Assign multiple internal parts (materials of different plants) to one MPN

HI
I have a requirement to assign multiple internal parts (materials of different plants) to one manufacture part number.
but in HERS material type it allows to assign to only one .
can  any body suggest how can I do this.
Sreeram

You can do that.
1:Assign the new plant to the sales org / distribution channel - Enterprise structure
2:DO the shipping point determination for the new plant.
3:Extend the materials to the new plant.
4:If there is intercompnay process, please check "Assignmnet of organizational units to plants" in navigation SD - Billing - Intercompany billing.
5: Check if there are any pricing records, output records....et cwhich has Plant as parameters. if yes maintain the entries for the new plant.
These are the things I could think of.
Before deleting the existing plants, make sure there are no open documents existing for these plants, else system will not allow to delete.
Regards
Sai
Edited by: Sai on Jun 1, 2010 4:19 PM

Similar Messages

  • PP-WM integration - staging pick parts across two different plants

    Hi,
    My requirements are as follows,
    I have a manufacturing plant A and a Sales plant B. For the vast majority of cases goods are manufactured in A, transferred to B and then sold. However in a minority of cases finished goods are transferred from B back to the manufacturing plant A to be consumed in the manufacture of a different finished good e.g. relabelling to another material number etc. Plant B is full WM HU managed.
    I want to enable pick parts staging via WM-PP. I am aware of the PP/WM integration steps in customizing but I am having difficulty in staging from plant B to A.
    I have set up a WM HUM managed storage location for the production supply area in plant A and assigned to the same warehouse as plant B
    Production Supply area is defined in Plant A
    Replenishment movement type is defined for storage type
    Storage Bin created in Plant A exact same type as bins in plant B
    Control cycle created to link Production Supply Area and Storage bin for component materials
    Process steps
    Create process order in plant A, list component material storage location as per production supply area storage location
    Process order staging creates the transfer requirement correctly
    However transfer requirement cannot convert to transfer order for staging. It does not appear to be able to recognise the stock in plant B and returns an error 'negative stocks not allowed in storage type'
    My challenge is as follows, is it possible to setup staging of pick parts between two different plants using WM transfer orders?
    Thanks in advance

    Hi,
    This is not possible. You can only stage from one plant and storage location - based on the supply area. The supply areas are maintained per plant and storage location and this is what the system will use for staging.
    Regards,
    Sinéad Curran

  • Assign multiple internal material to one MPN

    Hello.
    I have a requirement to assign multiple internal inventory managed materials to one manufacture part number.
    But when I create an HERS material it allows to assign to only one .
    Can you suggest a solution , a workaround , to solve this problem.
    Thanks,

    As of configurator 1.7.1 this still seems un-possible.  Contacted Apple enterprise phone support about this and they verified that at this time only one device can be assigned to a user.  A suggested workaround was to label the user with a device specific tag (IE "$USERNAME [iPad]" "$USERNAME [iPhone]") but obviously this leads to some other complications.  I asked the phone representative to please submit feedback concerning use cases where users need to have more than one device assigned.  Hopefully this can be addressed.  If other people have this question I would suggest submitting feedback at apple.com/feedback (no there isn't an option for configurator but I submitted my feedback under OS X).
    The squeaky wheel gets the grease.  Hopefully we will be heard.

  • HT204364 how do I order multiple card or postcard with different images each one in same order?

    how do I order multiple card or postcard with different images each one in same order?
    I keep paying separate shipping cost for each different photo

    That is not an option - with the exeption of photo prints you can only identical items on one order
    LN

  • While assigning batch material  get locked in different plant.

    Dear Guru,
    After  implementation ,frequently  facing problem, In CO02  we are  assigning the  batch manually  to the  material  but  one material  is  configured  with valuation type  domestic / import. while  assinging the  bacth to the material  system  showes to another  user  who iis entering the same material in different plant  is  xxxx  user is locked the material  so  u cant  assign  the batch, but   batch we are maintiaining  in   material level. (batch maintianed in material  level.)
    currently we are going  in sm12 transcationa and removing the lock, but   we want to know why it is happening. what is the root cause for the error.
    Please  advice.
    Thx
    Nara

    HI
    It is Standard SAP at a time same material or its masters cannot be used by multiple users ids or with same user id also
    system gives error material is locked.You can unlock it thru SM12 but be careful while soing so some the data which the another user using may be or may not be lost.
    the better way is to ask the user to come out of that material or release it after doing his work
    Regards
    Anupam Sharma

