Automatic inspection lot creation  upon reaching the next inspection date

Hi qm experts,
I have this scenario; my client wants to make an automatic inspection lot creation as well as posting to quality inspection stock of certain materials upon reaching its next inspection date defined in the msc2n transaction; how shall i make the inspection set-up of this materials??Thanks
Regards,
Matildo, Edsel F.
QM Consultant

Ok, you have me confused.  You want to do this as a one time thing?  I thought you want it to look every day, or every week, for batches that have reached their next inspection date?
If its a one time thing, then yes, just run QA07 one time.  It only looks at unrestricted inventory.  Do not set up any parameters in the bottom half of the screen for expiration date.  If you do, any of those that have reached expiration date will be moved to blocked stock and no inspection lots created.
If you want this to run regularly, you, or someone, needs to use QA05 to set up the batch job to run on a regular basis witht the approriate "days" value for how often your running it and how far in advance of the inspection date you want lots created.  And of course tick on "to inspection stock".
There is no "automatic creation" as I think your thinking.  You either run QA07 once a day, or once a week or as often as you want to.  OR you set it up in a batch job (QA05) to be run once a day, once a week or as often as you want to.
When the batch job is running, it 'appears' that the lots get created automatically.  But it is the QA07 program being run in batch that is creating them.
Craig

Similar Messages

  • Auto Inspection Lot Creation.

    Dear Expert,
    I have created new inspection type as Z01 by copying the 01 and I have maintain Inspection Lot Origins and Assign Inspection Types under 01. After that I have assigned my new inspection type Z01 to material master and activated it with material post to quality. Up to this it is working fine but after GRN system is not creating the lot. Even thou material is posting to the quality stock but no lot is in QA32.
    But if I Create the lot wih QA01 it working fine and I'm able to do the UD also. But for no automatic lot generated for purchase order.
    Please provide the details how to resolve this issue?
    Thanks and Regards,
    Manish

    Dear Manish
    These are the procudural steps when going to create a new inspection type
    1) Maintain task list usage - SPRO> QM> Quality Planning > Inspection Planning> General> Define task list usages
    2) Maintain inspection type - SPRO> QM> Quality Inspection > Inspection Lot Processing > Inspection Lot Creation > Maintain inspection types (for eg Z89) - Also maintain the task list usage here
    3) Maintain Quality inspection lot origins and assign inspection types - SPRO> QM > Inspection Lot Processing > Inspection Lot Creation > Maintain inspection lot origins and assign inspection types
    4) Define default values for inspection type - SPRO > QM> Quality Inspection > Inspection Lot Processing > Inspection Lot Creation > Define default values for inspection type
    5) please check for any user exits in MIGO which have been used which is creating any issues.
    Regards
    gajesh

  • Inspection lot creation logic related movement type

    Dear QM Guru,
    I'm newly for QM module
    I would like to know how config of movement type and lot origin under below config relate to inspection lot creation.
    Quality Management>Quality Inspection>Inspection for Goods Movements-->Movement Type/Update Control/Inspection Lot Origin
    i try to delete all record of customized movement type 949 that i think it copy from movement type 501 in this customizing then try to GR with this movement type, so system still generate inspection as normal.
    then i re-insert the movement back into this customizing again then i wonder that system automatic fill in lot origin for me and this field also gray that not changeable
    how system know the appropriate lot origin for this customized movement type?
    Please anyone explain to me.
    Thank in advance
    Konnapa

    Hi,
    Inspection lot origins are assigned to movement types in standart. The assignment is hardcoded and cannot be changed. In this customization step you can only see the origin assigned. When you copy movement types from standart the assigned inspection origin also gets copied, and you also cannot chenge this assignment.
    What you can do is to activate inspection for each movement type, or to customize selection of the inspection type within the inspection origin assigned.
    Regards.

