Assign the desired activity type to cost center 1102 within cost center acc

Dear all,
I am facing the problem mentioned as subject during entering the activity type.
please guide me to overcome this problem.
rgds,
Vijay Mankar

Hi Vijay,
The problem is as expected by me it is due to assignment and acitivty price details missing. This needs to be created in KP26.
Once you enter txn KP26 you need to type active version generally "0", then enter period 1 to 12, Fiscal Year "2007" and populate field "Cost Center" and "Activity type" now use "F5".
In the overview screen populate the value "Fixed Price" and "Variable Price" and save the transaction. (We are entering price for individual period but same across all period)
Now try creating Workcenter and assigning the Cost Center and Activity type. It should work.
Reward your points,
Regards,
Prasobh

Similar Messages

  • CAT2 - How can I see the rate assigned to an activity type?

    In transaction CAT2, there is a column named ActTyp (Activity type). How can I see the rate assigned to this activity type (example: 50$/hour pour activity type Project management) ?
    Thanks,
    Julien

    Hi Julien,
    plz goto KP26 and enter the acitvity type and cost center of the work center and check the price ..
    regrds
    pushpa

  • Activity Type ENGINE not set up for cost center

    Hi all,
    Currently, we have set up a work center in our system, which has the following intergration:
    - Controlling Area --> TECH
    - Cost Center --> TECH001
    - Activity Type --> ENGINE
    - Plant --> PN01
    - Work Center --> PL01
    Based on the above, the work center PL01 has the relationship of where Activity Type ENGINE and Cost Center TECH001 are linked together, where Cost Center is tied to Controlling Area TECH.
    However, when a user tried to create General Task List (Trxn IA05), under Work Center PL01 and Plant PN01, and inserted Activity Type ENGINE in Operation item. It gives the following error:
    Activity Type ENGINE not set up for cost center
    I have also checked KP26 that everything is setup correctly.
    Please can someone shed some light on the above?
    Many thanks and regards,
    Patrick
    PS: Full point guaranteed for helpful answer.

    Hi all,
    I have solved the issue by changing the Start Date of the Work Center. Now everything works well.
    cheers,
    Patrick

  • Error saying "Enter the sender activity type also"

    While trying to upload the HR details from NON SAP to SAP through SE38, an error reflects asking to enter the sender activity type.
    Can any body help me.

    Hi,
    Please refer to the online documentation help whose link is listed below :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c3/c6c2a40f4f11d2956400a0c930669b/content.htm
    This link mentions four different data entry scenarios that can be configured for data entry profile in CATS.
    if you want to have the activity transfered to HR, you have to activate this Controlling object for pers. cost assignment in your
    customizing:
    - Personnel Time Management
      - Time Data Recording and Administration
        - Integrating Time Management with Other R/3 Applications
          - Recording Personnel Costs
            - Enter Controlling objs permitted for pers. cost assignment
    here you can find in the documentation:
    'In this step, you specify which Cost Allocation or Funds Management  objects the personnel costs can be assigned to.
      and, in addition, for account assignment to activity type:
      COBL-LSTAR Activity type
       In cac1 'cost accounting variant' is set to 'Assignment of personnel costs to master cost center'. In this case, the cost center is not transferred to HR. Activity allocation is done directly from cats through the other (non-hr) components. Check for 'activity allocation' in the online documentation.
    the cost assignment variant 'B' (Assignment of personal costs to sender) needs a receiving accounting object.
    If there is no receiving object the cost assignment variant changes to '0'.
    regards
    Waman

  • Assignment of default activity type to individual person

    Hi All,
    I have following scenario.
    One maintenance order is created with one operation. Three persons are assigned to the same operation. All these three persons are having different per hour rate and so having different activity types.
    I have mentioned all these 3 activity types in assigned workcenter.
    But while executing in maintenance order I can assign only one activity type in operation tab and so the same is appearing during time confirmation as default.
    I need respective activity types to be appeared by default for each of persons. How can be achived this?
    Sundar

    Hi,
    As 3 different activity types are having 3 different per hour rate, it would better to define sub operations based on the activity type & assign the activity types separately for each sub operations.
    Regards,
    Maheswaran.

