Dear All,
At the moment we are on ECC6 EHP 4 and would like to use Document Management in SAP. Now att the PO and PR line item we need to click the Documents icon to see the if the is any document that is being attached to the line item . Is there any way that we can have and indicator at the PR or PO item to denote that there is an attachment attach without the need to click the Documents icon? Maybe an attachment symbol that outlook use whenever there is an attachment in the email.
Would appreciate if you provide any notes or configuration step how to do this.
Thanks

A purchase requisition is an internal document that's created to initiate a procurement transaction. The requisition is created to identify the materials that are needed to be acquired and when they're needed. Once completed by the initiator, it's sent to the appropriate approvers.
Upon approvals of the requsition have been provided, and a vendor is selected, a purchase order is created. The purchase order is an external document whereby an agreement is made to procure the materials at an agreed upon price and delivery schedule
The InfoCubes for each of these is different due to the nature of the documents (internal v. external).

Similar Messages

  • What is Tcode for purchase order and purchse requisition.

    HI all
    What is Tcode for purchase order and purchse requisition.
    Thanks

    Hi Melanie,
    How are you trying to check for the PR number? Are you accessing it via Portal (IE) or the GUI?
    If you are trying to get the PR number for a SC through Portal. Then please follow the below process.
    Go to the SC > Related Documents tab
    The related Documents tab should have all the follow-on document number along with the type of document.
    If you are trying to get the PR number for a SC through GUI, then:
    Go to transaction BBP_PD in GUI > Give the Object Types as BUS2121 and the Object ID as the SC number and click on F8.
    Once you have opened the SC then scroll down till you get the Header Links and click on the line.
    This should display the document that is linked to the SC.
    Hope this helps.
    Regards

  • Purchase order and purchasing requisition .

    Hi
    What is the difference between Purchase order and Purchase requisition . ?
    And why cube are different for them ?
    Regards

    A purchase requisition is an internal document that's created to initiate a procurement transaction. The requisition is created to identify the materials that are needed to be acquired and when they're needed. Once completed by the initiator, it's sent to the appropriate approvers.
    Upon approvals of the requsition have been provided, and a vendor is selected, a purchase order is created. The purchase order is an external document whereby an agreement is made to procure the materials at an agreed upon price and delivery schedule
    The InfoCubes for each of these is different due to the nature of the documents (internal v. external).

  • Destiny - $10 Reward Certificate for Pre-order and Purchase

    So as the title states, according to BB's promotion,anyone that pre-orders the Destiny game and purchases it, gets a $10 reward certificate. 
    I was one of the lucky few that actually pre-ordered the Destiny Limited Edition and did not have it get cancelled due to limited suppy. Regardless, why doesn't the Destiny Limited Edition have the special offer for the $10 reward certificate for pre-order and purchase? I am hoping this is just an oversite.
    Promo Link
    Solved!
    Go to Solution.

    Hi JBROWN52,
    Congratulations on securing a copy of the Limited Edition of Destiny!
    I wanted to jump in and reiterate what enuf has said. The $10 Reward Certificate bonus should be credited to your My Best Buy account within 20 days after you receive your copy of Destiny, whether it be picked up in-store or shipped to you. If for any reason you don’t see the points after this time has elapsed, please create a post letting us know and we’ll be more than happy to help out.
    Let us know if you have any other questions and thanks for pre-ordering Destiny at Best Buy.
    Cheers,
    Brian|Senior Social Media Specialist | Best Buy® Corporate
     Private Message

  • Relation b/n Contract, SA, RFQ, Purchase Order and Purchase Requisition

    Hi All,
    Could you please explain relation between
    Contract
    Schedule Agreement
    RFQ
    Purchase Requesition
    Purchase Order
    Regards
    Swamy

    You may get better responses in MM forum than in FI.
    <b>Purchase Requisition and Purchase Order</b>
    Purchase Requisition is created by any users who ever want any item for whatever purpose. This is routed to appropriate authority within the organization. When approved, the same can be converted to a Purchase order

  • Purchase Order and Purchase Request

    Hi Gurus,
    do you know how can I get a Purchase Request Number for an item in Purchase Order?
    I cannot find it in any BI Content Data Source...
    Regards,
    Dorota

