Hello
Stocks are available in the QA stock, The Availability check is considering this stock also, but during Production order confirmation,( CO11N) we are getting error message missing parts , we have two problem
1) we don't want to consider the different storage location / QA stock for availability check
2) Once we transfered the stock to Unrest stock , we can't do CO11N , we have to do manual GR / GI , how to overcome this.
Thanks
Ni
Hy Nick,
For your First Qustion,
For this go to OPJJ - Avaibility Check Control
Select Chcking Group which you have assign to your Order type
(OPJK) and remove tick from Incl. QI stock.And for Storage location don't tick No Storage Location after doing system will check Material availability in only production storage location (Which you have maintain in MRP - 2 view of Material Master) .
For pop up option, go to T.Code OPJK Slect your Plant , Order type and option 1 or 2 (At the time order Creation or Release).
Material Availability checks,
Don't tick No check option,
This setting will give the option of Pop up screen with Massage of Missing Parts.
For your Second Question
Sorry still I still don't under stand your Problm.
But I guess you want to restrict the GR until GI is not done due to Missing parts.Correct or not?
If yes then do the below settings,
go to t.code OPK4 (Parameters for Order Confirmation):-
Go to second tab General Individual Entry,
Tick Goods Movement selecttion and then also tick Terminate for Incorrect Goods movement.
This setting will help to terminate any confirmation for which goods movement containes any error.
Hope it will help to solve your problem.
Regards,
Dhaval
Similar Messages
-
Production Order missing Part list error date 1,857 is not convertable
*Dear Experts*
When i m trying to check missing part list at production Order then system is showing the error
The date 1,857 is not convertible (please correct) in Production order Missing part list.
Rgds
Pankaj AgarwalDear ,
System is throwing you this message beacue your FC calander is vaild till 2010 and asking you to put the date btn FC valid from 2004 and FC valid to 2010.
Goto -OP03-Select the Factory Calnder Tab in change mode (pencil mode ) -Select the applicable calender chek box-Double click this -Extende the validit date till 2020 or beyond so that u will not face not only in this particular issue but in many other txn later on .
Agian -come back to OP03 main screen -Slect the Holiday calaner -Extende the same way and reassing in Factory calander
after this , do not forget to re-ssign this FC in respective plant in OP03-Plant assingment .
Try and revert back
Regards
JH
Edited by: Jiaul Haque on May 27, 2010 3:14 PM -
Automatic batch management for Production order receipt
Hello ,
I have a requirement to setup & activate Batch Management only for Production order Good Receipt . I am looking out for what all configuration / data setup will be required to complete this .
To start with I have following questions .
1. Whether such activation is possible only for Production order Good receipt - 101 mov.type
2. IF yes , is Batch management activation status be at material or plant level .
3. As I need automatic assignment , should I be selecting Internal batch management .
4. What should be selected for valuation for Goods movement in Inventory management.
5. Is it necessary to have batch determination by maintaining Condition tables / Access sequence
6. What would be standard Class / characteristics to be maintained for automatic determination.
Also I will have to work with the running system where Material are already active and have stock in system . What precautions will I have take if I have to activate the Batch Management in a running system.
Appreciate all your expert advise.
Regards,
LawreiThanks Adler for your comments .
With reference to your point , need further clarifications
1. If batch management is selected to material , this means that it will be active for all movement types for Inventory and cannot be restricted to 101 mov.type .
I see that in config node
+Define Batch Creation for Goods Movements+
+Using this function, you can define for each movement type whether a new+
+batch is created for a goods receipt and how it is created.+
Can I not restrict batch creation only for 101 movement , but again here I don't have options to select only for Good receipt for order - Tran/Ev type - WF .
& what about below config node
+Define Batch Creation for Production Order / Process Order+
+In this step you can make the following settings in batch management for+
+the existing production control profiles:+
Is it possible in this node .
Please advise.
Regards.
Lawrei -
How to calculate missing parts for production orders?
