Automatic revision level in CS01 on initial create

Hi, I have a task to find out about BOM revision levels and if they can be automatically created when the BOM is created in CS01.  Our users are imaging that the step of choosing extras, next revision level will be too much for them to remember.  This would be for the rev level to automatically be created based on auth group and change master, but for the initial create and also the subsequent revsions.  They just don't want to manually choose the next revision level.  Is this a configurable option?  I have looked at OS54 and we have it set to automatc revision levels, but that is not what is happening with this.
Thanks in advance.

Hello,
The automatic revision level assignment is not meant for this purpose.
I think there is no standard functionality to automatically assign revision levels to BOMs, it can be done through development.
Regards
Prasad K

Similar Messages

  • Automatically adjust levels in a track to create a common "volume"

    Sorry for the dumb question but I am totally new to audio.
    I have recorded a conference where there were multiple speakers sitting different distances away from 2 microphones. Therefore, the levels of each speaker are different due to their differing distances from the microphones. Is there a way to quickly process the audio to adjust for these fluctuations in volume without having to go through it manually and turn up or down each speaker?
    Thanks,
    Tom

    You can try the Normalize (RMS) effect and also work with the compressor/limiter effect.
    I suspect it will still take a lot of hand work to tweek it.
    Good luck.
    x

  • Reverse Revision Level

    Experts,
    The current Revision Level for a material is F and a user created another revision level G by error.
    Now the revision should go back to F and the system will not allow this.
    Is there anyway this can be done? I will appreciate a feedback.
    Thanks in advance.

    Hi Anirudh Kodgule and Ravindra Shirase,
    The Change master was created in CC01 and the object types selected are
    BOM
    Task List
    Document
    Material
    The change master number is 300000530
    This was then assigned to a material via MM02 in basic data 1 and the revision level was F.
    The initial revision level was E and we needed to return back to E because the Rev level of F
    is not yet reached for the material.
    Ravindra, could you please explain more your suggestion
    Anirudth, I am not sure the document type to enter at the initial screen
    THanks for your anticipated replies

  • DIR - Change Revision Level

    Hello Friends,
    How can I change the revision level of a DIR without creating a new version?
    Per config, when I create a DIR it is assigned a rev level "-". Then I want to change it to an higher level "A" or "B" or whatever.
    I am using BAPI_DOCUMENT_CREATE2 and BAPI_DOCUMENT_CHANGE2 for my process. Eventhough I pass a different rev level, SAP creates the DIR always with the first revision level per the config, which in our case is "-".
    Any input/advise on this issue will be greatly appreciated!
    Thanks,
    Sam

    Revision level has to be changed using a separated function call - REVISION_LEVEL_UPDATE

  • How to map revision level materials to already created inspection plan?

    Dear All,
    I have created single inspection plan for many existing raw materials. Now it has been found that each raw material have different revision level as well as valid from date.
    My inspection plan is created on 02.07.2014 and each raw material has different revision level with valid from date which is also very old (like 11.03.2012 for revision level 09).
    My Requirement is:  how to correct my inspection plan?,  so that it will work for each assigned raw material and there will not be any material revision level wise problem created for the inspection lot so that my inspection lot should be created in REL status in QA32 transaction i.e. inspection lot is assigned automatically as per standard SAP functionality.
    Thanks,
    Narresh

    Hi Amol,
    Thanks for your reply.
    In this business scenario, we are not creating inspection plan for each raw material because there is similarity in inspection for 40-50 raw materials and total number of raw materials are around 500. This will be very difficult and unnecessarily data creation in the system.
    As per my understanding revision level is for material master revision and if material master changes then how it affect so much on inspection plan? also is it means that for every revision in future we will have to create new inspection plan?  hence I believe that if I will make back dated inspection plan for raw materials then it may work. Is my understanding is correct?
    Expecting much better solution from QM experts.
    Thanks,
    Narresh

  • Revision level of material automatically assign to purchase order

    Hello all,
    when I create a new purchase order for a material, is it possible to assign the latest revision level of that material (material master - basic data 1) automatically to the Revision level field on item level - Material data for the material in the PO? Meaning when I create the PO with this material, SAP automatically fills this field with the revision information from the material master?
    Thanks
    Anne

    It should pick latest revision level.Becuse PO get all data from material master.

  • Create Material Master Revision Level using CC02

    Dear oss ,
    Using CC02 for a change number I can view object material and I can insert a new material. The revision level field is greyed.
    Can I have a chance to create  revision level for a material directly using CC02 ?
    Thanks.

    If you want to create revision level of Material then use t-code CC11. I hope it would help you.
    Thanks!!!

  • Revision level copied when create a new material

    Dear guru.
    When I create a new material with fields copied from another do you know a solution in order to copy also the revision level of the model ?
    Thanks.

