Automatic Scheduling fails

Reports were running automatically. But now for the last 2 months they haven't and dont know why or what changed. now i have to go to each report and run them manually before they will run.
Could some one plesae help me in automatic scheduling again, please?
Regards,
DV

Hi dileep, what version of BusinessObjects are you on? If it is XI 3.1, you can right-click on the report to go to its History. From there you can see all the report instances. They should have either "success" or "failed" status. If it is "failed", you can click on it to see the error message.
Hope this helps.
If you are using the BusinessObjects tool, you should join [ASUG|www.asug.com]

Similar Messages

  • Sending an email to the user if the WEBi scheduling failed in CMC

    Hello Everyone,
    Current scenario :
    I am scheduling WEBi report through CMC and the report is going to end user email as an excel attachment.
    Desired Functionality :
    What happens is if the scheduling fails due to some reason. The email does not go to the end user on a particular date and then he complaints.
    What i need here an email sending option that if the WEBi scheduling has been failed in CMC an email should go to the user saying : " The WEBi scheduling has failed. The team is working on it " . (This is just a sample message)
    So the idea is to send an email to the user when the WEBi scheduling fails in the CMC. How to achieve this ?
    Regards,
    Ashutosh Singh

    Hi Ashutosh,
    You can send an alert email to a group when the schedule fails to run by choosing the "A job has failed to run" option under notification.
    You can see this option only if you schedule the report through CMC.
    Regards
    Sunil

  • Automatic Schedule Lines for SA

    Dear Gurus,
    Is it possible to create automatic Schedule lines for Subcontracting Scheduling Agreements????
    cheers

    Hi
    It is possible to create SA for item catgory L. No specific configurational setting is required.
    Pls check
    Regards,
    Raman

  • Error message if job scheduling fails.

    Hi,
    I want to catch the message if scheduling fails and send to an email id.
    can this be done?
    how can we do this?
    thanks in advance
    Vikash.

    Hi Vishal,
    I can elaborate on that. I dont have a sample code with me.
    Steps:
    1) Consider the job which is scheduled with the help of SM36 as Job_A
    2) Now, develop one program which needs to be incorporated as Job_B. This Job_B moniors and send whether the first job has triggered successfully, running or not.
        a) Now, to develop the program I would request you to take a look at the table TBTCO first.
        b) This table will have details of all the jobs that were scheduled in the system.
        c) Create a work area of the type TBTCO structure and try to fetch the details of the job which you 
            have triggered already.
        d) Now, check the value of the status of the job in the work area.
        e) if it is active/ready/released, then dont take any action.
         f) if it is cancelled or failed, then try to implement the logic of sending an e-mail with the contents
            saying the job has failed to run.
    3) Note: Remember to run this monitoring job Job_B after sometime the Job_A has started.
    Hope this much information would pull your mind to incorporate it easily
    Thanks,
    Babu Kilari

  • Job scheduling failed because the user has no permission to access this rep

    Hi. I've OBIP 10.1.3.4.1.
    When I launch a print with the scheduler I see this error:
    oracle.apps.xdo.servlet.scheduler.ProcessingException: Job scheduling failed because the user has no permission to access this report. [REPORT_URL]=[folderreport/report/report.xdo], [USERNAME]=[administrator]
         at oracle.apps.xdo.servlet.ui.scheduler.SchedulerServlet.scheduleJob(SchedulerServlet.java:1140)
         at oracle.apps.xdo.servlet.ui.scheduler.SchedulerServlet.doPost(SchedulerServlet.java:295)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:763)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
         at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
         at oracle.apps.xdo.servlet.security.SecurityFilter.doFilter(SecurityFilter.java:100)
         at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
         at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
         at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:866)
         at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:448)
         at com.evermind.server.http.HttpRequestHandler.serveOneRequest(HttpRequestHandler.java:216)
         at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:117)
         at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:110)
         at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
         at oracle.oc4j.network.ServerSocketAcceptHandler.procClientSocket(ServerSocketAcceptHandler.java:239)
         at oracle.oc4j.network.ServerSocketAcceptHandler.access$700(ServerSocketAcceptHandler.java:34)
         at oracle.oc4j.network.ServerSocketAcceptHandler$AcceptHandlerHorse.run(ServerSocketAcceptHandler.java:880)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
         at java.lang.Thread.run(Thread.java:595)
    In this env. I've a LDAP Security Model and all the report and all the users work.