Dear All,
I have this scenario i'm using collective orders\direct production method in my industry which means that sub assemblies don't enter any warehouses but transferdd directly to its superior order as a component , my problem is i want to know the missing raw material for the finished product , knowing that the FP has a 6 level BOM i want during ATP for production order the sustem checks only for the lowest level of material and takes only the CURRENT STOCK IN WAREHOUSES , what checking group should be used for the FP, Subassemblies and raw materials.
plz help
Ahmed SobhiHI,
If no Av. Check is to be done at all, then specify checking group as KP. But be informed, this will be impactive across all business processes meaning if you plan to sell the SFG & you place a SO for that item, an Av. Check will confirm it immediately as it has av. checking group as KP.
Now for the checking group maintained for raw mtl, go to OPJJ & check the details of the checking rule to know which receipts/ issues are considered & you may modify the same as per your need.
I would suggest do a test in your sandbox & if it meets your need, then adopt the same.
Regards,
Vivek -
Automatic Batch determination at time of Goods receipt for production order
Hi SAP experts,
Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
I have done the following settings:
1.Specified batch level at material level
2.External batch number assignment
3.Defined production order condition table '501' (plant/material)
4.Defined production order access sequence (order type-plant -material)
5.Defined Production Order Strategy type.
6.Defined Batch search procedure in Production Order.
7.Assigned Batch search procedure to Production order type for a particular plant , batch check not activated.
Please let me know of any more settings to be checked for the same.
For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components is taking place for 1 EA qty. from 5 different batches.
So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
It is desired that the system should do GR for the qty. 1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
Thanks in advance. good day.
Best regards,
RBHI Rahul,
As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
I am not sure if i understand your requirement 100%.
But let me explain you standard behaviour.
When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
Check and Revert,
Santosh Sarda -
Bins problem while creating goods receipt for production order.
Hi All,
I am facing a problem with selection of bins while creating goods receipt for production order in transaction MB31 and MBBE.
The order of filling bins is with respect to storage Unit not by document no, Please suggest something.
The scene is like that.
The bins are not filled in the proper sequence, the system checks for the empty bins and filled those later on.
like this,.
Typ StorageBin SC SS Stock Avail.st BUn GR Date DocumentNo Storage Unit Time
SLoc Batch Re IA PutawayS Pick qty Cert. No.
VN1 106A088 0 0 CS 01/25/2010 4739297 1005721391 10:00:59
100 0001020069 60 0
VN1 107B076 0 0 CS 01/25/2010 4739298 1005721392 10:01:01
100 0001020069 60 0
VN1 108B076 0 0 CS 01/25/2010 4739299 1005721393 10:01:04
100 0001020069 60 0
VN1 109A077 0 0 CS 01/25/2010 4739300 1005721394 10:01:06
100 0001020069 60 0
VN1 110B079 0 0 CS 01/25/2010 4739301 1005721395 10:01:08
100 0001020069 60 0
VN1 106B088 0 0 CS 01/25/2010 4739302 1005721403 10:01:11
100 0001020069 60 0
VN1 123B158 0 0 CS 01/25/2010 4739303 1005721389 10:01:13
100 0001020069 60 0
VN1 124A160 0 0 CS 01/25/2010 4739304 1005721390 10:01:15
100 0001020069 60 0
VN1 118A133 0 0 CS 01/25/2010 4739305 1005721396 10:01:17
100 0001020069 60 0
VN1 119A128 0 0 CS 01/25/2010 4739306 1005721397 10:01:20
100 0001020069 60 0
VN1 120B162 0 0 CS 01/25/2010 4739307 1005721398 10:01:22
100 0001020069 60 0
VN1 121B159 0 0 CS 01/25/2010 4739308 1005721399 10:01:24
100 0001020069 60 0
VN1 122B159 0 0 CS 01/25/2010 4739309 1005721400 10:01:26
100 0001020069 60 0
VN1 123B159 0 0 CS 01/25/2010 4739310 1005721401 10:01:29
100 0001020069 60 0
VN1 124B160 0 0 CS 01/25/2010 4739311 1005721402 10:01:31
100 0001020069 60 0
Thnks you,
Anmol.
Edited by: anmol112 on Jan 25, 2010 10:34 PMno replay, clossing threat.