  • "The root activity type is invalid" while importing a xoml generated by sharepoint designer in visual studio

    I am facing a problem with Visual Studio. Following what I did:
    Copy and modify a workflow in sharepoint designer 2013
    Import the generated files (xoml, rules, config) in a Visual Studio 2012 module
    Build
    I cannot build nor package the solution, getting the "The root activity type is invalid" error.
    I read a lot of forum but I didn't figure out how to solve the issue.
    Any help is really appreciated.
    Dario

    Hi Dario,
    According to your description, my understanding is that you got an error when you imported SharePoint Designer reusable workflow into Visual Studio 2012.
    Please check your process per the article below, compare the result.
    http://msdn.microsoft.com/en-us/library/ee231580(v=vs.110).aspx
    If this issue still exists, please feel free to let me know.
    Best Regards,
    Wendy
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Wendy Li
    TechNet Community Support

  • Error Activity type 502000 not set up for cost center 1000 cc111

    hi all
    While creating a work center (CR01) I need to enter a cost center and activity type for machine hours. However, while entering the activity type the following message appears:
    Message no. CR 061
    You are attempting to assign activity type XXXX to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center xxxxx.
    while creating the activity type in KL01 i have already given * in cc category so it should go for all cc
    What could cause this problem?
    Thank you in advance,
    Kind regards

    Hi,
    Check whether the activity type is maintained at the correct controlling area via KL03. If not, then create the activity type (KL01) in the corresponding controlling area.
    Regards,
    Darrel

  • How to Create New Activity Type  for Assiged to work centre Costing in Acti

    Dear Sir,
    We have four activity type to assigned in workcentre Costing Activity. Details are as under
    AIRJET     2010     AIRJET
    DONIER     2010     DORNIER
    SULTEX     2010     SULTEX
    SULZER     2010     SULZER
    in addition one more loom is comming in our unit and require new activity type.
    How can i create new.
    Please guide.
    Thanks in advance
    Regards
    Ajit

    Dear ,
    To create new Activity Type  , you need to follow the below steps :
    KA01 - Create Primary Cost Element for the new activities type.
    KL01 - Create Activity Type tied to the primary cost element. 
    KP26 - Change Activity Type/Activity Price Planning - maintain the Variable price
    Assign the activity type to cost center using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal Year as 20xx.
    Click on Overview tab on top and key in costing details in this screen.
    After performing this ,while creating the work center ,this combination of activity type & cost center should be assigned.
    At work centre level , you should have
    1.Create Standrad Value Key -OP19 and Formula Key in OP49.
    2.Create Formula Parameters in OP7B or u can use existing one to assing in the Standard Value Key
    3.In CR02-Assing the Standard value key in Basic Data  and select the Formula Key in Costing tab with cost centre assingement .Save
    Try and check
    Regards
    JH

  • Getting the desired condition type

    i have to pick the taxes from me23n--->invoice->taxes  for  PO smartform  based on tax code and the condition record no.s  valid date to  &  valid date from.
    im using A363 table in which im getting all the condition types for a given material & vendor.but i have to pick a condition type which has the valid date to(datab) & 
    valid date from (datbi)  equal to me23n(entered in me23n-->invoice,taxcode>taxes----->display condition record (for a particular condition type).
    for ex:
    after retrieving the data from A363 table i have
    condition type       valid date from    valid date to        condition record no.
    JMOP                  1.7.2007            30.9.2007           XXXXXXXXX123
    JMOP                   1.8.2007           30.9.2222           XXXXXXXXX456
    Now i want to pick  xxxxxxxx123  as this condition type   has the valid date to(datab) &  valid date from (datbi)  equal to  valid date to & valid date from (datbi)PO no.  in  ME23N transaction. please suggest from which table i can pick valid date to & valid date from (datbi) for a given condition record no. ,for a particular PO number.

    Hi Srinivas,
    Go for KONV-KSCHL. and check by takig values (Eg: if u take EKKO in tat KNUMV is the Documentation condition number ) take this number and go for KONV and paste that KNUMV in this table here u can check condition types used by the Purchase.
    KONV-KSCHL.
    Reward Points if helpful.
    Thanks
    Naveen khan

  • Activity Types to Cost Center

    hi,
    how to assign activity types to cost centers ??
    G

    I got a message like this when i try to include the activity rates to work centers, what settings do i want to maintain ?
    Activity type 10-140 not set up for cost center 1000 MPT080
    Message no. CR061
    Diagnosis
    You are attempting to assign activity type 10-140 to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center MPT080.
    Procedure
    Assign an activity type set up for cost center MPT080 to the work center or
    assign the desired activity type to cost center MPT080 within cost center accounting.
    Thanks

  • Maintenance Activity Type Assignment (PM)

    Good Morning!
    I know this is the PP forum, but I can not find a PM forum.
    Is it possible to assign multiple maintenance activity types to an order or a PM?  Possibly assigning the mainteance activity type to the operation...?