    Please check whether you have assigned below responsibility to the user trying to schedule report.
    XMLP_SCHEDULER

  • Outline agreement or automatic schedule from scheduling agreement

    Hello Master's,
    Plz find the below workflow which will brief u abt the complete process;-
    1.User raises indent(me51n) and then releases(me54n) else as per our MRP, indent/PR gets generated automatically.
    2. Standard Practice is that we invite offers, negotiate and place order (me21n) else f we have rate contract for any item we go for direct ordering (me21n) and then get it released (me29n)
    For around 20-30k material codes we have rate contract finalized with various suppliers for a period of time.
    When we find any indent/pr falling into this category, we dont invite offer but go for ordering as per the finalized price. The price is maintained in excel or pdf format.
    Problem is we want to map material codes with vendor and rates associated with the contract.
    For this either we have to go for outline agreement(me31k) of scheduling agreement(me31l) so that whenever any indent/PR gets generated in this category, order/delivery schedule will be generated automatically in SAP.
    Points in which i need help from you:-
    1. How to generate automatic po from outline agreement or automatic schedule from scheduling agreement.
    2. complete understanding of the difference between outline agreement and scheduling agreement.

    Hi Nilson,
    The data contained within the global outline agreement is distributed as purchasing contracts or scheduling agreements to the backend systems of the release-authorized purchasing organizations of the relevant corporate group. These purchasing organizations can then use the purchasing contracts or scheduling agreements according to the terms agreed centrally within the global outline agreement.
    For more details.
    http://help.sap.com/saphelp_srm50/helpdata/en/42/f93dfd975f3ee6e10000000a1553f7/frameset.htm
    Nishant

  • Hyper-V Host displays error "Automatic Reapir Failed" and will not start after Power Outage

    I have a single Dell PowerEdge configured as a Hyper-V host running Wink12 R2 Preview as a Native Boot VHD and hosting about a dozen VM's. We had a break in the power, just a lights on lights off, but it was enough to shut the machine down and trigger restart.
    But the machine won't restart--instead it displays a message "Automatic repair Failed" and none of the Advanced repair options work to get the host back online.
    Any assistance is greatly appreciated.
    Michael J. Murphy

    Hi MJMurphy,
    Sorry for the delay , it seems likely a disk problem cause of unexpect interrupt .
    Please boot the host from OS ISO and  try to copy the VMs' VHD files and any important data to a safe place (such as external USB)via command prompt mode  .
    (perhaps you need to prepare raid driver if you have a raid controler  )
    Using diskpart --> list volume to check the status of disk partion or you can contact the hardware vendor to check it .
    Hope this helps
    Best Regards
    Elton Ji
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Schedule failed launching in Ultra Search

    I am trying to launch a crawler immediately from the Schedule screen after created Ultra Search instance and file data source. The status is showing "Launching". After a while, I click Refresh status, the status is showing "Failed". Anyone knows why schedule failed launching? Is there any error log file that I can check to find out why it failed?
    Thanks in advance.

    Liya
    The log file for the crawler schedule should be explicitly listed in the information for the schedule. Please check the information for that schedule.
    This log file will be located in the log directory that you've specified in the "crawler" tab.
    Please locate the log file and let us know what you see in that.
    thanks
    edward

  • Automatic scheduling of Cproject

    Hi All,
    We have changed the plan finish date of an item from 31.12.2011 to 31.12.2012. Corresponding Cproject project definition is in Released status. As a part of synchronization the dates on the Cproject project definition changes to 31.12.2012. But the dates are not copied to the lower hierarchy i.e. tasks. We have only tasks under PD. 
    System message is u2013 Can not update scheduling data
    Reason u2013 As the Cproject is in Released status scheduling can not happen automatically. Scheduling should be carried out manually.
    How to enable scheduling automatically when the Cproject project is Released. Business do not want manual scheduling of Cproject project.
    Regards,
    Gaurav

    Hi Gaurav,
    There's no standard way to activate the automatic scheduling once the project has been released.
    You will have to enhance standard class CL_PPM_SCHEDULING / method GET_SCHEDULING_FORCE and force the parameter rv_scheduling_force to abap_true.
    Regards,
    Matthias