  • Inspection lot creation during GR with respect to Purchase Order

    Dear Experts,
    Here is my Question
    Inspection lot creation during GR with respect to Purchase Order
    Inspection type 01 set in the material master
    inspection lot will be created during GR for a Purchase order
    from my understanding for every GR a inspection lot will be created
    No batch Management
    but the requirement is irrespective to GR qty and number of times of GR
    we need inspection only one inspection lot
    For Instance
    There is a PO for 1000 kg no batch management
    now i do GR for 100 kg for 10 times with different dates
    now i need to have only one inspection lot
    not 10 inspection lot for each 100 kg
    can any one suggest a solution, please advise my understanding is correct
    Many thanks
    Raj

    Dear Raju,
    There is a solution for that .The setting can be done two ways, either in the material master or in the configuration
    1) Material Master
    MM02> QM View> Inspection Setup> 01> Control Insplot> 'X' An inspection lot for each purchase order item/order item 0r  An inspection lot for each material document and material
    a) 'X' An inspection lot for each purchase order item/order item
    This Means
    This setting is limited for use with the inspection lot origins 01 and 04.
    An inspection lot is only created during the first goods receipt for each PO item or production order.
    b) '1' An inspection lot for each material document and material
    If you set this indicator, the system creates only one inspection lot for a material document (in a goods receipt transaction) for each material. This setting is useful, if several purchase orders or partial deliveries are processed for the same material in a goods receipt transaction.
    2) You can do this default in the config
    SPRO > Quality Management >  Quality Inspection > Inspection lot creation >  Define Default values for inspection type > 01> Control Insp lot
    Hope this helps
    Regards
    gajesh

  • About the first inspection before mass production ,and the end inspection after mass production

    Hi ,experts :
           There is a scenario about my customer : before mass production they need to do first inspection avoid a lot of defect for the finish goods ; and he also need  doing the end inspection to check whether the mold can be used for next batch or need to do some repair .
         I want to add two operations in the routing ,but it seems unreasonable .
         Can anyone give me some advice  for it ? thanks advance .

    Hi Avril Liu,
    OPTION - A
    I think, you can try the below option which may not be the best solution but looks logical to me -
    a) Create to inspection types 8901 (Initial Mold Manual Inspection) and 8902 (Final Mold Manual Inspection) and assign them to inspection lot origin 89. Please note these inspection types are manually created and these are not linked to stock movement.
    b) Use the inspection type 8901 to test the initial condition of the process. In case if the UD = R, then use enhancement to create a new 8901 inspection lot by linking the old number in "TEXT" field.
    c) If the next inspection UD = R, then repeat the manual inspection lot 8901 inspection lot creation step. If the inspection lot 8901 UD = A, then this process is Good to start he process. So create a follow-up action and send emails to stakeholders.
    d) If you are not interested in testing the in-process quality of the produced materials, then you need not need 04 inspection type to be added for GR inspection. If you do test (I think yes, based on your answer...) you can add this inspection type to your material. Then you will be able to Release/Block your produced materials too using UD= A/R  respectively.
    e) Once the production process is complete, you can create manual inspection 8902 to test the mold characteristic. If the UD = R, then again execute the enhancement to create a new inspection lot 8902, by adding the previous inspection lot number in TEXT field, and keep repeating this process. If the UD = A, then there is no further need for testing, and follow-up mail can be send to the stakeholders for the completion of the process.
    OPTION - B
    Else, you may need to use inspection type 14 linked to your equipment doing the production, to test the mold characteristics. This process will be linked to PM-QM module, and you need to map this process too.
    1st inspection can be linked to 89 manual inspection to double check the process and the final inspection after entire production can be done through inspection type 14. Checking the produced material quality will again need inspection type 04 activation like normal process.
    Thanks,
    Arijit

  • Automatic inspection lot creation

    I am working in Pharma industry,
    For each material they have maintained certain validity period till date the material can be used or issued to production. now is there any way dat once the retest date is occured, the material should automatically create inspection lot & status should be under Quality Inspection in MMBE Stock.

    For this you have to activate the recurring inspection 09 insp type for the materials.
    Once the retest date or the expiry date is reached, you can run the transaction QA07 which will trigger the creation of inspection lots for materials which reached the retest date. Or you can schedule this to execute in background every night or weekly which will trigger creation of inspection lot automatically.
    please refer to the links below -
    http://help.sap.com/saphelp_46c/helpdata/en/2d/351ba4448c11d189420000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/6d/bb16f840f311d4b2f20050da4ceab0/frameset.htm
    Hope this helps you.

