Assign Shipping Point to Plant

Hello Everybody,
I Created a plant and shipping point in IMG config. However, when I tried to assign the shipping point to the plant via OVXC I couldn't find the plant. Did i miss something?
Please help.
Thanks,
Sirisha Matta

Hi,
You also need to assign the plant to the sales area & distribution channel. After making those settings, you will be able to assign a shipping point.
MdZ

Similar Messages

  • Assign Shipping Points to Plants: T-Code OVXC

    Hi
    In SPRO activity we need to assign shipping points to plants in Enterprise Structure using OVXC Transaction.
    For a company that has over 100 plants is there a possibility of doing this assignment through LSMW ?
    Regards
    Siddharth Sridhar
    SD Consultant

    Hi,
    You can always use an LSMW or BDC to move forward.
    But I would advise you to do the configurations manually.
    Direct table entry is possible, but not advisable, but you still have option for creating the transport request for the table entry to move to Quality for testing and then to production.
    Reward points if it helps.
    Regards,
    Harsh

  • Shipping point and plant assignment

    Hi,
    When i am maintaining enterprize structure in sd in assignment of organizational unit if i want to assign shipping point to the plant ,its not detecting plant untill i set up sales line(plant+sales organization/distribution channel) .what is the relation between sales line set up with shipping point to plant assingment? please clarify...
    Regards
    Supriya

    Shipping point can ONLY be assigned to a delivering plant.
    2. Plants can be "made" in to delivering plant by assigning Sales Org. , D channel to Plant.
    Therefore after 2 you have the possibility to assign shipping point to the plant (which has been made a delivering plant)
    PS - org unit plant is used in MM, PP and SD etc. but delivering plant is an important org unit for SD.
    From a business process perspective - PP: Plant is a manufacturing unit, MM: Plant is a storage of material unit. But to deliver goods to customers, a delivering plant has to be created. Shipping point is the starting point (& the org unit that controls) of outbound deliveries. Thus shipping point is assigned to Delivering plant.
    This is also logical from a business process perspective!
    Edited by: Typewriter on Aug 19, 2011 3:08 PM

  • Assignment of Shipping Point to Plant

    Hi
    Is there any method such as BDC/LSMW to upload shipping point to plant assignment. The t-code is OVXC.
    Thanks
    SD Consultant

    Yes if it is going to be in bulk, you can certainly assign the shipping point to plant through LSMW
    thanks
    G. Lakshmipathi

  • Shipping in shipping point from plant and storage location is not possible

    Dear Experts,
    i am trying to configure STO with delivery scenario in my company
    after creating PO (sto UB) and delivery through vl10b when i try to do picking in vl02n and when i enter storage location its giving error
    "shipping in shipping pointxx from plant xxxxand storage location xxxx is not possible"
    i ve checked all settings
    1.plant and sh point assignment
    2. ovl2 sh point determination
    3.ovl3 picking location determination
    4 all master data cust n mat for loading group and shipping cond
    not able to find any solutions plz help
    Regards
    Supriya

    Check your entries in following options in SPRO path:
    IMG - MM - Purchasing - Purchase Order - Set Up Stock Transport Order - Setup Stock Transfer b/w Storage Location - Setup Storage-Location-Specific Shipping Point Determination
    Option 1: Define Rule for Determination of Shipping Point
    Option 2: Assign Shipping Points According to Storage Location (this should be there, if in Option 1 Determin. Rule; Shipping Point is L: Storage-Location-Specific Shipping Point )
    Regards
    JP

  • EDI: partner profile for shipping point or plant

    I want to issue idocs for delivery notes based on shipping point or plant, not shipto party as is usual.
    How can I go about this?
    It looks like I need to create a new partner type. Or can I use logical systems?
    If logical system is used, then how do I make the connection document->LS?
    The external system uses the RCVPRN to determine which warehouse to handle the delivery for.
    I am changing the RCVPRN in a user exit now, but this still requires creating/ changing all partner profiles for shipto parties.
    Any ideas? previous experiences?
    Thanks,
    phillip

