Assign resources to all ISA - hang

Hi all,
i recently made 2 new computers with this specs:
K8N Neo2Platinum
A64 3200+ (939)
A-data 2*512 MB 400 MHz
Ati X800 PRO
Maxtor SATA 200 GB
PSU: no name 350 W, +3,3 - 15A, +5 - 15A, +12 - 9A
or alternative (i have changed it), no name psu, 300W, +3.3 - 28A, +5 - 30a, +12 - 15A
One of this computers have some instability problem a now even wont start up. D-led shows: Assing resources to all ISA. I would like to ask what does it mean?
I know my psu are creapy (i hate these garage sales companies, which sell around here   ). First i thing the problem will be in psu, but the second computers have the same specification and its running perfectly.  
Please help me.
dwayne

Quote from: lef on 03-September-06, 05:21:28
Hi , i realy need to know is what that D-led statment: assing resources to ISA means . Why? Becouse this problem realy @!?#ed me  Please Help me. my Pc is running normaly before and now D-led show assing resources to ISA ... LOL i hawen´t ISA !  .The same trouble as dwayne_stone .I run pc with only memory graf card and CPU. Thanx
Every PC still has ISA resources: keyboard, mouse, text-mode video, floppy drive, RTC, COMs, LPT...  As far as I see, none of you have mentioned BIOS version nor whether you tried to clear CMOS nor whether the keyboard lights flash or you get a beep.  The "resources" the msg refers to are IRQs, I/O addresses and possibly DMA channels which are all fixed for the system ISA devices.  Start by disconnecting all non-essential devices; next try swapping external devices, e.g. keyboard, mouse... just use a different keyboard & mouse and then try switching the interface PS/2<->USB.

Similar Messages

  • Assign Resources to all ISA

    Arg, I am getting this erro,Assign Resources to all ISA,r after switching video cards in my computer.  It only happens with the X800 pro and not the 9800 pro. I have gone back and forth between the 2 a few times.  With the same results.  BTW this is on a k8n neo plat 3400+, 3700eb, true control 550  24A-12v 40A-5V 32A-3.3V.  I also have audigy 2 and rocket raid 404 pci cards connected.

    well Now I can get it to boot, but still no video.  It makes a funny beep when the upper left corer of the d bracket is green.

  • Assign Resources to all ISA / Possible VGA Problem

    Pentium 4 2.8GHz
    MSI VIA PT8 Neo-V
    2x elixir 512mb DDR400
    6600LE AGP8x 256MB TV-OUT DVI
    Maxtor Diamond Max Plus 9 80GB ATA 133
    Raid Card (no info)
    Creative Labs Soundblaster Audigy LS
    Chieftec 340W 230V 
    XP Pro
    I recently had problems with my machine where it kept freezing during windows start up.  I changed hard drives, managed a new XP instalation.  But then it started freezing again.  The last couple of tiems I turned it on, it wouldn't do anything except report a disc error.
    I have removed every device in the machine, everything 1 by 1.  Plugging only one thing in, but I get the same light on the d bracket every time.  The error lights means 'Assign Resources to all ISA'.  I have tried clearing the CMOS with and without devices in.
    I also get a series of bleeps, which I think is 2 very quick bleeps, followed by 8 short bleeps

    well Now I can get it to boot, but still no video.  It makes a funny beep when the upper left corer of the d bracket is green.

  • Assign Resources to all ISA ..no post

    Hi,
    I can't search for this topic on this forum, I get an error response every time.
    MS-7030 with a Atllon 64 3200+ on an anted true power 430 supply, one WD hard drive and a 5700 Ultra video card. 2 PNY 512MB sticks on 2 and 3 slot.
    Get error code Assign Resources to all ISA , when booting up. I get to the screen saying "tab for POST, del for BIOS setup" but can't do anything from there.
    Is the MB bad? anybody else solved this problem?
    Help would be very, very greatly appreciated.
    Thanks,
    Alfred

    Thanks very much for you reply.
    I finally found the problem. I'm embarrased to say, I forgot to change from master to CS on my WD hard drive.
    thanks,
    Miron

  • Assign Resources to all ISA Error

    Hey guys... Since this is the most indescriptive error ive ever seen im gunna need some help.  Just built the computer and only have a master harddrive, and videocard in there.  The D-Bracket is reading the "Assign Resources to all ISA" error which doesnt seem to stop the computer from doing things, but i can hear it crunching away at something.  If i let it sit it will eventually respond like 10min later at which point it continues to run incredibly slow.  I have tried clearing the CMOS and it works, but does not solve the problem.  The keyboard is the only device hooked up and it is nonUSB.  I know the keyboard is good because it does repsond to keypresses like i said, just very very very slowly.  Any ideas on what is causing this and what i can do to fix it?  
    Thanks
    BTW
    Athlon 64 3000+
    K8N Neo Platinum
    Corsair TwinX 3200
    ATI x800XT
    Western Digital 80gig 7200RPM (set as master)
    No Floppy

