Automactic Selection of production Version

Hi.
I have created a material "A"
I maintained in material master's MRP4 view selection method "2"
I have created two production version with same validity period & same lot size "0001" & "0002"
I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
Now when i am going to create a process order system is selection production version "0001".
But I want automatic selection of production version "0002".
What setting shall I do?
Regards
Vivek

Dear Vivek,
I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
In order type dependent parameters maintain as manual selection
Then system will raise an pop-up to select production version while creating prodiuction order
The above setting is only useful while creating manual production order
If you are converting plan order to production order then above setting will not play any role
System will default take 1st PV
All you can do is you can change manually in plan order
Or if you want system to take automatically in MRP then you need to lock 1st PV
Also refer my reply from this thread
[Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
Regards
Madhu

Similar Messages

  • How to select the production versions for MTO?

    Hi PP Experts,
    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    Example:
    Material u2013 A  -
    sale order u2013 666001 u2013Prod version - 0001
    Material u2013 A --- sale order u2013 666002 u2013 prod version - 0002
    How to map the above scenario?
    Thanks in advance.
    Regards,
    Vimal

    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    If the Production version selection is based on Lot size means No problem.
    If both the Production version is same lot size, system will select the first PV only in MRP
    In STD SAP, we can't Give Production Version  in sale order level,
    If you want after MRP run , U can assign Production version in plan order or in production order Manually

  • Manual selection of production version in REM scenario.

    Hai gurus,
    I discrete manufacturing we  can several production versions and we can select the same manually
    when we convert planned order to production order. Like this whether it is possible in REM scenario
    to select the production version manually, if so what is the settings and procedure.
    waiting for the positive reply.
    regards,
    sekar chand.

    Dear Sekar Chand,
    Are you not able to select the production version in MFBF manually ,assuming if you have more than
    one production version for the same material?
    What Tejas has suggested you is to start the planning process itself based on Prod.versions ---> MRP
    run-> planned orders--> Production confirmation.
    In case if you do not take MRP run and go for a direct confirmation also you will be able to select the
    production version in MFBF.
    IF not means revert back.
    Regards
    Mangalraj.S

  • Selecting New Production version while Splitting a Production Order

    Hi SAP Gurus,
    Is there any option of selecting a New Production Version for a split Production Order?
    I have a production Order with three operations 10.20 and 30. This production Order is curently using the Production Version 001. Now , i have split the production order at Operation 30 and want to select new production Version 002 for the same.
    Can you please let me know if this is possible?

    Hi Sandeep,
       If you don't mind can you please let me know for what purpose you want to assign a new production version to production order after splitting at operation 30?
       To quickly recap, Production version is used if you have alternative BOM or alternative routings for a material. Based on Production Version that you have assigned in Material Master - MRP screen, your Routing and BOM details are selected.
        So how is this Production Version 002 different from Production Version 001 - is it in terms of routing or bom?
      With Best Regards,
    Srinivas

  • Selection of Production version during MRP run

    Hello experts
    At present I am having 2 production versions for a material code as PV01 and MV01.
    By putting validity date I am restricting correct version to be picked in MRP.
    Is there any other way, for example in material master where if I maintain the production version, then MRP should pick that only.
    Please suggest the best way.
    Regards
    Pradipta Sahoo

    Dear Pradipata,
    If you are having more than one production version for a material for the same Lot size and validity
    dates,and if you have given BOM selection method as 2 in MRP4 view,then always the system picks up
    the first production version defaultly.
    If you want the system to pick up the second production version in that case means,you have to lock
    the first production in MM02 or C223.
    Check and revert back.
    Regards
    Mangalraj.S

  • Selection of production version

    dear
    I have scenario like below
    have a BOM for Halb with BOM usage as 1Have another BOM for same material with usage as 3
    So i created two production version...i have a common routing for both version
    This particular halb is phantom item in bom level
    No what i want to achive is that
    1.system need to select first PV if the demand from Fert
    2.System need to select second PV if the demand from Halb itself(sometime a manual production order)
    So psl tell how to control selection of production versionon this scenario
    AF

    Dear Abu,
    Check by making these settings.
    1.When the demand flows from the finished product to sub-assemblies and components,then in this case the system always
    picks the first production version(assuming the lot size,valid from and to date is same for the different production versions for
    the sub-assembly) when you maintain the BOM selection method as 2 in the MRP4 view of the sub-assembly.
    2.When you provide the demand for the sub-assembly directly mention the second production version in MD61 and carryout
    MRP and check the results.
    Regards
    Mangalraj.S

  • Selecting production version in MRP run

    Hi dudes,
    our client is having reuirement is he will select the production version irrespective of lot size, but he select the production version at the time of manual creation of process order where it depends on resource(work center used in recipe of particular production version, BOM will be 1 alternative only.
    now while running MRP how to make system to allow manual selection of production version at the time of converting planned order to processs order.
    respond asap plz...
    Daniel.

