Automatic scheduling indicator should be disable in Work order

Hi Friends,
I want to disable Automatic scheduling indicator in work order while releasing,for this i have tried in configuration,infact its not getting disabled.
Could you please suggest me what enhancement spot i could use or any user Exit to meet the requirement.
Regards,
Srinika

Refer below document.
STEPS to use T-CODE SHD0 – TRANSACTION VARIANT
Transaction code which had been discussed is different, but that won't make any impact.
While you get Automatic Scheduling tick mark in step 3 of the document, select Invisible.

Similar Messages

  • Basic start and finish dates vs scheduled start and finish dates in work order

    Hi Friends,
    I have observed  that whenever releasing the work order,irresepective of number of operations in the work order, system generating scheduling start and finish dates are same, however after releasing the Work order and by adding another operation in the work order, immediately scheduling end date equaling to Basic finish date (i.e.: Basic start and finish dates are equal to Schedule start and finish dates).
    Can any body please explain why this is heppening
    Please find the screen shots.
    After adding one more operation in the operation list and save the Work order,then Basic start and finish dates are equal to schedule start and finish dates.
    Regards,
    Srinika

    Srinika
    There are many things that affect the order scheduling:
    IMG setting - scheduling parameters
    Work centre settings
    Operation values e.g. work, duration, operation control key settings
    Calendars
    Etc
    So one possible interpretation of the above data is that the initial order operations have no work assigned, or the operation control keys don't require scheduling, or the work centres arn't set up correctly.
    Then you add a new operation which does appear to work.
    Please supply a screen-shot of the operation tab.
    PeteA

  • How to avoid automatic data change in service notification from work order

    Hi,
    when I change work order address data the address data from the service notification connected to the order is changed too, how can I avoid this change? Is there anything on customizing to control whichs fields are updated automatically.
    Thanks,
    Juan.

    Hi,
    You can trying using Books of Business.
    Create a book and add that particular user to that book and at the time of task creation, through a workflow you can assign it to the corresponding book.
    This might resolve the access issue you are facing.
    hope it helps,
    Mayank

  • Task License Validation Error Message/ Automatic Scheduling for Disk Defrag is not working.

    I saw where I could possibly ask you for answers to the problems that I am having with Windows 8.1 pro. First of all I noticed that my disk defragmentation task which was set on daily wasn't operating.  It indicated that the last time it ran all disks
    for disk defrag was back on 4/20 and on the this morning of 4/26 there was the date 4/20 for all the disks.  I went into the Administrator Tools section of Control Panel and found Schedule Tasks.  When I opened Schedule Tasks I got the
    error message that indicated a Task License Validation Error. It went on to read:The task XML contains a value which is incorrectly formatted or out of range.  This is my question...are the two related...the inoperative automatic maintenance of disk defrag
    and this error message from task scheduler?  And how do I address each issue to solution.   Thank you very much. 
    [email protected]

    The MSDN Windows and Windows Phone app development forums are for developers to discuss writing their own Windows and Windows Phone apps.
    For help using Windows please post on the Windows forums on
    http://answers.microsoft.com .

  • Weekly schedule line should pass to last working day of the week in SAg

    HI,
    In a scheduling agreement when we have weekly or monthly schedules the system displays the date in the screen as 12/2010 or 13/2010 for say a weekly schedule.
    However when the data is stored in the table the delivery date is always the first working day of the week. In this case when the week is 13/2010 the data is stored in the table as 22/03/2010.
    Is there any way to change this to the last working day of the week?
    We have some config related to define delivery intervals in IMG--> Sales and Distribution --> Sales --> Sales Documents --> Scheduling Agreements with Delivery Schedules --> Define Delivery Intervals. Will this help solve my issue? If it solves what is the procedure behind this?
    Request you to provide your inputs.
    Thank You, Lakshmikanth

    Hi,
    Seems the delivery split concept is different from this requirement. Can Delivery intervals concept help us or not? IMG--> Slaes and Distribution --> Sales --> Sales Documents --> Scheduling Agreements with Delivery Schedules --> Control EDI Inbound Processing --> Define Delivery Intervals.
    What is the procedure and assignment details for delivery intervals concept?
    Thanks, Lakshmikanth

  • Preventing Deletion indicator in PR once work order is completed

    Dear colleagues,
    Users create work orders in IW31 with the choice of external service; control key is PM02. Once work order is saved purchase requisition (PR) is created in background. With reference to PR, purchase order (PO) is created by purchase specialist.
    When work order is technically completed (system status TECO) deletion indicator is set to PR line item(s) automatically which result in undesirable situations since PR(s) has subject to release strategy in our system.
    Is it possible to prevent setting deletion indicator in PR once reference work order is technically completed?
    Kind regards
    Melih

    Hi,
    In this case that behavior has negative effects on PR Workflow process because in our system when PR(s) is created it is subject to release strategy according to preconfigured conditions.
    Once the order is technically completed (TECO) deletion indicator is set to PR line item(s) automatically meanwhile release strategy tab is disappeared from PR line item(s).
    In addition to that in ME54N system gives the MEPO822 (Purchase requisition XXXXXXXXX cannot be released) message even PR is approved before the order is technically completed.
    Kind regards
    Melih

