Assign documentation as BOM item in a BOM of Raw material

Hi Everyone,
My customer used to assign documentation as BOM item... even for raw material in their old ERP system, that means for raw material, they will also have BOM, the BOM item will be documentation.
For SAP, normally we assign the documetation to the material master data. If we also assign the documetation as BOM item for raw material BOM... will there be any impact for the other business process?
Thanks,
Bin

Hy,
Documents are not play any crucial parts in PP Scenarios.I think it is good practice to assign Document to the Materials or BOM.Its provides one type of physical proof/Identity to the Material and Explains the BOM details.
You can assign Documents to the Raw material as below.
- Create BOM of Raw material through CS01 and assign Documents over there (Document screen - Item category D).Then assign Raw material to the BOM of Product.You will find Assembly tick for that material in BOM which represent the Documents attached to that Material.
Regards,
Dhaval

Similar Messages

  • Regarding BOM item return(KITs Return)

    Can any one please help me:
    Basically a BOM item (TPH77500--- Not Batch determined) hold 3 components TMD7710, TMD7711, TMD7712.( all the components are batch determined)
    I have completed the Oto C for the above BOM item with a qty of 2. When I am trying to return 1 qty of the BOm item, It is populating its components with qty 1, butduring delivery it is saying the error log as below;
    1. Document is Incomplete:You cannot Post Goods Movement for the material TPH7750
    2. The batches are not defined for the delivery item TPH7750.
    I have checked in the path edit---> Incompleteness Log, In that It is giving adescription:as per the status Group D8 in the Incompleteness Procedure L1 The Batches /valuation Type is not completely allocated.
    but the BOM item is not a batch determined material where as the components are Batch determined.
    Can any help me how I can rectify the above one so that  I can check the KITs Return Process and the KIt's Component Return Process.
    Regards,
    BadariNath.G
    9989425075

    Hi BadariNath,
    Assume the bom item is not maintained "batch management" in MM. Pls ensure "Batches /valuation Type" is not checked in Incompleteness Procedure.

  • BOM Item Number

    Hi techies,
    There is a requirement for the client to have blank / Alpha numeric values in the BOM Item Number for BOM.
    But i have referred them saying that use Sort string for the alphanumeric instead of using it in BOM Item Number. Still i m not so sure wat happens if we don use proper order of BOM Item Number (0010,0020,0030 Etc). I know the component gets ordered according to the alphabet order and not in the right order which we require. Even this they don feel important.
    other than this component ordering in BOM will there be any impact in any other part of the functional module.
    Could you Please advice me on this.
    Regards,
    Kris.S

    Hi Vivek,
    Thanks for sharing you experience on this. The client was very specific and hence for the legacy data moving to the SAP the item number would be either 0000 for few and alpha numeric. But in the future they would be like in standard SAP which specifies about the numeric version of it.
    Thanking you in advance.
    Regards,
    Kris.S

  • BOM item category T not accepting zeros

    how can i config. the system so that a component with item categort T (text) for a BOM can accept 0s ? it always asks me for a qty when there shouldn't be?

    Hi Raf,
    Just put it 1 and then in Material detail screen set Bulk Material tick on.After doing so you can find the component in Process order component screen but there is no need to issue it.
    This indicator also works same for other Item Catagory also.
    Bulk Material means - This materail is always available at the workcenter and there is no need to issue it.
    Indicator: Bulk Material
    This indicator defines a BOM item as a bulk material, which is available directly at the work center (for example, washers or grease).
    The dependent requirements of bulk materials are not relevant to materials planning. This means they are not taken into account for net requirements calculation. Therefore planning for bulk materials should be consumption-based.
    If bulk materials are subject to material requirements planning, you must create planned independent requirements for them.
    Use
    Dependent requirements are only created in the planned order for information purposes and they can be displayed there. Dependent requirements for bulk material are not shown in the MRP list or the stock/req. list.
    You can maintain this indicator in both the material master record an the BOM item. The indicator in the material master record has higher priority.
    If a material is always used as a bulk material, set the indicator in the material master record.
    In this case, the Bulk material indicator in material master record is automatically set in the BOM item.
    If a material is only used as a bulk material in individual cases, set the indicator in the BOM item.
    Regards,
    Dhaval