    Hi ,
    During MRP, system will select the production version based on Validity date & Lot size.
    If a material contains two production versions with same validity date & Lot size qty , system will select the First valid PV by default (unless it is locked) & will copy to planned order.
    When u convert the planned order to production order,default PV will be copied automatically from planned order. Here u cannot select PV manually.
    Settings:
    Create valid production version with lot size and Valid routing , BOM at MRP view of Planning material.
    Assign the selection method = 2 or 3 at MRP view of Planning Material
    Regards,
    Anand.

  • Automatic selection production version in MFBF

    Hello !
    I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
    I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
    Do you know what is missing for automatic selection works ?
    Thanks a lot.
    Vero

    Hi Vernoica ,
    Good Day , PV will be selected based on the lot size and the creation dates.
    It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
    If you would like to get rid the selection of PV,
    why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
    In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
    You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
    Hope it will resolve your problem.

  • Production version selection

    Hi
    If we have two production version with same lot size quantity and same validity date
    On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
    The selection key in Material master is Production version only
    Please explain the logic
    Regards
    Sasikanth

    What is the basis for the Selecting the production version .
    How the system identify this is the first production version ?
    system will check the validity date, from lot size and to lot size with requirement qty,  if both the PV has valid on date having same lot size, System will take first created PV, if the first created PV is locked, then system will take second PV
    If i created Version with Number 1000, 1001
    and if we kept 1001 as the first , Which version system will create ?
    System will take first created PV, if 1001 is created as first then system will take 1001

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • Production version selection according to explosion date

    Hello
    In customizing for MRP (OPPQ), parameters for BOM explosion / routing selection is 3 (BOM explosion number/order start date).
    In MRP4 view of material master, selection method for BOM explosion is 2 (Selection by production version).
    No MRP group is assigned.
    I have 3 production versions : one for 2014, one for 2015, one for 2016 :
    I use a BOM explosion number with fixed key date 1st December 2015 :
    When manually creating a planned order with dates in 2014 and explosion number EXP_1215 (fixed key date 1st December 2015), Production Version PV1 is selected (valid for 2014), but no routing is selected because explosion date is BOM explosion number, and in PV1 there is no valid routing in 2015 :
    Is it possible to select production version according to explosion date, and not order dates ?

    Hi Tristan
    The following modification note can be used to influence the selection of production version on planned orders:
    351773 - Selection of production versions for planned order
    Alternatively, you can create your own logic using BAdI MD_MODIFY_PRODVERS.
    BR
    Caetano

  • There is already a transaction for the systems of this product version(MOPZ)

    Hello All,
    I am trying to configure maintenance optimizer in Solution Manager 7.0
    on Windows 2003 server and SQL 2005 server.
    I am configuring this for SAP CRM 2007 server.
    Created the server, database and system in SMSY
    Created Logical Component in TA code SMSY
    SM59 connection for SAP-OSS is OK.
    S-User is assigned to a User.
    Created a solution using TA code solution_manager.
    Defined the product version for the solution created in the TA code
    solution_manager.
    When creating a Maintenance Optimizer transaction, I select the
    product version and its logical component in the Plan Maintenance
    (Phase) and click on Continue to go to Select Files Phase, I get below
    warning:
    Information Procedure 8000000130 Saved
    Warning: Status was reset by system
    Warning: There is already a transaction for the systems of this
    product version
    I cannot get pass this phase.
    I have deleted and recreated the solution, carried out the same
    activity again but its giving the same Warning
    Warning: Status was reset by system
    Warning: There is already a transaction for the systems of this
    product version
    Any help will be appreciated???
    Regards,
    Satish.

    Hello Ragu,
    Thanks for your response.
    As of now, we do not have ChaRM in place. Secondly, we use a single customer number.
    I would like to let you know that in our landscape we have two CRM server, one ECC sever, one SOLMAN7.0 server.
    I tried to configure MOPZ for CRM, ECC, SOLMAN server to download the respective STACKS.
    I was successful in configuring CRM and SOLMAN.
    But  when I tried to configure in ECC, it failed due to RFC erros.
    So I deleted the transaction for the ECC system and deleted the system itself in Solution Manager.
    Reconfigured the Systems in "SMSY", RFC connections are correctly defined to configure MOPZ between SOLMAN7.0 and ECC6.0.
    When I start configuring the MOPZ, I cannot get pass the first phase and this is when I get an error: There is already a transaction for the systems of this product version.
    Please let me know if you need further information.
    Regards,
    Satish.

  • Change Production version during creation of Process Order COR1

    Hi,
    Scenario:
    Based on the entered Material, Plant and Order type system need to trigger a popup asking the user to select the Production Version. This should happen before clicking on SAVE button, so that all the values will be populated correctly based on the changed VERID.
    I did not find a user exit that enables to change the Production Version (VERID) value. So I thought of displaying the popup in the user exit EXIT_SAPLCOZF_003 which will be triggered before initial screen appears, export the selected value and pass it to a User Exit or BADI where VERID can be changed. But cannot find a user exit to do it.
    Please help me find a User Exit or BADI to change the Production Version during creation of Process Order using COR1 transaction before clicking on SAVE button.
    Thanks,
    Manoj.