  • BO XI 3.1 - scheduling fails for locked PDF files

    Hi,
    I have scheduled reports in BO XI 3.1 and instances are stored as PDF files on the BO server.
    Issue I am facing : During the schedule time (daily morning), if the PDF file has been kept open by some user, the schedule fails saying the file is locked by someone else.
    I am thinking of writing some scripts (.bat file) to kill the session (file open by the user) and on success of this script the BO scheduler runs.
    But am wondering if there is anything in CMC/ Infoview where in we can restrict the access levels to just read and not write to the users ?
    Please advice.
    Thanks,
    Ash

    adding place holders to give different name to the PDF file is ruled out , as the users want the same name and only one copy of the file should be present at a particular time.
    As suggested by Tim -
    If we use a bat file to copy the file to another location (viewing location), the file can be overwritten in the original location but the bat file can not overwrite the PDF in viewing location (if the PDF is opened, during the file copy from original folder to viewing folder)
    PDF files are stored in the BOBJ repository
    Any other options ?
    Thanks,
    Ash

  • Scheduling failed with SXPG_COMMAND_EXECUTION

    Dear Experts,
    From last 2 days onwards my Backup is getting Scheduling Failed error, i have checked in Job log its showing the below message.
    SXPG_COMMAND_EXECUTE failed for BRARCHIVE - Reason: x_error
    Job cancelled after system exception ERROR_MESSAGE
    also i have checked at os level in sapackup directory log it showing that
    "Execution of BRARCHIVE finished with return code 3"
    So What could be the reason i am getting this message and help me needfully
    Regards
    Chandra B.

    Hi,
    If your CI & DB are on different host then first check SAPXPG destination is working fine or not using tcode SM59.(TCP/IP-->SAPXPG_DBDEST_<DBHOSTNAME>.). If it is failing the update the rfc destination with correct inputs & check.
    If you have scheduled your Archival backup using DB13 then this issue occurs(mosty after 30-40 days later after scheduling) If you schedule this form OS level this issue wont come. I have came across same issue & I tried by deleting old job & scheduled it again with DB13 & cds option.
    Please try the same & let us know.
    Thanks
    Sushil

  • Online Backup Failed (Status Its shows Scheduling failed)

    Dear all ,
    OS AIX , DB Oracle , SAP ECC6.0 , Tivoli Storage Manager
    Scheduled  Online Backups are  failed  (Backups are fired through DB13)
    JOB Status : Scheduling failed
    Job Log:
    02.12.2009     17:00:01     Job started
    02.12.2009     17:00:01     Step 001 started (program RSDBAJOB, variant &0000000000657, user ID BASIS)
    02.12.2009     17:00:01     No application server found on database host - rsh/gateway will be used
    02.12.2009     17:00:01     Execute logical command BRBACKUP On host PRODORADB
    02.12.2009     17:00:01     Parameters:-u / -jid ALLOG20091201170000 -c force -t online -m all -p initIRPoffsite.sap -a -c force -p initIRP
    02.12.2009     17:00:01     offsite.sap -cds
    02.12.2009     17:01:01     SXPG_STEP_XPG_START: is_local_host: rc = 403
    02.12.2009     17:01:01     SXPG_STEP_XPG_START: host = PRODORADB
    02.12.2009     17:01:01     SXPG_STEP_XPG_START: is_local_r3_host: rc = 802
    02.12.2009     17:01:01     SXPG_STEP_XPG_START: RFC_TCPIP_CONNECTION_OPEN: rc = 1003
    02.12.2009     17:01:01     SXPG_STEP_COMMAND_START: SXPG_STEP_XPG_START returned: 1.003
    02.12.2009     17:01:01     SXPG_COMMAND_EXECUTE(LONG)
    02.12.2009     17:01:01     <timestamp> = 20091202170101
    02.12.2009     17:01:01     COMMANDNAME = BRBACKUP
    02.12.2009     17:01:01     ADDITIONAL_PARAMETERS =
    02.12.2009     17:01:01     -u / -jid ALLOG20091201170000 -c force -t online -
    02.12.2009     17:01:01     m all -p initIRPoffsite.sap -a -c force -p initIRP
    02.12.2009     17:01:01     offsite.sap -cds
    02.12.2009     17:01:01     LONG_PARAMS
    02.12.2009     17:01:01     OPERATINGSYSTEM = ANYOS
    02.12.2009     17:01:01     TARGETSYSTEM = PRODORADB
    02.12.2009     17:01:01     DESTINATION
    02.12.2009     17:01:01     SY-SUBRC = 1003
    02.12.2009     17:01:01     SXPG_COMMAND_EXECUTE failed for BRBACKUP - Reason: program_start_error: For More Information, See SYS
    02.12.2009     17:01:01     Job cancelled after system exception ERROR_MESSAGE
    Note :
    when i execute immediately or through Command line  backup  is going fine
    but when i scheduling  backup it was Cancelled  (Status shows Schudling Failed)
    pls give me suggestion
    sathessh