    Problem Solved
    Heres what the problem was for those of you that also dont understand cryptic messages.  I had my HD hooked up as the only device on the cable set as Master.  Apparently the motherboard doesnt like it set that way.  To solve the problem (in this case) just set the jumper to Cable Select and everything will be fine.  The drive is a Western Digital so it might just be localized to that drive.  I saw in my searches for a solution that 2 people had the same problem but caused by their cd drive.  So if you happen across this error, check your jumpers it seems to be the root of the problem from what ive gathered/experienced.

  • 'Assign resources to all ISA' Error (Neo2 Plat.)

    finally put all my new components together on my new MSI Neo2 Platinum board.  however, its locking up shortly after boot.  Using the MSI D-Bracket, it's telling me its locking on the 'Assign resources to ISA' step.  my component are below, but the only things i have plugged in or powered on are the SATA HD's, RAM, Vid Card, SB Audigy2.
    amd athlon64 3000+
    512MB Kingston HyperX 3200
    12x8x16 Plextor DVDRW
    72x Kenwood CDROM
    40x12 Plextor CDRW
    2x Western Digital 80GB HD (SATA)
    Albatron geforce4 4600
    SB Audigy2
    any ideas as to what would be causing this?  ive owned several MSI boards and never seen this error.

    got it to get past that stage, seems it was a cdrom.  however, ive run into more problems with this setup than anything ive ever worked on.  still working on it now.  glad i didnt take apart this computer yet...

  • Assign resources to all ISA and garbled graphics on boot.....any suggestions?

    Subject says it all. I boot up and get the above mentioned error from the LED bracket. If i could see clearly enough i could mess around in the bios.... I just replaced the MOBO, PSU and video card and this is the first attempt at rebooting it with the new components (exact same components just factory new). 
    UPDATE: I can get it to boot up to windows now but the graphic display is still messed up although i can see when im in windows. When I use an old video card (geforce 2) It works pretty much like normal with no graphic errors. With either video card in I get no LED errors when im finally in windows.
    Could the new motherboard and video card with old HDD and winxp loading on it be causing the graphics issues? I will try a fresh install of winxp and see if that fixes it. Until then, any suggestions or comments would be appreciated. Thank you!

    Thanks for the replies. All the components i just put in were the same exact components, I just did RMA for replacements because I had a power surge or something and things went bad. Maybe I just got lucky with the maddog crap psu for a year. I did have a thermaltake 420 watt PSU but it caused problems and I tried the maddogg and it worked fine so I assumed it was better quality than thermaltake. Would poor PSU cause the graphics card to display funky? makes since that I put in the small video card and it works fine....maybe ill try putting in the RMA'd thermaltake 420 PSU again. Thanks again
    Also...No, I haven't done a clean install of windows yet because I wanted to start up and save some important data from the HDD then I was planning on doing a clean install after that.

  • Error Message while assigning resource to work orders

    Hi All,
    We have the MRS tool integration with service work orders for scheduling. When we assign the resources with 9 hours as duration there is no error. When we allocate more than 9 hours for some resources, not all, we receive the error message as
    " Duration    29,160 S is not a multiple of 15 minutes " .  These duration of secs varies when the duration is varied > 9 hours.
    We have checked the planning board profile configurations but nothing seems to be visible. In customising we have the following settings,
    Time Granularity                 : 15 mins
    Min duraiton of assignments: 15 mins
    Automatic Assignment Splits
    Min duraiton           : 2 hours
    Max overtime hours : 2 hours
    Max Ratio is %       :  75
    Can anyone throw some light on this?
    Regards,
    Selva

    Hi Anil Satya,
    The MRS is integrated with Service Order types and the operations are selected for each order then the assignment of hours takes place in MRS.
    If the assignment is done for 9 hours then there is no such error. These errors are very specific to some personnel numbers ( not for all )  where the duration is more than 9 hours.
    Is there any availability of resources for this operation / job through configuration settings? Why such a question is some resources even when 15 or 20 hours is assigned , no errors exists.
    Hope this explanation provides a better clarity.
    Regards,
    Selva

  • Standard ABAP functions for assign resources?

    Hi all.
    I would like to share this with you all.
    After loosing three days looking for any kind of standard FM to assign resources (rooms or instructors) to an event (E), I request your help.
    Any of you have found or used those functions in SAP?
    Thanks in advance for your support.