  • Regarding work order urgent pls

    Hi,
         i have a requirement where i need to get the time slots dynamically which i need to use in select query to retrieve data.
    the time slots are,
    S1 : 8-10 AM
    S2 : 10-12
    S3 : 12-14
    S4 : 14-16
    AM : 08-12 and goes on upto 20.00 PM
    when u open a workorder in iw33 transaction in the location tab u can find an ABC indicator where we are using these time slots for the work order.
    Now my problem is to select the work orders based upon the current systime and timeslot.
    For eg:   if user executes the report say at 10.00 AM he should get all the work orders falling in the time slots S1. in the same way if he executes the report at 12.00 he should get work orders falling in the time slot S1,S2,AM and the user may execute the report at any time.
    can anyone suggest how to implement the code and is there any functional module which takes current time and gives the time slots as output.
    In the standard workorder u wont find the time slots as S1, S2,S3  u will find it as A,B,C,D in ABC indicator field of location tab.
    pls urgent help me and surely u can expect points.
    Message was edited by:
            Ravi Kumar Gunda

    can you make use of the logic as
    sy-uzeit+0(2) --> hrs cnt like
    08
    10
    12
    14 16
    into variables and
    case timeslot.
    when
    endcase .
    vl = lower value
    vh = higher value and then substitute the same in the
    say user has entered a time of 11:40 am
    then set the lower value to 8
    and higher to  12
    vl = 8
    vh = 12
    do this in the case endcase.
    select query
    select f1 f2 ...
            fx   between   vl and vh .
    regards,
    vijay

  • Work Order History

    hi all,
    I want to create Work Order (WO) history / back date.
    I've already tried this way:
    1. Create WO
    2. Change WO Date (16.01.2010 --> 16.01.2008)
    3. Un-tick Automatic Schedule-->save
    4. Open WO, click Order-Functions-Complete-Do Not Execute
    but the results,the date of WO back again as previously , why? whether there is another way?
    please tell me how tu create Work Order back date..
    thanks

    Hi,
    Check the folowing settings in SPRO:
    1)Plant Maintenance and Customer Service>Maintenance and Service Processing>Maintenance and Service Orders>Scheduling>Set Scheduling Parameters. Here Set Do not adjust basic dates ,dep.reqmts to operation dates and maintain Maximum number of days start date can be in the past in the field "Start in Past". These two settings will not change basic start & finish as well as operation early start & early finish dates. If the no of days mentioned in "Start in Past " field is exceeded, the system automatically overrides the set scheduling type and uses "today" scheduling.
    The best solution however would be to create historical orders via IW61.
    Hope it helps ypur query
    Regards,
    S.Basu

  • Purchase Reqs created through work orders

    Currently when I attach a non-stock item into a work order it create a purchase req. The purchase req is automatically released, or is released when the work order is. The problem is that we have a release strategy that we must follow here at my company. When the Reg is automatically release it does not follow this strategy.
    Is there a way that i could turn off this functionality, and have those req follow our standard release strategy.

    Hello!
    If you don't want to convert PR into PO, then why you are creating it. There can be two cases:
    1. You want to create PR but don't want the material right now. In that case change the delivery date. 
    2. You don't want to do anything now. You want material after 6 months, only you want is to create a maintenanc eorder. In
    that case you can enter the material nad service on ly at the time of requirement.
    You can talk to MM consultant also you can put control this by release strategy also.
    Is there any other case that you are facing. Please discuss.
    - Vaibhav Mishra

  • Work Order DFF during Release

    Hi All,
    We are evaluating if we can populate Work Order DFF while creating work orders from ASCP.
    User will select planned orders in ASCP for release. Then the user can enter some field in ASCP.
    When the planned orders are released, this field entered should be populated in Work Order DFF.
    Request any pointers how can we achieve this.
    Regards,
    Yash

    Hi,
    Could you please share the solution what you did, so that i can check will it help for my requirements.
    Thanks,
    Suresh

  • Schedule lines should be in gray mode

    Hi Gurus,
    Any idea how to make the schedule lines in gray mode.
    My client demand is when we save the sales order and
    we go to va02 schedule lines should show in gray mode to avoid
    the changes  quantity.
    Thanks in advance

    Dear Protan,
    the solution suggested above with the help of user-exit USER_EXIT_FIELD_MODIFICATION (Include MV45AFZZ) is the correct way to make the schedule lines unchangable. But please take into consideration that in the "normal" sales orders you do not need to go to the schedule line screen to change date or quantity. It is sufficient that you change the date or quantity on the item level. Then the schedule lines will be changed (created/deleted) in the background automatically.
    So, if you really want to grey out the quantity and date fields, you have to do this on all screens (Sales Overview, Procurement, Shipment etc.) also on  the item level. Then the item will be unchangable at all. Please be careful with this.
    So, you have to grey out all item date and quantity fields in all screens of the order. To do unchangable only schedule line screen is then not sufficient.
    As Manam said above, the USER_EXIT_FIELD_MODIFICATION is the only correct place to make the fields unchangable. I can only confirm this.
    I hope, this additional info was also helpful for you.
    Kind regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • I plugged my ipod nano 6th gen in to the latest version of itunes today and as soon as i plugged it it it turned on automatically as it should when i came back to it 5 mins later, picked it up and it felt warm and it wouldnt turn on. what should i do?

