Automatic selection production version in MFBF

Hello !
I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
Do you know what is missing for automatic selection works ?
Thanks a lot.
Vero

Hi Vernoica ,
Good Day , PV will be selected based on the lot size and the creation dates.
It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
If you would like to get rid the selection of PV,
why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
Hope it will resolve your problem.

Similar Messages

  • Selecting production version in MRP run

    Hi dudes,
    our client is having reuirement is he will select the production version irrespective of lot size, but he select the production version at the time of manual creation of process order where it depends on resource(work center used in recipe of particular production version, BOM will be 1 alternative only.
    now while running MRP how to make system to allow manual selection of production version at the time of converting planned order to processs order.
    respond asap plz...
    Daniel.

    Hi ,
    During MRP, system will select the production version based on Validity date & Lot size.
    If a material contains two production versions with same validity date & Lot size qty , system will select the First valid PV by default (unless it is locked) & will copy to planned order.
    When u convert the planned order to production order,default PV will be copied automatically from planned order. Here u cannot select PV manually.
    Settings:
    Create valid production version with lot size and Valid routing , BOM at MRP view of Planning material.
    Assign the selection method = 2 or 3 at MRP view of Planning Material
    Regards,
    Anand.

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • MRP with selected production version

    Dear PP experts,
    I have two production version
    Prod. Version      From lot        To lot size        Base Qty.
       1001                      1                   100                100 Kg.
       1002                      101             9999999          400 Kg.
    The batch size mentioned in the material masters are Mimimum lot size 100 Kg. and Maximum lot size as 400 Kg.
    I have entered PIR in MD61 for the material for 350 Kg. Since I need planned orders selectively of 100 Kg. in MD61 I have maintained in schedule lines tab production version as 1001.
    After running MD41 system creates planned orders with the production version, but the batch size is not as per the production version.
    Pl. let me know what needs to be done.
    Regards,
    Prashant

    Hi Watson,
    I can see some conflicts in your Master Data settings.
    First of all you have set your Lot size ranges in Material Master Data from 100 to 400 Kg.
    And your Production Versions (1001) set lot size range is 1 to 100 Kg.Which may creates conflicts.
    Now your require qty is 350 kg.So as per your lot size restriction set in Material Master will force system to create one planning proposal of 350kg.I can guess you get one plan order of 350kg but due to selection made in (MD61) selected prod. version is 1001 instead of 1002.Which is again wrong
    Now to make the things correct you can have below options,
    1) change Lot size restriction to 1 to 100 in Material Master.So you wil get 3 Plan orders of 100 Kg and 1 of 50 kg.
    or
    2) Instead of changing Lot size in Material Master, use quota arrangement (MEQ1).For this you have to first activate Quota arrangement in MRP 2 view of Material Master.Then go to MEQ1 and create quota for the specified period.Here you can restrict lot size at production version level.
    Regards,
    Dhaval

  • Cannot select Product Version. Its greyed out ???

    Hi All,
           I have configured maitenance ooptimizer in sol man 4.0. but when i tried clicking the "Maintenance Optimizer" button under the "Change Management" -> "Support Package Stacks", I see every selection greyed out. I am not able to select any option (i.e Product Version, Priority, Short Text, and even the Back and Continue buttons are also greyed out).
        I have "SAP_MAINT_OPT_ADMIN" role under which the authorization objects CRM_ORD_PR and D_SOL_VSBL exist.
        I feel still there's some sort of authorization missing but not sure whats that.
       Can someone please reply to help me with this...
      Thanks
      Sourav

    Can I get some suggestions to the above question please.....

  • Production version selection based on Process order type

    Hi,
    I have the following requirement.
    A material is having two production version one is for R&D and one is for regular production. Now two process order types one for R&D and one for regular production. Now during creation of process order if we use order type of R&D then it has to select production version of R&D and if we use order type of regular productionthen it has to select production version of regular production. This selection has to be happened automatically. How this can be configured.
    Thanks
    Vinamrath.