    Closed without solution.

  • Revision level in CS61

    Hi PP Gurus,
                     I have brought revision level in t-code CS01, CS02 initial screen by setting IMG. but same does not getting incoporated in order BOm t-code CS61, CS62. What shall have to do with IMG setting.
    Can I add or change column inside BOM in t-code CS61, CS62. (I want to bring revision level column beside change number column).
    Could you please guide me to come out of this problem.
    Regards,
    Maddy

    If u have created proper change no in cc01with assigned object material with proper validity period-> u can give revision level to material...
    Once rev. level is there in material...
    Creat PO..-> check in item detailsmaterial data tab  for revision field..

  • Revision level in purchase order

    Hello all,
    when creating a purchase order for a material, the revision level from the material master will be automatically added to the Item-Material Data-Revision Level field.
    But what happens if in the meantime the revision level is updated on the material master, I guess the PO will not be updated on that field?
    The problem is, I need the updated revision level field on the output of the PO, currently I am using the field EKPO-REVLV in the sapscript which refers to the revision level data from the PO.
    Any suggestions?
    Thanks
    Anne

    Hi Prakash,
    I have tried to use this field in the form: AEOI-REVLV
    This should be the original table.
    I am using the standard print program for POs: SAPFM06P
    Unfortunatelly, somehow the value does not come up for AEOI-REVLV, but it does come up for EKPO-REVLV.
    Thanks,
    Anne

  • BOM explosion in subcontracting order according to revision level

    Hello experts
    I have different revision levels available for a subcontracted material, e.g. the BOM of this material has different versions depending on the validity date.
    When a BOM explosion is carried out in the subcontracting order (either in the purchase request or in the purchase order) the selected version of the BOM is done accordingly to the delivery date. It does NOT take into account the revision level even when I change it manually.
    Do you have any idea if it is possible to force SAP to consider the revision level instead of the delivery date for the BOM explosion ? (custo, user exit, BAdI, ...)
    Many thanks
    Amaury

    Hi
    BOM explosion in Subcon PO will be carried out automatically when you select the item category L.
    If you want to control the BOM selection based on the Alternative then you can go with Production version option and get the help from PP consultant to create the production version.
    Assign the production version in Subcontracting Inforecord.
    Click the BOM explosion button the switch to alternative BOM during the PO creation.
    Hope it helps
    Thanks/Karthik

  • Revision level not updated in Delivery inspection

    Dear QM friends
    I am facing the below issue when implementing delivery inspection.
    We are maintaining Engineering Change Number concept and it is applicable for Material Master, BOM and Task lists. So our inspection Plan will always maintained with Change Number for all inspection type.
    This Change number concept works fine in GR inspection (Inspection type 01) in following way. Revision number was maintained in Schedule Agreement Line Item, additional Data screen (In administration BOX). When GR was made inspection lot generated and shows the Revision number for the material in inspection lot display QA03 (Header). If plan having same change number system assigns the Plan and releases. Also this revision number can be viewed in QA32 screen itself.
    This is failing when creating inspection lot for a delivery. Origin 10 and inspection type used was 10. Inspection plan maintained with change number. Schedule agreement (Sale order) having revision number in the same tab of above said. Even though in lot display QA03 it was not appearing. So the same is not coming in QA32 screen. But inspection plan was attached automatically.
    We need same change number (Revision level) concept for Delivery inspection also. Kindly help us, i have missed any masters, or config or any steps i have to do to solve this issue.
    Thanks n Regards
    Madhan

    Any one kindly help us to resolve the issue.
    Thanks & Regards
    Madhan

  • Open PR Material Master Revision Level

    Hi,
    I am working on upgrade from 4.5b to ecc6.0.In this Project Material Revision Level and Change Number is assigned with Z Program.
    The Requirement is the Program has to check the Open PR 's and that particular Material  needs to be updated with Change Number and Revision Level.
    Now the Functional Specification to be prepared for the Technical Team -Based on the Open PR condition  -Now what are the fields to be specified in EBAN table in order to fullfill the open PR.
    As per my understanding Open PR means PO is not created and PO is created means that PR is closed.
    Or any other fields are to taken into consideration for preparing Functional Specification
    Please reply me ..
    Thanks for the reply.

