Assignment of different personnel no.

Is it possible to assign an employee two different personnel no. and allocate him two different company codes and generate a single invoice? Please explain?

Hi,
First of all pl. raise query properly, we are unable to reply for previous query related to Legacy system due to you have locked the same thread.
1. To transfer data from legacy to SAP there are many tools available such as LSMW, BDC.
First you need to prepare your data as per SAP format and then u can upload in SAP.
2. As per my knowldege you can create different personnel no. for one employee but it will create many complications for you,
so better pl. create one personnel no. for one employee.
Regards,
Ram Aware

Similar Messages

  • Is It Possible To Create Different Personnel Number For One Employee

    HI Experts,
            My Client need to get Different Personnel number for one employee,i.e for Trainee one Personnel number need to generate and same person when moving from Trainee to Probation another new personnel number should generate and again when same person move from Probation to Permanent another new personnel number should generate.
    1. How to generate 3 different Personnel number for One employee?
    2. How these 3 Personnel number should get linked, if want to get report for this one employee?
    Kindly help me.
    Thanks,
    Lavanya
    Message was edited by: Sikindar A

    Hi Lavanya,
    Your requirement can be fulfilled but not recommended...
    As you want to generate different position number at different stage of employment....
    i.e Trainee to Probation to Permanent...
    First go for Trainee Position Hiring ....  and generate first Number Say 5000000
    Then suppose employee complete training after 1 Yrs.. then again go PA 40 enter date as 01.01.2015 say... & execute... & give Ref. Personnel Number (5000000) & different position number... this time...
    This will link up all the personnel date from previous hiring record... & as per your need you can modify it.... Finally one more number be generated....
    Similarly,, you can do for Permanent employee...
    Once training or Probation period gets completed you can lock/ separate that employee  number
    Report ...
    You can get necessary details in IT0031...& with different Position numbers which you will using at different stage of hiring...
    Hope this should sort your issue..
    Regards,
    Veeram

  • How can we assign a different scope of planning in MTO scenario?

    Hi,
    We are using MTO scenario. In this case, during sales order creation checking control AE is getting triggered. We want to use a different scenario during rescheduling transaction. But as per my analysis, V_V2 is also calling the same AE checking control eventhough we assigned a different checking control for Back order processing.
    In this case, can we assign a different checking control (scope of check) for back order processing?
    Regards.

    Let me explain my requirement here....
    This is a kind of trading or sub-contracting. Initially we will give the forecast to vendor...but Vendor will start the finished product production only after getting the confirmed order from us. Hence we thought to use strategy 50. So we will create a PO to Vendor only after getting a confirmed sales order from customer.
    But in strategy 50 ATP confirmation is based on PIR. Hence we created a new requirement class (copy of 45 with ATP active). So in this new strategy ATP is against actual receipts instead of PIRs.
    But sometimes Vendor may not be able to supply as per lead-time...and he may postpone the delivery date. In this case we are getting exception message 10 for the PO...even though PO is specific to a sales order. Still rescheduling job (V_V2) is not populating the new confirmation date as it is referring to the TRLT.
    Hence we want to use ATP based on TRLT during sales order creation. And during rescheduling we want to use a different scope of check ('without TRLT' and with 'No storage location check'). Hence we created a new checking rule for rescheduling and this we assigned for that specific plant.
    As per my observation, rescheduling job is not picking the scope of check that is assigned for rescheduling....it is calling the same checking rule AE during rescheduling also.
    So my question here is... can we call a different scope of check during rescheduling run while using make to order strategy?
    Regards.

  • HT4314 I have two ipods in my house that were set up under the same email.  I have since assigned two different emails.  How can I change the game center account so that is not shared by both ipods because it is for two different users and they are not ha

    I have two ipods in my house that were set up under the same email.  I have since assigned two different emails.  How can I change the game center account so that is not shared by both ipods because it is for two different users and they are not happy?

    By "game center account", do you mean Apple ID?
    If so, you can change it.
    1. Tap settings and navigate to iTunes and App Stores
    2. Tap "Apple ID" and then tap "Sign Out"
    3. Log in with a different ID.

