Automatic PR'S to be created in system with MRP element

Sir,
Ply help me out how automatic PR'S will be created with the help of MRP element
regards
amey

Hi,
PLease check this link with screen shots for MRP run which will create PR:
http://www.sap123.com/showthread.php?t=89
Regards
Ram

Similar Messages

  • Unable to create Business System with role Integration Server

    hi Experts,
    we are unable to create a BS with role of integration server, its throwing error with internal server 500.
    please advise. we do not have any issues while creating TS with role of WEBASABAP.
    thanks and regards,
    Kesava
    Edited by: Prateek Raj Srivastava on Jan 23, 2012 12:13 AM

    Hi Kesava,
    what is the purpose of creating a business system of type IS? This is automatically done in the post installation by CTC templates. So if the post installation is successfully executed, this should already be there. And if not you should check if the post installation was properly executed and if there where problems analyse why they occured.
    The creation of the BS is just one part of the game, so I would highly recommend to execute the hole post configuration via template or follow the help.sap.com and execute it step by step manually in the described order. Otherwise i guess this will not work.
    If there where just problems with SLD - please also have a look at SA Note 1117249 - Incomplete Registration of PI components in SLD
    best regards,
    Markus

  • Problem when creating planned order with MRP run

    Hello,
    I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
    - planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
    - when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
    Material requires configuration
    Message no. 61259
    Diagnosis
    Orders and requirements for a configurable material must have characteristic values.
    Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
    System Response
    MRP: Requirements without characteristic values for a material cannot be planned in MRP.
    Procedure
    Check requirements or orders.
    Create a configuration evaluation for the material in the material master record if necessary.
    Thanks in advance.

    Hi
    I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
    Thanks
    Nagesh.

  • Create shopping cart with WBS element

    Hi,
    Creating SC with WBS element ( assignment no ) getting the error that "The account assignment objects are defined for different business areas" 
    Give me some input what could be the cause??
    Thanks
    Hareesha

    Hi Hareesha,
    As Sreedhar has rightly said the issue is definitely with the correctness of the data.
    Check the assignment of WBS to the proper business area which you are using to create the shopping cart.Check your org. structure and attributes and their assignments once again.
    Neverthless some OSS notes for your reference if in case you can not able to make P.Os or the SC's / P.Os are not getting transfered to back end R/3.
    <b>Note 727897 - WBS element conversion in extended classic scenario</b>
    <b>Note 1000184 - Account assignment error when document transfer to back end</b>
    Even after validating the data if the problem still persists please explain it clearly with the errors for further help.
    Rgds,
    Teja

  • Any chance to have a working system with Premier Elements?

    I've tried a good number of different video editors for HD video editing and they all lack certain features here and there that I find necessary for myself. I don't want anything out of this world, just a good, solid performance combined, ease of use, easy video clip import, good image quality from rendering and - that's it. Nothing special. No fireworks, do dancing girls...  Now, out of all the programs Premier Elements seemed to be very good, BUT it lacked the stability. Big time... Once I was working with that, the program just kept on crashing. Even if it would crash only once every 30 minutes, I could have taken that, but no... Had to be every second minute...
    But, that was still with Windows Vista, and I blame Vista for much of the problems. I've upgraded - with blood, toil, sweat and tears, to Windows 7, which already has proven to be much, much more stable than Vista. So, the question is that do I have a chance to have a working solution with Premier Elements and Windows 7, running with multicore processor and 8 Gb of memory and soon with dedicated HD's for operating system and program files, video files and intermediate working storage? Will my dream ever come true?

    Welcome to the forum.
    It is possible, as many here report great success running PrE 8 on many different systems. Probably the biggest consideration is the optimization of one's hardware and their OS. This ARTICLE will offer a few tips on the software end of things, and for Win7, be sure to look down the thread and see Black Viper's optimization page.
    Good luck,
    Hunt

  • Create TRM task with resource element assigned

    hi all.
    I want create a TRM tasks with the resource element yet assigned.
    There are some customize action or Add-in to do this???
    Thanks a lot
    Ismael

    Hi,
      Tasks automatically get created based on Transfer orders with the help of this BADI and program:
    LTRM_RQST_GLOBL_SCAN. Look at example  implementation class inside BADI definition.
    After implementing this BADI.
    Call this Function Module to create tasks automatically:
    LTRQ_REQST_SCHDL or you can set up this program RLTRQSCHEDULER in background
      For you to assign a task , use the following FM:
    LTSK_TASK_ASSIGN
    Hope this helps
    Thanks
    Vinod.
    Edited by: Funko Technical on Jan 20, 2010 8:47 PM

  • Can Anyone Tell Me How to Create Greeting Cards with Photoshop Elements 7 or 8?

    I need a 7x10 page setup so that when the card is folded to a 5x7 my photo is landscape on the outside of the card.  Currently I can only find a 8 1/2 x 11 paper size.
    Thanks,
    Lexington59

    In Photoshop Elements 8 Editor, go to the Create tab, and you will see Greeting card, with 5x7 page size.

