers -> Automatic Intercompany Asset Transfers -> Define Transfer Variants                                                                               
    AS per Note 327088 the settings for Variant 4 have to be as follow:-                                                                               
    Transaction Method = 4                                                   
    Retmt tr type  = 300                                                     
    Acq.trans.type = 310        
    regards Bernhard

  • Fixed Asset usefull life problem

    Dear Experts
    I have import fixed asset master, then when I created acquisition, I see the planned depreciation calculation quite strange,
    SBO recognize usefull life as month, not as total depreciation month
    for example :
    acquisition date : 31 July 2011
    acquisition value : 9.000
    usefull life : 9
    depreciation type : LINP
    planned depreciation :
    Jul 2011, depre value: 3.000
    Aug 2011, depre value: 3.000
    Sep 2011, depre value: 3.000
    system made the depreciation from Jul to Sep, because the usefull life is 9 (September)
    suppose to be the usefull life is total depreciation month, so in above example, suppose to be the depreciation is:
    Jul 2011 - Mar 2012 (9 months), depre value = 1.000 for each month
    Please kindly advice, how I can make usefull life as total depreciation month ?
    I really appreciate your help
    Thank you
    Best Regards
    JeiMing

    Dear JeiMing,
    B1 always use the first calender day in the year to calculate depreciation.
    In your case, the depreciation start from 01/01/2011. That is why the useful life has become 3 months only.
    Thanks,
    Gordon

  • Asset issue:AIST problem

    Hi experts,
    While doing entry in AIST,following error is coming:
    Line item settlement is not possible for asset 9000 90014 0
    Message no. AW050
    Diagnosis
    You want to carry out line item settlement of an asset under construction. This transaction can only be carried out for assets with active line item management.
    However, line item settlement is not active in the asset class of asset 90014 0 (company code 9000).
    If the asset is an asset under construction belonging to an investment measure, then you should carry out the settlement using order or project settlement.
    Procedure
    Check the setting for 'status of AuC' in the definition of the asset class.
    Pl advise.
    Regards,
    Samar

    HI,
    Go to OAOA, select the relevant asset class of the asset and under status of AUC, select line item settlement.
    After doing the above, you will not get this error anymore.
    Regards
    Anuj Agarwal

  • Asset diffrent currency problem

    I have two local depreciation  area for asset, one is using IDR, the other is using USD, when we do retirement, the local book net book value is zero, but for some asset, the USD depreciation area NBV is zero, some asset, the USD depreciation area still have net book value >0, e.g. 4.5 USD, why this happens,
    how can I change the system, so USD depreciation area will have zero book value and synchronzie with IDR depreciation area?

    Hi,
    Check the dep key that is assigned to your USD area, whether any Scrap Value was maintained r not....
    Thanks,
    Srinu

  • Asset is incomplete problem

    Hi SAP Exparts,
    I have created 3 asset masters and assets PO also created. When I am doing MIGO (goods receipt) I have facing in the below massage.
    NA AAPO184
    Short Text
            Asset PS00 6000000-0 In complete, check the Asset
    Diagnosis
       The ' Incomplete' indicator was set for asst PS00 60000000-0 because required entries were not made
    System Response
    In the standard system, the system rejects the posting to the asset and issues an error message. However, this error message in customizing so that it is only a warning.Howerver, if you make this change , you should be aware that is then possible to post to the asset, although an additional account assignment is missing.
    Procedure
    Start report RAUNVA00 for the asset, and complete the asset's specifications. then post the transaction again.
    The PO No is 7008090068.
    CoCd     Class     Asset     SNo.     Complete.     Compl.     Layou     FG     Field group     Field      0     1     statues of incompleteness     1000     3     Ord.dep.start date     ANLB-AFABG     15     1      1 3
    PS00     PS13     6000000     0     1     statues of incompleteness     1000     3     Ord.dep.start date     ANLB-AFABGName     Ar.     View     Views
    PS00     PS06     2500643     15     1      1 3
    PS00     PS13     6000000     0     1     statues of incompleteness     1000     2     Useful life     ANLB-NDJAR     15     1      1 3
    PS00     PS13     6000000     0     1     statues of incompleteness     1000     2     Useful life     ANLB-NDPER     15     1      1 3
    PS00     PS13     6000304     0     1     statues of incompleteness     1000     3     Ord.dep.start date     ANLB-AFABG     15     1      1 3
    PS00     PS19     10000631     0     1     statues of incompleteness     1000     3
         Ord.dep.start date     ANLB-AFABG     15     1      1 3
    Thanks& Regards,
    Srinivasareddy.sada