    Dear Kumar,
    Assuming the production version selection is automatic in  the order type dependent parameters,then during order creation this
    can be automated only through validity date of the production version or else by locking the production version manually which
    should not get picked or else only through different Lot Size.
    Check and revert.
    Regards
    Mangalraj.S

  • Automactic Selection of production Version

    Hi.
    I have created a material "A"
    I maintained in material master's MRP4 view selection method "2"
    I have created two production version with same validity period & same lot size "0001" & "0002"
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    Now when i am going to create a process order system is selection production version "0001".
    But I want automatic selection of production version "0002".
    What setting shall I do?
    Regards
    Vivek

    Dear Vivek,
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    In order type dependent parameters maintain as manual selection
    Then system will raise an pop-up to select production version while creating prodiuction order
    The above setting is only useful while creating manual production order
    If you are converting plan order to production order then above setting will not play any role
    System will default take 1st PV
    All you can do is you can change manually in plan order
    Or if you want system to take automatically in MRP then you need to lock 1st PV
    Also refer my reply from this thread
    [Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
    Regards
    Madhu

  • Manual selection of production version in REM scenario.

    Hai gurus,
    I discrete manufacturing we  can several production versions and we can select the same manually
    when we convert planned order to production order. Like this whether it is possible in REM scenario
    to select the production version manually, if so what is the settings and procedure.
    waiting for the positive reply.
    regards,
    sekar chand.

    Dear Sekar Chand,
    Are you not able to select the production version in MFBF manually ,assuming if you have more than
    one production version for the same material?
    What Tejas has suggested you is to start the planning process itself based on Prod.versions ---> MRP
    run-> planned orders--> Production confirmation.
    In case if you do not take MRP run and go for a direct confirmation also you will be able to select the
    production version in MFBF.
    IF not means revert back.
    Regards
    Mangalraj.S

  • How to add production Version  field in COOIS to selection options?

    Dear Experts,
    Need your suggestion for below issue raised by client.
    1) As per client, he was running COOIS with the selection option of a production version. But currently he is  not able to see this selection while executing a COOIS t-code.-----> Kindly guide me on its possibilities & necesary checks.
    2) If I want to correct it & want to add Production Version field in COOIS report what steps I should take?
    Need all your valuable guidence to resolve above issue.
    Thanks & Regards,
    Mehul

    Hello Vivek,
    Really thanks for your mail. Please see below comments-
    1) I checked the transaction COOIS & also told user to select Production Version after executing the report by giving Plant code & dates. But user asking for this field before execution.
    As per your suggestion I checked in Header level of first screen but its not showing me also.
    2)  I am using ECC6.0 version
    3) One finding from my side- This is I am checking only selecting Production Orders. But when I am selecting only Planned order then Production version can be seen in first screen under Repetitive Mfg. section.
    so kindly tell me why this not showing when Production order selected?
    Thanks in Advance for your help.
    Regards,
    Mehul

  • Production version selection according to explosion date

    Hello
    In customizing for MRP (OPPQ), parameters for BOM explosion / routing selection is 3 (BOM explosion number/order start date).
    In MRP4 view of material master, selection method for BOM explosion is 2 (Selection by production version).
    No MRP group is assigned.
    I have 3 production versions : one for 2014, one for 2015, one for 2016 :
    I use a BOM explosion number with fixed key date 1st December 2015 :
    When manually creating a planned order with dates in 2014 and explosion number EXP_1215 (fixed key date 1st December 2015), Production Version PV1 is selected (valid for 2014), but no routing is selected because explosion date is BOM explosion number, and in PV1 there is no valid routing in 2015 :
    Is it possible to select production version according to explosion date, and not order dates ?