-
Table name& field name for production order & operation confirmation
Hi All,
I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
Thanks and Regards,
PSSHi there,
CORU(R/3 Application development: PP Confirmations )
AFFW Goods movements with errors from confirmatio
AFRC Table of planned changes to conf.: Automatic
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRP1 Table of planned changes to conf.: Automatic
AFRP2 Table of planned changes for confirmation: B
AFRP3 Table of planned changes for confirmation: C
AFRP4 Table of planned changes to confirmatn: Data
AFRU Order completion confirmations
AFWI Subsequently posted goods movements for conf
TAFWD CORU: Messages that are not interpreted as e
TCORD Table for field-dependent check routines
TCORU Parameters for order confirmations
TCORV Table with Routines for structureing variabl
TCORW Confirmation: Window Control
TPARU Control parallelized confirmation processes
TPRRU Control table for process chain for confirma
TPRRUT Text table for process control of confirmati
TRUGS User status caused by deviation
CO(R/3 Application development: PP Production orders )
AFBP CIM order: Batch print requests
AFFL Work order sequence
AFKO Order header data PP orders
AFPO Order item
AFVC Operation within an order
AFVU DB structure of the user fields of the opera
AFVV DB structure of the quantities/dates/values
FAPW Index of production-/issuing plant for produ
FTIND Missing parts index
ORDCOM Communication control Operation download
T024F Production scheduler
T399X Parameters dependent on order type
T441C Profile - availability check
T441CT Texts for Profile "Display Availability Chec
T490 Transactions PP - orders - order category
T496B CIM order: Assigning document types to refer
T496D CIM: Destination/lists/spool parameters per
T496F CIM order: Form description of the list
T496K CIM order: Entity table of possible table id
T496N CIM order: List descriptions
T496P Print PP documents: Determination of output
T496R Print PP shop papers: Report control
T496T Print PP shop papers: Transaction control
T496V PP Print: Default Value for Printing Online
T496Z CIM order: Table-controlled table access
TC32 Assigning subscreen to processing location
TC34 Allocating operation to object type for the
TC62 Sequence of detail screens when processing h
TCO01 Sequence/operations control in logicstics or
TCO03 CIM order: Texts for TCO01, Description of o
TCO04 Table for controlling the screen sequence gr
TCO05 CUA status depending on panel, trans. type,
TCO06 Exclusive functions for PP orders
TCO09 CIM order: Text IDs of objects in orders
TCO10 Valuation variant for order costing
TCO11 Control table for production orders - availa
TCO12 Control table production orders - stock dete
TCO36 PP orders: Control table for calling up pop-
TCO41 CIM order: Default values for generating ope
TCO43 PP-SFC order profile
TCO43T Description of production scheduler profile
TCO60 Sequence keys for input facility and verific
TCO61 Sequence key for PP orders
TCO62 Defining screen sequences for input facility
TCO63 Sequence of detail screens when maintaining
TCODB Database fields development class CO per ord
TCOF Profile for missing parts info system
TCOFF Profile for Missing Parts Info System: Displ
TCOFFT Texts for Missing Parts Info System: Display
TCOFG Profile for missing parts info system: crite
TCOFGT Texts for Missing Parts Info System: Criteri
TCOFK Texts for functions in milestones/trigger po
TCOFS Profile for Missing Parts Info System: Sort
TCOFST Texts for Missing Parts Info System: Sort Cr
TCOFT Texts for Missing Parts Info System
TCOKO Constants for PP orders
TCOKT Account assignment categories for order
TCOP Field selection profile
TCOPS Field selection profile
TCOPT Description of Profile for Field Selection
TDUMMY Dummy structure of a table for READ with VER
TRUG Reason for variances in completion confirmat
TRUGT Text describing the reason for a variance in
TXPR1 XPRA control - missing parts info system
Regards
Hemant G -
Transfer Order not created while performing GR for Production order
Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
Let me give you a brief background.
This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
Supply area is created for WM location.
Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
1) Now when the Kanban is set empty a production order is automatically created.
2) Once the production order is confirmed the material automatically shows up in the bin.
A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
3) *PROBLEM* - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
Following are the settings which I have already checked:
1) In IMG, WM movement type 103 has auto TO indicator set.
2) IM-WM interface for 102 movement type and 103 movement type is maintained.
The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
I would really appreciate if anyone can help me in this.
ThanksHi Mike,
I do not know this function in SAP, so these are just my ideas:
1.