    Hello Roberto:
      the FM we're using is HRIQ_EVENT_CREATE, not very creative , but we found nothing more appropriate, and we found it very flexible to work with events (unluckily flexible is a synonym of complex and hard work).
    Let's move into when and how we used it:
    regular courses are still created using SAPgui
    we needed something more agile to use when a room or resource was needed for unusual activities (meetings for example), and no instructors were needed. We went into a web app. The user will indicate date(s), start and end time and resource. We developed a FM+webservice which "receives" the data inserted by the user and ends executing HRIQ_EVENT_CREATE. (precondition: we have a generic module created with its correpsonding event type needed to execute HRIQ_EVENT_CREATE)
    a previous step to the event creation (on a separate FM+webservice) will check for conflicts in the proposed resource reservation, where the user will see a report of conflicts and make necessary changes before submitting the reservation.
    Would you like to see our codes? Part of it is in Spanish which'll help you read the code
    Cheers,
    Michael

  • Project 2013 No Server, No Sharepoint, Updating Tasks From Assigned Resources Through Email

    Ok,
    I have searched high and low for this type of information and Im surprised after all these years that no one has asked or requested this type of information?
    I am a consultant, with my own version of Project 2013 to track how I run Projects.  This is the tool I use.  So this being the case it makes no sense for me to spend millions of dollars for Project Server.  I am just one person useing this
    as my tool of choice.
    My issues are:
    I create and assign a task to a resource with a name and an email address.
    I litterally have thousands of tasks with hundreds of assigned resources (People) with an email address.
    I need to update weekly all my task!!!  The entire point of using Project 2013 as a tool!
    However it appears Microsoft needs to make this very dificult to do. If I have to manually email all these people with task and manually ask them for an update, then manually update all these task then whats the point of even bothering using Micrsofts Project
    2013?  It is useless.
    I need a way to automate these updates without having a Server.
    The Question no one seems to be asking is this?
    Is there a way to update task through email, (Outlook), Why cant I send emails with a table of tasks assinged, request update in the task table, then the assigned resource sends me back the email with thier updates and I can automatically update my Project
    Task?
    Am I the only one who has asked this or thought of this?  Or are my expectations to high? I cant figure how Microsoft could ever expect a single user of Project even with only one project with 50 to 100 task listed to have to get on the phone or emal
    every single person manually, and manually update every single task every single week? I have used other Project type apps and they all have a way of sending emails out to assigned people to get task updates automatically.  Only Project doesnt! 
    Why?

    Thanks Prasanna,
    Really for the amount of money I have to pay for a Product that should have some way to update tasks.
    Think about this for minute.  I believe Project 2007 was able to do this ,,,, that made sense.... 
    Really ponder this question:  What is the purpose of Microsoft Project for a single user?  Does anyone ask these questions prior to development?
    The reason for Project to exist is to TRACK TASK!  THATS IT! Why would anyone want to track any type of task, hundreds of task MANUALLY?  It does me no good for me to be the only one tracking task.  It does me no good for me to be the only
    one looking at the task schedule.  Great, so IM THE ONLY ONE WHO KNOWS WHATS GOING ON? 
    So I ask this question.
    If this is the case then what is the point of tracking anything if it cant be shared or updated in some way or another?  Microsoft Project is useless as a single use product!
    Here is the kicker....
    I can purchase Outlook for a lot less, I can track any and all task, assign task to anyone with an email, I can assign and schedule task through Outlook and place an alert, set it as an appointment through the Calendar, change and assign start and end dates,
    and get updates through email on any task, calendar, anything.... Why then would I waste ANYTIME OR MONEY ON A USELESS TASK TRACKING PRODUCT LIKE PROJECT?  It does not do anything?  Outlook does a thousand times more than Microsoft Project! 
    Does that make any sense to anybody?  All Microsoft Project really is... is a stripped down Calendar/Task from Outlook with no ability to email, or communicate in any way shape or form with other people who are assigned the work.  What ends up happening
    is Microsoft expects single users to purchase Project Server?  Are you crazy?  This is the single reason why Project does not sale!  If Microsoft would go back to sales metrics of Project 2007 they would see a decline till now that will reflect
    this problem.  Its really a simple fix.  Sales would triple.  Until there is a solution it makes way more sense for me to use Outlook, schedule work task on others calendars and have them send me an update weekly through an automated spreadsheet
    through Outlook.  From there all the reports exist in Excel.  Why do I need Project anymore?  BTW  I have been a MS Project user since its inception....  SO IM not new to it... what a terrible waste of time, resources, and lack of
    vision for just a simple powerful addin that was removed after 2007.  Single users like myself will never purchase Project Server just so we can send emails with assigned task for an update,,, silly?

  • Permission to assign resource?

