Automatic creation of PO in supplying plant

Hi ,
There are three plants A,B and C. Plant A procures from B and plant B procures from plant C. Note ::: A cannot procure from C due to some financial matters.
i.e, A<B<C .
A plant to plant purchase order will be created in plant A for plant B. Thus this PO will be displayed in MD04 of plant B as ConRel.
As this material will be procured by plant B from plant C ,,, Plant B needs to create a P2P PO for plant C.
Now as soon as plant A creates PO for plant B ,, we need automatic PO creation in plant B for procuring material from plant C.
Is it Posible in standard SAP?
Regards
Rohit Chavan

Hi,
As per my knowledge it is may not possible in standard SAP.
If any suggestions please do update.
avs

Similar Messages

  • Automatically creation of storage location for material, in MF60

    Hi all,
    my collegue of PP module uses MF60 transaction.
    When he puts XXXX as Replenishment storage location, the system tells him this error: To stge loc. XXXX does not exist for material M1010000182 in plant 0001.
    In MM i have activate the automatic creation of storage location for plant 0001 and for all movement types.
    Why MF60 does not respect this requirement?
    If I try to do movement type 311 with MIGO, manually, there's no problem to transfer the material from a storage location to , XXXX s.loc.
    Is there something more that I have to do?
    Thanks in advance!
    Best regards
    Alba

    Thanks a lot...
    the note says:
    Summary
    Symptom
    A material without storage location view exists.
    If within a single material document, this material is moved in such a way that no change in stock occurs in total, the system does not create a storage location automatically even if this is set in Customizing.
    Additional key words
    OMC3, XLAUT
    Cause and prerequisites
    All postings to a segment (for example, material, plant, storage location) are only executed if a change in stock occurs. Only in this case, storage locations are created automatically. This way it is made sure that no empty segments are created.
    Solution
    The system behaves correctly.
    Header Data
    Release Status:     
    Released on:     07.07.2000  22:00:00
    BUT why IF i do 311 in MIGO, system creates automatically storage location (also if no change in stock occurs in total).
    AND if doMF60  (that does mouvement 311), system does not create automatically the storage location?
    Best regards
    Alba

  • STO-PO-Vendor (supplying Plant) pickup in condition Type (Freight)

    Hi,
    I am doing STO PO, system is automatically picking the vendor code (supplying Plant) in condition type (Freight) in condition tab.
    I want to system should not pick the vendor code in condition type (freight). It should be shows blank.
    Please guide me.
    Regards,
    Devendra

    Hi,
    Check transaction variant  is used which inturn you cretae STO PO, system is automatically picking the vendor code (supplying Plant).
    NOTE:Transaction variants  is used for to hide fields, menu functions, screens, to supply individual fields with default values or to change the ready for input status of one or more fields.Check in T.code: SHD0
    Regards,
    Biju K

  • Automatic creation of transportation lane between two Plants or location

    Hi,
    I am aware that when we cif Inforecords from R/3 to APO new transportation lanes automatically gets created between the Plant and Vendor.
    The isssue which i am facing is that i want transportation lanes to be created between two plants . The TL should be created automatically. I could find the below details from sap help.
    http://help.sap.com/saphelp_scm41/helpdata/EN/3e/dfaf376ed96c21e10000009b38f8cf/frameset.htm
    Transportation Lanes with Reference to R/3 Material Master Record
    Storing a special procurement type with procurement type F: External Procurement and special procurement U: Stock Transfer (in the MRP 2 view of the R/3 material master record), means that the material has to be procured externally from another plant (supplying plant) or transferred from another plant.
    To also be able to perform stock transfers for this material in the SAP APO system, there has to be a transportation lane from the supplying plant to the receiving plant. If you have transferred a material with this special procurement type from the SAP R/3 system, the SAP APO system automatically creates a corresponding transportation lane from the supplying plant to the receiving plant for the supplying plant (from the special procurement type) and material/plant combination. The transportation lane is given the creation indicator u201CSu201D for special procurement.
    I am not able to make sense of special procurement U: Stock Transfer (in the MRP 2 view of the R/3 material master record),
    Is this Special procurement some sort of customization as i could not find U: Stock Transfer  in my implementation.
    Please help me understand this. What exactly should i do to create TL between Plants automaticcaly through Cif.

