Assigning Work Center to Operatios?

HI,
I Create two operators, named op1 and op2,
and they are in the same Workcenter.
I assign a SFC named sfc001  to op1,  But if I login use op2 account, op2 can to start and complete with sfc001?
is it normal condition? or someone have another solution to setting their's permission ?
THANKS,
WAYNE
Edited by: Sergiy Katerinich on Dec 15, 2011 3:12 PM

Hello Wayne,
I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
Regards,
Alex.

Similar Messages

  • PM-HR assigning work center to employee changes position

    Dear all,
       I have an urgent issue, and I have absolutelly no idea how to resolve it, because it takes place in the module PM, and I dont know anything about it.
       The problem is that when users go to tcode IR02 and make an asignament of a employee to a work center the system also changes the position of the employee for the work center (I mean, SAP in the back ground goes to Infotype 0001 of the employee and changes the position of the employee).
       Is there a way of avoiding it? I think it is due to a bad customizing in the integration PM-HR, but Im not sure at all.
    PS: sorry if this is the wrong forum to post it, I didnt find a PM forum, If you know a forum that fixes better please let me know!!!
    Any advice will be GREATLY appreciated and rewarded
    Thanks a lot in advance

    Hello Wayne,
    I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
    Regards,
    Alex.

  • How to assign work center to class

    hi any one tell me how to assign w c to class

    Mukesh,
    In the Workcenter Create(CR01) or Change mode (CR02), in the basic data tab down you will find a function button "Classification" hit this button, system will prompt for Class assignment.
    Class Type for work center is 019.
    Regards,
    Prasobh

  • CNR2 HR Assignment - Work Center Description

    Hello,
    We use CNR2 to maintain work centers.  In the "Change Work Center: Basic Data" section I am able to change the description of the work center.  I then click the 'HR Assignment' button at the top of the screen and notice that the work center description located above where the 'persons' are assigned does not get updated.  Is there a separate location where the work center description must be maintained? 
    Thanks,
    Jordan

    I figured it out.  Transaction code PO01 can be used to update the work center description for the HR assignment.
    Thanks,
    Jordan

  • Work center assignment HR - PS

    Hi everyone
    is there anything else to do to assign work center in HR except what I've already accomplished:
    1. work centers have been created in CR01and customized in OP42
    2. via T-Code PO01 I assigned a work center to a position (connection A!003).
    What else should be done? How can I see the work center in organizational plan (PPOSE) besides Detailed description of an object???
    Will PS team-members be able to observe my work center from HR in their T-Codes???
    Best regards,
    Eldar

    HI,
    you cannot see ur work center directly in the Org.Structure.Please use this report RHXSTR06 which will give the existing work centers that are assigned to ur Organization Unit.
    Thanks and Regards
    Swati

  • How to assign work centre in OM

    Hi,
    In organizational structure how to assign work centre.
    it is necessary to assign cost centre to org structure.how ?
    President has to be given personnel no.?
    if employee is reporting to two superiors of different depts or different regions ,how the employee should be placed i.e dual reporting?
    Urgently reply.
    Thks
    Archana

    Hi Archana,
    1. To assign Work Center the T-code is PO01.
    2. Yes. In SAP HR every employee has to be given Personnel Number irrespective of their designations.
    3. No its not possible according to me (Gurus Pls correct me too if I am wrong)
    Hope above answers are helpful to you.
    Regards
    Pavani
    Remainder: Points to be given on answered.

  • Work Center in equipment master

    Dear All,
    We have created equipment master for 1000 palnt and then assigned work center belongs to 1100 palnt.System accepted 1100 plant work center.My requirement is  plant number and work center palnt must be same.

    You will need to develop something to stop this occuring.
    The the user-exit link at the top of this forum
    PeteA

  • Actvity type in work center

    I assign cost center the activity type in kp26
    In work center when i a assign the cost center not automatically seen in the activity type tab
    In the order creation when is assign work center am not able to see activity type in the bottom
    Where to do the setting

    In KP26 , You Have maintained Activity Type , Price for Activity Type & Cost Element , Not Cost Center
    After this In Work Center , in Costing Tab , You Have to Maintain Cost Center , Activity Type & formula.
    When u input this Work Center in Maintenance Order , you will get Activity type in Order
    Regards,
    Edited by: Srinivas Narayana Gowda on Jun 15, 2009 9:17 AM

  • Solution monitoring through Work Center

    Is it possible to do transaction DSWP -> Solution Monitoring  >System
    monitoring tasks in transaction solman_workcenter? If so, how can I
    import my current system monitoring tasks into my assigned work center?

    Is it possible to do transaction DSWP -> Solution Monitoring  >System
    monitoring tasks in transaction solman_workcenter? If so, how can I
    import my current system monitoring tasks into my assigned work center?

