Automatic invoice generation for service contract
Hello,
I want to create the automatic invoicce generation for service contract based on the order.
whenever i raise service contract order system should create the invoice automatically.
could please let me know the settings?
Hi JP Reddy
You can schedule VF04/VF06 for your requirement, such that VF06 will run every 15/30 minutes and will generate billing document for your contracts automatically.
Else go for Z extension development which will assign as output type to your contract and once triggered it will create invoice.
try and revert
Similar Messages
-
Automatic invoice release for services
Hi Gurus,
I am facing this problem only for services PO, not for material PO.
I have a price difference in the invoice verification, so the document is block. Then I change the PO price so as to eliminate the difference. In this moment the PO and the invoice have the same price, but the service entry sheet was posted with the original price.
In MRBR the invoice is not found during automatic release.
The same process, works fine with PO material.
kind regards
BrianHi,
In case of a PO from MM-SRV (purchase order for external services)
unfortunately it's not possible to release the invoice automatically.
If you create an invoice to a purchase order for external services,
the system propose the value of the entry sheet and not the value
of the purchase order. According to this for the invoice release
the invoice amount is compared with the value of the entry sheet and
not with the value of the Purchase Order.
Therefore the blocking reason still exist, even if the purchase order
value were increased. These invoices can only be released manually
using MRBR. -
Mile stone billing for service contract
Hi gurus,
can you help me for the following:
i want to configure mile stone billing for service contract in my client business process,
can any one send me the complete configuration process steps for mile stone billing.
I'll reward you full marks,
Thanks in advance
nitchelHiya...
Billing Plan for Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing
dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of
the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a
billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and
cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :-
1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1. Item -> Schedule lines.
2. Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order Item Turbine 100,000
Billing Plan
Billing date Description % Value Billing Block Milestone Billing Status
01-10-94 Contract 10 10,000 - x x
01-03-95 Assembly 30 30,000 x x
01-04-95 Maintenance 30 30,000 x x
01-05-95 Acceptance 30 30,000 x x
01-06-95 Final invoice .. .. x
Network/Activities
Milestone Estimate Actual
Assembly 01-03-95 01-03-95
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
2. always updated with the actual date of the milestone
3. updated with the actual date of the milestone, if the date is earlier than the
planned billing date for the date
Keep Sapping
Regards -
How to create service items and sales order for service contracts.
Hi,
I have created item using Purchased Item template and one more item(service item) using service /warranty program template. Then I have used these items to create sales order with service item in it and closed that order , but Iam not getting this order in service contracts. Is this right way to create sales order for service items. I
item name:- personal_computer
copied from purchased order template. service is enabled and install base is checked and enable service coverage is enabled.
item name:- service_item
copied from service /warranty program template
service is selected to inactive,
service type: service
duration: 1 year
template: Gold
and saved the item.
Then I have used these two items in sales order for service contracts. But that sales order is not hitting in service contracts. Is there any error with item creation.
Thanks,
Bharat G.Following SAP Notes to be referred for Service Tax:
1. 778976 u2013 Service Tax and Ecess on Service Tax
2. 1032265 - SEcess on Service Tax
Regards
AK -
How do I "run" an ldt file for Service Contracts?
Ref. BugNo. 4450150
How do I “run” an .ldt file for Service Contracts?
Do I use FNDLOAD and if so is this the way to do it
FNDLOAD apps/apps_password 0 Y UPLOAD @FND:OKS_TOP/patch/115/import/US/okskfinv.ldt
ThanksSee Note:142483.1
Subject: How to Define the ORACLE_SERVICE_ITEM_FLEXFIELD -
BOM IN CRM Only for Service Contract
Hello
We want have a BOM explosion working in CRM for service contracts
Here are the details :
We have replicated the materials from ECC to CRM. We are not maintaining any BOMu2019s in ECC.
The idea is that we maintain the BOM Structure in CRM only, as we donu2019t want to have the Items as a billable item in a position, only for information purposes (or later on for metering)
We have maintained the product category for the header product in CRM so we are able to maintain depended components
(Relationship type SCDEC S Dependent Components (DC) )
Not we are able to assign dependent component to the header material
Item category groups:
We understand that the standard item category groups that should be used are ERLA for the header product and LUMF for the Item product.
In order to support the same functionality for the given item category group , maintained at the product level in ECC we copied the same setting for the item category group from the standard to
our settings.
Standart
Tx type Item Cat Group item category structure scope
TA ERLA TAQ A single level Explosion of Structured Product
TA LUMF TAP A single level Explosion of Structured Product
So we have copied TAQ to ZTAQ and TAP to ZTAP.