    [idm6]
    When trying to create a user with user form I assign 2 resources to waveset.resources like this:
    <Field name='waveset.resources'>
    <Expansion>
      <list>
       <ref>doelgroep</ref>     <!-- variable containing correct value 'ambtenaren' -->
       <ref>doelgroep_db</ref>
      </list>
    </Expansion>
    </Field>But when running this form and press save I get following exception:
    WavesetException: User helpdesk1 does not have rights to add the following Resource to User 1100000000303 :<br>- ambtenaren <br>What is the AdminGroup or permission that I need to assign in order to be able to assign resources to a user? the ambtenaren resource is just an LDAP resource that I can assign without problems via active sync form.
    Thanks,
    Marcel

    Hi Marcel,
    your issue is not about capabilities but about scope. "helpdesk1" controlles an organization that does not controll the org that "ambtenaren" is a member of.
    Long ago i used that as a feature, putting resources in hierarchical orgs in order to make them non assignable to admins that do not controll that org. While that works you have to be aware that an admin that can not see an org is till able to remove a resource in that org from a given user and therefore cause the account to be deleted. While this is fine from an audit point of view it can end up very destructive.
    I now put resources either to #ID#All (can't be done in the GUI) or i create a dummy org where all resources are put in and add that org to the controlled orgs of my account admins using an admin role to define those. Then i define the privileges to assign and remove resource accounts with form logic. This is more efford but makes sure that an admin that may only assign minor resources does not have the power to remove whatever he likes.
    Regards,
    Patrick

  • Getting dump while assigning resource to role

    Hi,
    We are using BAPI_BUS2177_STAFFING_ADD  to assign resource to role.
    It is assigning first resource to first role in first project. And giving dump for next resource to role assignment for the same project.
    Short dump description is like as follows:
    The exception 'CX_DPR_FATAL_ERROR' was raised, but it was not caught anywhere
      along
    the call hierarchy.
    Since exceptions represent error situations and this error was not
    adequately responded to, the running ABAP program
      'CL_DPR_AUTHORIZATION_SERVICES=CP' has to be
    terminated.
    The problem is of "COMMIT". I ma not understanding where to write exact commit. Even if we are commiting at project level it is giving dump.
    Could you please give any suggestion on it.
    Thanks & Regards,
    Anil Salekar

    Hello Kaixiang,
    When you add staffing to project then commit after each resource assignment. That will avoid the dump.
    Use:
    CALL FUNCTION 'BAPI_CPROJECTS_COMMIT_WORK'
             TABLES
               return = it_return.
    Note: Re award if useful
    Thanks,
    Appasaheb..

  • What  is difference btw project Assignment, Resource Assignment and task Assignment.

    Hi,
    I am new project accounting Module .
    what  is difference btw project Assignment, Resource Assignment and task Assignment.

    Project Assignment, Resource Assignment refers to the resource management part and Task assignment is basically the work assignment to the resource.
    An assignment/requirement is created in PJR for create demand for the resource requirement of the project and when the resource is aligned he can be assigned to the task in the work plan.
    Refers to the top down approach in this case.
    Additionally a resource can be assigned to the work plan and a assignment can be created to get the resource allocated to the project.
    Refers to the bottom up approach in this case

  • Assigning resources in Project Server 2013

    Hi,
    Is it possible to assign a resource to a task through PWA in Project Server 2013?
    I have a created a project in PWA, built team,saved and published but can't assign resources.
    Do i need to open Project Professional to assign the resources?
    K.Gokulraj

    Hi José,
    This behavior is normal. See my example below with 1 resource on a fixed duration and effort driven task:
    If I add a second resource, the duration is fixed so it will not change. The task is effort driven so the total effort will be kept at 40h, but splitted between the 2 resources:
    The units will still be 100%, the assignment unit behavior has significantly changed in Project 2010, see references below:
    http://blogs.msdn.com/b/project/archive/2010/04/29/assignment-units-in-project-2010.aspx
    http://ntrajkovski.com/2012/11/20/units-and-peak-units-in-ms-project-2010-what-are-they/
    If you insert the peak column in the task usage view, you'll see that the % unit for the 2 assignments are 50%.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • How to assign resource (not personel resource) to Activity/WBS/Network

    Hi,
    can anybody show me how to assign resources (not personel resource) to Activity/WBS/Network, how to plan/manage resources in PS
    Thank you
    Long

    Hi,
    Resource Planning will work in Project in two methods.
    1.work center:
    In work center we will assign resources such as machines etc to execute the Projects
    2. Workforce Planning:
    In work force planing resource assignment to network activity will happen. Project Team will be assigned to WBSE. Capacity planning / levelling will happen through this functionality.
    Refer the below URL to know more details of resource planing in projects
    http://help.sap.com/erp2005_ehp_02/helpdata/en/ed/b7853488601e33e10000009b38f83b/frameset.htm
    Hope this will help you.
    Regards,
    Rakesh Pradhan