    Hi,
    You have given one line item in error detail as
    PS00 PS13 6000000 0 1 statues of incompleteness 1000 3 Ord.dep.start date ANLB-AFABGName Ar. View Views
    It seems from above that ordinary depreciation start date is compulsory filed in asset master data which is not maintained.Please check.
    Warm Regards

  • Asset Depreciation Calaculation Problem

    Dear Experts,
    I have one issue..
    Suppose I purchased on asset on 1st may 2009 Rs.100000/-  Every month deprecitation is Rs.1000/-.
    Ok Now i am running deprecitaion for month may system posting (April month Depreciation Rs.1000/- and May month Deprecition Rs.1000/-) Rs.2000.
    I want the depreciation from the asset purchased date means from (1st may) i don't want april month in my scenario.
    where can i set this. Please give inputs on this

    hi,
    Please check asset capitalization date, depreciation start date in asset master data.
    Thanks

  • Asset Posting Cenvat Problem In J1IEX

    Dear All,
    While posting CENVAT in J1IEX after simulation i got this error
    There is no item category assigned to account 2070360/DSCL
    Please Help me !
    Pardeep Malik

    solved

  • Asset takeover date and asset split

    Hi All,
    I have an asset X with NBV of say 2000 (APC 5000 and Acc Dep 3000). This is currently available in system as one single asset.
    The problem is u2013 above asset is in fact a sum of many small assets for which useful life is different and NBV is different (we are tracking it outside SAP as of now)
    Say Asset 1..with APC of 300, Acc Dep as 200 and NBV of 100 u2026total useful life is 10 yrs and remaining useful life is 2 yrs
    Asset 2..with APC of 400, Acc Dep as 250 and NBV of 150 u2026total useful life is 10 yrs and remaining useful life is 4 yrs
    Similarly I have different assets which add up to asset X as mentioned above.
    Asset take over date is 31.12.2009 (We follow Jan to Dec year). We have gone live in mid 2010.
    I would like to bring those assets into Sap now. I mean make the adjustments now u2013 split the asset X to different assets. (We did not calculate dep for asset X until now from go u2013 live).
    We want to the calculate dep for newly created small assets from month May, 2011.
    Could someone help me with the correct process to be followed.
    One option I am thing about is u2013
    1)     Scrap the asset X (40 posting key will be posted to u2018asset disposal accountu2019 (P&L Account))
    2)     Make co code status to u20182u2019 and make changes to take over date.
    3)     Create new assets (in AS91) for all small assets with their useful life (Say for asset 1 u2013 I will keep total useful life as 10 yrs and remaining useful life as 2 yrs
    4)     In takeover values in AS91 u2013 I will put APC as 300 and Acc Dep as 200 for asset 1.
    5)     Make an entry through OASV for total APC, Acc Dep and remaining value to u2018asset disposal accountu2019 (P&L Account u2013 which is posted in point 1)
    6)     Put the co code back to active status u20180u2019.
    My Questions u2013
    1)     Can I follow above method or is there any other easy way?
    2)     What should be the takeover date? Is it 31.12.2010?
    3)     Should I change the takeover date back to 31.12.2009 after my transactions are complete or can I leave it as 31.12.2010? Its affects.
    4)     In OASV can I make posting to u2018asset disposal accountu2019 which is a P&L account? (System might ask for cost center which I thought I can provide it in OKB9).
    5)     Will the above process effect my current assets in SAP? I mean I do not want to spoil the current set up in system.
    Thanks in advance for the patient reading and providing solution.
    Regards,
    Kumar

