Automatic GI issue for Confirming Production Order

Hi
I am trying to confirm the Production order using CO15, But at the time , i want to make the GI automatic for the componets , I maintain the back flush indicator for the components in the material master. How to make GI automatic
Thanks
JJ

Hi
Kindly check the following setting to ensure you have done correctly:
Material master
With the Backflushing key (MRP2) you can specify that
-The material is not generally backflushed - that nmeans this material wherever used will not be backflushed
-The material is always backflushed - Always wherever this material used will be backflushed
-The work center determines whether the material is backflushed - WC setting has the priority if this setting is made.
Work center -
You can set the Backflushing indicator on the Basic data screen. This is only taken into account, if the material master stipulates that the work center should determine whether the material is backflushed. Work centers are assigned to a production order via the operations. The operations are copied from the routing used.
Routing
You can stipulate that the material is to be backflushed, on the component overview in the routing. This indicator is always taken into account, irrespective of the indicators in the material master or work center.
If the Backflushing indicator has been maintained in the master data, it is copied from there when you create a production order. You can change the indicator in the production order, as you like
Thanks

Similar Messages

  • Tables for Confirmation Production Order.

    Hi Friends!
    we want to be find Tables for Confirmation Production Order[PP].
    reply,
    Rahul

    Hi Rahul,
    MAST     Material BOM
    STKO     BOM Header
    STPO     BOM Positions (detail)
    MAPL     Assignment fo Task Lists to Materials
    PLKO     Routing Group Header
    PLSO     Routing Group Sequence
    PLPO     Routing Group Operations
    AFKO     Production Order Header
    AFPO     Production Order Position (details)
    Thanks,
    Reward If Helpful.

  • GI for every Operations, not for whole production order

    Hi,
    I have assigned the components into operation and would like to do goods issue for every operations.
    But MIGO or MB1A only do goods issue for whole production order, there is no selection fields for operation no.
    How can I only do the good issue for production order by operations?
    thank you very much.
    Best Regards,
    John H

    Hi,
    You can do goods issue for each operation using backflushing while confirming each operation.
    In CA02 that is in routing go to component allocation select the components which you want to issue for certain operation and select new assignment. In new assignment select the operation.
    In the same manner select the components which you want to issue and assignment it to operation.
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Automatic goods issue for outbound delivery, during the transfer order confirmation

    Hello,
    Could you please advise how to realize automatic goods issue for outbound delivery, during the transfer order confirmation in the WMS.
    Now after creation of outbound delivery, i can't post the goods issue. Before i have to make the transfer order and confrim it and only after this i can post the goods issue in the VL02 t-code.
    Could you please advise - what i have to customize that to make automatic GI for outb. delivery (i mean with creation material document) during the TO confrimation.
    Thanks in advance.

    Hi Iiya
    Check the below setting, might be helpful

  • Open the reservation for the Production order

    Hi,
    I have post the GI for Production order MB1A with movement type 261 from 100 peaces components. I would like to cancel a partial quantity of components from this posting (about 30 peaces). After cancel it the reservation for the production order has to be open for 30 peaces of components.
    I've canceled it through MB1A and mtype 262 but the reservations weren't open and in the PO (component overview there is always the sign"the Final Issue for This Reservation").
    Which T.code and mtype could I use.
    Thanks
    Dede

    Hi,
    Have you cancelled the movement (of 30 pieces) by selecting the "with reference" option from the menu?
    If not, then reverse the current cancellation document. Then again cancel the 261 movemtn by selecting the with refernce button from the menu. It will sove the problem.
    Check & revert.
    Regards,
    Rohit.

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • BAPI - Goods receipt and then create transfer order for a production order

    Hello Everyone
    We need to do goods receipt and then create transfer order for a production order (Material for WM scenario)
    We are using BAPI 'BAPI_GOODSMVT_CREATE'
          i_items-orderid = wa_afpo-aufnr .
          i_items-order_itno = wa_afpo-posnr.
          i_items-mvt_ind = 'F'.
          i_items-stge_loc   = wa_afpo-lgort.
         i_items-stge_type = '901'. "wf_styp.
         i_items-stge_bin = wf_sbin.
          i_items-entry_qnt  = wf_qty.
          i_items-entry_uom = wa_afpo-meins.
          i_items-entry_uom_iso = wa_afpo-meins.
          i_items-batch      = wa_zmobtag-charg.
          i_items-move_type  = '101'.
          i_items-move_reas  = wl_3131.
    We are passing i_items (like line of goodsmvt_item) along with other parameters to BAPI and its creating material document and Transfer order automatically. Problem is the TO created is showing destination storage bin as default storage bin( from material master).
    The field goodsmvt_item-stge_bin is just changing the Source bin details. There is no field for bin in the BAPI so that we can change the Destination storage bin as per our requirement.
    My requirement : Creating material doc and then TO. Material should move to specified storage bin.
    Please let me know any alternate way( No BDC) so that my requirement is achieved.
    Regards
    Swetabh

    Hi ,
    can u check these fields ,
    STGE_TYPE_PC     UBTYP     CHAR     3     0     Storage type for transfer posting
    STGE_BIN_PC     UBPLA     CHAR     10     0     Storage bin for transfer posting
    Regards
    Prabhu

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • Issue with printing production order after changes through CO02

    Hi,
    Currently I have one issue with printing production order changes through CO02. If I go for print, all the operations are captured in printout. But after the print, if I add any new operations to this production order, and then go for print, its not capturing the newly added operations. Also, there is information popup coming "Copies will be printed for order. Original list already printed". This message effectively means, even after changes, when I go for print functionality, its just going for printing copies of original printed list.
    Can anyone help me out to get the newly added operations reflected in the print through CO02 ?
    Regards,
    Shiva

    Hi Shiva,
    Refer SAP note 28887.
    Source: http://www.sapfans.com/forums/viewtopic.php?f=9&t=308577
    Please search /google before posting queries.
    Regards,
    SuryaD.