ZS01 is a copy of SC (service contract)
Tx type Item Cat Group item category structure scope
ZS01 ZLEI ZTAQ A single level Explosion of Structured Product
ZS01 LEIS ZTAP A single level Explosion of Structured Product
But when we use a header product in the service contract, we cannot see the BOM is exploding.
We have also created some products in CRM with exactly the same Item Category groups as the standard and when we create a standard order (TA) in CRM, the BOM is NOT exploding.
Questions:
Is it possible to have the BOM setup only in CRM, like we try to do it?
Is it possible to use our own item category groups in CRM more is the functionality only working with ERLA and LUMF?
Is it possible to use the BOM Explosion in Service contracts as well ?
What steps are we missing to get the BOM explosion in CRM ?
Thank you for your help
Frank
Edited by: Frank Foerstner Foerstner on Dec 9, 2011 12:34 PMThanks Nablan, I could do that for multiple header coming in file. But I have a question for you on BAdI ALM_ME_006_GOODSMVT. I have implemented this BAdI , and this BAdI is called by a function Module ALM_MEREP_006_CREATE. When I test this FM giving the Material , Orderid and Movement type entries, this BAdI is triggered when giving a breakpoint. I've given this code for changing the movement type to 961. Cause the stanadrd scenario does not maintain Movement type 961 in Mobile Asset Management. The Movement type 961 for unplanned Materials comes to SAP and changes to 261 as maiantained by TCOKO table. To bypass this & retain the movement type 961 in SAP I'm using this BAdI. Currently this is what I'm doing and am stuck in the method interface how do I call the method.
method IF_EX_ALM_ME_006_GOODSMVT~CREATE .
break-point.
*DATA : i_ce_goodsmovement TYPE REFERENCE
ALM_ME_CUSTOMER_ENHANCEMENT.
DATA : lr_badi_goods_movement TYPE REF TO if_ex_alm_me_006_goodsmvt.
DATA : ls_user_data TYPE ALM_ME_USER_DATA-USERID.
*DATA : goods_movement TYPE ALM_ME_MATERIAL_MOVEMENT.
CALL METHOD lr_badi_goods_movement->create
EXPORTING
ce_goodsmovement = ce_goodsmovement
IMPORTING
user_data = ls_user_data
custom_user_data = ls_ce_user_data
goods_movement = goods_movement
changing
return = return[].
CALL FUNCTION 'ALM_ME_COMMIT_OR_ROLLBACK'
TABLES
return = return.
endmethod.
Please help me to get the data in this method. How do I call this. -
Invoice verification for services
Hi Friends,
this is chandra shekar, can any one tell me how to do invoice verification for services.
regards
chandra shekarDear,
An invoice for a service can refer to a service entry sheet.
The services actually performed (work actually done) by a service vendor is recorded in a Service Entry Sheet with reference to the purchase order.
Access the activity choosing the Transaction code, ML81 or ML81N Maintain Entry Sheet.
On the Initial Screen, choose "Other Purchase Orders" icon and click this, the system will pop up a new screen.
In this screen in the Purchase Order field give the reference purchase order number and choose [Enter] to continue.
You will get a new Service Entry for this Purchase Order number.
Here, on this screen, choose "Create Entry Sheet" (a white paper icon.)
System allocates a service entry sheet number internally, and you will get the number on your screen.
On the "xxxxxxxxxx Create Entry Sheet" screen, maintain the desired entries under appropriate fields:
Choose Service selection icon at the bottom of the screen to adopt the data.
The system will give you a pop up screen with the purchase order number on that; Choose [Enter] to continue.
The system will give you a new screen Select Services since Reference the services list from purchase order is displayed here.
Choose the line item and choose on Services icon on top of screen.
You can observe the system copied the service line item from purchase order with open item quantity.
Change the quantity per your requirements.
With this the basic information for the service entry sheet is fully completed. As to the requirements, you can fill other fields also if required.
To accept the service, choose the "Accept" icon or [Control] + [F1] (Green flag icon).
You can see the traffic light has turned yellow in color. This means it is ready to save the service entry sheet.
Choose Save.
The color signal for the status display switches from yellow to green.
If you want a detailed steps with screenshots, please visit: https://ocps.net/fa/om/Documents/Toolroom%20Assistant/ML81N_Creating_An_Entry_Sheet_03-29-2007.doc
Regards,
Syed Hussain. -
Conditions for service contract
hello,
I am creating service contract containing one line item ( i.e.activity) and no. of services in that line item. in the change mode i wanna put some condition on the activity level but not on service code level, but system is not showing the condtion in change mode. for activity level . pls adviceHi,
For service contract you can not assign any condition type.
You can assign at service level.
Hope it will help you.
Regards,
Manish Agarwal -
How to get price list line id for service contract line(subline)
Does some one know how to find a price list line id for service contracts line (sub line)?