    Dear Yoganand.V
    thanks for your immediate response
    and still i am facing this issue
    the Backups are triggered from DB13 and Scheduled from Central Instance not Application Server and Auto Script is running at OS level and pls look FINISHED BACKUP LOG for your Reference
    08.12.2009     17:50:18     Job started
    08.12.2009     17:50:18     Step 001 started (program RSDBAJOB, variant &0000000000717, user ID S2K_BASIS)
    08.12.2009     17:50:18     No application server found on database host - rsh/gateway will be used
    08.12.2009     17:50:18     Execute logical command BRBACKUP On host PRODORADB
    08.12.2009     17:50:18     Parameters:-u / -jid ALLOG20091208175017 -c force -t online -m all -p initIRPdaily.sap -a -c force -p initIRPda
    08.12.2009     17:50:18     ily.sap -cds
    08.12.2009     18:29:23     BR0051I BRBACKUP 7.00 (34)
    08.12.2009     18:29:23     BR0055I Start of database backup: becbwhwk.anf 2009-12-08 17.50.18
    08.12.2009     18:29:23     BR0484I BRBACKUP log file: /oracle/IRP/sapbackup/becbwhwk.anf
    08.12.2009     18:29:23     BR0477I Oracle pfile /oracle/IRP/102_64/dbs/initIRP.ora created from spfile /oracle/IRP/102_64/dbs/spfileIRP.ora
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 17.50.19
    08.12.2009     18:29:23     BR0319I Control file copy created: /oracle/IRP/sapbackup/cntrlIRP.dbf 15122432
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 17.50.20
    08.12.2009     18:29:23     BR0057I Backup of database: IRP
    08.12.2009     18:29:23     BR0058I BRBACKUP action ID: becbwhwk
    08.12.2009     18:29:23     BR0059I BRBACKUP function ID: anf
    08.12.2009     18:29:23     BR0110I Backup mode: ALL
    08.12.2009     18:29:23     BR0077I Database file for backup: /oracle/IRP/sapbackup/cntrlIRP.dbf
    08.12.2009     18:29:23     BR0061I 42 files found for backup, total size 141794.742 MB
    08.12.2009     18:29:23     BR0143I Backup type: online
    08.12.2009     18:29:23     BR0130I Backup device type: util_file_online
    08.12.2009     18:29:23     BR0109I Files will be saved by backup utility
    08.12.2009     18:29:23     BR0142I Files will be switched to backup status during the backup
    08.12.2009     18:29:23     BR0289I BRARCHIVE will be started at the end of processing
    08.12.2009     18:29:23     BR0134I Unattended mode with 'force' active - no operator confirmation allowed
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 17.50.20
    08.12.2009     18:29:23     BR0229I Calling backup utility with function 'backup'...
    08.12.2009     18:29:23     BR0278I Command output of '/usr/sap/IRP/SYS/exe/run/backint -u IRP -f backup -i /oracle/IRP/sapbackup/.becbwhwk.lst -t file_onli
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     Data Protection for SAP(R)
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     Interface between BR*Tools and Tivoli Storage Manager
    08.12.2009     18:29:23     - Version 5, Release 5, Modification0.0  for AIX LF 64-bit -
    08.12.2009     18:29:23     Build: 316B  compiled on Oct 23 2007
    08.12.2009     18:29:23     (c) Copyright IBM Corporation, 1996, 2007, All Rights Reserved.
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BKI2027I: Using TSM-API version 5.5.1.0 (compiledwith 5.3.0.0).
    08.12.2009     18:29:23     BKI2000I: Successfully connected to ProLE on porttdpr3ora64.
    08.12.2009     18:29:23     BKI0005I: Start of program at: Tue Dec  8 17:50:20 IST 2009 .
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     -- Parameters --
    08.12.2009     18:29:23     Input File            : /oracle/IRP/sapbackup/.becbwhwk.lst
    08.12.2009     18:29:23     Profile               : /oracle/IRP/102_64/dbs/initIRPdaily.utl
    08.12.2009     18:29:23     Configfile            : /oracle/IRP/102_64/dbs/initIRP.bki
    08.12.2009     18:29:23     Manual sorting file   : disabled
    08.12.2009     18:29:23     Tracefile             : disabled
    08.12.2009     18:29:23     Traceflags            : disabled
    08.12.2009     18:29:23     Parallel sessions     : 1
    08.12.2009     18:29:23     Multiplexed files     : 1
    08.12.2009     18:29:23     RL compression        : 0
    08.12.2009     18:29:23     Exit on error         : disabled
    08.12.2009     18:29:23     BATCH                 : enabled
    08.12.2009     18:29:23     Buffer size           : 131072
    08.12.2009     18:29:23     Buffer Copy Mode      : SIMPLE
    08.12.2009     18:29:23     Redologcopies         : disabled
    08.12.2009     18:29:23     Versioning            : enabled
    08.12.2009     18:29:23     Current Version      : 581
    08.12.2009     18:29:23     Versions to keep     : 6
    08.12.2009     18:29:23     Delete Versions      : <= 575
    08.12.2009     18:29:23     Backup Type           : file_online
    08.12.2009     18:29:23     TSM log server        : disabled
    08.12.2009     18:29:23     TSM server            : [email protected] with 2 sessions configured, using 1 session
    08.12.2009     18:29:23     TSM client node      : PRODORADB_TDP
    08.12.2009     18:29:23     Days for backup      : Sun Mon Tue Wed Thu Fri Sat
    08.12.2009     18:29:23     Backup mgmt class    : DAILYMGMTCLASS
    08.12.2009     18:29:23     Archiv mgmt class    : DAILYMGMTCLASS
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 18.24.44
    08.12.2009     18:29:23     BR0232I 8 of 8 files saved by backup utility
    08.12.2009     18:29:23     BR0230I Backup utility called successfully
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0056I End of database backup: becbwhwk.anf 2009-12-08 18.24.44
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 18.24.44
    08.12.2009     18:29:23     BR0052I BRBACKUP completed successfully
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 18.24.44
    08.12.2009     18:29:23     BR0291I BRARCHIVE will be started with options '-U -jid ALLOG20091208175017 -d util_file -c force -p initIRPdaily.sap -cds'
    08.12.2009     18:29:23     
    08.12.2009     18:29:23     BR0280I BRBACKUP time stamp: 2009-12-08 18.29.23
    08.12.2009     18:29:23     BR0292I Execution of BRARCHIVE finished with return code 0
    08.12.2009     18:29:23     Job finished
    regards

