Auto GR creation against PO after consumption of material in Process order.

Hi GURU's
My client is asking about automate GR against Purchase Order when he confirm the porcess order of GR consume material means when he confirm the process order, the GR is created for the comsume material( GR must be equal to consume qnty) against Purchase Order.
1) Is thier any material type issue
2) what are the setting need to be done
Please take an Urgent action bocs its a critical point to me solve.
Hope for the best for ur response.
My ID:- [email protected]
Thansks in to all
Parminder

Hi Guru's
My Requirment is...............
Suppose I have material  X (GAS) type ROH.
I have already made  a monthy base Purchase Order this.
We Get GAS through Pipe Line.
stock my be vary( zero or some stock)
my question or requirement is when I create a Process Order for Material Y where this Material X is consumed ( 261 Mov Type).
When I confirm the Created Process order for Material Y(suppose 20) & require quantity of X for this Material Y is 40 & we have no stock or may be less than the require quantity at this time system check the availability & Generate GR for this material X against Related Purchase Order or If have Multiple Purchase Order then ask for Purchase order selection & then post the Confirmation (GOODS Movment).
Hope u understand my requriment ,Please suggest
Thanks
Parminder

Similar Messages

  • Creation of Purchase Order soon after Relase or Save of Process Order

    Hi,
    I have a requirement wherein client wants Purchase Order needs to be created soon after Relase or during Saving of Process Order. How this can be done..Is there any standard way or enhancement options. If enhancement how to go about it?

    It's related direct procurement with By using the special procurement key, you can combine direct procurement with other special procurement types. The material will then be planned differently, depending on whether it is planned as a BOM item or as a finished product.In Customizing, the system creates a special procurement key for direct procurement as standard. The special procurement key contains the procurement type F for external procurement and the Direct procurement field is selected.
    Hope this can help.
    TQ.

  • Replace the component after batch determination in the process order.

    Hi dudes,
    How we can replace component for which batch determination done with a new component in a process order. can any body suggest if its possible.
    thanks in advance.
    Robert

    Hi,
    i am not able to delete the component in the materials overview after the batch allocation done by batch determination rather giving batch manually.
    i.e if i give batch directly in the batch field i can able to delete that entire component row, but if do batch determination for that component once its done i can't  able to delete.
    thanks in advance
    Robert.

  • Auto PO creation against GR

    Hi all,
    I want a purchase order to be generated automatically as soon as the GRN is done.
    The purchase order will be created of the GR quantity.
    Can someone help me out with the steps to be followed for doing the same.
    Regards
    Sushil

    Hi,
    If you want to be able to just post a GR and have a PO generated automatically (immediately without further input) then you need to try what I suggested in the earlier post.
    You have to flag the movement type to indicate that you want an automatic PO (I would recommend generating a new movement type for this so that it is not generated by accident, but you can try it on a 101 in your "play" client first). SPRO MM > Inventory management > Goods Receipt > Create Purchase Order Automatically)
    You also need a full info record for the materials concerned (so that it can determine the vendor and price etc.).
    Finally you have to allocate the plant to a standard Purchasing Org. SPRO Enterprise structure > Assignment > Materials Management > Assign standard P org to plant.
    The other options being suggested are methods of adding items to a GR that have no PO raised, they do not create a new PO specifically for the GR you are doing.
    Steve B

  • Movement 262 against a Process Order and a RESERVATION number.

    Dear PP experts,
    Our raw materials are reels of paper. Our inventory supplies the production with a reel e.g. 1000kg and posts a 261 against this order (and against the reservation).
    By the end of the production phase any remaining raw material qties are returned to the inventory and a 262 against this order is posted (but the reservation is not updated).
    This causes the withdrawn qties shown at many pp info views to be *incorrect8. While the post goods movements lists are correct.
    A MIGO for 262 and with reference to a reservation is not possible.
    I did post finally a 262 against a reservation through COR6 and having the u201Cbackflushingu201D indicator on at the material view (process order material view). The u201CConfirmation of process order create: Goods movementu201D view had all info and MOV. TYPE 261 active and I was able to change it to 262 and saved it. All updates seems to be ok and withdrawn qties are the same with the sum of u201Cpost goods movements listu201D.
    IS THERE A WAY TO POST SUCH A MOVEMENT (262 AGAINST A RESERVATION) BUT NOT FROM COR6 (AVOIDING TO SAVE A CONFIRMATION TOO) ? Let's say to use only the screen of "Post Goods movement" of COR6 wo the 1st screen of confirmations? Or any other Tcode that might exist.
    Thanks in advance for yr suggestions.
    Kind regards,
    Elly