    You need to define setting in IMG for this from source to Target location.
    Follow this path :
    Production->Material Requirements ->Master Data->Define Special Procurement Type
    example :
    Plant      1004
    SP type    40   Stock transfer (proc.from alter.plant)
    Procurement type     F    External procurement
    Special procurement  U    Stock transfer
    Plant                1039
    Manish

  • Supplying Plant field is not appearing in vendor creation of receving plant

    Dear Friends,
    Iam configuring Cross Company Scenario to my  client for the version SAP 4.6C as they implemented a new company code and want to transport the material from one company code to another company code.
    I made all the required customizations in the system
    while creation a vendor code in the reciving plant in Pur.Org.Data screen->Extras--> Add.Pur.data i am unbale to view plant field where we maintail supplying plant
    In OMSG at purchasing data at add purchasing data PLANT, vsr relevacne & plant relevance made optiional
    but while creation of vedor code the other two VSR relevance and Plant relevance indicators are populating but the PLANT field is not appearing.
    without this assignment while creating a STO, shipping data tab is not appearing
    Please Provide me input in solving this error.
    Thanks inadvance
    Regards
    Srini

    Dear Srini Behara
    The field selection is controled at Vendor accounting group.
    For Vendor account group (std 0001) , the field Plant in additional Pur data is supressed whereas for accounting group 0007 this field is activated.
    Please rfer the following path to activate the field
    SPRO--> Financial accounting --> Account receible and Payable --> vendor accounts --> Master data --> Prepataions for creating vendor master data --> Define account groups with screen layout
    Select the Vendor account group and go to Purchase org data and change the Plant filed option.
    Or create teh Vendor under accounting group Plant (0007 std)
    warm regards
    Ramakrishna

  • Vendor creation for supplying plant in STO

    I m trying to create a Vendor for the Supplying Plant for Intercompany STO scenario.
    When I go to the Purchasing data (Extras - Add purchase data) of Vendor master to assign Plant, I m not getting the field to assign the Plant.
    I do I have to do to get this field, am I using wrong vendor account group. Please help.
    Thanks in advance,
    Ashish

    Hi,
    Go to OMSG,
    Double click on Vendor A/c Group and then double click on "Purchasing Data" under Field Status sub screen.
    Then double click on "Add. Purchasing Data" under Select group, here Mark field "Plant" as optional if it is suppressed

  • Automatic Creation of multiple Transportation Lanes

    Hi all.
    Is it possible to avoid following standard behaviour:
    Change of Supplying Plant in the Special Procurement Type
    If you have changed the supplying plant in the special procurement type in the ERP system, the SCM system creates a new transportation lane for the new combination of supplying plant (from special procurement type) and material/plant. The already existing transportation lane and the now invalid combination of supplying plant and plant in the ERP system is locked for orders in the SAP APO system. This can be seen from the lock indicator X that is set by the system.
    Automatic Creation of Transportation Lanes - Transportation Lane - SAP Library
    Our need for some SKU is to create automatically two T-Lanes. Considering user exit EXIT_SAPLCMAT_001, we added a new line on CT_CIF_MATLOC (and relative CT_CIF_MATLOCX) with different SUPPLPLANT, but the system obviously blocks (SPRKZ) the SKU on one of the two T-Lane.
    Thanks in advance for your support.

    Hi Mauro,
    In my opinion you have to create a program to delete the lock indicator. First you have to extract the information from tr.lanes, then change (delete X indicator) and save. This job should be scheduled before heuristic run.
    To extract data from tr.lanes you can use BAPI_TRLSRVAPS_GETLIST2. To change and save you can use BAPI_TRLSRVAPS_SAVEMULTI2.
    Hope that can help you!
    Thanks.
    Regards, Marius

  • Contract automatically set as source of supply for PR/PO

    Hello MM experts,
    I am thinking about implementing the following scenario and I have 4 questions
    PM service order  that creates a Purchase requisition automatically.
    I will have in the system a MM contract for that material / vendor / plant
    It is possible in SAP that the contract is set automatically as a source of supply in the automatically created purchase requisition?
    If it’s not possible in the PR it’s is possible at the time of PO creation?
    What configuration is needed in the system for this?
    It is possible to automatically create a PO from a PR with no steps for the  user?
    Thanks a lot for your valuable help and regards.