System does not create a TR or a TO. the material automatically shows up in the Bin.
I think it's a normal SAP behaviour. If you do GR against a PO the quant(s) will appear in interim storage bin w/o TO. The TO is to move the quants from one bin to another, but in this case the quant comes from 'nothing' and arrives at the bin.
If you make confirmation and consume the components refering to a PrdOrd, the components will disappear w/o TO from storage type 100 + dynamic bin, because there's no TO that could move them from dynamic bin to 'nothing'.
So, these 'movements' are to change the WM stock level and TOs are not designed for this.
2.
There's difference between auto creation of TO and immediate TO creation. Please check what SAP help says in case of TOs for outbound deliveries:
http://help.sap.com/saphelp_47x200/helpdata/en/c6/f8406c4afa11d182b90000e829fbfe/frameset.htm
3.
Now when the Kanban is set empty a production order is automatically created.
So, if you remove the stock from the Kanban it triggers the creation of a PrdOrd. This is very logical in a Kanban system because it is a pull system. but your problem is not this, it's clear.
If you just created an automatic TO and would remove the stock from Kanban-bin, a new PrdOrd would be generated, and so on. As many times you remove the stock a new PrdOrd is created and this might be the reason why no TO is crated automatically. In this case this would be a push system and not kanban system.
I do not know this process but if we concentrate only on the pull system, maybe this Kanaban is to store the FG until an event (e.g. shipment) should trigger the stock removal from this bin. (just my assumption)
Please try to mark the TR creation for the movement type w/o auto / immediate TO and tell us the result (whether you get the TR if you confirm the PrdOrd).
Regards,
Csaba -
Dear Guru's,
we have a requirement i.e. user can convert planned orders in to production orders (CO41) based on those production orders we can get Route card( Z Smart form) presently we are using manual input for that Route card. recently we got requirement for this i.e. make to automatic generation of route card for this requirement we need to get the list of child's production orders based on parent production order
so as per my requirement i need to get all child part numbers production orders based on parent production order number and quantity i tried in MD4C and CO46 but those transactions codes are picking multiple lines also so for this requirement please give your valuable suggestions
Regards,
VenkatDear Friends,
Thanks for your reply,
My business process is MTS purely strategy 10, for route card all components with production orders we can give input as like bellow these production orders are converted from planned orders,between few components are don't have production orders those are F-30 materials,because of this reason i need link for production order to child components orders
01
IND1
IND1
A1CE2003520103-005
55685815
02
IND1
IND1
A1CE2003520103-010
55685814
03
IND1
IND1
A1CE2003520103-015
55685813
04
IND1
IND1
A1CE2003520103-020
55685812
05
IND1
IND1
A1CE2003520103-025
55685811
06
IND1
IND1
A1CE2003520103-030
07
IND1
IND1
A1CE2003520103-035
55685810 -
Movement type for production supply missing in warehouse
Gurus,
I am getting this error when i use TC-LP11
movement type for production supply missing in warehouse
What should be done?All I can suggest is checking the master data:
Must have at least one Prod. Supply Area and one control cycle set up.
PSAs are part of the WM-PP interface and are created in WM and are used to group together Work Centres (which are Production master data).
Created under application menu:
Logistics/LE/Master data/Warehouse/Production Supply (Tx LPK1/2/3 see also LS41) and assigned to Work Centres under application menu:
Logistics/Production/Master data/Work centres/Work centre/Change (Basic data view).
(To find out the PSA aka Supply Area from Process Order Display Tx select: Goto \ List \ WM Picklist and scroll to right)
A Control Cycle defines for a given material, Plant and PSA:
which WHS to get the material from
which interim storage type to take it to
which bin to place it in (can be dynamic for pick parts)
Logistics/LE/WM
Master data/Control cycle record/Create
Regards,
Nick -
Transaction similar to MDVP, for Production Orders
Hello.
I have used transaction MDVP to perform a collective availability check on Planned Orders. Do you know of a similar one that gives me the same information on Production Orders?
I have used CO24 to get a report of Missing parts, but I feel that MDVP shows information in a better way, so I'm looking for the equivalent of MDVP for Production Orders.