  • URGENT........ACTIVITY TYPE AND THEIR ASSIGNEMENT TO WORK CENTER!!!!!!!!!!!

    Hi Friends,
    I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
    I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing.  However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
    I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
    And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
    can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
    regards
    sandhya

    Hi,
    You need to do the following:
    1) Create an Activity type for the Assembly activity.
    2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
    3) Define a Cost Centre corresponding to the above Work Centre.
    4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
    5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
    6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
    7) Execute the Plan price calculation (T-code KSPI)
    After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
    Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
    Regards,
    Assign points if useful

  • How to use Assignment Enforcement(Work Center Maintenance)

    I thought that I was not able to start SFC in the work center which Assignment Enforcement is set in Enforced.
    However, SFC was able to be begun and to be completed by using POD in the following situations.
    Is the mistake found in my way to use Assignment Enforcement?
    Product A can use just resource RSC01 in operation PR001.
    Resource RSC01 is assigned to work center WC001.
    I set Assignment Enforcement in Enforced.
    And No user assign to work center WC001.
    I start SFC at operation PR001 and resource RSC01.

    Yousuke,
    Let me quote the guru of ME first:
    "The Assignment Enforcement option only applies to the actual assignments made in SWA (Rich Supervisor Work Assignment).  If any assignments were made in SWA, then those will be enforced as defined by this rule.  There is still one validation that is performed no matter how this option is set:  The operator must still be in the W/C to perform the work in the Rich POD.  We donu2019t want users from WC1 working in WC2, ever.  That is why we always make this validation, even if the rule is set to None."
    So, in case you use Rich POD, SWA and Assignment Enforcement option, then you should see the error message caused by Assignment Enforcement.
    Regards,
    Sergiy

  • How to find cost center assigned to a work center

    Hi Guys,
                 I need to find cost center assigned to work center.
    from Which table I should to get it.
    Cheers
    S Kumar

    Hi,
    Please use the table CRHD to get the object ids and then go to the table CRCO with the object ids and get the Cost center assignment to resources.or you an create a query by SQVI and use it.
    regards,
    kaushik

  • Assignment of activity group to work center

    Hi,
    We want to assign activity type to work center more than six,
    how we can assign activity type more than six to work center?
    i have created activity type group in klh1,
    in activity group i have assigned activity type more than six,
    How we can assign activity type group in work center?
    Regards
    Gajjen

    HI
    It is not possible to assign more tha six actvities to a cost center as per SVK defined in the WC.
    Check with the business process field for assign  with your CO guy in thw WC.
    A business procedure within an enterprise that uses resources and can involve activities from a number of different cost centers in a controlling area.
    When executing a business process, activities can be utilized for several cost centers of a controlling area.
    Check and revert
    Regards
    Anupam Sharma

  • Resources assigned to a Work Center

    Hi Experts ,
    Is there any Function Module to get the 'Person Responsible' and the Resources assigned to a Work Center ?
    Thanks,
    Radhika.

    Hi Renjith,
    Thanks for the quick reply. The Second FM is exactly what i was looking for, but regarding the Person Responsible field, i need related to the Work center only not the Project Definition.
    Any idea of person responsible for work center ?
    Thanks.

  • Error when assigning the personnel no to work center

    Hi,
    I have uploaded the HR mini master.Now when I am trying to assign the personnel no to work center it gives me an error as to no objects found. Although I am able to see the list in F4.Checked the validity of both the masters (HR and WC).
    Please suugest!
    Regards,
    Meghana

    Hello,
    Have you tried to assign personnel number one by one ?
    You said you checked the validity for both WC and HR.Did you mean you checked the validity of personnel number you tried to assign ? Also check the relationship period in the pop up screen before F4.
    Regards,
    Deepak

Maybe you are looking for

  • SCSM 2012 Side-by-Side upgrade

    I am currently running Service Manager 2010 SP1 on two Windows Server 2008 R2 VMs (their databases running on a separate SQL 2008 R2 server), with SSRS being hosted on yet another SQL 2008 R2 server (4 servers in total make up the entire SCSM environ

  • F.13 Clearing Documents contain no data

    Hi, I have carried out F.13 transaction to clear some customer accounts. However, the system displays that it has created a few clearing documents in the output. But when i see the document postings, i see no data in the documents. It says List is em

  • Upgrade from FCS to FCS2 academic possible?

    I have the non-academic version of Final Cut Studio and I want to upgrade to Studio 2. I saw the academic version on Ebay, unregistered. If I bought this version, would Apple deny my current registration numbers?

  • Solitaire game won't load??

    I was able to play free card games but now they won't open. Could this be a Mac problem?

  • Bapi_PO_Create1 having some problem with POCOND

    Hello All,    i am using the bapi_po_create1.. i have created PO's from PR's now i have to also add a pricing condition type for Freight. the problem i am having is that i build the data into POCOND and POCONDX for the fields : fs_pocond-itm_number