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Updating of QM info structures on the basis of inspection lot creation date

    Dear Gurus,
    Our business requirement is as follow:
    Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
    Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
    Suppose this inspection take 2 days for analysis at laboratory.
    Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
    I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
    I think there should be some configuration settings available for this purpose.
    Please help me out.
    Regards
    Honyal

    Any valuable input are welcome
    regards
    Honyal

  • Automatic Inspection Lot Creation for HUs (storage Loc.) in WHS

    Hi All,
    can someone guide me through customizing/with end result expected from client. How can I setup this configuration.
    The requirement is all Chem.Raw Materilas are subject to Quality inspection with HU managed storage Loc. with WMS.
    Good Receipt is posted Via Vl31n into Quality Stock. Subsequently a Transfer Order will be created & confirmed to transfer of materials from 902 interim storage type to destination storage type and bin. (due to lack of space in the Whse).
    Now expected is that when Usage decision made (Quality Managment) the stock type should change from Q to Unresticted within the same bin and same storage type and material should be made available to issue for orders.
    Also when GR is done 101 mvt. an inspection lot should generate automatically in Whse under the quant.
    Most appreciate your help.
    Regards
    Chandra

    Hi Chandra,
    Generally WM movement type '309' is assigned for posting change (Sap standard setting). This movement type is generally assigned against 321 IM movement type.
    Modify the settings for WM movement type '309' as below:
    Path: LE -> WM -> Activities -> Transfers -> Define Movement types
    - Automatic TO X (activate)
    - Activate 'To item can be confirmed immediately'
    - Activate 'propose confirmation'
    - Activate 'post to same bin'
    This should solve your problem.
    On your other question
    Generally the inspection lot is assosiated with the WM
    stock and Quant if the stock Quality stock is posted to bins directly.
    Please display the Quant using LS23 and let me know your findings.
    Regards
    Madhu

  • Inspection lot creation during STO return

    Hello Gurus,
    is there a trick to trigger inspection lot creation during STO return ?
    Scenario is the following:
    1 - Creation of STO
    2 - Supplying plant ships materials... stock in transit
    3 - Receiving plant receives materials
    4 - Materials with defects -> Receiving plant add new line with return tick on the same material
    5 - GI from Receiving plant... stock in transit
    6 - Supplying plant receives materials -> Inspection lot has to be created
    I used inspection type 08 on Receiving plant w/o success.
    Many thanks.
    Stéphane

    No inspection lot is created when we return Materials to Vendor (Plant A) even if we maintain Inspection type 02.
    Before STO customizing, Plant B creates a subcontracting purchase order. Next Materials are sending to Vendor (Plant A) and put in "Stock provided to vendor" (Transaction ME2O).
    Vendor (Plant B) creates a Repair request (Sales document / Transaction VA01). Next run VRRE to reveice Materials to repair. Inspection lot is automatically created. The usage decision triggers the creation of Service order to manage all the repairing flow. Last step is to deliver Materials to Plant A and create Repair invoice.
    Repair request supports all repairing flow (inspection lot, service oder...), especialy status (out of warranty or not).
    After STO customizing, I expected the following result:
    1° - Return STO to Vendor (Plant A) / ME21N with return tick
    2° - Plant B ships Materials / MIGO wih 101 (SAP converts in 161)
    3° - Stock in Transit
    4° - Materials receive to Vendor (Plant B) / VL10B
    5° - Creation Inspection lot
    6° - UD triggered Service order creation
    7° - ...Repairing flow with Service order...
    8° - Materials ship to Plant B
    9° - Repair invoice
    10° - Stock in Transit
    11° - Plant B receives Materials
    As I said, there are 2 blocking points:
    - Inspection lot not created when Vendor receives Materials
    - Service order not created automatically (because no Repair request to support inspection lot, service order...)
    Thanks a lot for your help.
    Tell me if you have any questions.
    Stéphane

  • Automatics Inspection lot Creation?