  • Scheduling Failed

    HI,
    We have encountered a problem. Our Database is Oracle and Online+redolog backup has been scheduled daily. Jobs starts at 00.05 AM from Indian time and completed at 09.00AM. But two days ago the job has not started and we are getting red in DB13, when i click to see the log, i am getting only a message Scheduling Failed, and there is not any log to find why Scheduling failed. Its already scheduled from a long time and it was running properly, and today again the same message we are getting. What i feel that there must be some resource un avaliablity that's why the scheduling is failed. But how to find out the cause.
    I have verified all the dev_w* files there is no information, Can anyone help me to find out the cause of this problem. We are on ECC 6.0 and Oracle 10.2.0.2.0
    Regards,
    Subhash

    Dear Subhash,
    I had faced the same problem with SAP on DB6.[SAP Note 1242278 - DB6: Status 'Scheduling failed' in planning calendar|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1242278] ? After Implementing this SAP Note, in my case, the same problem was resolved.
    Regards,
    Bhavik G. Shroff
    Edited by: Bhavik G. Shroff on Nov 4, 2009 7:32 PM
    Edited by: Bhavik G. Shroff on Nov 4, 2009 7:34 PM

  • Whole database offline + redo log backup  Scheduling failed

    Hi Experts,
             In DB13 I have the following Issue,  Whole database offline + redo log backup  Scheduling failed.
    How to solve this.