    I plugged my ipod nano 6th gen in to the latest version of itunes today and as soon as i plugged it it it turned on automatically as it should when i came back to it 5 mins later, picked it up and it felt warm and it wouldnt turn on. what should i do?

    I have the same problem and can't seem to figure out what the problem is. I rebuilt my iTunes library and still my 6G nano crahes whenever I load an AAC tune onto it.  MP3s and podcasts all work fine, it's just the AACs... 
    Just *loading* an AAC song will cause the Nano 6G to reboot as soon as it disconnects from Itunes. It will then reboot a few times and then go into recovery mode. :-(
    Karen

  • Automatic scheduling of Cproject

    Hi All,
    We have changed the plan finish date of an item from 31.12.2011 to 31.12.2012. Corresponding Cproject project definition is in Released status. As a part of synchronization the dates on the Cproject project definition changes to 31.12.2012. But the dates are not copied to the lower hierarchy i.e. tasks. We have only tasks under PD. 
    System message is u2013 Can not update scheduling data
    Reason u2013 As the Cproject is in Released status scheduling can not happen automatically. Scheduling should be carried out manually.
    How to enable scheduling automatically when the Cproject project is Released. Business do not want manual scheduling of Cproject project.
    Regards,
    Gaurav

    Hi Gaurav,
    There's no standard way to activate the automatic scheduling once the project has been released.
    You will have to enhance standard class CL_PPM_SCHEDULING / method GET_SCHEDULING_FORCE and force the parameter rv_scheduling_force to abap_true.
    Regards,
    Matthias

  • Automatic confirmation indicator set in TO

    Dear forum
    I am creating a transfer order with reference to a delivery, using transaction LT03.
    But when I look at the transfer order in display mode after it is created, the Confirmation indicator (LTAK-KQUIT) is set automatically in the TO.
    How is the configuration made to avoid having the confirmation indicator set in the transfer order?
    I had a look at the IMG settings in LE->WM->Activities->Confirmation and removed the "Confirm immediately" indicator set for the movement type 601 GI for delivery...but it did not do it for me, the Confirmation indicator is still set in the transfer order.
    Anyone knows?
    thanks

    IMG settings in LE->WM->Activities->Confirmation
    From SAP Help:
    "Immediate confirmation of a transfer order item only works out
    *if the respective movement type does not disallow this
    *if the storage type from which the materials are picked is not subject to pick confirmation
    *if the storage type into which the materials are put away does not have a putaway confirmation requirement."
    If you remove any of this conditions, then the stock transfer order will not be set to confirmed automatically. In my case, I just had to set the "confirm stock removal" indicator for the storage type in question, in order to remove the automatic confirmation indicator in the stock transfer order.

  • Final issue indicator on the general data button on the work order

    Hi Gurus,
    can anybody please let me know why the final issue check box is checked automatically even before the goods are issued via migo against the work orders. This check box is on the general data tab of the material entered on the components tab of the work order. Please help. As a result of this, the store room clerk cannot issue the material againsth the work order, because this check mark is checked. I want to understand what is causing the check mark to be checked automaticallu even before tthe materials are issued out
    Thanks
    ANusa

    Hello!
    This might have occured due to completion confirmation of order before goods issue. Generally this happens if final issue indicator is set as default in completion confirmation tab. Please check and reply if problem is something else.
    Regards,
    Vaibhav Mishra
    Edited by: Mishra_Vaibhav on Jan 27, 2011 5:23 AM

Maybe you are looking for

  • Printing differ with differ printer

    hi all, i am facing problem while printing script result showing different display with diff. printer. Issue is : printing more characters in column so, all other  column values are shifting right side while with another printer it is printing correc

  • Changing a PDF with a text box, and then flatten the text box onto the underlying PDF before sending the document out.

    I download PDF documents from municipalities, often and from numerous municipalities. They have a scanned image of a form that I need to fill out, I enter my contact info as a text box onto the form, along with other information, but when I save the

  • Skype not doing anything.

    Just installed. It's just a blank splash screen with the rainbow and the clouds. Nothing on it. I click sign in from the icon at the bottom and nothing happens. Stays stuck like this for hours. Please help. I have an important business meeting. Was g

  • E-mail Notification Setup

    Please help. I'm trying to set up the Notification Method in Entreprise Manager 10g Database Control. I wish to send DB notifications via internet to a Hotmail e-mail address. 1. Is this possible ? 2. Which value should I provide for E-MAIL(SMTP)SERV

  • Populating combo boxes

    hi all, can any one help me in writing code for populating one combobox depending on selection in another combo box in java or javascript like country,state,city in address by selecting particular country in country combo box ,states belongs to that