Assigning a different inspection plan to an inspection lot

Hi,
I have a situation where the incorrect inspection plan is assigned to an inspection lot. Is there any mechanism to assign a different inspection plan to an inspection lot i.e. without having to reverse a goods receipt.
Regards,

>
Shyamal Joshi wrote:
> Hi Kaushal,
>
> There are more than one reason for this error. Check the followings.
>
> - The key date for inspection lot should be later than the key date for the inspection plan, later then the date when you assigned the material to the plan.
> - The usage of lot and inspection plan should be same.
> - The status of inspection plan must be released.
>
> Regards,
> Shyamal
Why are you not checking these things I am sure the reason would be there only. If dont wana check it is your wish. Any ways best of luck

Similar Messages

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Is it possible to create  inspection plan for "Inprocess Inspection"

    Hi,
    Is it possible to create  inspection plans for "Inprocess Inspection".
    If yes , what would be the "task List Usage".Is it "1"?
    If no ,then how to map this requirment?
    Regards
    Vemula

    Hi
    Vemula
    Generally as Per SAP std Routing is used for inspection of 03 type of inspection.
    but you can also customize the Inspection task list Usage for Inprocess Inspection.
    This is possible through
    QCC0>Quality Inspection>Insp lot creation>Assign Insp type to origine>
    here informt of 03 inspection type you can assign
    Task list type:Q
    Usage:either 1(Production) or 3(Universal)
    save
    Regards
    Poonam

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • LSMW Direct Input Inspection Plan Not Writing Inspection Char File

    Hello Experts,
       I am using Direct Input Program RCPTRA01 to Load Inspection Plan.
    Created 3 structures - Inpection Plan/Operations/Inspection Characteristics one below the other in that order.
    We have a internal numbering system for assigning Group to Inspection Plan.
    I defined GROUPID column in Maintain Source Fields Inspection Plan/Operations/Inspections characteristics structures and set "Identifying Field Content" as 1.
    When i read data - program is reading inspection plan and operations. But it is not writing Inspection Plan file.
    What am i missing. Spent quite a bit of time trying to figure out what i am missing.
    Any help is appreciated.
    Thanks in advance
    Thanks

    Hi,
    I have exactly followed the same thread.
    1. I have actually maintained 3 files, but when reading it takes only the header file.
    2. When Creating input session I an getting a error,
    No profile with entry tool for task list /  3 in session INSPLAN
    Regards
    Subbu.

  • Single inspection plan for all Inspection Plan usages

    Hi
    I have to prepare a single inspection plan, than can be used against inspection type '04' and '15' and '01'.
    Please tell me which inspection plan usage I should use, I tried '3' = Universal, but at inspection lot creation the system is unable to find inspection plan.
    Thanks in advance.

    My customer manufactures semi-finished good, some times he can purchase semi-finished from the market. Sample are reserved for future testing as well.
    so following inspection types are required for the same material
    1) GR against PO                '01'
    2) GR against Production    '04'
    3) Sample Management   '15'
    Almost all the time, the same specifications are tested and my customer wants to maintain a single inspection plan.
    I have one option that is to create 3 inspection types using all the above  inspection types and to use the same "Usage" say '5' in customizing of Inspection Type. But I don't know the consequences
    Please give me other solution or highlight the consequences of my solution
    Kindly help.
    Edited by: Chris SAP on May 13, 2010 11:36 AM

  • Inspection plan assignment

    Iu2019m facing an issue when creating inspection lots.
    I have one task list group with 3 counters inside.
    Counter 1     Material A / Plant A / Customer A;
    Counter 2     Material A / Plant A / Customer B;
    Counter 3     Material A / Plant A / Customer C.
    When I create these inspection lot through of transaction QA01, the system is assigning  the  inspection plan properly to each one of these combinations.
    If the creation is done through a delivery the system doesnu2019t assign any inspection plan.
    Somebody can help me?

    The inspection lot origin that I'm  using is 02
    I created 2 inspection plans to  2 differents customers.
    I also created 2 delivery process with 2 differents customers and the Inspection Lot was created after the Goods issue in the delivery process, but the Status is CRTD.
    As I believed that it was wrong, then I tried to create new inspection lots through the transaction QA01 to each one of this customers, with lot origin 02 to check the system behaviour.
    At this test the system assigned properly the inspection plan to the inspection lot.
    I read the explanation of marwadi, and I understood that can't assign inspection plans at the Customer level.
    Can you check if is it OK?
    Thank you
    Tiago

  • Copy from different plant - Inspection plan

    Hi,
    May I know which method or tcode that i can use to copy inspection plan for various plant for the same material? Let's say I have material ABC, plant 0002, and I still have 4 other plant 8002,8003 ..
    Please advice. Thanks.