    It is very much possible. You can try this use case. It's pretty simple. But Vice-versa is not possible.
    ~ Guru

  • Cannot find the Revision Level field in the item details

    Hi All,
    1) I have created a PR with 2 items in the R/3 Backend using the me51n transaction in which for one of the items i have updated the Revision Level field.
    2) To transfer the purchase requisitions created in the above step to the SRM system(sourcing cockpit) i executed  the report BBP_EXTREQ_TRANSFER with transaction SE38.
    3) Now when i go to the SRM portal and navigate to find the external requirement in the sourcing cockpit, I am not able to find the Revision Level field entered in the backend.
    Can some one help.
    Regards
    Sam

    Hi
    Please go through this ->
    Version Management in R/3
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/60b43bb7492147e10000000a114084/frameset.htm
    Versioning in SRM
    http://help.sap.com/saphelp_srm50/helpdata/en/42/c92d6e3ed16babe10000000a1553f6/frameset.htm
    Prerequisites for Version Control in SRM
    I)        You have activated the version control so that the system creates historical versions.
    See the path in the IMG: SRM Server  ®  Cross-Application Basic Settings  ®  Switch On Version Control for Purchasing Documents
    II) You have set up and activated the workflow for the approval of changes to active purchasing documents. See also: Approval Workflows for Documents and Objects
    ( Related link -> http://help.sap.com/saphelp_srm50/helpdata/en/5a/af5efc85d011d2b42d006094b92d37/frameset.htm )
    Some related SAP OSS Notes ->
    Note 1030548 - Revision level in SRM 6.0 connected to ERP 2005
    Note 1026021 - EXTREQ interface: Data transfer structures
    Note 122105 - ME51, RM06BBI0: Revision level is not filled
    Hope this will definitely help.
    Regards
    - Atul

  • "Setup encountered a problem while validating the state of Active Directory: Exchange organization-level objects have not been created, and setup cannot create them because the local computer is not in the same domain and site as the schema master. Run se

    Team,
    I am trying to Install Exchange on my Lab, getting below error
    message.
    The Schema Role is installed on Root Domain and trying to install
    exchange on Child domain.
    1 Root Domain - 1 Child domain. both are located on single site.
    “Setup encountered a problem while validating
    the state of Active Directory: Exchange organization-level objects have not been created, and setup cannot create them because the local computer is not in the same domain and site as the schema master. Run setup with the /prepareAD parameter and wait for
    replication to complete.”
    Followed below articles:
    http://support.risualblogs.com/blog/2012/02/21/exchange-2010-sp2-upgrade-issue-exchange-organization-level-objects-have-not-been-created-and-setup-cannot-create-them-because-the-local-computer-is-not-in-the-same-domain-and-site-as-the-sche/
    http://www.petenetlive.com/KB/Article/0000793.htm
    transferred the schema roles to different server on root domain, still no luck.
    can someone please help me.
    regards
    Srinivasa k
    Srinivasa K

    Hi Srinivasa,
    I guess, you didn't completed the initial setup schemaprep and adprep before starting the installation. You can do it as follows:
    1. Open command Prompt as administrator and browse to the root of installation cd and run Setup.exe /PrepareSchema /IAcceptExchangeServerLicenseTerms
    After finishing this,
    2. Setup.exe /PrepareAD /OrganizationName:"<organization name>" /IAcceptExchangeServerLicenseTerms
    3. To prepare all domains within the forest run Setup.exe /PrepareAllDomains /IAcceptExchangeServerLicenseTerms. If you want to prepare a specific domain run Setup.exe /PrepareDomain:<FQDN of the domain you want to prepare> /IAcceptExchangeServerLicenseTerms
    4. Once you complete all of the 3 steps, install the pre-requisities for Exchange 2013
    5. Finally, run the setup program
    Hope this will help you
    Regards from Visit ExchangeOnline |
    Visit WindowsAdmin

Maybe you are looking for

  • Upgrade from OracleAS 10.1.2.0.0 to OracleAS 10.1.2.0.2

    Hi all. I've been reading the "Oracle® Application Server Upgrade and Compatibility Guide 10g Release 2 (10.1.2) for UNIX Part No. B14090-05". I'll need to upgrade an OracleAS installation here. I have OracleAS 9.0.4.1.0 installation and a Oracle BI

  • Automatic PDF Scaling when Printing

    Hi everyone! We have some reports that show all twelve months of a fiscal year, and whenever they're printed, a notice pops up saying that wide reports will automatically be scaled for PDF printing. Unfortunately, by scaling it means cutting off the

  • CMP and TO

    Hi, i'm trying to use the TO (Transfer Object) Pattern, and i used Firestorm to generate all the TOs and CMP Entity Beans I'm trying to create a new Entity Bean, and the create method for this CMP receives the TO (like it says on the Pattern). The pr

  • Agile PLMA: MDS mapping table for BOM table

    Hi, I'm looking for BOM equivalent table in mds schema. Currently OBIEE 10g is installed. It would be really helpful, if you could share the entire schema mappings (Agile to MDS schema). Thanks, Prem.

  • Can't restore to 4.0

    I need to restore my iPhone to iOS 4.0 but keep getting an error. I don't want 4.0.1 since 4.0 never gave me a problem and believe in "if it aint broke, dont fix it". How do I restore to 4.0 ??