    Hi Elly,
    To return via reservation number is not available in SAP, however, there is a workaround.  When perform Goods Issue via Reservation (Mvt 261), there will be a material document get created.  This material document will be used as reference to perform Goods Return (Mvt 262) in which it will update the respective reservation qty.
    You may then use tcode: MBRL - Return Delivery or tcode: MIGO with A02 Return Delivery, R02 Material Document.
    1) Enter the Material Document that was used for the Goods Issue via reservation.
    2) Be careful here, select ONLY the required material(s) (by default, all materials issued via the material document is selected) and their respective qty for return.
    3) Check and Save it.
    Hope these steps help.
    Cheers!
    SweePeng

  • Auto po creation after save sales order.

    Hi, Experts,
    A s per  my business requirement, We have mapped configuratin for auto PR creation at a time of order if stock not available, But system not create automatic PO after save sales order. I want to crate Automatic PO after save sales order, it is possible i know , But for that which type for configuration require i don't know, can anybody give me solution for this issue.
    Thankls a lot in advance,
    Regards:
    Happy

    Hi,
    It's possible to create PO automatically after sales order is saved.
    1. Set up back-to-back, i.e. PR can be automatically created after the SO is saved.
    2. Item category - make sure 'Create PO automatically' checkbox  is ticked.
    3. Enterprise Structure --> Sales Organization - ensure that PO type, purchasing group etc. is maintained.
    4. Transaction code SWETYPV - Ensure that both checkboxes are ticked for BO (object category), BUS2032 (object type), ALECREATEE/CHANGED and ERRORCHANGINGPURORD/ERRORCREATINGPURORD.
    5. Optional: You could execute BD86 to check for consistencies (note that you can still get it work even if BD86 shows errors)
    Regards,
    HweeLing

  • Automatic creation of PR after MRP run

    Hi,
    can anyone please tell me what all fields are picked up in a Purchase Requisition(PR) in the scenario of automatic creation of PR after MRP run.
    If we are using more than 1 PR type in the system how is it determined during the MRP run that the PR will be created for which type.I understand that source list will have to be created and maintained but how is the PR type determined
    Thanks in advance

    In PR the system checks for the material and vendor. See the steps below.
    Step1:Auto PO tick in material master Purchasing view (mandatory)
    Step2:Auto PO tick in vendor master Purchasing view
    Step3:Maintain Source list for vendor and material (If u r not using source list for auto PO creation, the assign the Source of supply to a PR in ME56)
    Step4:Maintain Pur. Inforecord
    Step5:ME59n : execute for PR and Vendor In ME59n, you can also select the PR document type. If you want to select different document types, go for multiple entries and enter the doc types.
    When u execute, the system will give the appropriate PRs. Select the required and convert to PO.
    But through MRP you cannot create PO directly only Planned orders can be created.
    Reward if helpful..
    Thanks,
    Srib

  • Auto PO creation from PR through ME58 problem.

    Hi experts.
    We are providing facility to our client  auto po creation from PR through Me58 transaction code.
    I am facing amazing problem is that it is working fine in development client , not working in Quality and  Production client , exactly  problem is that ME58 u2013 Ordering Assigned Purchase requisition  & Process Assignment  Create PO , Purchase order cannot be created, PR  shift in document overview , it means user want to drag and drop in purchase order then system create PO , this problem I am facing in Quality & Production , but it is working fine in development server there is no need to drag and drop , immediately after Process assignment Create PO , system directly convert PR into PO  just only need to check and save PO. I compare everything with development & quality data including material master , source list and everything still I am unable to understand where is the problem , is there any customization settings related to auto po ?  pls. suggest any solution to solve this issue.
    Kumar