  • New task assigned to user from CurrentItem:UserField using Assign task action is assigned to different user.

    Hello ! 
    I have run into "funny" problem. 
    I have following workflow:
    User is creating item in ListA. In new form he needs to put Manager which is User Field column type. From people picker he is choosing login name Domain\jo (Two letters seems to be important here). User is resolved correctly to John Doe. Item is saved and
    added to list correctly. In list view John Doe is displayed in Manager column. In view item John Doe is in Manager field. In powershell Id;#John Doe is as a Manager field value. 
    Now the "funny" part:
    After item is added to ListA workflow is started automatically. Workflow is assigning new task to user from Manager (CurrentItem:Manager) field using Assign task action. Now the new task is assigned to different person i.e. John Dimagio with login name DOMAIN\jod
    ! When I am logging value to wf history of the CurrentItem:Manager field I am getting sth like i;123#DOMAIN\jod . So value is completely different and wrong. 
    Can someone explain why is this happening? 
    My guess is that using two letters login name can cause such case but why ?
    Regards,

    Hello ! 
    I have run into "funny" problem. 
    I have following workflow:
    User is creating item in ListA. In new form he needs to put Manager which is User Field column type. From people picker he is choosing login name Domain\jo (Two letters seems to be important here). User is resolved correctly to John Doe. Item is saved and
    added to list correctly. In list view John Doe is displayed in Manager column. In view item John Doe is in Manager field. In powershell Id;#John Doe is as a Manager field value. 
    Now the "funny" part:
    After item is added to ListA workflow is started automatically. Workflow is assigning new task to user from Manager (CurrentItem:Manager) field using Assign task action. Now the new task is assigned to different person i.e. John Dimagio with login name DOMAIN\jod
    ! When I am logging value to wf history of the CurrentItem:Manager field I am getting sth like i;123#DOMAIN\jod . So value is completely different and wrong. 
    Can someone explain why is this happening? 
    My guess is that using two letters login name can cause such case but why ?
    Regards,

  • Assigning a different inspection plan to an inspection lot

    Hi,
    I have a situation where the incorrect inspection plan is assigned to an inspection lot. Is there any mechanism to assign a different inspection plan to an inspection lot i.e. without having to reverse a goods receipt.
    Regards,

    >
    Shyamal Joshi wrote:
    > Hi Kaushal,
    >
    > There are more than one reason for this error. Check the followings.
    >
    > - The key date for inspection lot should be later than the key date for the inspection plan, later then the date when you assigned the material to the plan.
    > - The usage of lot and inspection plan should be same.
    > - The status of inspection plan must be released.
    >
    > Regards,
    > Shyamal
    Why are you not checking these things I am sure the reason would be there only. If dont wana check it is your wish. Any ways best of luck

  • Assigning a different mask for the same role

    Hi All,
      I have two users user1 and user2 are created in MDM and each assigned to the same role say role1.
    My requirement is user1 should get data of catagory 1 where as user2 should get all the main data in MDM.This catagory 1 is part of the main data.
    For this scenario i have created a mask say for example  catagory1_mask for catagory1 data and assigned this mask to the role role1 where user1 and user2 are being assigned to this role.
      And i have one more mask all_mask for user2 where i have assigned all the records of the main table to this mask. So when user2 logs into the MDM he would get all the data in MDM.
    If i assign this all_mask to the role1 user1 cal also access the whole data including user2. But as per the rqmt user1 should not access the whole data but have to access only catgory1 data.
    Can anybody advice me how can i assign a different masks to a one role when 2 users have been assigned the same role?
    Regards
    Sireesha.

    Hi Jitesh,
      I am getting one issue after creating duplicate role in portal.
    As u know i have created 2 duplicate roles for user1 and user2. Before creating the duplicate role i was able to see the user1 and user2 in the SRM MDM UI page of general tab.
       After creating the duplicate roles for these users am not getting the user1 and user2 in the User dropdown field of MDM UI screen...
    Is this bcoz of creating duplicate role?
    How can i get the user1 and user2 here?
    Please advice me...
    Regards
    Sireesha.