    Hi Phillip,
    it looks like I need to create a new partner type. Or can I use logical systems?
    > Yes, you can use LS
    If logical system is used, then how do I make the connection document->LS?
    > You can use FM: MASTER_IDOC_DISTRIBUTE to send the outbound IDOC...
    Regards,
    Hendy

  • No shipping point in plant

    Hi all,
    I don't know why there is no shipping point in plant althought i have set in OVXC. Pls tell me where do i have to check also?
    Thanks,

    Hi
    Step 1:Shipping Point Determination by maintaining Shipping PointLoading GroupShipping Condition
    Step 2: Pick Location Determination by Maintaining  Shipping Point PlantStorage Condition
    Step 3; Maintain the Loading Group In Material Master
    Step 4: Maintain the Shipping condition in the Customer Master
    If u Maintain the Route Determination Please check the Shipping condition is Maintained
    Regards,
    Michael

  • How to assign shipping point for STO

    Hi experts
    for STO, PO=>Delivery
    When creating PO, enter material master then press enter, client want to proposal shipping point automatically
    for example, when create PO, enter material master, if the material master MRP2 view storage location is 1130, then proposal shipping point 7000 after press enter
    Is SAP stardard function can do this?

    Hi,
    If your configuration is proper in IMG, then shipping tab will reflect in P.O
    And for your speciefict requirement activate shipping point determination on the basis of storage location
    IMG >> Materials Mang. >> Purchasing >> Purchase order >> Set up stock transport order >> set up stock transport between storage location >> set up storage location dependend shipping point determination
    Here u can carry 2 activities
    In this define rule as Strorage location speciefic shiping point detemination for delivery type
    and next step assign shipping point according to storage location
    kapil

  • Where do we assign shipping point to sales doc.

    where do we assign shipping point to sales doc.

    hi,
    i guess this time your question is correct but answer is not. We can for sure assign shipping conditions to sales document in the document type definition at VOV8 transaction. In the shipping section we have a field to input the shipping condition. This is very used incase of cash sales.
    regards
    sadhu kishore

  • Org structure quiries - about sales org to plant assignment &shipping point

    Dear All,
    My client is asking why the assignment of single sales organization with respect to all plants, why not separate sales organization for each plant?. But here we configured the single sales organization since a single sales department is there. How to convince the same to them effectively?
    What is the significance of shipping point (to give an explanation to client) - my client is asking is shipping point is same as plant?
    how do i convince them with the best possible answer
    regards,
    Archu

    hi archana
    My client is asking why the assignment of single sales organization with respect to all plants, why not separate sales organization for each plant?. But here we configured the single sales organization since a single sales department is there. How to convince the same to them effectively?
    if you have more sales organisations,One distribution channel and three divisions. the no of sales ares willl be more
    we have three sales organisations,One distribution channel and three divisions.
    Nine sales ares we have
    If you have more sales organizations then the master data will be more. so keeping sales organization to minimum will help to maintain master data easily
    Possible reasons for having more than one sales organization for each company code:
    · Different legal responsibilities, for example product liability
    · Unusual stipulations (for example legal), which make it necessary to distribute different product lines separately u2013 for example, products for medicine and veterinary medicine
    · The desire to separate completely the sales activities of different enterprise areas
    Separate distribution responsibilities, each with their own Marketing and Pricing policy u2013 for example, one for the domestic market and one for export
    Overlapping customer and product master records or the desire to maintain customer and product master data in a specific, unusual way
    · Overlapping responsibilities for order entry, or for sales and distribution processing (sales authorizations)

  • Shipping point and plant

    Hi experts,
    In VL01N, the system pops up the message below when entering storage location, picked qty & batch. Pls help to solve. Thx.
    "Shipping from shipping point 2000 and plant 1001 is not possible.   Message no. VL027".
    Acutally, shipping point 2000 has been assigned to plant 1001 in OVXC. In shipping point determination, shipping condition 20 - loading group 1000 - plant 1001 - proposed shipping point 2000 has been maintained. Shipping condition & shipping point between the sales order & delivery match.