  • Process Code for Outbound Production Order??

    Does anybody know the Process Code for Outbound Production Order??
    BASIC Type : LOIPRO01
    Message Type : LOIPRO
    Regards,
    Ravi

    Hi Everybody.
    There's no standard process code for LOIPRO Outbound Idocs.
    This Idocs are threated as master data info, and could only be automatically generated by Data Distribution Model.
    BD64.
    Anyway, you can define your own Outbound Process Code in WE41 using CLOI_MASTERIDOC_CREATE_LOIPRO FM.
    You can choose.
    Regards.
    Albert.

  • Can we restrict the partially confirmed production order from getting delet

    Dear all,
    Can we restrict the partially confirmed production order from getting deleted?
    I.e. if the production order is having status PCNF then the deletion flag indicator (status DLFL) should not be allowed to set
    SmanS
    Edited by: SAP PP Consultant on Feb 4, 2009 6:12 AM

    Hi,
    Then must be there is change in BS22.Check allowed transaction setting for Status PCNF/CNF .For reference purpose compare it with other client IDES or sand box.
    For your reference I have pasted Error log on the same.
    Balance of ORD 1000000702 is not zero
    Message no. KO115
    Diagnosis
    The balance on object ORD 1000000702 is not zero. That is, there are still costs on the object.
    System Response
    The object cannot be closed and the deletion flag must not be set.
    regards,
    Dhaval

  • Mass reversal of one component issued  to many production orders

    Hello SAP GURUS
    One of the common component is issued  to many production orders from wrong storage location ie instead of 0002  storage location it got issued from storage location0001,
    Is there any way to mass reverse of this common component  that got issued to multiple production orders
    Thanks & Regards
    Himakar Raigir

    Dear Himakar,
    In my understanding,There is no standard T Code to do this mass reversal.
    But in MIGO/MB1A you can do 262 movement to the same storage location from which it was consumed for one single
    production order if required or else you have to cancel all the documents using MBST.
    Check and revert
    Regards
    S Mangalraj

  • Mass change final issue indicator in production order

    Hi
    Is there any report can show final issue indicator for all production order? How can I mass change the indicator?

    Hi,
      In reports such as COOIS and COHV you can select in the initial screen "List: Components" and check your "Change layouts" to view the report with the "Final Issue" indicator.
    But you cannot do a mass change in this option. One way is : You can just select the particular order -> goto Component Overview of the order to be changed and do the necessary changes and save to get the required result.
    -Thaila Shree

  • How to create a Reservation for my production order

    Hi,
    I have a production order for that I need to purchase 2 materials. but my problem is when the material come there is no reservation for my production order. someone can take it for another production order. How can I do that the system create a  reservation after the GR
    Thank

    Dear,
    When you create and release production order, the reservation is created for that order. Now you should first activate the Avelability check in production order.
    It is PP configuration
    Then you need to activate dynamic aveailability check in goods issue in MM configuration.
    Hence if the stock is reserved for your production order, then no one can issue and system will give error message.
    please come back if required.

  • In house mfgd. raw materials for a production order- Cost capturing

    Hello Experts,
    The scenario is as below:
    Client wants to manufacture in house some of the raw materials for a production order of sub assembly. These raw materials are made from scrap, with some manhours spent on it. After making them in house, these are handed over to stores for kit preparation.
    The planner wants to create a stock of these materials (without making individual prod. orders since there are many of these). One option is, planner can do the cost centre issue reversal (202 movement). But the raw material cost is also getting captured in it from the material master.
    From costing point of view, the cost of raw material should not be included since it is made from scrap. Only the cost of man hours spent is to be accounted for.
    Please help as to how to map this scenario. For capturing cost of man hours spent, we can include a routing for it in the production order of the sub assembly. But how to eliminate or exclude the material cost. All inputs from your side are appreciated. Thanks in advance
    Regards,
    Chetan.

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

Maybe you are looking for

  • Error 'No valid source context supplied' for getEntity / getEntitySet call

         Hi All we have configured our ECC system with IW_BEP and Gateway as standalone system. We have developed the Gateway Services using SEGW in backend ECC system and have registered these services on Gateway system. However when we are executing ge

  • "The application Safari has unexpectedly quit." / "Archive and Install"

    ...The system and other applications have not been affected. Would you like to submit a bug report to Apple? I was working on my eMac last night when all of a sudden Safari shut down. I tried to open it again and I kept getting the above error messag

  • Clear Settings Anomaly in ACR 7.1rc

    First, a bug: when you click Clear Settings in ACR 7.1rc (Mac version, at least), the Edit menu highlighting stays on after the operation is complete. Second, Clear Settings in ACR 7, when applied to DNGs that have had settings made in earlier versio

  • Sync software?

    Hello all can anyone recommend some form of sync software for mac. I have dropbox but I am not so fussed about online syncing just the ability to sync folders from two macs onto an external drive. I have tried cronosync and sync standard and the pair

  • Question about background colors

    Greetings folks, I have a question about background colors using a DW template in CS4.The page in question is here: http://www.webrevamps.com/dw/assignment11.html On the left nav, I want the background color to extend throughout the entire sidebar. N