  • BOM Item details

    Hi,
    Whats the usage of table STAS and how different is it from STPO ??. Kindly respond.
    Rgds

    STAS          BOM Item Selection
    STPO          BOM Item Details

  • Alternativ BOM Items

    Hallo,
    we have a Problem in Using alternativ BOM Items.
    Example
    BOM:         800000
    ITEM 01:     300000 1 ST
    ITEM 02:     300001 2 ST
    We create a Route for 800000 with 2 Work Center
    01 15H with  Material 300000
    02 10H with  Material 300001
    And finally we insert a Production Order for 800000
    with the created Route an Material BOM.
    This works correct.
    Now our new Problem.
    We want to work with alternativ Material for ITEM 02
    (Example: Material 300002)
    When we create the Production Order we will be asked by the System witch Material we want to use for ITEM 02 Material 300001 or 300002.
    Has anyone an Idea to solve this.
    Thanks
    Regards, Dieter

    Hi,
    Pl. recheck the BOM.
    Bom usage 1.
    Item Type : L
    SAM

  • Sale order BOM and Prod order BOM

    hi,
    pl. let me know the procedure to extract trough the BOM for a given Sale order.
    Similarly also pl. let me know the procedure to extract PRodn order BOM.
    In both the above cases i do not mean the BOM that we have in std BOM. (CS03)
    regards

    HI
    For order BOM you have to create thru CS61 with refernce to sales order and display by CS63 moreover if you want it to create thru CS01 the selet the usage 5 for Sales and distribution
    For other information use these tables to get more info
    STPO          BOM Item Details
    STPU          BOM Sub Items (designators)
    STKO         BOM Header Details
    MAST         BOM Group to Material
      Hope it will help u
    Regards
    Anupam Sharma

  • How to create production order for multiple items having common raw materia

    Dear all,
    We are running a sheet metal fabrication company at Vadodara Gujrat.
    Please guide us how to create single production order for multiple items using single raw material??
    For example, We want to produce baby shirt(item code AAA001), shirt with full sleeve(item code AAA002), shirt with half sleeve(item code AAA003),shirt slim fit (item code AAA004),shirt loose fit(item code AAA005) from single raw material say(item code XXX001).
    Right now we have to create 5 production order to produce above 5 items of single sales order  in SAP B1 though it is made from single raw material which is foolishness and time consuming too. (Please also note that to produce any finfish good item, raw material required for that item may vary every time in our process.)
    Kindly guide us how to solve the problem.
    Thanks.
    RUPESH  +91-9227744273
    WEB : www.gorasia.co.in

    Hi Rupesh Gorashiya,
    This is possible through MRP for that you have to put Sales Order first and Run MRP Wizard
    MRP Wizard Put Multi Production Order as per Item Taking in Sales Order just click it on and execute.
    Thanks,
    Srujal Patel

  • Bom item data - Document assignment not getting saved in table STPO

    Dear All,
                  As per out customer requirement, they want to display assigned drawing documents of Bom items in CS11. But it is not reflecting in cs11 eventhough we have assigned documents in Bom item detail overview Document assignment tab page. Moreover this is not getting saved in table STPO.
                   Waiting for solutions
    Thanks & Regards
    Dhananjay Kulkarni