There is actually a column in table okc_k_lines_b which is called price_list_line_id, but it looks like it is never used (all columns values are NULL). I have tried to investigate reprice API's which are used in contracts authoring form, but they are too huge and it didn't lead to nay result. There is a way (bad hack), by calling OKS_QP_INT_PVT.COMPUTE_PRICE it is possible to get price list line id by which contract line is priced, it would be kina fine if I would need to find line id for some rows, but it wont work for thousands!
Is there some proper way how could I get price list line id by which is service contract line priced?Hi,
Check out the following query that gets the price_list_id on subline_level and more.
The price_list_Id is stored as a rule.
SELECT
chd.contract_number
, par.party_number
, par.party_name
, ldf.pas_nummer
, ldf.pas_houder
, rh.object1_id1 hdr_price_list_id
, rsl.object1_id1 sl_hdr_price_list_id
, pld.parkeerterrein
, msi.segment1
, sit.description
FROM
okc_k_headers_b chd
, okc_k_lines_b clt
, okc_k_lines_b cls
, okc_k_lines_b_dfv ldf
, okc_k_items cit
, okc_rule_groups_b rgh
, okc_rules_b rh
, okc_rule_groups_b rgt
, okc_rules_b rtl
, okc_line_styles_b lst
, okc_rule_groups_b rgs
, okc_rules_b rsl
, okc_line_styles_b lss
, qp_list_headers_b plh
, qp_list_lines pll
, qp_list_lines_dfv pld
, qp_pricing_attributes pat
, mtl_system_items_b msi
, mtl_system_items_tl sit
, hz_cust_accounts cac
, hz_parties par
WHERE
rgh.chr_id = chd.id
AND rh.rgp_id = rgh.id
AND rh.jtot_object1_code = 'OKX_PRICE'
AND cac.cust_account_id = rtl.object1_id1
AND par.party_id = cac.party_id
AND clt.chr_id = chd.id
AND clt.lse_id = lst.id
AND lst.lty_code = 'SERVICE'
AND rgt.cle_id = clt.id
AND rtl.rgp_id = rgt.id
AND rtl.jtot_object1_code = 'OKX_CUSTACCT'
AND cls.cle_id = clt.id
AND cit.cle_id = cls.cle_id
AND cit.jtot_object1_code = 'OKX_SERVICE'
AND cls.lse_id = lss.id
AND lss.lty_code = 'COVER_ITEM'
AND cls.id = rgs.cle_id
AND rgs.id = rsl.rgp_id
AND rsl.jtot_object1_code = 'OKX_PRICE'
AND plh.list_header_id = rsl.object1_id1
AND plh.list_header_id = pll.list_header_id
AND pll.rowid = pld.row_id
AND pat.list_header_id = pll.list_header_id
AND pat.list_line_id = pll.list_line_id
AND cit.object1_id1 = pat.product_attr_value
AND cit.object1_id2 = chd.authoring_org_id
AND msi.inventory_item_id = cit.object1_id1
AND msi.organization_id = cit.object1_id2
AND sit.inventory_item_id = msi.inventory_item_id
AND sit.organization_id = msi.organization_id
AND sit.language = userenv('LANG')
AND cls.rowid = ldf.row_id
Hth,
Martin
Edited by: mvdons on 4-sep-2008 2:13 -
Resuls Analysis for Service Contracts - Revenue in Excess of Billing.
Dear Experts,
We are running RA for Service Contracts.
COntract period is 01/11/2010 to 30/10/2011. Montlhy Value is 1000, Yearly value 12000
1) The Billing Plan is Quarterly Billing (deferred).If we Run RA in KKA3. Planned revenue showing is 12000 / 4 quarters = 3000 .
If we Run RA in KKA3 , the planned revenue shown is 3000 instead of 12000.
2) We have incurred some cost for the month of November 2010. If we RUN RA on KKA3 for the month of november 2010 , we should get 1000 as Actual Revenue and 2000 Should be shown in Revenue in Excess of Billing(REB). But it is not showing as Revenue in Excess of Billing.
Please help.
Regards,
Shareeq
Edited by: K M AHAMED SHAREEQ HUSSAIN on Oct 28, 2010 2:55 PM
Edited by: K M AHAMED SHAREEQ HUSSAIN on Nov 4, 2010 4:18 PMDear Experts,
The Planned Revenue problem is solved now. We will have to run a Program(OSS Note). The Revenue in Excess of billing is there. Please help.
Regards,
Shareeq
Edited by: K M AHAMED SHAREEQ HUSSAIN on Nov 7, 2010 4:32 PM -
RA for Service Contracts.
Dear Experts,
We are running RA for Service Contracts.