Thank you!Hi,
Use code COHV
Vishal -
WM Material Staging for Production Order
Hi,
In the process order txn Cor3, Go to > List > WM pick list> the initial screen is Display WM Material Staging for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the BSI, Category and Storage Bin. Your help is greatly appreciated.
ThanksDear Ellen,
If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
'"<i>1" pick list item
This materials are picked according to the required quantity specified in the production order.
'2': Crate or kanban parts
These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
'3': Release order parts
Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
"0" not relevant to WM-PP
These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
For instance:
You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
'Storage bin' filed will contain a value automatically, if your settings are proper.
E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
Additionally you have to define control cycles for materials you use for your production. (LPK1)
The control cycle says from which storage type & bin you want to consume the components.
BR
Csaba -
Hello,
Perhaps somebody has faced this problem...
During goods receipt for production order via MIGO with 101 movement
type for split-valueted materials a new valuation type is not created
for the materials despite it is set on the screen (batch number =
valuation type). No error messages occur.
Thank you.Alexx,
I do not know if I have misunderstood you question.
Are you asking that you want a new valuation type to be created during goods receipt. If yes then let me tell you it is not possible.
Valuation types are assigned to the valuation category in customisation. You cant create new one during GR. You need to enter the Val type and batch number during GR. Then the Val type is assigned to the batch. You can see this in MSC3N.
If the valuation type is already entered in the prod order then automatically the val type is populated in the GR. You need to enter the Batch number alone.
Hope this clarifies your doubt.
Regards
Ram -
Hi SAP PP Gurus
Can any body know about picking for production order using T-Code CO27 and its related setting in customizations because i use it and i get error message
"No data exists for chosen selection" .
Regards,
Rajesh.Hi Ram.
Thanks for your reply.
I try that table and i get the result as below but after that what i do.
Reservation 2382
Item 1
Record Type
RequirementType AR
Reserv. status
Deleted
Mvt allowed X
Final issue
Missing part
Material 91004020
Plant 2510
StorageLocation CY
Supply Area
Batch
Distribution
Special Stock
Requiremts Date 29.09.2006
Requirement Qty 10 -
Inspection for production order
hi all,
While I tried to generate inspction lot for production order automatically, i get an error message : inspction lot create fail. I've done these steps, is there any mistake here :
1. in material master, i set inpection type 03 and choose prefered inspect type and active options.
2. I've create an inspction plan with usage '1'(Produc) and status '4'(Release) and inspect operations with control key 'QM01', also aign MICs into them.
3. when i create product order with TCode 'CO01' and release this order, it can't create any inspection lot automatically, when i try to do this manually with menu, i get that error message.
Did i missing any setting?
thank u very much.Dear,
In Material master, QM view in the insp type 03 details
check box-insp with material specification
Check box-insp with task list
In the above check box, which one ticked?
If both are ticked then you need to maintian material specification in QS61, or remove this tick from check box-insp with material specification in material master
So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1
Also refer this link,
QM - 03 TYPE INSPECTION
Hope it will help you.
Regards,
R.Brahmankar
Maybe you are looking for
-
Post Author: happymouse CA Forum: Performance Management and Dashboards Dear all, I have a dashboard with multiple analytics within it. Currently, for refreshing of the dashboard, we need to click on the submenu name. Kindly advise if there is any wa
-
I've been out of the loop - is there any hope for my Audigy 2 in Vis
Are they going to eventually come out with drivers that will make my Audigy 2 ZS Plat Pro fully functional again, so I can use all the ports and features again? Or are they going with X-Fi only now? It would be a shame if I spent over $300 for a soun
-
Table parameter of RFC FM in background task
hi I have a RFC FM in system A which has two table parameters, first table parameter table1 will have the data and the second table parameter table2 will be filled with in the FM with the error and success messages. Now i am calling this RFC FM in a
-
Adblocking with /etc/hosts and connman
I'm using the hostsblock package to create a custom hosts file. Everything works fine with netctl+dnsmasq, but it doesn't with connman. It seems connman redirects all traffic to itself by writing "nameserver 127.0.0.1" in /etc/resolv.conf I can't pin
-
Hello. I'm Frenzy and this is my first message. I was wondering if there's a way to apply local changes to a picture by including the part I need to be changed in a square (like when you crop it). Without using the graduated filter. Thank you all for