Hi Tanya,
I think, you want to ensure that you need to allow only specific GL codes to be posted to WBS. If yes, then this can be achieved by using validation functionaliy (t code OPSI). In validation you can specify a set of cost elements, which are allowed for postings to WBS.
Normally all GL codes, which have been created as cost element in controlling can be posted to WBS.
Award points, if useful.
Regards
Rakesh Pawaskar
Message was edited by:
Rakesh Pawaskar
Similar Messages
-
BAPI to assign budget to a WBS element.
hi,
I need to find BAPI to assign budget to a WBS element in a project.
The transaction to do this is CJ30.
Its imp...
Please help..
Thanks & Regards
ShabariLook at BAPI_RESERVATION_CREATE1
rgd
Frédéric
(next time search the BAPI with transaction BAPI or in ifr.sap.com) -
Assign Multiple equipments to WBS element
Hi all,
Can anybody tell me how to assign mutilple equipment to single WBS elements. As far as i know we can assign only one equipment to WBS element.
My requirements is to assign more than one equipment to particular WBS elements. How should i do?
Please help me
ThanksHi to the best of my knowledge you can not assign more than one equipment to a WBS in standard SAP
It would all depend on how you structure your project in the past I have seen
Project with first level WBS and then folliowing on from there you can have multiple WBS elements below this one for each equipment. This would then allow for reporting etc at both levels of the WBS.
If you can supply a little more information I will try and help further.
Jim -
Assign activity type to WBS element without network
Hi There,
I have a customer business scenario where I have to assign activites to WBS element without network.
can any one help me on that..
Thanks,
ParitoshHi Thomas,
Thanks for your information. I have created customer Project with one network and multiple WBS.
But another issue related to project RBB & DIP profile. I have a scenario it like quantity should be updated from DIP profile in quotation and billing price should take from sales condition record.
After booking activity base cost directly from KB21N and it is showing in line item. Still when I am trying to run transaction with DP82 to update sales base price system is giving me a message "No expenditure item found" although in WBS level showing all the cost/quantity.
Can any one tell why I am getting message and how to correct it?
Paritosh -
Link between Cost element GL Account and WBS element.
Hi,
I want to get the List of all dollars sitting on the GL account attached to the selected WBS element.
For this, Any one please suggest me the table where i can get the link between the WBS element and GL account.
or
Table for link between the Cost element and GL account
and Table for link between the Cost element and WBS element.
Thanks,
Suresh.Hi,
1. There is no link between cost element and WBS
2. Link between cost element and G/L account is one-to-one. This means, that if it's a primary cost element it has the same code as the G/L account. If it's a secondary element, no link exists.
3. The table where you can see the postings on your WBS is COEP. There you will find the cost element, WBS, amounts, etc.
Regards,
Eli -
Assignment of WC in WBS element
Hi all,
Can we assign workcenter on WBS elementHello,
1st we should be clear that what is the functionality of work center?
Work Center is an Organisational unit that specifies where and by whom an operation is to be executed
In SAP PS work centers used for workforce / resource / capacity planning /scheduling a work . That all is possible in activities and process.
So we need activity to assing work center not the WBS.
Thanks -
Creation of Documents and assigning it to WBS Elements
Hi all,
I have a question regarding creation of documents.
I am using T-code CV01N.....
How to create the document and how to assign it to a WBS Element?
Do we have any BAPIs or FM available for this?
Thanks in advance....Hi Raj,
Documents can be created/checkin from WBS/activity without going to CV01N. For this, you need to have the DMS configured.
Another way, Create document using transaction CV01N and attach manually in WBS/activity from Project Builder.
Srinivasan Desingh -
Issue on distribution of quantity to WBS elements in invoice
Hi SAP Gurus,
I have an issue with the distribution of quantity to WBS elemements in SAP.
There is a purchase order with 6 line items. For the first line item a quantity of 3 is ordered and the same quantity of 3 is assigned to 7 WBS elements in the account assignment tab. There were 3 invoices created for this line item. For a particular WBS element a quantity of 1.050 was assigned and when we drilled down through the 3 invoices we found only a quantity of 1.028 is assigned to this Particular WBS element. Can someone please tell me as to why this mismatch has happened.
Thanks in advanceHi Raman,
I am sorry but this is not the case . There are 7 WBS elements used for this PO. The quantity is distributed to 7 wbs elements as follows.
Percentage Quantity
1st WBS element- 8.7 0.261
2nd WBS element 17.4 0.522
3rd WBS element 18.2 0.546
4th WBS element 8.8 0.264
5th WBS element 6.4 0.192
6th WBS element 5.5 0.165
7th WBS element 35 1.050
This is the assigned structure in the PO for all the 7 WBS elements. But when you look into the 3 invoices a quantity of 1.028 has been distributed to 7th WBS element and a quantity of 0.214 has been assigned to 5th WBS element which is causing the mismatch
Also in the 2nd and 3rd invoices only 6 wbs elements are used. Can you please tell me as to why there is a WBS element missing in the 2nd and 3rd invoices if the splitting is happening automatically.
Regards,
Dwarik -
We want to post actual cost through statistical WBS elements.
when we do the posting on Costcenter assigned to a Statistical WBS element (2nd level), I was in the opinion that, the actual cost posted on the Costcenter of statistical WBS (2nd level) will reflect to the top WBS element (which is non-statistical in 1st level).