  • CREATING "MASTER" PROJECT WITH PREMIERE ELEMENTS (PRE)

    I am creating a new thread following up on earlier questions re Premiere Elements 8.0 (PRE).
    I have created (authored?) 14 projects with music using PRE and burned each on 1 DVD.  I did not save to a folder, but went to Share and Burn Disc.  They show well on TV from an ordinary DVD player.  Now I must combine these projects into 3 "master" projects on 3 DVDs and burn multiple copies to send to former members of my Boy Scout Troop.  See the chart below. I thought (silly me) that I could do that straightforwardly with PRE.  I am going to start following suggestions from Bill Hunt and Nealeh.  
    Titles of Existing “Premiere Elements 8.0” “Sub” Projects
    All Burned Individually to NTSC DVD Standard
    Each Project Now on Separate DVD
    No. of Slides
    Running Time
    Min:Sec
    Desired
    New Project for DVD Players
    Introduction & Dedication
    21
    5:30
    DVD NO. 1
    417 Slides
    69:46
    With Main Menu Marker for Each SubProject
    1974 Canoe Trip
    60
    9:12
    1975 Canoe Trip
    105
    16:41
    1976 Canoe Trip
    24
    5:12
    1977 Canoe Trip
    16
    3:00
    1978 Canoe Trip
    89
    14:02
    1979 Canoe Trip
    15
    2:15
    1982 Canoe Trip
    87
    13:54
    1973 Jamboree
    62
    10:42
    DVD NO. 2
    247 Slides
    34:32
    With Main Menu Marker for Each SubProject
    1981 Jamboree
    124
    15:11
    1985-2001 Jamboree
    61
    8:39
    Troop 184 Camping & Hiking
    190
    34:28
    DVD NO. 3
    443 Slides
    78:12
    With Main Menu Marker for Each SubProject
    Other Activities 1972--1985
    65
    10:19
    Troop 184 Family Camping  1974--2006
    188
    33:25
    Total Slides
    1,107
    182:30
    182:30

    Hey, those ain't "newbie" questions. The first one gets posted to the Forum Comments forum weekly. The second one, well I should have posted my normal detail, but got lazy - mea culpa, mea culpa.
    1.) This ARTICLE should step you through the processes with the e-mails. If you have any questions, let us know. There are several places, where e-mail notification can be turned ON and OFF. Some are global, and some are specific to threads.*
    2.) Ah, the ImgBurn site. The top 2/3 are all ads. Hey, it's great free software, so who can blame 'em? Scroll down to where the page has the various versions and what they addressed. There is a Download button there (well below those ads). That is what you want. Normally, I mention the scrolling way down page, but you caught me here.
    Good luck,
    Hunt
    * Going back a few months, while trying to help another user on the Forum Comments forum, I got hit with a global change in my e-mail settings. I got about 1,000/day, for every forum that I participate in - think 1,000 x PS, PrPRo, Encore, InDesign, Illustrator, Audition, PrE and all of their sub-fora! Fortunately, it only took about 3 days for Adobe to get that fixed.

  • Can I create a matrix with empty elements?

    I am trying to make a 3D plot of experimentally obtained data points. I understand how to set up the block diagram, but the problem is that I dont have a z data point for every combination of x and y. I need to make a matrix like this:
    5   6   7   8   9   10   11
    3        53     820       15
        45       35      57
    25     34      57         48
    5   6   7   8   9   10   11
    Where the blank spaces signify no data was taken, so the matrix needs to have some type of 'greyed' cell.
    If I try to do this now, the VI just inserts zeros in those places and I get an incorrect surface. If I put NaN in those spaces, VI plots the points, but does not connect them to make a surface. 
    Any suggestions?
    Thanks in advance!
    Luke

    Luke,
    I can see two options:
    1. Try to fill the voids by interpolation. Look into the interpolation vis.
    2. There are methods that can plot such a so called 'scarce matrix'. Such a method basically accepts the data as a series of 3D vectors and performs a 2D curve fit. Typically 2D splines or B-splines are used as test functions. However, I don't know if this is available in Labview. Such code is available e.g. in the NAG library.
    Cheers
    Edgar

  • Creating a System in System Landscape of EP7.0 connecting to ESS6.0

    Could someone explain in detail and hopefully with examples, of the process of creating the System with the alias 'SAP_WebDynpro_XSS' in the System Landscape when implementing ESS.
    I am getting an error message of wrong password, and I think it has to do with the fact that I haven't entered this data in correctly.
    Thanks,

    check at
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/49/f7cf3f06bd3946e10000000a114084/frameset.htm">Creation of system</a>
    hope this helps,
    regards,
    Sudhir

  • Trouble in a SAP system with load balancing

    Hello masters:
    I had a trouble with workitems that came from a SAP system with load balancing. They doesn't receive the workitem ID in the UWL.
    I created another system in the portal as a "dedicated application server", and made the necessary configuration in order to replace the first one, and then my workitems worked fine.
    However, I would like to know what appened with the first system created as "system with load balancing". Why this system didn´t pass the workitem ID to the application (web dynpro abap) that execute the workitems?
    Thank you.