    In R/3 tr: /nme23n- display purchase order
    It will show the last Purchase Order that you displayed.
    On the Purchase order on the top left corner, click on purchase order, and click "other purchase order".
    the pop up asks you to enter either purchase order or purchase order number
    enter the purchase request number for which you want to see the purchase order and hit ok and vice versa..
    go to status tab and double click on purchase order
    you will get the corrsponding purchase order for the purchase request..
    and if you chose purchase order on the pop up you can get the purchase request number
    For the data source:
    2lis_02_itm, 2lis_02_scl
    http://help.sap.com/saphelp_sm32/helpdata/en/8d/bc383fe58d5900e10000000a114084/content.htm
    Both of them together can address your requirement.

  • Purchase order and Purchase requistion report

    Dear Experts,
    I have run the MRP and PR was been generated to purchase department and purchase department has converted those PR to PO, but now i want to check that when was the PR generated date and when purchase department made the PO.
    In short i required the PR Vs PO service level report.
    Regards,
    Phalgun Patel

    Hi Palgun & Madhu,
    ME5A will suffice your requirement. This report will provide following things,
    PR creating date
    PR release date
    PO number
    PO creating date
    PO delivery date
    You need to choose the layout according to your requirement.
    Regards / US

  • User Exit/BADI for Purchase Order and Purchase Requisitions

    HI,
    I have a requireent where i have to check the the user does not enter both Subitems and Over a Limit for a Service Purchase Requisition.
    Is there a User Exit or Badi that i can use where this information is availaible.
    also i have to check that release strategy is assigned to every purchase order where the version has been completed.
    Is there a User Exit or Badi where Information of EREV table is availaible.
    Regards,
    Tarun Bahal