    Hi,
            Below is the Log details,
    BR0120I Control files
    File                                                Size   Id.      Device  Link    Type
    /oracle/PRD/origlogA/cntrl/cntlrPRD.dbf         13975552    0      5578783  NOLINK  FILE
    /oracle/PRD/origlogB/cntrl/cntrlPRD.dbf         13975552    0      5578784  NOLINK  FILE
    /oracle/PRD/sapdata1/cntrl/cntrlPRD.dbf         13975552    0      5578772  NOLINK  FILE
    BR0616I Tablespaces in table TSORA for SAP owner SAPSR3:
    PSAPSR3, PSAPSR3700, PSAPSR3USR
    BR0227E Not enough disk space in /test123/PRDBK for backup, missing at least 149478.274 MB
    BR0056I End of database backup: behzgxph.afd 2012-02-28 03.05.40
    BR0280I BRBACKUP time stamp: 2012-02-28 03.05.40
    BR0054I BRBACKUP terminated with errors
    BR0280I BRBACKUP time stamp: 2012-02-28 03.05.40
    BR0291I BRARCHIVE will be started with options '-U -jid ALGOF20110129030500 -d disk -c force -p initPRD.sap -sd'
    BR0280I BRBACKUP time stamp: 2012-02-28 03.06.09
    BR0292I Execution of BRARCHIVE finished with return code 0

  • "Quartz Scheduler failed to initialize" error in application log

    We are BIPublisher 10.1.3.4 as J2EE app and I am getting this error in the application log. I have created myDS datasource to get rid of the following error. But no success..
    Please Help..
    Thanks!
    Srini
    09/01/09 15:13:43.298 [ecid: 10.39.38.45:96428:1231514019135:0,0] 10.1.3.3.0 Started
    09/01/09 15:13:46.492 [ecid: 10.39.38.45:96428:1231514019135:0,0] xmlpserver: QuartzInitializer: Quartz Initializer Servlet loaded, initializing Scheduler...
    09/01/09 15:16:55.835 [ecid: 10.39.38.45:96428:1231514019135:0,0] xmlpserver: QuartzInitializer: Quartz Scheduler failed to initialize: org.quartz.SchedulerConfigException: Failure occured during job recovery. [See nested exception: org.quartz.JobPersistenceException: Failed to obtain DB connection from data source 'myDS': org.apache.commons.dbcp.SQLNestedException: Cannot create PoolableConnectionFactory, cause: Io exception: The Network Adapter could not establish the connection [See nested exception: org.apache.commons.dbcp.SQLNestedException: Cannot create PoolableConnectionFactory, cause: Io exception: The Network Adapter could not establish the connection]]
    09/01/09 15:16:55.837 [ecid: 10.39.38.45:96428:1231514019135:0,0] xmlpserver: Error preloading servlet
    javax.servlet.ServletException: Failure occured during job recovery.
    at org.quartz.ee.servlet.QuartzInitializerServlet.init(QuartzInitializerServlet.java:170)
    at oracle.apps.xdo.servlet.scheduler.quartz.ExtendedQuartzInitializerServlet.init(ExtendedQuartzInitializerServlet.java:124)
    at com.evermind.server.http.HttpApplication.loadServlet(HttpApplication.java:2371)
    at com.evermind.server.http.HttpApplication.findServlet(HttpApplication.java:4824)
    at com.evermind.server.http.HttpApplication.findServlet(HttpApplication.java:4748)
    at com.evermind.server.http.HttpApplication.initPreloadServlets(HttpApplication.java:4936)
    at com.evermind.server.http.HttpApplication.initDynamic(HttpApplication.java:1145)
    at com.evermind.server.http.HttpApplication.<init>(HttpApplication.java:741)
    at com.evermind.server.ApplicationStateRunning.getHttpApplication(ApplicationStateRunning.java:414)
    at com.evermind.server.Application.getHttpApplication(Application.java:570)
    at com.evermind.server.http.HttpSite$HttpApplicationRunTimeReference.createHttpApplicationFromReference(HttpSite.java:1987)
    at com.evermind.server.http.HttpSite$HttpApplicationRunTimeReference.<init>(HttpSite.java:1906)
    at com.evermind.server.http.HttpSite.initApplications(HttpSite.java:643)
    at com.evermind.server.http.HttpSite.setConfig(HttpSite.java:290)
    at com.evermind.server.http.HttpServer.setSites(HttpServer.java:270)
    at com.evermind.server.http.HttpServer.setConfig(HttpServer.java:177)
    at com.evermind.server.ApplicationServer.initializeHttp(ApplicationServer.java:2493)
    at com.evermind.server.ApplicationServer.setConfig(ApplicationServer.java:1042)
    at com.evermind.server.ApplicationServerLauncher.run(ApplicationServerLauncher.java:131)
    at java.lang.Thread.run(Thread.java:619)

    Pl see if ML Doc 738967.1 helps
    HTH
    Srini

Maybe you are looking for