    Hi,
    Config setting.
    Settings for Automatic PO creation is:
    1. Select the Automatic PO check box/option in Purchasing view of material master
    2. Select the Automatic PO option in the purchasing data view of Vendor master
    3. Maintain Purchase info record
    4. ME56- Assign the vendors to PR's
    5. ME58- Create PO via assignment list(PR-> PO)
    6. ME57- Assign and process PR's
    7. ME59N - Create PO automatically via PR
    Above step by step procedure is involved in the Automatic PO creation.
    SAM

  • Auto PO creation from PR

    Dear All,
    I have done all process required for Auto PO creation from PR. With TCode Me59 i am able to create a PO also but some field in PO are blank like in header level Additional  tab - Validity Start and Validity End, in Communication tab - Your Reference and Our Reference.
    And while using ME59N, its shows error
    "PO cannot be created
    PO header data still faulty
    Enter Our Reference
    Enter Validity End
    Enter Validity Start
    Enter Your Reference
    Requisition could not be converted"
    How will i fill these field. Any link from info record or source list. These field are necessary in PO.
    Please anybody help me to solve this issue.

    Yes Sir. You have said the right thing. At first i have done the same that make these fields optional. but here as per our business these fields are mandatory for PO. Is there any other way that we forcefully enter data in these fields.
    And one more thing i want to ask, i have created PR through MRP run, in this how could i maintain fixed vendor, valuation type, purch org, info record. These all things are necessary to create auto PO creation. Now what are we doing that we create PR through MRP run and then go to change PR enter all these thing and then run ME59N. After that the same problem some fields are blank in PO.
    Please suggest me any other way to maintain this....

  • Auto PO creation from service PR(ME59N)

    Hi All,
    We have service PR's and need to convert to PO's automatically via ME59N.
    I have followed below steps but unable to convert to Po's getting message no Pr's found while executeting ME59N
    checked VMR and Automatic PO check box selected.
    Step1: Creating PR for services
    Step2: and assigned source to this PR through t.code: ME56 (contract existed for this vendor)
    Step3:Run the ME59Nby giving PR Number, but PO is not created
    what could be the reason..is any idea about auto PO creation for Service PR's
    Incase of material i can successfully converts PR's PO's but services i can't.
    Thanks in Advance,
    Warm regards,
    Venkat
    MM/SRM Consultant

    Hi venkat
    it should create a PO if the contract is valid..
    Note 733045 - Wrong Interface values passed to Services for ME59N
    When transaction ME59N is used to convert service purchase requisition
    (PR) to purchase order (PO),the program within the ME59N transaction
    calls the service package with the wrong interface values.
    The following example illustrates one such case :
    A Service PR is created and an Outline agreement is assigned as a source of supply to the PR.
    when the transation ME59N is executed using the PR's the system performs a mandatory check against the Tax code and tax code has to be entered against each service line to complete the transaction even though the tax code is maintained as a condition.
    In the above situation,system behaves in a correct manner for the
    transaction ME59 but fails for the transaction ME59N.
    Other terms
    MS_SERVICE_PACKAGE , ME59N , ME59 , WITHOUT_SCREEN , COPY_SERVICES
    Reason and Prerequisites
    The calling program of the transaction ME59N calls the function
    MS_SERVICE_PACKAGE of services with the wrong interface values.
    is it applicable for you?

  • Designer hangs during universe creation against SAP BW

    Hi,
    We are trying to create OLAP universe against SAP BW 3.5 and we are running into issue wherein the designer just hangs and is not able to create the classes and objects, in most cases we have waited for about 30-35 mins and still it doesn't come back. We tried this for both against an Infocube as well as against BW query.
    I have couple of questions regarding the process flow for universe creation against SAP BW,
    Does universe stores/extracts any data from BW, like storing LOVs for the hierarchies? I know it does reads the rows, columns, free characterstics etc. in case of BW Query.
    The time to create the universe depends on what factors, size of the cube or amount of metadata? The customer is concerned regarding what is the guideline on how much time would this process take when the universe comes back with the classes and objects. If there is any such guideline, what is it?
    Any response on this is appreciated.
    Thanks,
    Amit Banavalikar