  • Release Strategy different plant in one PO

    Hi.,
    Can u clarify, I want to set release strategy in PO .
    In PO two line item entered for each line item is different plant 1000, 2000.
    IS there Possible to do release strategy in this scenario .
    If  possible please guide me how to proceed this.
    Best Regards
    K

    yes you can do.you have to create a characteristics for Plant(field WERKS)and table CEKKO select multiple values in the characetristics.you add this with your class and in the classification of release strategy enter both plants 1000,1100(within same company code) along with your other characters.try it will work.
    note: you cannot do it for 2 company codes.because company code at header level and it is unique.
    hope this helps
    reward if useful.
    regards
    venkadesh

  • Please help! i need to make multiple custom shaped frames for different videos in one scene and cant work out how!

    hi there!
    im really stuck on this and cant work it out i hope you guys can help! i have been trying to make a single shot or scene whatever you want to call it with multiple videos playing all at the same time in it but i want them all to have their own custom shape. i know that i can just put them together into one frame and play them at once but they are all the original rectangle shape they where filmed in and i could put a mask over each one to make it a circle but i want to make each one a custom shape for example if you where to make a face out of 4 videos and one was the shape of the main part of the face one was the eyes one for the hair and one for the mouth now i would have to make the shape of each video the right shape for the corresponding body part then place them on top of each other and then i would have a face made from looping videos. i cannot work out how to make the frames of each video a custom shape after searching tutorials please can someone help me with this it would be greatly appreciated as it is a collage project. thanks very much for your time in the matter Josh.

    ok thanks yea thats helped alot im new to this so thats why it seems basic to you but not me. i have tryed to find out through tutorials but could work it out. im now able to do this but i want to draw my mask free hand and it seems you can only place points with the pen tool? is this the only way to make the shape of my mask? or example in photoshop which i know well i can use a paint brush and paint any shape i want to make a mask but i cant see how to do that in after effects? any help on this would be greatly appreceated. thanks josh

  • Multiple Charges. Twice on different days and one is pending with a Trial Fee

    I have been charged not once, not twice, but three times for the month July. All charges were deducted on different days. It is impossible for my card to be charged for multiple accounts, for this is the only account I've created.

    Hi there! I recommend reaching out directly to Spotify Support. They can be reached through their Twitter Page or through the online contact form.
    Make sure to check your inbox and junk folder for an email from Spotify. Once you get it, make sure to reply back right away, even if it says it's from a "no-reply" email.
    Cheers!

  • Can we give 2 materials existing with different plants in 1 Sales order

    can we give 2 materials with different plants in 1 Sales order

    Hi dear,
    In that Case : u can create a single delivery...... AS the ccriteria for delivery split as per standard are
    1. ship-to-party
    2. shpping point
    3. route
    4. incoterms
    5. transportation zone
    Thanks,
    Raja

  • Internal Batch No. Assignment for Materials generating different series.

    Dear Experts,
    Required your Valuable suggestion on Batch Number assignment.
    My Client Requirement is he has only 5 Materials for which Batch Management needs to be activated.
    Consider These 5 Materials are 10000, 10001, 10002, 10003, 10004, and 10005. These 5 Materials should have an Independent Internal Number Range. All these Materials belong to same material type.
    Like for example consider
    10000 material the Batch internal  number should be u201CA00001, A00002, A00003, A00004u2026..etc
    Similarly for 10001 material the Batch internal number should be u201CB00001, B00002, B00003, B00004u2026..etc
    Similarly for 10002 material the Batch internal number should be u201CC00001, C00002, C00003, C00004u2026..etc
    Similarly for 10003 material the Batch internal number should be u201CD00001, D00002, D00003, D00004u2026..etc
    These no. ranges need to be picked up automatically at the time of Goods Receipt.
    Is there any User Exit Or Customer Exit available on this. Kindly suggest your Valuable Suggestion on this.
    Best Regards

    Try with user exits EXIT_SAPLV01Z_001 and EXIT_SAPLV01Z_002.
    Per OSS note 148765 - Sample source code f.internal batch no. allocation, it looks you can assign the internal number range based on material number.
    Regards,

  • Assign Multiple Sales Org for One Plant in STO process

    Hi Experts,
    Aware that I can assign multiple sales org to 1 plant (relationship: many to many).
    I am trying to create STOs to supplying plant and assigning them to different sales organization but encountered problem.
    Example:
    Supplying Plant 1000 - Sales Org 1000A (food) and 1000B (apparel)
    Receiving Plant 1100
    Plant 1100 wants to issue 2 STOs to Plant 1000 - 1 for each Sales Org (for instance STO1 to food division, and STO2 for apparel division).
    However, when I tried creating STO in the system, noticed that in the shipping tab (item details) the sales org, DC has been assigned to 1 particular assignment and data is locked.
    Tried to get into SPRO to configure and define the shipping data for plants but noticed that it's 1 to 1 relationship (SPRO - IMG - MM - PO - Set up Stock Transport Order - Define Shipping Data).
    How can this be done?