    Hi,
    Check out the Transaction Code QST04 -->Display Inspection Plan
    QSR5 --> Archive inspection plans
    Best Regards,
    Brijesh

  • Inspection Plan/Revision level

    Hi PP Gurus,
    I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
    The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
    I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
    We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
    Kindly help me to assign the new Inspection Plan to the Inspection Lot.
    Thx in Advance
    Regards,
    Rakesh wade

    Hi,
    I do not know the impact of revısıon level on İnspaction lot.
    But, with reference to the Revısıon Level only the Confırmation wıll work both in Descrete and aswell as in REM.
    Say ıf yor Revesıon Level ıs AB, and the date ıs 01.03.2008, then during confirmatıon the sytem will explode the BOM with referenec to this Date.
    It may be possıble that there may not be any BOM available on that date then there wıll not be any Components suggested for GI or backflush.
    Probably you can corelate the same thıng to your ınspectıon lot... ( inspectıon lot not available etc..)
    Hope thıs helps..
    Regards,
    Siva

  • Task list usage inspection plan - Universal 3 and GR 5

    Dear Friends,
    while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal
    may i know what is the difference
    Please advise also
    There is task list type  Goods receipt model  -    501  which  is Material, vendor and manufacturer what that mean and where it  is used
    Thanks & Regards
    Raj

    Hi Rajkumar,
    While planning an Inspection,which Task List gets assigned to which Inspection Lot is linked through combination of TaskList Usage and Lot Inspection Type
    In spro (at the location as suggested above) we assign TaskList usage to the Inspection Type. When any Lot is created based on the setting in QM view of MM, it looks for this link for automatic assignment to the lot.
    For your question "while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal"; both options will work as long as the above config in spro is maintained.
    It is however advisable to use the standard option of TaskList Usage of  05 as it is easier to segregate and analyse TaskList / Inspection Plans based on their usage; in case any need arises.
    Hope this helps,
    Thanks,
    RKM.

  • Inspection plan 2985 has been deleted error

    Hi,
    We ahve created a new material and gr made for that materail as it is coming frist time we have created a inspection plan with QP01, but when i done  QA02, chnage inspection lot to calculate the sample quantity system is giving error that   Inspection plan 2985 has been deleted , and we are not getting the sample quantity and also the material is not coming in QE51 to update .
    regards,
    zafar

    Hi Zafar,
    Make sure you have assigned the material to a valid inspection plan in transaction QP02, once the material is assigned to the plan then go to QA02 under the inspection spefication tab click the task list / spec button, this will then automatically assign the inspection plan to the inspection lot. If you have assigned the material to multiple plans for the same usage it will give you a pop up selection of which plan to choose. Once the plan is assigned you will be able to see the inspection lot in transaction QE51N.
    Regards,
    Roderick

  • Reset inspection plan after results recording

    Dear all,
    i had one problem to be cleared, if u can please solve it.
    My problem is i have assigned wrong inspection plan for one insp. lot, and i have recorded results and saved. My question is there any provision that i can reset the other inspection plan for that particular lot and record resullts again.

    Hi Vijay,
    Goto QA11/QA12 Change Udage Decision enter the inspection lot number and select Usage Decision -->Functions -->Cancel Lot.
    Then cancel the Material Document by which the Inspection lot was created.
    Then make the GR and new lot will be generated. Then assign the Inspection Plan, Results Recording.
    Thanks and regards
    Murugesan

  • QM Material specification with inspection plan

    Hello,
    I'm trying to setup QM material spec with inspection plan and it doesn't work.
    I setup material master (With insp plant and with material spec).
    I Created a characteristic that I used in my inspection plan and maintained the characteristic in the material specification.
    When I create an inspection lot (89), the characteristic is always inserted at the end instead of redefining my specifications into the pre-defined characteristic.
    Have I missed something?
    Ghislain

    As per our business scenario for Pharmaceutical we use Inspection with attached MIC with Sampling and Sample drawing Procedure, Sampling scheme to check the Quality of RM/PM/FP, can u give me some idea regarding;
    1) Material Specificaton in Inspection plan
    2) Reference Operation set with its use.
    3) Dynamic Modification Rule
    As for pharma we do;
    1) Create MIC
    2) Create Inspection plan
    3) Attaching the MIC to an Inspection plan with sampling and sample drawing procedure
    4) Attacing an Inspection Plan to an Inspection Lot
    5) Result Recording and Usage Decision of Inspection lot for
    In Automotive and othe Process Industry how the Dynamic modification rule,reference operation set, material specification flow.
    Reply will be rewarded
    Thanks in advance its urgernt

  • Inspection plan as per customer sale order

    Hi QM Expert,
    I want to create Inspection plan automatically when inspection lot is created against production order which is made by reference of sales order which contain the specifications of product required by customer every time the customer change the value as per it,s requirement ,is it possible in SAP ,please Guide me step by step
    Regards
    Aaditya

    Dear Aditya
    Is it that all mics keep on changing or is it only some of them randomly. As this is a MTO automizing the inspection plan is not possible.
    I could see only 2 possible solution
    1) If only some of the mic changes make use of addition mics in result recording. manualy insert the mic with the specification at the time of result recording. you can also give the specification while inserting
    2) create an inspection plan based on the customer using differernt group counters or using a single group counter and dependent charactertistic. You can change the specification before the GR is made or even after the GR is made
    If you think you have some idea about automising please let us know
    Regards
    Gajesh

  • How to create inspection plan in mass for material

    Dear Guru,
                    How to create inpection plan for material in MASS, usually we will create inspection plan in QP01 but in mass for more than one material how to maintaain? Please help
    Regards
    Karthik.

    Hi raja
    refer following lonks
    QM- LSMW FOR INSPECTION PLAN
    Re: CEWB:Inspection Plan upload
    bapi for qm inspection plan
    Regards
    Sujit