Automatic goods movement at the time of confirmation in IW42

Hey gurus,
In a maintenance order i ve reserved some materials to be issued from the stores. Now i am not issuing the reserved materials from the stores and going to iw42 for confirming the operations of the order. If i select the item overview of the operation line against which we have booked the material, in the goods movement section i can see my reserved material which hasn't been issued from the stores. Now when i'm saving the confirmation, goods movement of the unissued material is automatically taking place and the cost of the material is getting booked in the order. How do i stop this automatic posting of material?
Regards,
Abhishek

Hi friend
           in spro
Plant Maintenance and Customer Service-Maintenance and Service ProcessingMaintenance and Service OrdersCompletion ConfirmationsDefine Control Parameters for Completion Confirmations
you can define the setting of goods movements
jitender

Similar Messages

  • Restrict user to delete item in good movement at the time of confirmation

    Hi ,
    I have one requirement i.e. When user confirming the partial confirmation and if he selected the goods movement button i have to restrict the user not to change the material quantities in the goodsmovement screen.How i can do it .Is there any user-exits to do so, if any plz give me more info .
    Regards,
    Anand

    Hi
    Try any of the below enhancements
    CONFPP01
    With this customer enhancement you can determine your own default values
    (ones that deviate from SAP logic) for a confirmation. The confirmation
    can be changed in the customer enhancement.
    The following are copied to the interface: the operation in the order
    (AFVGD), the order header (CAUFVD) and the confirmation (AFRUD) as well
    as the confirmation parameters (TCORU). The confirmation is copied back
    from the customer enhancement to the SAP standard program.
    CONFPP02
    With this customer enhancement you can make your own checks of the
    confirmation after the SAP checks have taken place. The confirmation
    cannot be changed.
    The following are copied to the interface: the operation in the order
    (AFVGD), the complete order header (CAUFVD) and the confirmation
    (AFRUD).
    CONFPP03
      With this customer enhancement you can make your own checks once an
      operation has been selected for confirmation. The data cannot be
      changed.
      The following are copied to the interface: the operation in the order
      (AFVGD) and the complete order header (CAUFVD).
    CONFPP04
    With this customer enhancement you can carry out your own checks on the
    confirmation. The confirmation can for example be changed depending on
    the user's entries.
    The following are copied to the interface: the operation in the order
    (AFVGD), the complete order header (CAUFVD) and the confirmation
    (AFRUD). The confirmation is copied back from the customer enhancement
    to the SAP standard program.
    CONFPP05
    With this customer enhancement you can update your own data once you
    have saved the confirmation. You cannot change the confirmations.
    In this customer enhancement it is strictly FORBIDDEN to send error
    messages or other messages because otherwise there is the danger that
    data will be inconsistent. SAP takes no responsibility for this !!!
    The following are copied to the interface: a table with all the
    confirmations (AFRUD) created in this transaction and a table with the
    order headers (CAUFVD) that belong to it.
    CONFPP06
    With this enhancement you can determine which data from a manually
    entered confirmation is transferred to the automatically created
    confirmations, for example, when a confirmation is entered for a
    milestone operation.
    In addition to the order data (IS_CAUFVD) and operation data (IS_AFVGD),
    the confirmation type (I_CONF_TYPE) is also transferred. The data from
    the manually entered confirmation is imported via the structure
    IS_AFRUD_MAIN and the data determined by the system for the
    automatically created confirmation is imported via the structure
    IS_ACT_DATA.
    The data from the automatically created confirmation can then be
    modified and exported via the structure ES_ACT_DATA.
    CONFPP07
    With this enhancement you can define your own detail areas (screens)
    that can be issued for the single screen entry of time ticket
    confirmations.
    Two function modules are available to implement the flow control for the
    customer-defined screens. While the function module EXIT_SAPLCORU_S_100
    transmits the data from the confirmation, order, operation and work
    center, the entered confirmation data can be exported using the function
    module EXIT_SAPLCORU_S_101 and the structure ES_AFRUD.

  • Goods receipt at the time of confirmation

    Dear all,
    At the time of confirmation only i want to do goods receipt in the goods movement screen. So please suggest me the configuration setting by which i can do GR at the time of order confirmation.
    Thanks,
    Aravind.

    Hi,
    As others have mentioned, auto GR can be done in the below listed manner:
    1. Maintain control  key with auto GR. If you want only auto GR in last operation then create a new control key for which only auto GR is checked in SPRO T. Code: OP00
    2. If you want auto GR only for few order types then for the respective order type create a production scheduling profile and assign that order type in production scheduling profile and in work scheduling view of material master maintain this production scheduling profile with auto GR checked in SPRO t. Code: OPKP.
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Automatic Price Change at the time of Confirmation of PP order