    Please understand my customers requirement,
                               Presently they are assigning drawing document of each mat in material master. And if they want to see the drawing of each component of bom through Bom maintenance then they double click on component in bom, goes to mat master then additional data then document data and then drawing. In this way they need to open minimim 5 windows, which they want to make minimum 2 windows.
              In bom they are having more than 300 components. This is not possible to define document as component with item category D of so many components. One more idea I given to them is to club all drawings in one document and define that document as component with item category D, but in this way they can't identify  the individual drawing with part name.
              One more idea I given to them is to assign drawing document of individual component in item overview - Document assignment tab page from where they can open the drawing but it needs to open minimum 3 windows. So they are ready to assign drawing document in item overview - Document assignment tab page but they want, it should reflect in CS11 document column, from where they can easily open the drawing document.
              One more thing I observed that, assigned document to item overview - Document assignment tab page is not getting saved in Table STPO. I can't see this field content in STPO, which may be the reason that it is not reflecting in CS11.
             Is anything missing from Document management system?
    Please think and reply friends it's Urgent.
    Thanks & Warm Regards
    Dhananjay Kulkarni

  • Function module to update operation assignment for a BOM Item

    Hi Group,
    we have a requirement as under:
    Goto BOM Change using CS02->select any BOM item and click the Menu path->Extras->Operation Assignment; and check one or more Operations and then save the transaction.
    The above functionality has to be achieved through an Upload program(using Excel) with a Function module/BAPI to serve our purpose. we already did the functionality upto creation of BOM but could not proceed further on this current requirement.
    Kindly let me know your inputs if you have already worked in such type of requirement.
    thanks in advance for your inputs and let me know if any further info is needed.
    Regards,
    Vishnu

    Hi,
    Check the Bapis for BOM
    BAPI_MATERIAL_BOM_GROUP_CREATE
    CSAP_MAT_BOM_MAINTAIN
    I hope second BAPI will be more usefull for your requirement.
    Regards,
    Goutam Kolluru.

  • No specification is assigned to the material in the BOM item

    hello
    when I want to create or modify certains BOM (cs02), i have this error message.
    It is a warning, but nothing is done in the BOM.
    Where does this error come from ?
    And how to solve it ?
    Thans

    see below the error message :
    Item material 421Z2811-2001 is not assigned to a specification
        Message no. CM_BOMBOS052
    Diagnosis
        No specification is assigned to the material in the BOM item
        00125813-0240.
    System Response
        The system cannot create a composition for the bill of material since
        there is no material-specification assignment.
    Procedure
        Ensure that the items in the bill of material are assigned to one
        specification in each case before the composition is generated.
        Otherwise errors occur during generation and you have to repeat the
        process.
    I Don't know, what is a spécification in a BOM ? Never we have used a "spécification"
    @+

  • Assigning contract to bom item

    Hi,
                  We are creating contract with BOM sub item pricing Item category (TAP)and assigning manual condition type to sub item TAN.
    And creating order with Same BOM materials sub item pricing and trying to assign contract at header item with item category TAP.
    What is the problem here is that Pricing is not carrying out from Contract to Sales order ,when contract been assigned at header item category TAP and expecting price will be changed in sub item with item category TAN where manual condition type set up.
    Can any body please help me out what can be done for the price change in sub item when contract getting assigned at header level item TAP.
    Regards,
    Pavan.

    Hi JP,
                I have tried with item category TAE as Main item and TAN as sub item Still contract new pricing is not carrying to Order.
    What i am thinking is tht can copying controls will make any difference in this.
    Can you give any more options ,which will help me in this.
    Thanks & Regards
    Pavan

  • Assignment of BOM items to operations in CS01 / CS02

    Hello Sirs,
    How can we assign the BOM items to operations in  transaction codes CS01 / CS02 through path Extras --- Operations assignment.  Currently the option cannot be selected.  Please let me know the solution for it.