    I hope there was some missing configuration in the first case which was not replicating the workitem from SAP Inbox to UWL.
    Thanks
    Arghadip

  • How to create a JComboBox with Dates???

    Hi... I need to create a JComboBox with Date elements...
    For example: from "Jan-01-2007" to "Mar-02-2007"
    Jan-01-2007
    Jan-02-2007
    Jan-03-2007
    Mar-01-2007
    Mar-02-2007
    Anyone know how to do it???
    Regards...

    //here is an example how to get the date
    //I think this might help you!!!
    import java.text.DateFormat;
    import java.util.Date;
    public class DateFormatExample1 {
        public static void main(String[] args) {
            // Make a new Date object. It will be initialized to the current time.
            Date now = new Date();
            // See what toString() returns
            System.out.println(" 1. " + now.toString());
            // Next, try the default DateFormat
            System.out.println(" 2. " + DateFormat.getInstance().format(now));
            // And the default time and date-time DateFormats
            System.out.println(" 3. " + DateFormat.getTimeInstance().format(now));
            System.out.println(" 4. " +
                DateFormat.getDateTimeInstance().format(now));
            // Next, try the short, medium and long variants of the
            // default time format
            System.out.println(" 5. " +
                DateFormat.getTimeInstance(DateFormat.SHORT).format(now));
            System.out.println(" 6. " +
                DateFormat.getTimeInstance(DateFormat.MEDIUM).format(now));
            System.out.println(" 7. " +
                DateFormat.getTimeInstance(DateFormat.LONG).format(now));
            // For the default date-time format, the length of both the
            // date and time elements can be specified. Here are some examples:
            System.out.println(" 8. " + DateFormat.getDateTimeInstance(
                DateFormat.SHORT, DateFormat.SHORT).format(now));
            System.out.println(" 9. " + DateFormat.getDateTimeInstance(
                DateFormat.MEDIUM, DateFormat.SHORT).format(now));
            System.out.println("10. " + DateFormat.getDateTimeInstance(
                DateFormat.LONG, DateFormat.LONG).format(now));
    }

  • System with BI - XLMA Connector

    Hi All,
    I would like to use the BI Integration wizard in VC and as a pre-requisite I followed the below steps ..
    Creating a System with the BI-XLMA connector.
    1.Created a System from par .
    2.Selected “com.sap.portal.systems.BIUDI”
    3.Chose “ SAP_BI_XMLA” as Portal Component
    4.Enter the System ID and Name – Finish – Open Object Editor
    5.Under Property category - 
    Connection Properties
    -Data source name: empty 
    -Server URL: http://server:port/sap/bw/xml/soap/xmla
    -Statefulness : none
    6.User Management –
    Logon Method: SAPLOGONTICKET
    User Mapping Type : user,admin
    7.Create a System Alias and add it
    8.Test Connection :
    ( <i>Result :
    Retrieval of default alias successful
    Connection failed. Make sure user mapping is set correctly and all connection properties </i> )
    Let me if I have wrong somewhere and what could be the possible reason the Connection Test to fail.
    <b>P.S :</b> User is mapped properly with SSO in BI system with Portal
    Thnks,
    NR

    Hi,
    Was able to get the Connection Tests successfull.
    How to ....Resolve VC Issues- PDF  was indeed very helpful.
    Now able to work with the BI Integration Wizard in VC.
    Regards,
    NR

  • Create SO without triggering MRP

    Dear Guru,
    May I know how the process works for manufacturing company. Let say they manufactured material A & then it goes to QA inspection. Then how the material move to finish good stor. loc. What is the movement type, t/code & who normally doing that.
    Today I try to create Sales Order & Delivery Order but with condition bypass MRP. I noticed that there is no stock for material A. So based on user I pump in stock via MIGO by using movement type 334. I'm not sure this is correct method.
    1. If not, may I know what is the correct movement type to pump in stock in stor. loc.
    2. How may I create SO & DO without triggering MRP. Reason is user said they have stock so they wana sell that. But they dont know how to create SO coz the moment create SO, system trigger MRP.
    Please advice.
    rgds,
    nantha

    Hi,
    Production Process:
    Sale order/demand-MRP-Planned order-Production  order-GI & GR(101 and 261)-Quality inspection(321)-Stock-outbound delivery(PGI)-Billing.
    1.In your case,once if it goes to quality inspection,it will create 1 inspection lot.quality person has to process that lot and give the UD.he will post the material to unrestricted stock with 321 movement type.(QA32 transaction code)
    2.If you want to have intial stock,do in MB1c,561 movement type
    3.In your case may they have used some user exit to trigger MRP.take the help of ABAPER to find it out and stop the triggering of MRP.
    Normally,IF stock is there you can create SO and DO without running MRP.
    Hope i try to clear ur doubts

  • How to create array with "n" elements...

    Hy, how can i create a array with "n" elements ?

    i know, but the thing is: the other methode (which
    one isn't developed fom me) needs an Object Array
    (Object []) to work correctly...then take a look into the method toArray() of the Collection interface.
    thats why i need this gay "object Array"....I think it would be wise to avoid that adjective in this context and meaning.

Maybe you are looking for