    You can set different sales areas (~sales organisation) for one plant in SAP - based on issuing SLoc provided STO between storage locations is activated.
    SPRO > Materials Management > Purchasing > Purchase Order > Set up Stock Transport Order > Set Up Stock Transfer Between Storage Locations > Define Shipping Data for Stock Transfers Between Storage Locations
    Edited by: Csaba Szommer on Jul 2, 2011 6:14 PM

  • Scheduling Agreement  with multiple line items of different plants

    Dear Gurus,
    In all plants, delivery of goods is done through multiple plants under one sales order.
    The system is given provision to create centralized sales order with multiple delivery plants but it fails at the time of execution.
    Hence sales order of same customer has to be prepared three times which leads to lack of control at central office.
    scheduling agreement is created and scheduled to deliver through multiple plants. While creating outbound delivery flashes error message as " Delivery split due to different shipping points"
    Please help me out.
    Regards,
    Anbu

    Hi Naveen,
    I guess you would like to change the delivery adress in the BBP_DOC_CHANGE_BADI.
    Here you can identify the delivery adress (partner function 00000027) line item by the field P_GUID. This P_GUID in the partner table (ET_PARTNER-P_GUID) consists the GUID of the SC line item (ET_ITEM-GUID).
    When you know the line item GUID, you can find the SC line item number in the item table (ET_ITEM-NUMBER_INT) and you can see which is the first, second... line item of the SC.
    Regards,
    Peter

  • InfoPackage to load multiple flat file for different plant

    Hi
    There is a requirements to load the data from multiple flat files by different plant into BI which source data is coming from other system. Each flat file has it own naming convention.
    As data has to load via infopackage into the targeted cube. Then I have to create multiple infopackage in order to load the data according to the number of flat files that provided. However, new plant will be created due to expansion of bussiness. If that is the case, additional infopackage is required to create as and when there is a new plant. 
    Is there a way to create a infopackage to load the data from flat file by plant? Your advice is much appreciated.
    Thanks and regards
    Kang Ring

    Hi,
    The best way I can suggest is....
    1. Create a folder in AL11 for your requirements.
    2. In InfoPackage under Extraxction Tab you can have File Name , just side of this you can fine ABAP Routines ICon there you click on that and asks Name give some and then it will takes to your into ABAP Code there you can access the AL11 and then write code in such way that to take file irrespective of the File name, whatever the file is there in that Folder it ahoud take from that AL11 Folder path.
    3. Load the Data using PC.
    4.At the end of the PC Delete the File in AL11 folder , becasue we don't need it for next load.
    Else
    See the thread
    Re: Automation of load from application server
    Thanks
    Reddy
    Edited by: Surendra Reddy on Jun 4, 2010 11:03 AM

  • Batch Management in different plants

    Hey SAPers
    I am using batch managment for certain materials. But I don't need batch management of same materials in other plant. SAP is not allowing to change the status in other plants.
    Business needs to maintain materials in batches in warehouse but not in stores.
    Do we have a way out for this problem.
    Please respond.
    Thanks.
    Regards,
    MAM.