    Hi Cathy
    Please make sure that your plant 1001 and shipping point 2000 is assigned  properly
    Then your OVL2 shipping point determination settings
    As you are getting this error while entering the storage location
    That means your OVL3 is not maintained properly
    OVL3 is storage location determination settings
    It is determined thro
    1.Shipping point
    2.Delivering plant
    3.Storage conditions from MMR (optional)
    In t code OVL3 maintain for Shipping point 2001 and Delivering plant 1000 and storage conditions of material maintained in MMR (plant data/storage location data 1 ) or you can keep  this as blank also
    For this combination maintain your storage location the key which you are manually entering in VL01N
    Regards
    Raja

  • Shipping point and Plant in CRM 4.0

    Hi experts,
    Where do i find Plant and Shipping point in CRM Sales transaction? of CRM 4.0 version.
    Thanks in advance.
    Regards,
    DV.

    Hi DV,
    For sales order exchange scenarios please check the following notes:
    541113 - Data exchange scenarios for orders (CRM-R/3)
    511074 - Change of CRM documents in R/3 Backend System, part 1
    520045 - Change of CRM documents in the R/3 Backend System, part 2
    705200 - Data exchange - Scenario X, Y and Z (old version)
    889051 - Scenario A: Overview and settings (new version of 705200)
    620139 - Scenario A: Interdependent changes in sales documents - R/3
    Kind regards,
    KZ

  • Shipping point in Plant

    hi
    can there be more than one shipping point in a plant.
    Regards,
    vijay

    Yes ,plant is having more than one shipping plant.
    in ovl2 you can assing more than one shipping point.
    Regards
    jrp

  • How to Avoid the Tax and Shipping point and plant redetermination

    Dear experts
    my business requirement is to change the Ship- to address while creating the sales order . Due to this my taxes and shipping/plant data get re determined . The order type i am using triggers to planned order and availability check .
    When i change the address of ship to the proposed date gets changed and effects the delivery planning ,
    Please suggest a way  if i chnage the address of SH during sales order creation or change ( VA02) . my shipping data should not determined  and the availability check wont carry out
    Regards
    Vinay Kr  Joshi

    HI,
    if you change the ship-to-adress, in my oppinion it is right, that there is a new planning.
    if you wont have this planning, you should set the dates fixed in the availability check.  sign date and quantity fixed.
    Hans

  • Shipping Point Assignment to Plant

    Hi,
    Can anyone tell me the T Code to assign Shipping point to plant.
    Though. I have defined plant in Enterprise Structure, when i go the assignments and try to do this assignment there is only the standard plant appering in the structure and hence am not able to assign the Shipping point for my plant.Am working on ECC 5.0
    Regards,
    Tommy

    Hello Tommy,
    Shipping point to plant assignment T Code : OVXC
    Shipping point determination path:
    spro>logistic execution>shipping>basic shipping function>shipping point & goods receiving point determination-->assign shipping point
    Reward if helpful.
    Regards,
    Priyanka
    Message was edited by:
            Priyanka Dixit

Maybe you are looking for

  • Hp 6310y can't get new hard drive to load windows 7

    model 6310y -- Windows 7 home premium 64 bit My desktop PC stopped working.  I took it to local computer store and they said it was HD.  I bought new hard drive and tried to install retail Windows 7 home premium 64 bit OS.  I got an error message Cod

  • ISE 1.2 Guest Portal - Device registration portal

    Hello, I have a problem with the following setup: - Cisco ISE 1.2 (latest patch) - Cisco WiSM with 7.0.220.0 (first generation) I have build Guest access via ISE. Because the WiSM's highest version is 7.0.X I used LWA with a redirect to the ISE guest

  • Docking solutions for Late 2013 MBPr

    I recently started a new job and I was issued the latest version of the 13" MacBook Pro as my work machine. My setup currently consists of two 22" Dell monitors, which take up the majority of my desk space. For the first few days, I tried to use the

  • Dbms_job.submit in Oracle 7

    Hello All, I need to run a job everyday between 8AM and 6PM for every 5 mins. I tried the following and it didnt run. Submitted the job succesfully. But for some reason the next_sec is set to current time always. so its not running. Any ideas would b

  • My ipad 3 froze and now is not turning back on what should i do?

    my ipad 3 froze and now is not turning back on what should i do?