    For Purchachase requisition , the BADIs and USER EXITS are
    ME_COMMITMNT_PARKING BAdI for Redefining Commitment Interface When Parking
    ME_MEREQ_PARKING BAdI Purchase Requisition: "Hold"
    ME_REQ_HEADER_TEXT Copy Header Text: Enjoy Purchase Requisition
    try with the above BADI's
    MEREQ001 Customers' Own Data in Purchase Requisition
    for Purchase order , the BADIs and USER EXITS are
    ARC_MM_EKKO_CHECK BAdI: Enhancement of Archivability Check (MM_EKKO)
    ARC_MM_EKKO_WRITE BAdI: Enhancement of Scope of Archiving (MM_EKKO)
    EXTENSION_US_TAXES Extended Tax Calculation with Additional Data
    MEGUI_LAYOUT BAdI for Enjoy Purchasing GUI
    ME_ACTV_CANCEL_PO BAdI for Activating the Cancel Function at Header Level
    ME_BADI_DISPLAY_DOC BAdI for Internal Control of Transaction to be Invoked
    ME_BAPI_PO_CREATE_01
    ME_BAPI_PO_CREATE_02
    ME_BAPI_PR_CREATE_01
    ME_BAPI_PR_CREATE_02
    ME_BSART_DET Change document type for automatically generated POs
    ME_CCP_ACTIVE_CHECK BAdI to check whether CCP process is active
    ME_CCP_BESWK_AUTH_CH BAdI for authorization checks for procuring plant
    ME_CCP_DEL_DURATION Calc. of Delivery Duration in CCP Process (Not in Standard)
    ME_CHANGE_CHARACTER Customer-Specific Characteristics for Product Allocation
    ME_CHANGE_OUTTAB Enrich ALV Output Table in Purchasing
    ME_CHECK_ALL_ITEMS Run Through Items Again in the Event of Changes in EKKO
    ME_CHECK_OA Check BAdI for Contracts
    ME_CHECK_SOURCES Additional Checks in Source Determination/Checking
    ME_CIN_LEINRF2R BADI for CIN India - Delivery charges
    ME_CIN_LEINRF2V BADI for LEINRF03 excise_invoice_details
    ME_CIN_MM06EFKO Copy PO data for use by Country version India
    ME_CIP_ALLOW_CHANGE Configuration in Purchasing: Changeability Control
    ME_CIP_REF_CHAR Enables Reference Characteristics in Purchasing
    ME_COMMITMENT_RETURN Commitment for return item
    ME_COMMITMENT_STO_CH BadI for checking if commitments for STOs are active
    ME_COMMTMNT_PO_RELEV Check for Commitment-Relevance of Purchase Orders
    ME_COMMTMNT_PO_REL_C Check for Commitment-Relevance of Purchase Orders
    ME_COMMTMNT_REQ_RELE Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_REQ_RE_C Check of Commitment Relevance of Purchase Requisitions
    ME_DEFINE_CALCTYPE Control of Pricing Type: Additional Fields
    ME_DP_CLEARING Clearing (Offsetting) of Down Payments and Payment Requests
    ME_FIELDSTATUS_STOCK FM Account Assignment Behavior for Stock PR/PO
    ME_GUI_PO_CUST Customer's Own Screens in Enjoy Purchase Order
    ME_HOLD_PO Hold Enjoy Purchase Orders: Activation/Deactivation
    ME_INFOREC_SEND Capture/Send Purchase Info Record Changes - Internal Use
    ME_PO_PRICING Enhancements to Price Determination: Internal
    ME_PO_PRICING_CUST Enhancements to Price Determination: Customer
    ME_PO_SC_SRV BAdI: Service Tab Page for Subcontracting
    ME_PROCESS_COMP Processing of Component Default Data at Time of GR: Customer
    ME_PROCESS_PO Enhancements for Processing Enjoy Purchase Order: Intern.
    ME_PROCESS_PO_CUST Enhancements for Processing Enjoy Purchase Order: Customer
    ME_PROCESS_REQ Enhancements for Processing Enjoy PReqs: Internal
    ME_PROCESS_REQ_CUST Enhancements for Processing Enjoy PReqs: Customer
    ME_PURCHDOC_POSTED Purchasing Document Posted
    ME_RELEASE_CREATE BAdI: Release Creation for Sched.Agrmts with Release Docu.
    ME_REQ_OI_EXT Commitment Update in the Case of External Requisitions
    ME_REQ_POSTED Purchase Requisition Posted
    ME_TAX_FROM_ADDRESS Tax jurisdiction code taken from address
    ME_TRF_RULE_CUST_OFF BADI for Deactivation of Field T161V-REVFE
    ME_TRIGGER_ATP Triggers New ATP for Changes in EKKO, EKPO, EKPV
    ME_WRF_STD_DNG PO Controlling Reminder: Extension to Standard Reminder
    MM_DELIVERY_ADDR_SAP Determination of Delivery Address
    MM_EDI_DESADV_IN Supplementation of Delivery Interface from Purchase Order
    SMOD_MRFLB001 Control Items for Contract Release Order
    AMPL0001  User subscreen for additional data on AMPL             
    LMEDR001  Enhancements to print program                          
    LMELA002  Adopt batch no. from shipping notification when posting
    LMELA010  Inbound shipping notification: Transfer item data from 
    LMEQR001  User exit for source determination                     
    LMEXF001  Conditions in Purchasing Documents Without Invoice Rece
    LWSUS001  Customer-Specific Source Determination in Retail       
    M06B0001  Role determination for purchase requisition release    
    M06B0002  Changes to comm. structure for purchase requisition rel
    M06B0003  Number range and document number                       
    M06B0004  Number range and document number                       
    M06B0005  Changes to comm. structure for overall release of requi
    M06E0004  Changes to communication structure for release purch. d
    M06E0005  Role determination for release of purchasing documents 
    ME590001  Grouping of requsitions for PO split in ME59           
    MEETA001  Define schedule line type (backlog, immed. req., previe
    MEFLD004  Determine earliest delivery date f. check w. GR (only P
    MELAB001  Gen. forecast delivery schedules: Transfer schedule imp
    MEQUERY1  Enhancement to Document Overview ME21N/ME51N           
    MEVME001  WE default quantity calc. and over/ underdelivery toler
    MM06E001  User exits for EDI inbound and outbound purchasing docu
    MM06E003  Number range and document number                       
    MM06E004  Control import data screens in purchase order          
    MM06E005  Customer fields in purchasing document                 
    MM06E007  Change document for requisitions upon conversion into P
    MM06E008  Monitoring of contr. target value in case of release or
    MM06E009  Relevant texts for "Texts exist" indicator             
    MM06E010  Field selection for vendor address                     
    MMAL0001  ALE source list distribution: Outbound processing      
    MMAL0002  ALE source list distribution: Inbound processing       
    MMAL0003  ALE purcasing info record distribution: Outbound proces
    MMAL0004  ALE purchasing info record distribution: Inbound proces
    MMDA0001  Default delivery addresses                             
    MMFAB001  User exit for generation of release order              
    MRFLB001
    Regards,
    Anirban

