Assigning XSteps to control recipe destination

Hello Experts,
I have a question related to XSteps. I have used XSteps in ECC5.0. One of the deficiency we faced compared to process instructions is, process instruction categories can be assigned to control recipe destinations and can be generated without directly assigning to phases of recipe. This immensely reduces the maintenance effort. This is not possible in XSteps.
Even if the XStep references should be defined to destination while its definition, it should be assigned to each phase of the recipe. Any change is there in this design in ECC6.0?
Also what is the use of context in XStep reference definition?. When I try to create new context, its asking me to select a node and not letting me create.
The last question is, is there any mass assignment tool developed by SAP to assign XStep references to recipes?
Thanks
Prathib

Even if the XStep references should be defined to destination while its definition, it should be assigned to each phase of the recipe. Any change is there in this design in ECC6.0?
Ans: -
Nope. it is your chioce if you wiosh to assign it to individual phase of or single reference to all phase. It purely defpends on how efficient your design it.
We has 28 Phase (Ave) in each reciepe and we still have managed to keep Xsteps reference to minimum. Thanks to efficient XSTEPS master data designing.
Also what is the use of context in XStep reference definition?. When I try to create new context, its asking me to select a node and not letting me create.
Ans: -
Reference can be used in Reciepe and it helps in easing your reciepe creation. Context can used in reciepe or process order. Context is used to assign individual operation or phase. This is used is general all phase in generation tab could not be used.
The last question is, is there any mass assignment tool developed by SAP to assign XStep references to recipes?
Ans: -
There is one. I will find out and let you know. U can try yourself as well.
I have a question related to XSteps. I have used XSteps in ECC5.0. One of the deficiency we faced compared to process instructions is, process instruction categories can be assigned to control recipe destinations and can be generated without directly assigning to phases of recipe. This immensely reduces the maintenance effort. This is not possible in XSteps
Ans: -
You can do this in XSTEPS as well. But of what use will it be if simulation does not show data and the way you wish to see the data.
Simulation can be done for each XSTPS tree you define in XSTEPS master data.

Similar Messages

  • Regarding control recipe destination

    Dear all,
    What is control recipe destination is it the end user or otherwise similarly for a person in shopfloor how does he view Pi sheet and how he will enter details of various parameters in it and how he will close the PI sheet.
    What will happen in CO53 and what do we do in CO54 , please give in detail
    regards
    venkat

    Hi Venkat,
    Control recipe destination is  the process control system or the line operator to whom the process instructions are transferred to be carried out. When processing the order, you can generate one control recipe with the process instructions for all phases, for each control recipe of a process order.
    You then assign the control recipe destination to the phases of the master recipe, by maintaining the process control data in the process instruction overview. This section describes the assignment of a control recipe destination to a phase.
    Please find detailed documentation on the SAP Help URL as below:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/05/603bc6462311d182b50000e829fbfe/frameset.htm
    Please check and confirm.
    Regards
    Datta

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control recipes for PI sheet and external system

    Dear All,
    I need to create control recipe for PI sheet and for external system also. Can I use the characteristic based process instructions? Since I can assign only one control recipe destination for a phase, can i generate the data of a particular phase in both the control recipes.
    Thanks in advance
    Regards
    Prathib

    Thanks Brahmankar,
    But i dont understand what to enter in  input parameters for EAD_TEXT.
    Could you plz help me out.
    Best Regards,
    Parag Save.

  • Configuring RFC destination for control recipe

    Hi,
    There was a very good document in SDN which explains in detail how an external control recipe destination has to be configured with RFC destinations etc. written by somebody from IBM.
    I cant find the document in the forum now.
    Can any body please help me on this?
    Thanks in advance.