    I had similar problems, setting the "Connection timeout" on the SAP/BW connection within Designer (default 10 minutes) from 10 min. to 60 or 120. ALSO: uncheck the universe limits on "number of rows (5000)" and "query duration (10 min)".
    This solved the problem.
    The connection timeout which is set directly on the SAP-BW connection in designer seems to be used in a wrong way. The definition of the "close connection after xx minutes" means that the connction should be closed after xx minutes of  not being used by any process.
    With SAP BW the connection seems to be closed regardless of it's use after the specified time period.
    regards,
    Walter

  • Auto WT creation while doing partial GR in inbound delivery

    Hi All,
    We need auto WT creation once GR got completed. It is working fine using PPF if entire item GR got completed. But if we are doing partial GR , WT is not getting created.
    We do GR partially with HU and WT need to create for that HU only.
    Please help me if you have any idea about this.
    Thanks,
    Srikanth.A

    Hi experts,
    I have the same problem.
    We have deliveries with several items and we are using Tx /SCWM/GR for the partial GR (for each item).
    The partial posting to the ERP works fine.
    After the posting we want to create the putaway warehouse task only for the item for which we posted the GR. Unfortunatley the creation only starts (by PPF) if the GR is posted for whole delivery and for all items.
    Is there a way (by PPF) to initiate the creation of the WT only for the item for which the GR is posted?
    Thanks
    Ralf 

  • Batch number format setup and auto batch creation during first GR

    Dear all,
    This is a batch question.
    I know that both the master batch and the stock data for the batch are created automatically during the first goods receipt. Thus, I do not need to create this data manually.
    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    Thanks.

    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    ==> Yes - See IMG activity 'Define batch creation for Goods Movements'
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    ==> See exit EXIT_SAPLV01Z_003
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    [[> See IMG activity 'Activate Batch Classification for Goods Movements in IM"

  • TCODE for Process order creation against Sales order

    Hi gurus,
    Pls tell me what is the TCODE for Process order creation against Sales order
    Eg. CO07 is for production order from sales orde

    Typically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
    Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
    please check and revert back.

  • Difference between Auto TO creation & Immediate TO creation

    Dear all,
    What is difference betwenn Auto TO creation & Immediate TO creation ?
    Please provide your answers..
    Regards,
    Rocky

    For any automatic triggering of any evenet/transaction in SAP...one has to schedule a report/program to run in regular intervals....although some these regular intervals will be suggested by SAP...but you/your business can take deceision of scheduling the run.
    If you want ur TO to be triggered immediately without aggregating the other TOs and without holding the time frame then go for immediate and on the other  side..if you want to trigger  after aggregating bunch of TOs within a time frame set by business then go for scheduling the report/program.
    Hope this clears...
    BR,
    Krishna

Maybe you are looking for

  • Goods Mvnt without PO number?

    Hi, Please provide me Link or Doc's for "Goods Movement without Purchase order number/ with reference ?" Thanx

  • What is an "sit" file?

    I have pictures in an Olympus RAW format (.ORF I think) from an Olympus 5050 Zoom Camera. I installed the Camedia Master 4.1 software and then went to the Olympus website to download the latest update (4.2). The file downloaded and displayed in the d

  • ChaRM: SDTM Test Message, no actions available

    Hello Solution Manager Gurus, in our system, when a Test message is created it can be set to In Process, but when it is In Process there are no actions available. This is the contents of the action determination log: Determination started Application

  • Code inspector error with exception

    I have below code : IF P_SUMM = C_ON.    CALL FUNCTION 'ZSD_REPORT_HEADER'             "Write std Nike header          EXPORTING               PROGRAM   =  V_PROGRAM               LINE_SIZE =  SY-LINSZ               RUN_DATE  =  V_DATE              

  • The box and original case are not supposed to be included?

    Hi. I have a question about Adobe Creative Suite 5.5 Design Premium Windows. I bought it from an ebay seller and received only CD. According to him, adobe stopped making boxed products for that line several years ago. Is it true? Please let me know a