  • Purchase Order and Purchase Requisition

    Hi To All,
    my customer while using tcode me2m hase extracted purchase order opened since 2007. now he want to close all this order and settle them to zero. this operation should be done also for the purchase requisition.
    there is a standard way to do this? if not any idea?
    thanks
    C.

    Hello
    Just by doing
    In the PO line item level details, activate DELIVERY COMPLETED check box.
    system will not close po from GR
    U will have to check what is the gr qty did till date
    and update the po with the same qty manually
    eq
    if po qty is 50 and total gr done till date is 40
    change the PO qty to 40 and save
    this is the way u can shot close the po
    Which effects has the "delivery completed" indicator?
    The purchase order item is considered closed, even though the total quantity may not have been delivered.
    Although a further delivery is not expected, it is still possible.
    At the time of the next goods receipt, the system suggests the item as unselected.
    The purchase order item can be deleted, even if the total quantity was not delivered.
    Although the "delivery completed" indicator is not set, a purchase order item is still considered closed if the full quantity has been delivered. In this case, the "delivery completed indicator" is not required.
    The system allows to make further goods receipts. Why?
    Answer
    See note 16239 and 856279
    hope this helps
    Edited by: Umakant Bhangale on Oct 11, 2010 5:20 PM

  • Planned Order creation for Sales Order and Purchase Order

    Hi
    We have a following requirement.
    In normal scenario when we have demand for material  which was created by MD61 and in addition to that if there is Sales Order the 1st planned order gets revised.To better expalin this consider possible scenario
    You create plan via MD61 for 200 qty .The system creates Planned Order for 200.
    Now there is Sales Order for 150 peices.Then what happens is original  Planed Order of 200 is changed to 50 and another planned order is created for 150 peices.The requirement is not summed.
    Now in new scenario instead of Sales Order there is Intercompany Purchase Order of 150 peices.
    Now the system is not changing original Planned Order of 200,but it created another planned order of 150.So now there are 2 Planned Orders of 150 and 200.
    What I want to know is there any way wherein the system will reduce the original planned order (similar to Sales Order scenario)
    Regards

    Hi,
    Use Strategy 52 in urs case.
    PIR witll be created .
    None convertable planned order will be created.
    Once you get sales order for that material.
    New planned order will be created which will consume PIR( planned order ).
    Eg.
    PIR 10.
    Planned order 10 qty.
    Sales oder 6
    Planned order for SO 6 qty
    Planned order through pir will become 4 qty.
    Regards,
    Vishal

  • Tracking of Purchase orders and Purchase Requisitions per Equipment

    outside a query, is there an easier way to track all the PRs and POs generated for an equipment's maintenance?
    I have to list down the orders (from the equipment) and extract the POs and PRs, and i find it quite tedious.
    Thanks everyone!

    hi
    i think the best option will be tracking by account assignment category F ,and get the PR and PO
    regards
    thyagarajan

  • Purchase order in Purchase requisition

    can we get the purchase order status using the purchase requisition.
    Thanks
    Jayashree

    Yes, it will show you the PO number and the date it was created on the line item of the PR.
    1. In ME51N > Layout button > select change layout.
    2. Select Purchase Order and Purchase Order Date and move to Display Column.
    3. Save layout.

  • Report for purchase requisition, purchase order and schedulling agreement.

    Hi, thanks for your help.
    I need a report or query just to view in one screen the related docs. as purchase requisition, purchase order and schedulling agreement.
    I don´t know if there is a table or trx. with that information.
    Is it possible to get that information via query ?
    Thanks for your help.
    Regards.

    For PR and PO you can use ME5A
    For PR and Scheduling agreements also you can use ME5A.