    Hi Kumar,
    You Specify the transfer date for the asset data transfer. This date derermineds the status of posting to be used for the transfer. Posting up to this date will be included in the transfer. This specification also determines  whether you want to perform the transfer during fiscal year ( with transfer of posted transcation/depreciation in the current fiscal year) or at the end of the fiscal year (with out transctions).
    If the trasfer date is not the last day if the fiscal year ( according to the fiscal year variant FI), the system interprets this as transfer during the fiscal year. The system cannot transfer any historical transactions. It can only transfer cumulative values from the end of the last fiscal year, and the transctions in the current fiscal year (This is only possible for the transfer during the fiscal year).
    Ex....
    Transfer date - December 31, 2009
    Last Closed fiscal year 2009
    Specify the take over date as 31.12.2009. If the company gone live with SAP on 01.01.2010.
    I hope above note will clear your doubt.
    Regards,
    Narendra Kumar,

  • Calculate depreciation start date based on user defined field in asset

    Hi,
    I have a specific scenario where the start of depreciation date for asset needs to be calculated on user-specific logic.There is a additional field "installation date" in asset master screens.The requirement is that for depreciation areas 10 and 11 user wants that the depreciation start date to be calculated on the installation date rather than capitalization date.
    I tried using the exit AMAV0001 where we can change the asset value date which determines the depreciation date at the time of first acquistion to asset.But the problem is we can't change it as per depreciation area wise and thats why posting error was coming.
    Please suggest if any idea on this.
    Thanks in advance.

    Hi Adriano,
    in your example 2 issues influence the described behaviour:
    1) In your example the revaluation occurs in the capitalization year, in which all acquisitions (and revaluations) are managed under the period for the first acquisition. Only as of the year following the capitalization year the period control "pro rata" would really consider the revaluation or another acquistion as of period 4. In case you want the period control also being considered according to the posting period in the capitalization year, set the indicator XBZDAT with the correction report from note  92925.
    That should solve your issue.
    2) In case you use the new depreciation calculation engine you have the possibility to use individual period controls for revaluation also. This means you could specify period control for acquisitions as "pro rata" and for revaluations "next month". To realize this create a new transaction type for revalutions as described in note 1138166 . Unfortunately this feature is not possible with the old depreciation calculation engine.
    Regards,
    Markus

  • Creating Asset Lines from Projects

    Hi All,
    We have transactions recorded in Projects module which need to be sent to assets module for creation of assets
    However, the problem here is that they need to create many asset lines from one transaction (400-500 asset lines)
    Users have been manually completing information required to create asset lines from projects module and running the program to transfer to assets module
    In this case there are too many lines to create manually,
    Is there any workaround to this issue?
    Can the lines be transferred to assets module and then split on the prepare mass additions form? If so, can you please let me know the details, to transfer the line as a "multi-unit" line so it can be split on the mass additions form
    Thanks!

    I was thinking just that conroy, attached is a crop of the type of the black and white scan I'm working with, this was originally a trace, it is a very large document this is just one part of it.
    Thanks Noel I did mess around with your suggestions, not sure I achieved what I was after, it was either too strong removing everything or too weak.
    What I'm trying to do is get rid of the speckle (despeckle filter cleans it a little) and just have all the lines nicely redrawn and crisp. I've so far being doing it manually but it is 1) inaccurate and 2) taking me a very long time.

Maybe you are looking for

  • IMovie 10.0.6 Crashing!!!!! Need help ASAP!!!

    Why does my iMovie Crash when i open a library from an external hard drive? It used to work fine but then today it starts crashing! We just went on a big holiday and it has all the footage from it!!! Please help!!! This is the message it gives me whe

  • Envy 4500 won't scan text to produce a searchable PDF file

    I used to have a Photosmart 4400 C printer that would let me scan to produce searchable PDF files, i.e. I could select letters or words using a text selection tool in my PDF reader.   Today I Just purchased a ENVY 4500 e- All-in-One-Series.  It will

  • In the advanced tab of languages and Region the time and date formats will not change

    For a certian Application I am using I need to change the format of the Time and Date. I had no problems in Mountain Lion. In the advanced tab of languages and Region the time and date formats will not change. I need the date format to read as 01/01/

  • Trimming double byte space in Oracle

    Dear All, DB Version: Oracle 10g Client : Oracle SQL Developer How can we TRIM double byte space in Oracle without first converting it into single byte and then using TRIM function. Sample data is : トヨタカロ-ラナンカイ (カ I want to TRIM trailing double byte

  • Can't find  the contract in the inbox.

    Hi, After making the required changes, Contract is submitted it for approval, selected the continue and when I try to find the contract in the inbox I can't find it so I can't finish the booking. Appreciate your input ? thanks siva