    Dear SAPIENTS,
    With GRC done inspection lot is created automatically in my scenario. Can anybody let me know where this etting is applied and what more I can do so that in inspection lot autmatically.
    Regards,
    Kaushal Rai

    Yes Kaushal,
    Absolutely Correct.
    - 01: Goods Receipt Insp. for Purchase Order
    It trigger the lot while you post, Gr against Purchase Order.
    - 08: Stock transfer inspection
    It trigger the lot while you transfer stock, Material to material transfer, plant to plant transfer etc.
    - 09: Recurring inspection of batches.
    It trigger the lot while, the next inspection date reaches for the batch.
    - 04: Goods receipt inspection from production.
    It trigger the lot while, the Finish product get received from the Pro. Order.
    - 03: In-process insp. for production order.
    It trigger the lot while, the Pro. Order get released, it is for inprocess inspection.
    - 14: Inspection in Plant Maintenance,
    It trigger the lot while, the maintenance order get released.
    And all these lot are triggered automatically.
    Regards,
    Shyamal
    Etc....

  • Inspection Lot Creation after UD

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after UD for the same batch number.
    There will be several GR during one shift for one SKU with the same batch number.
    F.E. shift (6 am to 2 pm) at 7 there will be first GR of finished good. Inspection lot is automaticly created and QA at 9 will make UD for this lot. If production will made GR after that a new inspection lot will be created for the same production batch.
    Is there any possibility to make only one inspection lot even if UD is taken.
    Thanks and regards,

    I guess what bothers me is that for your selection of "2" you include date. Our standard SAP system does not include date on that key choice.  Just material/batch/storage location.
    I re-tested one just to be sure.  Created a new process order for 30. Reveived 15.  Got an 04 inspection lot created.  Processed the lot, posted out the 15 to unrestricted and made the UD with an Accept code.
    Then I GR another 10.  These went straight to unrestricted as I expected.  Then I posted the final 5 in a 3rd GR.  Same result.. straight to unresticited.
    I'm not sure why your not seeing the same.  Again, seeing that 'date' in your number # choice is bothersome.  If some modified that to include the date of receipt and included the time stamp in that, then your going to get new inspection lots.
    Are you sure they didn't post it to a different batch on the second or third posting.  And of course, this does refer to the same process order.. correct?  You not using three different process orders for this are you?
    Craig

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection type 01 - inspection lot creation based on vendor batch number

    Hi Guys,
    this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
    I am facing the folowing requirement:
    I have activated inspection type 01 for a raw material.
    I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
    The system creates its own goods receipt batch number 0546 based on internal numbering.
    A new inspection lot is created.
    I am posting a second goods receipt from vendor a with vendor batch 0001.
    The system creates a new batch number 0547 based on internal numbering.
    A new inspection lot is created.
    I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
    Option 1: Post the second goods receipt against the first internal batch number created.
    I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
    Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
    Or do I have to use an exit and some ABAP code to get the wanted result?
    Thanks for your advice in advance.

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

Maybe you are looking for

  • Muse forms not working

    Adobe Muse FORM widget is not sending to email. checked Muse settings, all is good according to instructions. getting PHP and SQL error message. site hosted on Go Daddy. Designer, not coder. kat

  • How to get source table inside Template Mapping code template

    Hi guys, I have the following scenario, I have an table from external database and want to map it to an oracle table. This is done with Template mapping and I selected an Load code template on the execution unit that holds only the external table, th

  • Add field BLDAT in BSEG

    Is it possible to add in bseg the field BLDAT and if it possible how?

  • Migrating 7.3.4 to 8.1.7 - whitespace? issue

    We are migrating 7.3.4 to 8.1.7. We are aware of the need to ltrim/rtrim varchars, etc. I am looking for the Oracle documentation of the change that requires these changes. Can anyone point me to the text of this change? Is the migration guide on-lin

  • Cannot delete and save a bracket in custom controller

    hii all, I am getting a strange problem.I have long methods in custom controller. The final end bracket at the bottom is giving an error:unmatched bracket....When i try delete and save it, itz not getting saved.... I cant find a solution to this.Plea