  • Purchase Requisitions, Purchase Orders and Receipts

    Hello all,
    The following is the sequence for Purchasing
    Purchase Requision -> Purchase Orders -> Receipts
    However I have a requirement to bring in the related Purchase requisions,purchase orders and receipts from 11i into R12 instance.I can do that using the open interfaces.However How do i link these 3 objects together?
    I intend to import the purchase orders first and then import its related purchase requistions and the receipts...In doing so how do i link them together.How do i know that this purchase order was created from this Purchase requistion or this receipt is meant for this purchase order? What is the joiing columns in the base/open interface tables?
    Thanks
    AJM

    Hi Venkat
    1. To perform ATP do we need all the issues(Sales Orders, Deliveries) and receipts(Purchase Requisitions, Planned Orders) in APO?
    Yes you need all the mentioned elements above in APO to do ATP check. Again, you can also extend the scope of the check to further more receipts and issues. All  depends on your configuration of scope of check.
    3. I guess in Apo the planned order and process order is a single elment. Is that Correct?
    Yes, technically a planned order can be a planned process order or a planned production order.
    regards
    Mohan Chunchu

  • Purchase orders and requisitions - R12 user interfaces

    Hi,
    I see that the purchase order can be registered in the system by two different interfaces (I'm running R12.1.1): Using Oracle forms (Navigation path: Purchasing Super user: -> Purchase orders -> Purchase orders) and using Java html pages (Navigation path: Purchasing Super user: ->Buyer workspace ->Orders).
    I have two questions:
    1. The second option (using java pages) is not documented in the usersguide. Is it fully in production or they are still developing it? Why there are two different interfaces for the same purpose?
    2. I see that from Java pages interface I can only see requisitions, but I cannot enter new ones (Navigation path: Purchasing Super user: ->Buyer workspace ->Requisitions). Should I enable somewhere this or the requisition is not developed using Java pages interface?
    Thank you

    993322 wrote:
    Hi,
    I see that the purchase order can be registered in the system by two different interfaces (I'm running R12.1.1): Using Oracle forms (Navigation path: Purchasing Super user: -> Purchase orders -> Purchase orders) and using Java html pages (Navigation path: Purchasing Super user: ->Buyer workspace ->Orders).
    I have two questions:
    1. The second option (using java pages) is not documented in the usersguide. Is it fully in production or they are still developing it? Why there are two different interfaces for the same purpose?
    2. I see that from Java pages interface I can only see requisitions, but I cannot enter new ones (Navigation path: Purchasing Super user: ->Buyer workspace ->Requisitions). Should I enable somewhere this or the requisition is not developed using Java pages interface?
    Thank you
    http://docs.oracle.com/cd/E18727_01/doc.121/e13410/T446883T443956.htm
    http://www.apps2fusion.com/training_demo/puneetk/Professional-Buyer-Work-Center.pdf
    HTH
    Mahendra

Maybe you are looking for

  • MIGO  entrada de mercadoria com NF. Que tipo de movimento?

    Bom dia, Preciso criar uma NF com contabilização de imposto na entrada de mercadoria (MIGO) O processo é: Pedido (ME21N) u2013 EM (MIGO) com NF imposto I3 u2013 Fatura sem NF Crie um movimento Z01 por copia do 101, mas o sistema na MIGO ou MB1A da es

  • GL Acct Net Chg Trial Balance -TCode

    Good Day, I'm looking for a transaction code that I can use to provide the net change on all GL accounts in our ledger. I ran a report to extract all the information for a particular month and need something to balance it against. I've tried S_ALR_87

  • Item label help no longer allows HTML

    Hi. Moved to V4 from V3. The help text when displayed now escapes the HTML I have in place. I use DB functions to return help text (which include HTML markup) into a "hidden"-type field. That is then used in the help text definition for another item

  • Error Message code 1900 in syntax check and code LV_ERR in user interface

    In my webdynpro component when i did the code inspector check i have an error message in syntax check which says "Message code 1900: ObjectType WDYN Object name ZXXXX Row 1 Column 0 the size of the PXA buffer reached a critical value at 158 percent.

  • SpeedGrade CS6 and CC AppCrash analysis needed

    Hello, Last week I was fighting through repeated SpeedGrade crashes when trying to apply a custom-saved Look to a Grading layer. A single click or attempt to move the layer immediately generated a crash. I thought that my machine was hitting 100% usa