    Hi,
    Select the component
    Menu > Extras --Operation assignment
    Select the operation and save.
    This will assign the component to opeartion.
    Option 2.
    Ca02
    Here select the operation and click Compalloc in the menu.
    Now here also you can assign
    Regards,
    Vishal

  • Ref Char fpr item descrption in BOM

    Hi All
    I want to change the item description in BOM through variant configuration (reference character ).
    The scenario is in sales order i will be entering the size (lenght and width) this two char should reflect or change the item descrption of the item in BOM.(which will b selected through sel.condition).
    Can anybody guide how to configure for the above req.
    Advance thanks
    Thanks and Regards
    Praveen S

    Praveen Sasi1,
    You are asking for Variant Configuration.
    1. Create Material
        a. Configurable Material - KMAT
        b. Gen. Item Category Group - 0002
        c. Item Category Group - 0002
        d. You won't have Accounting -1 and Accounting -2 View.
    2. Include Access Sequence - 57 Variants (Table 57)
    3. Include Condition Type VA00 - Variants in pricing procedure
    a. Maintain Charchteristics - CT04  (A property that describes and differentiates objects Ex. Length, Color, weight..etc)
    Say Ex Z_Engine_Dukati
    Basic data: Z_Engine_Dukati
    Description: Automotive
    Status : Released
    Data type: Charachter format
    Number of Chars: 9
    Values assignment: Single value(appply tick mark)
    Values TAB:
    char Values -
    > Description -
    > D ---> O -
    > S
    001 -
    > 500 cc -
    >yes -->NO -->NO
    002 -
    > 1000 cc -
    >NO -->NO -->NO
    003 -
    > 1500 cc -
    >No -->NO -->NO
    Click Save.
    silimlarly maintain other charchteristics.
    b. Classes: CL02
    Note Here Class type = 300 (Variants)
    Here you list all the charchteristics with Date and Value
    c. Configuration Profile: CU41
    d. Then Maintain condition records in VK11
    Moreover check the link
    [https://wiki.sdn.sap.com/wiki/display/ERPLO/SDVariantConfiguration]
    Regards
    Sathya

  • Cost Estimate using Commercial Price 3 of BOM item

    Dear Experts,
    I am trying to create a cost estimate for certain materials using ABC costing variant. The objective is that the cost estimate should pick up Commercial price 3 from the material masters of the BOM item and then calculate cost estimate for the main product (The costing variant has been customized this way). However, for certain main products, the system is picking up the standard price of the BOM item and in some main products it it correctly picking up the Commercial price.
    The BOM items used in the different products are different.
    I am unable to understand this behaviour. If anyone has come across any such problem before, please help.
    Regards,
    Aditya

    hi,
    Check the Valuation variant and the strategy sequence whether you have selected the Commercial price 3 as the first priority and the Standard price as the next priority. If u don’t want the standard price to be picked u remove this in the strategy sequence.
    Further where the system is picking the standard price, possibly the commercial price 3 has not been defined in the material master. Possibly , the system is unable to find the commercial Price 3 and it is fetching the next Price as defined in the valuation variant which is the standard Price.
    assign points if useful.
    regards,

Maybe you are looking for

  • Windows/Boot Camp printer sharing with OS X

    I have three Macs on a wireless network - 2 MacBooks and a MacMini. The MacMini and one of the Macbooks runs Win XP under Boot Camp. The MacMini has a USP printer attached. I can print to this printer from both of the WinXP/BC machines and the OS X M

  • Output type FAX and Email

    Hi, I hace newly created email output type and it is working fine, that is mail is sent to the vendor with attachment. Issue is when the vendor is having fax number and also email id in his master data, Though I am using the email message type, outpu

  • Regarding Java Proxy development in PI 7.1

    Hi all,          Can anybody provide us the step by step creation of java proxy development in PI 7.1 using SAP nteweaver developer studio7.1 Any useful links present for this? Edited by: sasitharan on Mar 3, 2009 9:18 AM

  • Adobe Illustrator: Can't see Character preview?, Illustrator CS3: Can't see Character preview?

    I'm using Adobe Illustrator CS3 and I can't get the Character pulldown in the toolbar at the top to show me a preview of the typefaces before I select them. They all shown in the same standard typefaces.  How can get I Illustrator to to show me previ

  • Link to line up under the h2

    Hi, this image is a screenshot of a box that is doing my head in.  Unfortunately site not live, which I know makes it harder for you to help me.  But I will endeavour to be succinct. The box is a div .. #box1 {     background-color:yellow;     height