    Dear,
    Here you need to consider two parameters.
    Contract  : Its an yearly or monthly contract with a desired vendor on Quantity(Quantity Contract) or Value(Value contract) based.
    But if you are creating a service P.R using maintenance order for that particular maintenance service.Here system considers the account assignment as "F".
    If you want to capture the service cost of contract,
    Create an AMC for the services of that vendor and create P.O with account assignment as "U-Unknown". At the time of service required by maintenance department, They will create a maintenance order and do service entry with respect to "Maintenance Order". So actual cost will update in maintenance order.
    You can create a "Automatic P.O "with respect to P.R as our friend Jurgen said for supply.This can be done by activating the check box in material master of "Purchasing" view.
    You have an option of assigning the agreement in 'Maintenance Order"At the time of creating a P.R through it.But If your contract "Account assignment" and P.R "Account assignment" Creating through maintenance order will be different.So system will populate an error message as" Account assignment in agreement and Requisition incompatible"
    Regards,
    Pardhu

  • Excise invoice does not exist in supplying plant

    Dear all,
    We are having a scenario where in we are doing stock transfer from one plant to other the system gives an error message that the excise invoice does not exist in supplying plant.
    Created a PO for stock transfer, posted GI against it, created excise invoice in J1IS with transaction type other. We are having separate excise registeration for the two plants.
    Secondly request to kinldy let me know what account enteries should be generated when we post excise invoice for the supplying plant.
    Regards,
    mahesh.

    Hi,
    In case of STO process using SD the process flow is like
    1. Create a PR against the supplying Plant (ME51N)
    2. Create a STO (PO) with ref to the PR (ME21N)
    3. Create a Outbound Delivery with ref to the STO. (VL10B/VL10D)
    4. Create a Proforma Inv (VF01) No Acc docs gets generated.
    5. Create a Excise Inv for the supplying Plant (J1IIN) Accounting Doc gets Generated.
    The Accounting Entries at the time of Excise Inv creation for the supplying Plant is:
    Excise Duty Expenses on  Sale                               Dr
    Excise Duty  Payable                                    Cr                    
    Sec.& Higher Edu Cess Payable on Excise               Cr                                            
    Edu .Cess Payable on Excise                    Cr
    At the time of Goods Receipt at plant
    1.Good Receipt at Receiving Plant (MIGO) - No Accounting docs get generated only Qty update takesplace.
    2. Capture & post the excise @ the Receiving Plant during MIGO by entering the Supplying Plant excise inv as reference.
    Hope it is Clear.
    Revert incase of any queries.
    Regards,

  • Automatic creation of PO's from Requisitions

    Hi
    I'm trying to get a grasp of what's needed to automatically create approved PO's upon approval of a requisition.
    There seems to be two ways to do it, a release program under a Contract Agreement, or using workflow with a Global BPA.
    Under either method, would you need to create a Contract Agreement or Global BPA for each and every supplier? Is there any easier way to achieve this?
    Thanks

    To automatically created Approved PO's you will need the following
    1. To create Standard PO's a Requisition will have to use a Quotation. This quotation can be attached to an ASL to default while creating a req
    The Workflow "PO Create Documents" should have automatic creation allowed set to yes
    2. To create Releases a Blanket PO must be attached to an ASL . The Workflow "PO Create Documents" should have automatic creation allowed set to yes
    Please let me know if you have any questions
    Thanks
    Navin

  • Automatic creation of po during goods receipt

    Dear all,
    po has not been created, but while receiving the material i want automatic generation of po. i have some knowledge about it but it is not working. Can some one send detailed information. with navigation details. Tips that are posted on the sdn is not working.
    Regards

    Hi
    Pl Make sure you have done following settings for the Automatic Creation of PO during GR:
    1) In SPRO ---> Enterprise Structure ---> Assignment -
    >  Material Management ---> Assign Std. Purchase Org. to your Plant...
    2) In Material Master -
    > Purchasing View -
    > Pl. Check. Automatic PO check Box   and  Maintain Purchasing Group....
    3)Create your Vendor for oyur Company Code and  Std. Pur. Org. combination and in that Vendor Master -> Purchasing Data View--- > Pl. Check Auto. PO Check Box...
    4)For your Vendor -Material Master - Plant -Std. Pur. Org combination Maintain valid Info record...
    5)In OLMB --->  Goods Receipt -
    > Automatic Creation of PO ---> for the M.Type:101  pl. check  Auto PO check Box
    6) In OLMB ---> Movement types ---> Copy,Delete, Check M.Types ---> Choose the M.Type:101   and go into Details -
    > Then goto  allowed Fields for M.Types for M.Type:101 --->  there for the M.Type:101   make the field   LIFNR as a Mandatoty field...
    If you have done the above settings properly...then  in  MIGO ---> Choose Transaction GR  and referance as Others
      and do the GR....Make sure you are doing GR with M.Type:101....and yougive the Vendor's name during   GR....
    Now If you save the GR ...automatically PO will be created...
    this you can see it by displaying the MIGO Document..
    Reward if useful
    Regards
    S.baskaran