    Hi Manoj,
    So - almost four years later - I saw your post and I saw myself in the very same situation as you did...
    I found a solution for those who wants to change the production version of the production order from the sales order creation: create an enhancement in the function module 'MD_VERSION_SELECTION' and you are good to go.

  • Determine production version in cross plant failed

    Hi folks:
    I trying customizing and implementing a cross plant scenario:
    *_Plant A01 - Production Plant_*
    *+-- Material Mat001*
               +-- MRP 2 Procurement Type: E 
               +-- MRP 4
                      1--- Selection Method: 3
                      2--- ProdVersions:         
                               +--- Production version 001.  Valid from / to 01.01.2000 / 31.12.9999
                               +--- Production version 002.  Valid from / to 01.01.2000 / 31.12.9999
    Plant A02 - Planning Plan
    *+-- Material Mat001*
               +-- MRP 2 Procurement Type: E
               +-- MRP 2 Special Procurement:  80 ( to Plant A01 )   
               +-- MRP 4
                      1--- Selection Method: 3
                      2--- ProdVersions:         
                               +--- Production version 001.  Valid from / to 01.01.2000 / 31.12.9999
                               +--- Production version 002.  Valid from / to 01.01.2000 / 31.12.9999
    Also, call transacction COR4 and  change "order type parameters" to : "automatic selection of production version" for both plants.
    But, i when run MPS ( MD41 / MD42 ) for material Mat001 in plant A02, production version is missing ( blank ).
    Any ideas?
    Someone has used badi MD_MODIFY_PRODVERS?
    Thanks in advance,
    César.

    Hi All:
    Well, I made a mistake. Do not update the selection method for the material in the planning plant.
    Final Data |
    Plant A01 - Production Plant
    +-- Material Mat001
    +-- MRP 2 Procurement Type: E
    +-- MRP 4
    1--- Selection Method: 3
    2--- ProdVersions:
    +--- Production version 001. Valid from / to 01.01.2000 / 31.12.9999
    +--- Production version 002. Valid from / to 01.01.2000 / 31.12.9999
    Plant A02 - Planning Plant
    +-- Material Mat001
    +-- MRP 2 Procurement Type: E
    +-- MRP 2 Special Procurement: 80 ( to Plant A01 )
    +-- MRP 4
    1--- Selection Method: 3 <<<<<< WAS NOT UPDATE  !!! >>>>>>>
    I test badi MD_MODIFY_PRODVERS, but not necessary today.
    Thanks ,
    César.

  • MRP Run with production version.

    Hi Experts;
    I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
    But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
    Is it possible to cover safety stock with alternative BOM.
    Please help..
    Thanks,
    Malka

    Hello Malka,
    For your issue,,
    As per other expert suggested you can block the first production version but if in future you want use first production then,,
    In these case you maintain production version in many way
    Ex.
    1.  Lot size .(if production version using for specific lot)
        Maintain the Lot for both production version, so Production version 1 lot completed system take       second production version.
    2. Production version validity date (If production version using for specific period )
        In this case after completion of 1. Production version period system take second one
    3. Manually selection of production version (If multiple production version and all have same condition)
        Whenever you convert the planned order to production order, one pop up come and ask for                manually selection for Production version, for this you go to OPL8 and select the Manually                production version
    I hope this information cover your all requirement, No need to go with quota arrangement
    Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
    Regards
    Umesh Mali

Maybe you are looking for

  • ITunes can't find My Music folder & won't launch - Vista OS

    Hello, I've been using iTunes successfully for months with Vista, then one day iTunes wouldn't launch. I got the error message "The folder itunes cannot be found or created and is required. The default location for this folder is inside the my music

  • How long does it take to be an "official iPhone Developer?"

    I decided that I wanted to be a iPhone developer a couple of days after the March announcement. So I filled out the contact information, and of course got the reply that the beta program was full. Fast forward to July 14th, when I got a email from th

  • Infinity 1 and slow speeds during the evening and ...

    Was installed Tues 4th June. Predicted speed was 21.5 down and 5.0up, when installed it was actually 28.0 so pleased with that. I.P profile 25. Speed is absolutely fine during the day - 24 down, but every evening it plummets to between 1-3 mb. This c

  • Basic requirements to view iBooks created by Author?

    Hello, I've been working on a simple iBook as a promotional device to attract investors to a project. While it works fine on my iPad 2, it isn't working with my partners who own the iPad 1. I've gone through these forums to better understand the requ

  • People turning purple?

    So this is a little complicated, but stick with me. I am editing some footage in FCP. The footage consists of a girl lit under a blue light (simulating moonlight). The footage is properly color balanced, and it has a hint of blue to reflect the natur