But, I cannot able to see the actual cost in the 1st level WBS which also a Billing element (with this, finally we want to do the Resource Related Billing).
So expalin me how to bring actual cost posted on the costcenter of a Statistical WBS, to top WBS element which is non-statistical.U can book the actual cost from Procurement Cycle or by direct Invoice posting using FI transaction.
Procurement Cycle:
When you create PR or PO user Account Assignment Q or P and maintain WBS element. When u do GR or service entry actual cost is captured on the Project (WBS element).
Using FI Transaction:
When there is no PO and to book the cost u can use F-43 to post actual cost (via Invoice) and mention WBS element.
U can check the Actual Cost using Line item report CJI3 or S_ALR_87013532.
Venkat -
hai,
Is it possible to post depreciation to WBS element. And also i want to know, whether it is possible to assign the asset to WBS element in time dependent tab in AS01.
Can any one guide me on this.
govind.Hello
Yes this is possible as of release 4.7. Note 684659 - FAQs about account assignment objects as of Release 4.7 - will provide you with all the detailed information.
Regards
Javier -
Invoice posting error with WBS element
I have created purchase order with account assignment category P with WBS element. Quantity 2 numbers and unit price 10000Rs. I checked WBS element in this u201CAVAC Availability control activeu201D check box is selected. Now I am trying to post invoice for this PO with amount 25000Rs with tax amount 1200Rs but getting an error saying u201Cavailability controlu201D cannot post invoice. Help me in this regard
GPHi,
It would be a great help if you would send the error code from the error message.
Kind Regards,
Arminda Jack -
Derivation of Cost Center from WBS element MAster data at the time of invc.
dear all,
during invoice postings with wbs element account assignment system do not derive assigned cost center from wbs element master data.
how can the system derive the cost center automatically??
Is there any BADI available to this issue.
regards
saqibDear,
WBS is Real and cost center in the master data is for statistical postings i.e. responsible cost center in WBS.
How to make substitution (OKC9) deriving the cost center in document line items / invoice posting etc.
Kindly give detail process for its configuration steps and is there any BADI available which can be useful in this regards?
Regards,
Saqib Usman -
Functional Area for WBS Element
Hi Friends
While posting Invoices in SRM 7.0 for WBS elements the Functional Area is sometimes picked up from WBS element directly and sometimes from Responsible Cost Center of the WBS.
Also in cases when we have split account assignment with CC and WBS elements then many times only the COST Center Functional Area is passed for all the account assignment split.
E.G. we have 1 line item with 10000 value and Account Assignment is split in 4 parts 1 CC and 3 WBS element. For this functional are of the Cost Center is passed for all four account assignments rather than passing 4 different functional areas based on each cost element.
Can someone help me understand how the standard functionality works or is there any specific condition in which the responsible cost center Functional Area is picked up instead of WBS element Functional Area.
There are some documents where in case of split accounts system is passing separate functional area for each account assignment. So i am not able to conclude what is the standard function to determine Functional Area.
Regards
UshirHi Akash,
The scenario you mentioned is correct it will pick up the CC functional area in case there is no functional are on WBS but in our case that is not the case. For all the WBS we have the functional area maintained but still some times the functional area is picked up from responsible cost center of the WBS.
The problem is we are not able to replicate this in Q or D environment. The documents posted by users in production are pointing to some wrong Functional Area and its not correct.
Regards
Ushir -
Need Employee Names and Employee Numbers that charge a WBS Element
Hello,
Does anyone know how I can get a list of employee names and employee numbers that are charging a series of WBS elements?
ThanksHi,
You could use transaction CATS_DA with Receiver Account Assignment and enter the WBS element.
Good luck!
Tammy -
Report with cost center, Wbs element and cost element
Dear Experts,
I am creating Income Statement report with report painter using table CCSS.
In this report, I need cost centers, cost elements/ GL accounts and WBS elements.
Report is okay except sales. Because my cost elements for revenue are created with the category "11", it is not showing in the report.
Please suggest what changes to make to get sales revenues in the report.
ThanksHi Simi
Structure CCSS of Report Painter is combination of several tables including COEP
Even your revenue should have been updated in COEP table...
May be your report's selection conditions are preventing the revenues from being displayed... Can you check that?/
Also, you can build this report from FI Structures
Br, Ajay M
Maybe you are looking for
-
I have a new Macbook Pro hooked up to a new Belkin wireless router. I can connect to the internet without a problem. I have an HP officejet printer hooked up the the router to work wirelessley, The router is reading it as connected. My computer reads
-
Update a site column dynamically to Approval Status
Hello all this is what I have; InfoPath form with Form Status field (Form Status promoted to SP form library as site column) form switches to read only view when Form Status = Approved SharePoint form library set to require content approval Copied an
-
Is there a way to add a Thunderbolt port to a early 2010 iMac?
I don't care about the display but I'd like to get one of the new Thunderbolt disk arrays. TIA
-
Item Renderer Display Optimization
I have pretty basic row item renderer displayed within a data group, it is composed of a few labels and an icon. It has a few nested layouts to display everything properly, but I would not consider it a complicated layout by any means. Whenever I dis
-
Purchase Requistion release date as system date
Dear Experts, Our Requirement is the top management want to know time taken to release a purchase requisition,means the duration between purchase requisition creation date to release date. here user are manually changing the release date to system da