  • Automatic Creation of Maintenance Plan, Measurement plan

    Hi Pal
    Business : The equipments are procuring for the purpose of supplying into customers.It is installed (via sales delevery) at customer location as requirement. From  the installation date rental will start and periodic visit is applicable after every 3 months. The technician will capture  some reading In initail installation time, periodic maintenance time.
    Requirement : The equipment will be created automatically thro serial no when doing the GR(Its possible) . Automatic creation of Maintenance Plan for the equipment  for 3 month frequency, 70% call horizon, early and late completion of 100%. Additionally the scedhule start date need to pick it from the notification end date of its respective equipment.Also measurement points should be generated in automatic way (Its fixed& common for all equipments).
    Is there any possiblity to complete this requirement? Please help me and suggest.
    Regards
    Thenna

    There is no suitable BAPI available to create Maintenance plan.
    Try for BDC.

  • Automatic creation of PR after MRP run

    Hi,
    can anyone please tell me what all fields are picked up in a Purchase Requisition(PR) in the scenario of automatic creation of PR after MRP run.
    If we are using more than 1 PR type in the system how is it determined during the MRP run that the PR will be created for which type.I understand that source list will have to be created and maintained but how is the PR type determined
    Thanks in advance

    In PR the system checks for the material and vendor. See the steps below.
    Step1:Auto PO tick in material master Purchasing view (mandatory)
    Step2:Auto PO tick in vendor master Purchasing view
    Step3:Maintain Source list for vendor and material (If u r not using source list for auto PO creation, the assign the Source of supply to a PR in ME56)
    Step4:Maintain Pur. Inforecord
    Step5:ME59n : execute for PR and Vendor In ME59n, you can also select the PR document type. If you want to select different document types, go for multiple entries and enter the doc types.
    When u execute, the system will give the appropriate PRs. Select the required and convert to PO.
    But through MRP you cannot create PO directly only Planned orders can be created.
    Reward if helpful..
    Thanks,
    Srib

  • Automatic creation of NB purch.order from UB re-stock order

    Hi SAP gurus,
    we have the following business case (we operate in an R/3 4.6C version): we purchase goods from an Intercompany/3rd party vendor (e.g in US) which are imported in a different EU country (e.g. BE) before being physically received in the final destination country (e.g. ES).
    If the user places the PO (NB order) with receiving plant directly the ES plant, this will generate wrong reporting in Intrastat and eventually in VAT (e.g. if Tax code determination is automated on the basis of the receiving country).
    From our understanding for getting the right Legal reporting (Intrastat/VAT) a 2 steps process is needed:
    1) create the PO (NB order type) with receiving plant a "virtual" plant in the country of importation (e.g. BE)
    2) create a subsequent re-stock order (UB order type) from the "virtual" plant in the country of importation (e.g. BE) into the real final destination plant (e.g. ES)
    Does anybody know if it's possible to have the automatic generation (material master settings via the MRP run in R/3 or APO) of the purchase order (NB order type) as a result of a lack of stock in the supplying plant (the 'virtual' BE one in our example) of a re-stock order (UB order type)?
    If so, could you please provide some hints?
    Thanks in advance for your help
    Regards
    Michael

    Michael,
    From a planning perspective, use Stock Transport orders:
    Set up STO BE>ES (Normally, type of sto is dependent on company codes, but I will assume you want UB)
    Setup STO US>BE (again, type of sto is determined by business requirements, but I will assume your selection of NB)
    You will need a plant in BE.  All the standard STO configuration and master data for both legs of the journey would have to be created.  
    You will need to perform receipt transactions in the BE plant, as well as issue transactions to the UB order.  One would normally think that the goods must physically move through belgium, and that an importer of record would need to take possession of them at the border.  If you use MTO, the two orders (NB/UB) can be account assigned to the same sales order and therefore linked.
    Planning would be satisfied by the two step jump.  Other business requirements would have to be worked out.
    Rgds,
    DB49
    Edited by: Dogboy49 on Mar 22, 2010 10:13 AM

  • Automatic creation of  Warehouse No. data in the material master

    Hi all,
    I want the automatic creation of  Warehouse No. data in the material master record at the time of the first goods receipt is allowed.
    Similar to the way where we can do the same for Storage Location by clicking on Create SLoc. automatically in the plant parameters settings.
    can it be done..plz guide.
    Regards,
    Sandeep

    Hi Deepak ,
    Such facility is not available for Warehouse .
    Regards
    Ramesh Ch