    Dear,
    Please check these links,
    [RFC destination |https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/3861e693-0e01-0010-e791-9b44d2693e6c]
    [Link2|https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/201769e0-3174-2910-e287-baa58d198246]
    [LINK3|https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/208c4788-7f02-2a10-da80-bbaf7a202780]
    Regards,
    R.Brahmankar

  • Advantages of PI sheet and control recipe

    can u pls let me know the advantages of using Process instruction sheet and control recipe,
    and if it is not maintained , then what will be the reflection.
    thnx-rgds
    Amitabh

    Hi,
    Control recipe is used to send a proper destination or to the operator who has to input the data and confirm this action performed.
    control recipe will be sent back to the process order and instructions with data will be available. when creating a process order, control recipe will be created, which will contain the process instruction.
    To specify the PI that are to be generated in the processorder when control recipe is created  for the control recipe destination.
    There are 3 steps to be performed such as
    1) Define control recipe destinations
    2) Assign PI Categories
    3) Set process instructions to be gerated automatically
    Please let me know.
    Regards,
    Mohan R

  • XSteps based Control Receipe (PI_CRST) failed

    Hello Experts,
      When I complete the XSteps based PI Sheet in CO60 the process message 'PI_CRST' is failed with error message "Control Recipe destination not available in process order".  Can any one help me with this?
    with best regards
    K. Mohan Reddy

    Hello Mohan,
    You need to look at a couple of things to find the root cause of this issue.
    1. Have you configured the control recipe destination in the XStep tree? - This can be done under the destinations tab at the root level. Even if you do not include the destination for the children XSteps of the root, it will flow from the top but never the other way round.
    2. Check the destinations you are using for the process message category PI_CRST. In an XStep scenario, you should be using :
    PI02 Type: 01 Destination Address: COCI_CONFIRM_CONTROL_RECIPE 
    PI09 Type: 01 Destination Address: COCI_CONF_CNTRL_REC_TO_PO_XS
    Regards,
    Mudit

  • Process instruction sheet and control recipe

    dear,
           can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works.
    if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration as well as process.
    thnx-rgds
    Amitabh

    Hi,
    In control recipe destination the destination type must be browser based.Another is Abap based generally it is using.
    So select that recipe destination, select phase & go in deatil u will find INSTR.READ1, READ2,SIGN which can used as a instruction.
    There are two types 1:process sheet 2: remote fuction call (RFC)
    Process sheet is used for giving instructions to line operator & also entering data during reaction etc per period.
    For INSTR- select it give instruction for that particular phase.
    READ1 - In which we are one column is available where we can enter 1 value by line opearator
    READ2- Here 4 columns are available u can use it as date,time,temp,total etc. as per your requirement.
    SIGN- Here u can use it as a to identify who entered the value.Systen will ask for pass word after entering ID
    After creation & releasing  process order  create contriol recipe.
    Thern go for T code- CO 53 - send control recipe(control recipe monitor)
    http://help.sap.com/saphelp_46c/helpdata/en/f3/6ee4117aed11d2a5fe0060087d1a6b/content.htm
    CO60 - Operator will enter the values
    CO54 - send process messages
    http://help.sap.com/saphelp_46c/helpdata/en/ac/6a101268ce11d2a67600104b57eaa3/content.htm
    CO55- Check the report.
    Check the above & reward if useful.
    Regards,
    Suhas

  • Enabling Xsteps in master recipe and process order

    Hi experts,
    I am trying to enable the Xsteps by assigning 'Xsteps' in Master recipe profile. But Xsteps tab is not getting enabled in master recipe. I think this is the only one setting to activate Xstep. Can anybody help me on this.? IS this a technical issue(Something related to basis?)
    Similarly I dont see the Xsteps tab in process order also. Is the SAP version a reason for this. I think Xsteps functionality are available from 4.7 onwards.
    Can anybody help me on this please?
    Thanks in advance.

    Dear experts,
    I encounter the same problem of Prathib. I'm working on ECC 6.0 and would like to use Xsteps. The repository is available (R/3 Enterprise SCM Extension 2.0 is imported) and I created several xsteps but i cannot imprt them in the master recipe because the button "Xsteps" is not active in C202, even the recipe profile is correctly set to PI01_XS.
    All SAP notes i found (01466 and 607815) are referring to 4.7 and are correctly implemented in my system. So the customizing and extensions are in place, but the button "Xsteps" is not active.
    Can anybody help and suggest further settings i need to do in order to use xsteps?
    Thanks & Regards.