  • Tool for displaying Interrupt Numbers assigned to differant devices

    Hi ,
    I need to know whether is there any tool to display the interrupt numbers assigned to different devices in a system. Actually i am developing a WDF driver for a device which has normal interrupt
    line(not MSI) connected to the APIC.I have configured the interrupt for my device.But still my ISR is not getting called .
    can anyone help me with this regard.
    Thanks.

    The device manager will do this use View setting resources by type and look at the interrupts.  A negative (or large hex value) is an MSI interrupt, a small integer value is a regular interrupt.  You say you have configured the interrupt for your
    device, for a plug and play driver the system should be giving you the interrupt. configuration in start device, is this what you mean, or are you just trying to connect to a specific interrupt?
    Don Burn Windows Filesystem and Driver Consulting Website: http://www.windrvr.com

  • Test Package - Assignment to different tester

    hi to everybody,
    I'm using STWB_2 and STWB_WORK during test in an implementation project. I have created a test case with different process steps. Some of these steps are to be executed by a key user, other by another key user. How can I assign the different tester inside the test package. I would like to show this information when the testers display the package. Any idea????
    Thanks a lot
    lelio

    Hi Lelio,
    Ok. So, you have already considered the Package creation at Transaction Code Level.
    One suggestion is, to let the first tester finish his/her transaction, have a test step called 'Create a message', let him/her create a message alerting the next tester to commence the next step. All such messages are with respect to a given 'Test' within a Test package - at Test document/ Transaction level, so they'll have the right 'context' when someone opens the message.
    I know this isn't a great solution, but using a standard functionality for a different use.
    Best regards,
    Srini-
    Hi Lelio,
    I was going through [this|https://websmp107.sap-ag.de/~sapidb/011000358700000193922008E] presentation today - from SolMan Enterprise Edition and it seems like your query is answered by this version of SolMan. Please go to slides 8 to 11 of 25.
    There is also a [SAP Tutor |https://websmp107.sap-ag.de/~sapidb/011000358700000183912008E.sim]file which explains how the new functionality works. It's great to see this - and I wish this was part of normal SolMan pack itself !
    Of course, this would come at some extra cost. Perhaps, a case for you to consider at a later stage, or if your project/support organisation can spare that rightaway
    Warm regards,
    Srini
    Edited by: Srinivasan Radhakrishnan on May 26, 2008 3:08 PM

  • Orders/Notifications assigned to a personnel Number

    I need to get all the orders and notifications assigned to a personnel in plant maintenance. Can anybody suggest me the tables where I can query and get the orders and notification assigned on personnel Number. This Personnel Number get populated against the order in TRANSACTION -IW37 .
    Any Idea????

    That transaction is using AFVC and the view VIAFKOS. u have personnel number in AFVC and the Order in VIAFKOS.
    Join conditions are AFVC-AUFPL = VIAFKOS-AUFPL & AFVC-APLZL = VIAFKOS-APLZLT

  • Assigning 2 different license to one database

    Hi Guys,
    Is it possible to assign to different license to one database to SAP Business One 8.8 PL20?
    Regards,
    Michael

    Hi Michael,
    Why do you need assigning 2 different license to one database? I don't think that is the right use of the license even if it is possible.
    Thanks,
    Gordon

  • AFAB DEPRECIATION ERROR (CO ACCOUNT ASSIGNMENT HAVE DIFFERENT PROFIT CENTERS)

    Hello Every One
    we had a user “ABC” who used to run this AFAB depreciation month end activity as a background job. and was working for her perfectly fine. But since she is no more with us. Now New users “123” and “546” when they run the same activity in the same manner it does not show a batch session created in SM35 list, because there are errors associated with the above 2 user names that I saw in the SM37 LOG which is the cause of making this activity to fail.
    for User 123 it cancelled the job and error shows "CO ACCOUNT ASSIGNMENT HAVE DIFFERENT PROFIT CENTERS"
    for user 345 it shows "Not all the documents in the last posting run were posted"
    I will appreciate every one help as it is very crucial and month end activity
    Thanks in Advance

    Hi
    Execute Afab with Repeat option, test mode and error analysis ON
    It should tell which asset had problem. For the 1st error, your asset might have 2 co objects in it and both have different PC s.. See if it can be cchanged
    Br. Ajay M

  • CO Account assignment have different profit centers.