    Dear Sir,
    When Production Order is being confirmed (T Code COR6), the
    price of the BOM material (Finished Goods with standatd price)is getting
    changed. PR document type FI document is created and UMB key
    is getting the hit with a very minimum amount. (0.01 Indian Rupees) . This is not happening regularly. But suddenly in one confirmation it is happening. The process order are created in
    the system for 1 month say Start Date 01.01.2009 End Date
    31.01.2009
    This is happeing when confirmation is made in first day of next month
    for previous month i.e. for process order of January 2009 (Start
    Date 01.01.2009 End Date 31.01.2009 ) confirmation is made on the
    01.02.2009. Document date is 01.02.2009, posting date is
    31.01.2009.
    The PR (Price Change) docuement is getting generated on 01.02.2009 with posting date on 01.02.2009.
    At the mont end there is no manual Price Change thru MR21 transaction.
    Regards,
    Partha Pratim Bhar

    Hi,
    You need to check that material Standard Cost estimation has run or not for the next period. Normally Standard cost run can be run every period or once in 3 periods or once in a year. Based on this the standard cost estimate will update the material prices in the costing 2 view if any changes in the existing price. May be his could be the reason you may face the problem.
    Regards,
    V. Suresh

  • Automatic goods issue when the activity is confirmed not happening

    Dear all,
    I am facing one issue. I have attached a backflush item to the activity. The stock is also available for that material. But when i do the activity confirmation that material is not getting issued automatically.
    Can anybody tell me what could be the reason.
    Regards,
    Sudhir Kesarkar

    Thanks jibat,
    As you suhggested i have checked in cogi. The error appearing there is 'Maintain valuation type'. This occured because the material is split valuated and we have to maintain the valuation type. But is there any way to automatically flow valuation type to the material attached to the activity.
    Regards,
    Sudhir

  • Parallel Processing at the time of confirmation

    Hi Gurus,
    During confirmation of production orders / collective orders (T.Code u2013 CO11 / CO12 / COHV) or through REM Backflush done in Repetitive Manufacturing (T.Code - MFBF), material components get locked, for processing when multiple users are transacting either confirmation of above orders or MM-IM transactions in parallel.
    Eg. Goods Receipt for components in stores cannot be made during confirmation by planning production scheduler and vice versa.
    As a result, transaction of Goods Receipt making cannot be executed getting error message u201CUser lockedu201D.
    Please suggest us how parallel processing can be carried out on same materials simultaneously like working on CO11, CO12, CO1P and MIGO for the same material. System should allow processing parallel with minimum execution time.
    Any SAP notes available for this?
    Any one faced such issue and resolved this, please share.
    Thanks in advance,
    Regards,
    Srini

    Hi Srini,
    Normally this should not be a big problem, since it takes just a short time to process automatic goods movements related to production order confirmation (backflush GI, and GR).
    But if in your reality it is, then SAP offers a decoupling concept, which results in posponing those movements, and perform them en-mass at a more convenient time when it less disturbs (like after normal office hours). Look in the link for full details:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/b1/c04d42439a11d189410000e829fbbd/content.htm
    Regards,
    Mario

  • Automatic goods movement for serialized material

    We are confirming a material which have two components.
    Both the components are serial number managed. can we post automatic goods issue for those components while confirming the header material using backflush indicator or in any other way?

    Hi, I  believe standard SAP does not supports automatic goods movement for the serialized material.
    Regards
    Edited by: Sarvan on Mar 25, 2010 4:33 PM

  • BaDI:Automatic goods movements

    Hi gurus,
    Can anybody tell whether we can use the BaDI :Automatic goods movements (menu path: SPRO> Production>Shop floor control >system modifications>Business add ins--> BaDI :Automatic goods movements) for the following requirement.
    1)To check the quantity of components Backflushed  with respect to the Yield  during partial 
      confirmation through co11n transaction(against the Production order BOM ).
    Scenario:# We reserve components for the production order in batches.
    We save production order eventhough component qty is insufficient(don't want to stop 
                     production) to fulfil the whole order quantity.
    We reserve partial quantity of components through batch split in production order.Open qty
                     will be there in the  component overview screen without  batch
    Our problem : 1) System not backflushing components proportionate to yield qty (batch split 
                              component with insufficient component qty)
                          2) No check/error when we post higer goods yield with insufficient component(no error )
    OR
    can we use the following Enhancement to solve the above problem
    CONFPP04    PP order confirmation: Customer-specific input checks 2 (menu path: SPRO> Production>Shop floor control >system modifications>Enhancements for order confirmations--> customer specific input checks with changes)
    Thanks in advance
    Jan

    Hi Jan,
    For your queries, refer to the following link:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b1/c04d01439a11d189410000e829fbbd/frameset.htm
    Hope this will help you in some way........

  • Goods receipt is automatically created at the time of confirming the transf

    Hi,
    we are following the confirmation control key inbound delivery process.
    I am making an inbound delivery with refernce to the purchase order.
    then i am making a putaway against the inbound delivery through LT0F and creating a transfer order against the inbound delivery.
    Then i am confirming the transfer order through LT12, when i am confirming the transfer order the goods receipt is automatically created without manuallyy doing a PGR in inbound delivery.
    Can any one let meknow how to avoid the creation of the auto GR at the time of confirming the putaway TO
    Sunil

    Hi,
    In LT0F check in  the initial screen -->control data -->weather the adopt put away quantity field value is 4. If it is 4 then the GR will be posted automatically.
    Regards,
    Bharat.