  • XStep- creation of two control recipes

    Hi,
    I am using the Ecc 6.0 Enp 3.0
    I have created a Xtsep structure with parameters and checked. so errors found.
    XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
    The second control recipe has the all details which are captured from XStep.
    Why First control recipe getting created.. am I doing something wroing in setup..
    Thanks,
    JK

    Why don't you just create a custom view object? There's even an example or 2 in the docs:
    http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
    Edit: you are aware that you can create a View Object based on more than one table?
    John

  • Control Recipe and PI sheet assignment in Master Recipe

    Hi,
      Can anyone guide me in detail about the Assignment of PI sheets in detail and also guide me the generation of Control recipe during Process order release.
    Also explain hoe to generate PI sheet automatically. brief me in Step by step.
    Regards,
    Muthamil

    Closed

  • Error when sending control recipe to external destination

    Hi,
    When Iam trying to send control recipe to external destination through CO53, Iam getting the status of the control recipe as 'Sent'. But when I check the tRFC log, I get the status, "connection closed (no data) ".
    By selecting the line in the log and executing the LUW I get the message, target system/gate way not active.
    In the external system I get the message " Illigal activity"
    I checked the RFC connection in SM59 and connection is ok.
    The RFC is working from SE37 and the control recipe can be processed without any issues through SE37. The problem is when I try to send from CO53.
    Request your expert advice to solve at the earliest.
    Thanks in advance
    Prathib

    Hi Prathib, Have you got the solution to this problem

  • Control recipe cretaion if the process inst categories assigned in Order

    Hi, As i understand you can assign the process instruction category either in o10c or in process order- opertion - phase, it self. my doubt is if it is assigned in phase of the order, there is no fileds like general scope, filter etc which is there in o10c. in case if we assign the proc inst cat in order, how system creats the control recipe without those fields? please advise.

    Hi All, i think my question is not clear. my question is in o10c we have fields like general scope. if you enter here cons_1 (consumpltion), against this we need to enter general scope as "for all reservations", then only in pi sheet it will display cells to enter the values for all components. if we enter cons_1 in recipe, i could not find this general scope field where i need to specify that this process inst category is for all items in reservation. i hope this explanation will clear my doubt.
    Thanks.

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Control recipe generation from process order

    Hi,
    Iam using XSteps to generate control recipes for external destination ie destination type 02. But I find no control on the number of control recipes that can be generated.Whenever I click on the generate control recipe botton,  a new control recipe is getting generated,
    I need to have a control on this similiar to the case of destination type 04. ie system will not generate a control recipe if already a control recipe is there for a destination.
    Can anybody know how to bring this control?
    Thnaks in advance
    Regards
    Prathib

    Hi
    If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
    SDG

Maybe you are looking for

  • Samba and Solaris, access slow via XP

    Hi everyone, I've new to solaris and I've installed 10, update 5. I've configured samba (very badly I believe) so that I can access my solaris box from my XP 64 computer. Both are on a local network (connected via a Belkin router) and in the same wor

  • Extracting Audio from DVD?

    Not sure if this is in right section, but can anyone give me some tips, I have a DVD that I want to extract the complete audio from, and put onto CD to listen to, what do I need to do it? Thanks in advance Jim.

  • Populating a collection with function results

    I am calculating some statistics and need to use a collection to store the results of several function so they can be used in a procedure. Example: PROCEDURE PRODUCTIVITY_INSERT(p_first_of_month IN DATE) AS BEGIN vc_FirstofMonth := p_first_of_month;

  • Text file generator gets out of sync!

    Has anyone any experience of this behaviour in the text file generator in Motion...... Basically the first entry in the list is only displayed for half the time of the other entries! This means that any repeat keyframes that I apply (even if I apply

  • Angry birds on iphone and ipad

    Hi, I have received my new ipad a few days ago and downloaded it also because I have it on my iphone. Is there a way to have the levels that I have already beaten come up on my ipad? I am new to how things work, maybe I need to attach it to my comput