    dear abdul
    You can manage batches in different plants for many materials. For this reason, batches must be uniquely identifiable. In the SAP System, the batch number uniquely identifies the batch. You use the batch level to specify whether the batch number for a material is unique in one plant, or in all plants.
    You choose the batch level in Customizing for Batch Management under Specify Batch Level and Activate Status Management
    Batch Levels
    Plant level
    The batch number is unique in connection with the plant and material.
    The batch number is only known in the plant in which it was created if the stock is transferred to another plant, the batch is unknown in the recipient plant and the system does not adopt any data. You have to recreate and specify the batch in the receiving plant; that is, the same batch number may have different specifications in several plants.
    Material level:
    The batch number is unique in all plants in connection with the material.
    The same batch number has the same meaning for the material in all plants. One batch number cannot have different specifications in different plants. During stock transfer to another plant, the specification of the batch is known in the destination plant even if the batch is placed into storage in that plant for the first time.
    Client level:
    The batch number is unique in the whole client. A batch number can only be assigned once in the client. You cannot assign the same batch number for different materials.
    The batch number is only unique at the chosen level.
    Changing the Batch Level
    In the standard SAP System, the plant level is set as the batch level. If you want to use a different level in your company, you have to change it in Customizing and carry out a conversion program.
    You choose the batch level in Customizing for Batch Management under Specify Batch Level and Activate Status Management.
    While the conversion program is running, you can only post batches at the old level. You can only post batches at the new level after the conversion has been completed.
    You cannot change back from a higher level to plant level in the standard system. However, you can change the batch level from client level back to material level.
    To change the batch level from plant level to material level, the material has to be subject to batch management in all plants.
    This will help you for config setting:
    Logistics general - Batch Management
    1.1. Specify Batch Level
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Specify batch level and activate batch status management Transaction  OMCT
    1.2. Batch Number - Activate Internal Number Assignment
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Number Assignment --> Activate internal batch number assignment Transaction  OMCZ
    1.3. Batch Creation - for Goods Movements 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Creation of new batches --> Define batch creation for goods movements Transaction
    1.4. Characteristic Value Assignment -- Update Standard Characteristics 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Update Standard Characteristics Transaction
    1.5. Activate Batch Classification for Goods Movements in Inventory Management 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Valuation for goods movements --> Activate Batch Classification for goods movements in Inventory Management Transaction  OMCV
    1.6. Batch Determination – Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define production order condition tables Transaction  OPLB
    1.7. Batch Determination – Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define SD condition Tables Transaction  V/C7
    1.8. Batch Determination – Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define Production Order Access Sequences Transaction  OPLF
    1.9. Batch Determination – Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define SD Access Sequences Transaction  V/C2
    1.10. Batch Determination – Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production Order Strategy Types Transaction  OPLE
    1.11. Batch Determination – Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Strategy Types Transaction  V/C1
    1.12.  Batch Determination – Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define IM   Search Procedure Transaction  OMCY
    1.13.  Batch Determination – Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production order Search Procedure Transaction  OPLG
    1.14.  Batch Determination – Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Search Procedure Transaction  V/C3
    1.15.  Batch Determination – Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate IM search procedure/activate check Transaction  OMCG
    1.16. Batch Determination – Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Assign Search procedure to production order Transaction  OPL8
    1.17.  Batch Determination – Batch Search Procedure Allocation(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate SD Search procedure Transaction  V/C5
    1.18.  Batch Determination – Activate Automatic Batch Determination(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Activate Automatic Batch Determination in SD -->For delivery item categories Transaction  V/CL
    1.19.  Batch Determination – Batch Selection Class
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Selection Classes Transaction  CL01
    1.20.  Batch Determination – Sort Rule
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Sort Rules Transaction  CU70
    1.21.   Batch Determination – Make Settings for Batch Where-used list
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Make Settings for Batch Where-used list Transaction  OMBB 
    reward points if helpful
    thanks and regards
    ravikant dewangan

  • Material number are same but attribute of materials are different.

    What if we have two system connected with APO with similar material numbers but in fact different material in description.
    I mean, numbers are same but attribute of materials are different.
    How to address it in APO.....?
    Regards

    HI,
    An SCM system (APO) can be integrated with multiple ECC systems (logical
    systems). It may therefore be the case that the number assignment for certain
    master data objects, for example, material masters, is not the same in all these
    logical systems. In the example above, material number A in logical systems 1
    and 2 signifies the same cube, whereas the same material number in logical system
    3 (perhaps a subsequently purchased plant) is a cylinder.
    If logical systems 1, 2 and 3 are planned with the same SCM System, the problem
    arises that the system cannot simply transfer the ECC material numbers into APO,
    as they may be ambiguous.
    To guarantee that the naming of master data in distributed system landscapes is
    unique, business system groups are defined in APO as areas of the same naming
    convention. A Business System Group (BSG) groups different physical systems to
    form a higher-level logical unit.
    If, for example, two logical systems (LS1 and LS3) exist in a system landscape in
    which you want to integrate APO and contain different materials with the same
    name (Material A is a cube in LS1, but a cylinder in LS2), this conflict must
    be resolved for integration in APO. First of all, both logical systems are to be
    assigned to different business system groups (BSG1 and BSG2).
    check and revert back , Hope it will help you.
    Regards
    Ritesh

Maybe you are looking for

  • How to use one variable as a default value for another variable?

    Hi Experts, Is it possible to use one variable as a default value for another variable? For example: Variable 1 = current calendar year month Variable 2 = mandatory input ready variable for calendar year month I want to use variable 1 as default valu

  • C200 All in one Windows 8.1

    I recently tried to install 8.1 on the above machine but came across problems on the initial boot. Windows installed fine but after about 30 seconds after booting my screen went blank. After a search of the problem i found that Intel has discontinued

  • How to use Euro symbol in xml tags?

    How to use Euro symbol in xml tags?

  • How do I import bookmarks etc. from Netscape 8 ?

    My Netscape 8 browser would not load, and said it needed Firefox 3 or later to run. When I installed Firefox 4, it was set up independent of the Netscape program, but did not import any of the bookmarks etc. from the old browser. I am running Windows

  • Searching for orders by Description long text

    Team, I am able to search using IW38 and IW37N by Order description short text.  Is there a way for me to search the long text descriptions of PM orders?