  • Good Movement at the confirmation of an operation

    Dear All,
    I tried to make good movement when I maked an confirmation for an operation.
    I configured whit TC: OPK4 automatic good movement and whit TC: OP67 I choosed option automatic good movement for control key.
    However, when I maked an confirmation (TC: CO1F), the system didn't propose the material from BOM, for issues, or the finished good to get in stock.
    And an additional question: if I have many operations on the routing and each of them have the same control key (PP01, for example) the system cannot accept any automatic good movement.
    What can I do in this case?
    Thank you very much for the answers.
    Regards,
    Marian

    Hi,
    You are trying progress confirmation right...
    As per my knowledge for production order confirmation you could findth egoods movement...
    in CO15 or CO11N...
    For th e second question if u have N number of operations then you could confirm operation wise in CO11n and for first operation goods issue and for the final operation goods recipet will happen
    Regards,
    sravanthi
    Edited by: Sravanthi683 on May 21, 2009 10:34 AM

  • Formula at the time of confirmation

    hello anybody pls help,
    my client is asking formula at the time order confirmation for scrap qty. l am explining the scenario.
    i have created BOM for FG. In that i have maintaing RM, scrap and packing materials and i have two operations for this.
    i have created production order for FG with backflush. in this my scrap qty is not atcual qty. i have confirmed first operation and made goods issue more than the planned qty with movment type 261. then i am going to confirmed for second operation. here my client is asking formula before posting goods movement in CO11 t.code for scrap qty. it should be caluculate automatically from Issued RM qty to FG QTY (101 MVT) and RM return qty( 262 MVT). like
    scap qty = (RM1 qty +RM2 qty) - FG1 qty-FG2 qty - RM return qty.
    let me know is it possible.
    thanks & regards
    Bhakta

    Bhakta,
    Following are the list of Confirmation related  enhancements,
    Cust. specific enhancements when saving - CONFPP01
    Determine customer specific default values - CONFPP02
    Customer specific input checks 1 - CONFPP03
    Cust. specific check after op. selection - CONFPP04
    Customer specific input checks 2 - CONFPP05
    Customer specific enhancements when saving- CONFPP06
    Confirmations: Actual Data Transfer - CONFPP07
    Since I dont have the SAP access at this point of time, I will not be able to comment on which one can be usefull.
    Regards,
    Prasobh

  • Automatic goods movement in co07

    Hi,
    I am trying to process an order without material (rework order). But while confirming I am not able to do the automatic component backflushing since components are not reflected in the goods movement screen of the order confirmation. Do I need to do some additional settings or is it the system that does not allow an automatic goods movement in this case?
    Thanks in advance
    Snigdho

    Dear Snigdho,
    CO07 is used for some rework purpose or for a dismantling process,
    Moreoever it will be created without reference to a material,so how is the system picking the BOM, and
    the BOM components?
    IF you are making the system to pickup always few components,then you can make the setting
    mentioned by Mr.Brahamankar and go ahead.
    Check and revert back.
    Regards
    Mangalraj.S

  • Goods movement 101 in Production Order Confirmation.

    Hello Gurus,
    I do the production confirmation via CO15, but when I press the 'Goods movement' button, there are only the components existing on the Goods movement item.
    I can not see the material which I produced with the Movement type 101 'Goods receipt for order into warehouse'.
    Can anyone tell us how to maintain it to allow us do the goods movement for the product?
    Regards,
    Tiger

    Hi Ranga,
    Thank you for your answer.
    I resolve my question according to your solution.
    Select 'Auto Goods receipt' in control key via OP67
    Also thanks to Benny.
    Regards,
    Tiger

  • Automatic goods movement

    Dear expert,
    I have one question regarding goods movement in PP. How to deactivate automatic goods movement on creation of production order.
    I have untick backflush on material master, work centre, routing. Then i have also untick "collective order with goods movement" in configuration of order type.
    What are missing?
    Point will be reward

    Hi.
    To deactivate  automatic Goods movement please check below points
    For Auto GI 1. Remove the backflush indicator  at material master , Work center, Routing , Production order.
    2. Deselect the "all Components" check Box at OPK4 for your order type and plant Combination.
    For Auto GR.
    1. Change Auto GR  Control Key assigned at Last Operation
    2. Change  Production scheduling Profile Assigned at work scheduling View.
    Pradeep

  • My mobile phone is always automatically shut down at the time of the photo.

    My mobile phone is always automatically shut down at the time of the photo.

    Plug the device into a wall outlet and leave it for about 20 minutes. If it has not powered on at that point try a reset by pressing and holding the home and power buttons for about 15 seconds until the white Apple logo appears.

Maybe you are looking for