    Hi Tristan
    The following modification note can be used to influence the selection of production version on planned orders:
    351773 - Selection of production versions for planned order
    Alternatively, you can create your own logic using BAdI MD_MODIFY_PRODVERS.
    BR
    Caetano

  • Product version

    Hi,
    I am in mid of solution manager upgrade and need to download the target stack again but the product version Solution Manager 7.02 is not reflecting in creation of new transaction through dswp. Please help.
    Regards,
    Mridul

    Hello Mridul,
    Do you mean in SMSY under change product assignment?
    When you want to add the installed product version, but the downloaded product is not in the drop down list?
    If this is what you mean, then you need to check the box "Free Product/Select Product Version" , then whjen you click the product drop down list, the product version should be there and selectable.
    If you mean't something else can you please provide more details?
    Regards,
    Paul

  • Product Version SAP ERP 6.0 Missing from solman 7.0

    Hi All,
    I have installed an ECC6 system and now  i need to configure the solution manager and download the support packs
    and xml file for EHP4 upgrade. I have done this before where in i configure the new system in SMSY as SAP ERP 6.0
    and then configure maintenance optimizer and it gives me the option of Enhancement Package Installation.
    However now in the current solution manager i dont see the product version  SAP ERP 6.0 when im clicking
    trying to creating a new system.
    Our Solman version is 7.0 . I tried creating my new system under SAP ERP EHP as ehp version 1 and used maintenace
    optimizer but it does not give me the option of EHP package installation. Can any one let me know how to address this
    issue??
    Regards,
    Ershad Ahmed.

    Hi,
    Goto Tcode SMSY
    1. Under Landscape Components --> Product Systems --> Select ERP --> Under that select your system ID and click on it,
        Goto --> Header Data on your right side, change the Product Version to SAP ERP 6.0 and SAVE.
    2. Goto System Groups and Logical Components --> Logical Components  --> SAP ERP --> Create NEW Logical Component for   your ECC system under this component and select Production version as SAP ERP 6.0 & assign ur system then SAVE.
    3. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and REMOVE your ECC systen form the Solution and SAVE.
    4. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and ADD your ECC system form the Solution and SAVE.
    Regards
    Kannan.K

  • PRODUCTION VERSION

    When i am creating process order for a material it is showing a message that
    'Production version is not maintained'.What should be done to solve this problem.Please guide me on this.It is urgent.

    Hi,
    Go to MRP 4 view, select Production Version.
    Give the name for the version, say 0001,
    By default it is valid from today's day to 31.12.9999.
    Again click on this version,
    select the necessary BOM (in Bill of materials Tab) and routing (in planning data tab) .
    Check it and if ok, you will get check start in Green.
    Or else use T.Code C223, to create production version for the material.
    Hope it is clear.
    Srini

  • Best production version and master recipe?

    Is there a way in SAP (ECC.5.0) to  choose the best production version on its own besides the date?
    Can MRP choose the best production version  and master recipe on its own based on cost?
    If so How? Config?
    Please advise
    thanks
    Walter

    Hi,
        MRP  selects production version based on   Lotsize,Validity date and status.In R/3 ,we dont have functionality like
       1. Simultaneous MRP and Capacity Planning
       2. Best Optimum  route of production.
    This is very much available in APO only. You can use either of Quota arrangement or Capacity evolution functionality to distribute planned qty into other resources based on past experience.
    Regards,
    Velmurugan S

  • Use of production versions

    Dear Masters,
    I have two BOM's for one material.I have created production versions for the same.
    1.I want to create two production orders using two BOM's? How to create ?
    Also how we can use the production versions at the time of creting production orders using MD02 & MD04?We have Make To Stock strategy.
    Thanks & Regards,
    Ram Kulkarni

    Hi Ram,
    if u create production order by manullay, u can select production version manuulay by doing following settings.
    1. Goto OPL8 define production selection = Manual selection for your ordre type/plant combination
    2. Define Bom selection  method =   2 or 3  by production version.
    while creating production order(Co01) system will ask u to select production version
    For MRP run,
    system always select first  valid production version by default. Here u can define lotsize to select production version. And another way is u can define Quta arragement inthat u can define percentage quota for each production version.
    while creating production order from planned order (MD04) system will copy the production version from the planned order.
    regards
    pradeep