The Contract period is 01/11/2010 to 30/10/2011. The Montlhy Value is 1000, so the Total value of the Contract is12000
The Billing Plan is Quarterly Billing (deferred). We have incurred some cost for the month of November 2010. If we RUN
RA on KKA3 for the month of november 2010 , we should get 1000 as Actual Revenue and 2000 Should be shown in Revenue
in Excess of Billing(REB). But it is not showing as Revenue in Excess of Billing.
Please help.
Regards,
ShareeqPatch Updated.
-
MIRO invoice verification for Service entry sheet
When trying to do invoice verification for Service entry sheet i am getting this below error pls guide me
Delivery note/service entry sheet 5000000150 does not exist
Message no. M8183Hi,
You may be saves SES number and now SES is not released!
1st Just cross check PO history TAB of service PO(ME23N), did you have only service entry sheet number or you have service entry sheet number and material document( will be created after releasing SES) with 101 movement type.
You have created service entry sheet (SES) in ML81N and got SES number, so as to recognize the vendor performed service. Next step, you need to accept service by releasing SES( in ML81N by clicking green flag or if release strategy there for SES, you need to release SES in ML85) so that FI document will be created.
Once SES released, then you can do MIRO w.r.t SES only.
Check doc:
http://help.sap.com/bp_bl604/BBLibrary/Documentation/209_BPP_EN_FI.doc
Regards,
Biju K -
Proforma invoice for Service Contracts
Hello,
I know the invoice types F5 for order related proforma and F8 for delivery related invoice. Now I'm looking for possibilities to create a proforma invoice based on a Service contract (Order Type WV) as a periodical invoiced sales order.
I tried to use proforma invoice (type F5) with Service contract but the billing plan will be set on status C (completely processed) so that the same period can not be invoiced again with the real commercial invoice. The billing status in the sales order has been changed as well with the proforma, which should not be the case as the proforma should just generate a printout.
Does SAP offer anything or how can I setup customizing to be able to create proforma for periodical sales orders?
Kind regards
RafaelHello,
Thank's for the information.
Finally I tried to copy our existing invoice type and set it up like F5 but the problem is still that the billing plan periods are set to status C - completely processed. The accounting side is OK as no accounting document is being created.
But with this billing plan situation it would not be possible to create first the proforma invoice for one Period and then later create the real commercial invoice for the same period.
Any ideas what I can setup to avoid this problem? I thought of chancelling the proforma after creation so that the billing period will be opened again, but this is no user friendly or professional solution.
Thank's in advance for your ideas.
Kind regards
Rafael -
Automatic PO creation for Service Purchase Order
Dear friends , good afternoon !
Is it possible to create Service PO's automatically via ME59 ?
We tried to flag on the automatic PO generation in the vendor master , and assign an vendor master to the purchase requisition but no PO was triggered.
Does anyone knows the way to make it possible ?
best regards,
AleHI,
You can not create Service PO with ME59N.
Problem is that you can not maintain info record(ME11) for Services because of their consumble in Nature.
It is STD SAP functionality.
Although You can maintain info record for material with out Material Master but it not in case of Services.
Hope Clear U !
Regards,
Pardeep malik -
Hi All,
I added a new field to the CUSTOMER_H structure, thru EEWB to service contract object.
But it is not displaying the customer fields tab in the service contract?
When i look at EEWB project ZSERVCONTRACT, after the generation it is displaying a warning message, 'More than 10 extensions cannot be displayed in the SAP GUI.
Can some let me know what could be the issue? Is there a way to getting around this and bring up the customer fields tab at header level?.
Best Regards,
KiranHi Viswa,
Try to recreate the EEWB project for this...
Assign business transaction and CUSTOMER_H and with ADD_NEW_FIELDS as the type of ehancement.
Shud solve ..
Siva
Maybe you are looking for
-
How do I use iTunes shar to share apps with in my household
I heard that sharing apps with in a household is ok. So I wanna co it but not sure how to do it with I tunes share. Help please
-
Problem while setting background color for jsplit pane
Hi ALL, i am using jsplit frame inside jframe. i placed jtree inside left jsplit frame. I am not able to set background clolr to jsplit frame. when i hide(jtree.setvisible(false)) jtree is shows default background color.it is not showing backgroun co
-
after working in Photoshop, where I press the option key a lot, the right side [numeric board] is switched off. I wish to prevent that not so handy action bij Apple
-
This complaint is a bit of a 3-part complaint... 1. The iTunes 12 sidebar is gone. I've read numerous other complaints on the site about this issue, and have seen the resolution given, which returns a limited, non-complete version of the sidebar.
-
Password not accpted above 8 characters
Hi, We are facing a strange issue after upgrade. We have upgraded from 4.7 to ECC6 and it is non unicode. However when we try to login it takes a password which is 8 characters or below ones. the user id with password above 8 characters is not allowe