    I have a PM with three operations, one operation is to lubricate, one operation is to inspect and one is to verify safety guarding.
    My maintenance activity types are Safety, Quality, Environmental, Delivery, Morale, Cost (these are from an old Ford system, I don't know why we still have them), Preventative Maintenance, Predictive Maintenance and Lubrication.
    Can I assign the Lubrication MAT to the operation that is for lubrication, the Preventative Maintenance MAT to the operation for inspection and the safety MAT to the operation for safety guarding?
    Currently I can only assign one maintenance activity type (MAT) to a work order / PM/ PdM order as a whole, not on an operational basis.

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • Activity Type set up for cost center

    Hi All ,
               While creating a task list i m getting a message
    Activity type is not set up for cost center in the year 2008
    Message no. CR062
    How could i set the activity type for cost center? Plz tell the procedure.
    regards
    sunil
    Edited by: sunil gupta on Sep 19, 2008 10:12 AM

    Dear Sunil,
    Check out this,
    1.Create a Cost center using T code - KS01.
    2.Create an activity type using T code - KL01.
    3.Assign the Rates for an activity type & cost center combination using T code KP26.
    4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate
    under Fixed price and set value as 2 for distribution key and plan price indicator as 3.
    5.After performing this ,while creating the work center ,this combination of activity type & cost center
    should be assigned.Then while creating routing/task list this work center can assigned for performing
    operations.
    Check with this & revert back if you need any further help.
    Regards
    Mangalraj.S

  • Cost center and activity type

    Hi,
    how can I link a cost center to an activity type ?
    Regards

    Hi..
      You can defined a activity type to a cost centre category not a particular cost centre.
      Suppose you have one activity 99xxxx you can defined it to cost centres cat "P" for prod
      you can defined it in KL01 activity master creation.
      If you want to assign one specific activity to be used for a particular cost centre then creat the cost centre under spl cat and creat master data for activity type for that cat.
    kkumar
    Edited by: kkbdsp on Mar 29, 2011 10:03 AM

  • Activity Type at cost center

    Hi All,
    Is Activity types are used only at production cost centers or u can use for any material use in general, i mean, Say i ahve 2 machinerys, i spend bearings and oil for repairs, i called this activity as antifriction. i issue bearings and oil towards this activty to machinery cost center. now i want a report like how much cost i spend on antifriction activity for machine 1 & 2. How should i map my cost ceners to get this report. Can any body tell me what exactly activty types used for?
    Thanks in advance
    Sarayu.

    Hi
    Activity types classify the activities produced in the cost centers within a controlling area. To plan and allocate the activities, the system records quantities that are measured in activity units. Activity quantities are valuated using a price (allocation price).
    In Overhead Cost Controlling, costs based on the activity type are posted separately in fixed and variable portions. When you divide the activities of a cost center into activity types, you should consider whether the costs can be allocated effectively to the activity types.
    You can plan, allocate, and control costs either at the activity type level of a cost center, or at the cost center level.
    You can also assign the activity type of a cost center directly example: deprecitation postings.
    You can assign one activity type, multiple activity types, or no activity types to a cost center.
    I hope this helps.
    Regards
    Kavitha

Maybe you are looking for

  • Passing value to a dynamic page from a pdk-java portlet

    Hi everyone. I'm quite new to portlets, so I'll try to present my problem as well as I can: I have a PDK-java portlet in which I read some information (like name, location) about user.It works ok.Now I want to use that infomation in another portlet,

  • DAQmx Timing (sample clock).vi

    do u know what is the critaria to use DAQmx Timing sample clock.vi... or in what situations this vi must b used?

  • Backup not recognized after logic board swap and restore from clone

    My MacBook Pro had a new logic board put in. I have an external drive that was a clone of the internal boot drive made with Carbon Copy Cloner, so I had booted my Mac Mini from the clone to continue working while the MBP was in the shop. When I got t

  • Blue Ray Project done - time for SD

    Ok I have fininshed my Blue Ray projct and made my iso. Stupid question time. Can I go to project settings and change the project to DVD to make my SD or should I start a brand new project? Thank you.

  • ABAP SD - In Schedule agreement  Tax %age is coming in 3 digit

    Dear All, The tax %-age  is in 3 digit fromat . Instead of this we require 2 digit fromat . It means that the comming data expected to divide by 10. We are using standard Smart form . Through  T. Code VA33 you can access it. Instead of 340% , I need