    Dear Users,
    I get the warning message like "CO account assignment have different profit centers" while creating PO, now i need this message to be displayed while creating PR. Please help me out with settings.
    Thanks.

    Why don't you post the message number which is showing at the time of PO creation.
    I don't think its possible within any standard settings.
    Because system checks the same path for "Define Attributes of System messages" during creation of PO and PR.
    If you have custom message, then you can do it through development for the custom message.
    If this is standard message, then you also have to go for development. By using any user exit or badi, system can triggered the message.
    Regards
    Dev

  • Assigning two different data sources to infosource

    hi
    i have a small problem. Actually we have a development bw server which is having client no.500.
    we have a development r/3 server which is of client 330. and we have defined a rfc connection for client 330 in bw client 500. and all the infosources are assigned to that rfc connection which is configured for 330.
    In 330, we  have very less data. We have one more client 700 which is having data. Now i have created a rfc connection for this client 700. and i want to use this connection  as a source for client 500 in bw.
    can i disable the existing rfc connection of 330 and use rfc connection of 700 for the same infosource.
    Please reply.
    regards
    padma

    You can assign from different clients of your source system datasources to your infosource. I've already linked 30 datasources out of 30 clients to one infosource. No problem.
    So you can link both of your clients to your infosource. I think it is important not to delete the connection to client 330 because this - I think - is the client where you do all the "customizing" setting for your datasource. Then this datasource-infosource connection is the basic for the transports to the production system.

  • Request/task is assigned to different client in Charm

    Hi All,
    We did a change in the transport route, just adding a new transport group in the existing transport route. The Project consistency and everything looks fine.
    But, we are facing an issue while creating a Transport of copies for an normal change. when i check the application Log it says "request/task XXXXXXXX is assigned to different client Charm".
    When i check that particular TOC in a satellite system, there is no proper owner name available and it took SMTMCSP system user. Also, the Target system is empty. Please help us to fix this issue.
    Regards,
    Prabhushankar B

    Hi Pavan,
    This is the standard behavior for the 'Normal Corrections'. They work under the philosophy of 'Release Mgt' where all normal corrections move to production together as part of the release.
    If you want changes to move independently, you should work with Urgnt Corrections. They have their own tasklist. But please note the urgnts are re-imported with the maintenance cycle when it is moved to go-live phase and imported.
    Thanks & Regards,
    Kriti Bhalla

Maybe you are looking for

  • Can't boot off Apple Hardware Test disk

    Can anyone suggest why my laptop won't boot off of its Apple Hardware Test disk anymore? I have not tried it in years, but want to try now. I have the original, and a copy I made years ago, and neither will boot. I can select them at startup disks in

  • Collation Error during SAP ABAP Engine Unicode Central Instance

    I am trying to follow instructions on installing XI Prerequisite components. I am getting conflicts on collations. My back-end database is SQL Server 2000 (SP3,hot-fix and unicodecp850bin2 fix). SAP expecting SQL_Latin1_General_CP850_BIN2 collation a

  • Where can I find an installer for Lion for my older Mac?

    Last year I purchased Lion for my main Mac; this year I upgraded to Mountain Lion. Now I'd like to bring one of my older Macs up to the newest OS it's capable of, which is Lion. I can't find a Lion download/installer on the App store anymore. The  10

  • EPSON BX320FW does not work under OSX 10.9 via WIFI

    Hi after my upgrade to 10.9 the printer started to does not work. I could see the printer, but the status is waiting. When I try to print, I see the message "Finding a printer", and it failed. Any idea?

  • Failing to sleep (again) VERY HOT MBP in the bag/like a bakery

    Hi 2 all, i'm italian so my english should be C-- but i have a trouble with my MBP about sleeping the mac. Simply don't work randomly and the white led remain on withot pulse. I tried to see in Console if any task stop the sleep process -sounds a jok