A company uses Plant Maintenance for Engineering overhauls. MM is used for Engineering spares only (i.e. not for goods for resale etc).
The requirement is to set up ongoing Plant Maintenance Orders, one for each item of plant (only 600). The plan is just to leave them open, as they are only used at a simple level.
Anyway, for each PM order, the requirement will be to settle automatically, and to a particular GL code and a particular cost centre.
So, for three different works orders:-
Cost Centre -
>   333     334     335
GL code
1234----
>(X)
1235----
>(Y)
1236----
>(Z)
1) What is the best way to achieve this? I am thinking that GL code will be specified by order type (therefore I will need about 10, corresponding to the GL codes) and cost centre will be specified by Work Centre in each order.
2) How do I set up automatic settlement? Can this be at period end only or instantly when good are booked to the order by the stores.

Hi ,
For Plant Maintenance with FICO , you need Settlement rule & settlement profile. 
The settlement rule determines what portions of a sender's costs are to be settled to which receiver(s).
In thesettlement profile you determine to which objects orders of this order type can settle to. You can also assign an order type to a settlement profile at a later date. You can change the settlement profile in the order.
After you create the settlement profile , you need to save the profile to particular order type.
Inside the settlement profile , you will define the control parameter of how is the way to settle included which cost center to post.
For automatic settlement , i think you need user exist - Please refer to userexit IWO10027 or COOM0003 with your abaper.
Thank you.

Similar Messages

  • Send cost centre and attendence type not filled automatically

    Hello,
    I am configuring the time recording in ESS. I configured the recording profile and in cats2 it looks good. The send cost centre and attendence type get filled automatically. But when I do the same thing in ESS the values are not populated. Is there something I have to take into account in order to get this done?
    Thanks a lot, Vanessa

    Dear Venessa,
    Please note that in contrast to personal templates, which enable you to prefill the data entry area when you start time recording, the system first displays default values when you create a new account assignment row with one receiver object and at least one working time.The system only proposes default values when you create a new account assignment row. In ESS, this is correct, because it does not make sense to provide default values for the sender cost center and activity type if you are only entering an attendance or absence type.
    Hope this helps,
    Regards,
    Roy

  • Automatic Settlement for Prod.orders & Product Cost Collectors.

    Dear all,
    Please help me how to carryout the Automatic settlement of Production orders &
    Product Cost collectors on every month last working day mid night.
    Please tell me how to schedule this as an automatic scheduled job.
    This program is not been allowed to schedule as a job.
    Waiting for your inputs.
    Please help me.
    Regards
    Mangalraj.S

    Hi
    Create a Variant with the order types need to be setteled at the period and schedule the same in background processing.
    Regards
    Venkat

  • Cost centre and Profit centre in one query - Authorisations not working!

    Hiya,
    I have another problem related to Analysis Authorisations.
    I have created an AA with Cost Centre and Profit centre access restricted to a certain node of a hierarchy (type 1 - this node and below). For example, the User can only run a query at Cost Centres level of Country Belgium - the query works fine. Now, the user wants to drill down by the relevant Profit centres. According to the log, the system checks for Profit centres like * and says the user is not authorised. All this, despite the fact that all Profit centres belong to country Belgium and user has been given access to see these profit centres.
    What do I need to do to enable drilldown by Profit centre? I can't make a "*" access to Profit centre as the user will be able to run other queries at global level, which is not what I can allow.
    Any suggestions?

    Hello,
    I don't know if it is relevant, but I had a similar problem when I had two characteristic each with hierarchy restrictions in one authorization object.
    I "solved" it by separting each characteristic into its own authorization object.
    BR
    Ondrej

  • How to Capture Multiple Cost centres and Business Unit information in a project?

    Dear Experts,
    With the help of UDA functionality in project super responsibility, I have captured Cost centre and Business unit information and this info will be used/reflected in CC and BU segments of all transactions gets recorded against that project.
    Now, our user wish to have multiple cost centres and business units to be tracked in the same one project. How is this feasible? Below example describes my requirement in a summary, please advise.
    An Indirect project is created when a defect on a machine reported from client's customer and all subsequent activities (purchases, travel to customer site to analyse and troubleshoot, purchases for any in-house analysis etc..involves costs spending internally) in resolving that defect/project involves 6 to 7 different departments (Sales, Tech Support, Quality team etc.,who actually work/travel and spend costs against project until defect resolution). And, each of the above departments will have 1 dedicated owner (project owners) to manage that project and each of these 6 or 7 owners owners will have their own cost centres (eg: 2345 - Sales team) against which they wish to see their transactions (travel, purchases during defect resolution) globally.
    So, all I want to know is how can I make one single project to accommodate multiple cost centresand business unit information to be assigned using UDA? Please let me know if I am not clear.
    Regards
    Venkat

    I think you should use the expenditure organization on the transaction itself to derive the CC/BU. Have AA lookups and define AA rules where you look at a Exp Org to BU or Cost Center to derive accounting.

  • Combination of cost center and GL account in Report painter report

    Hi Guys,
    Im creating a report for  profit centers using library 0FL- which uses table FAGLFLEXT in the report painter GRR2.I need to enter cost center with gl accounts in the characteristics.as these cost centers
    are assigned with cost elements.Can I do that ? cuz when I enter combination of gl a/c and cost center,I wobn't get nay data but only gl accounts shows the correct data.How to use combination of cost center and gl a/c, or I am good only with gl a/cs.Please suggest.
    Regards
    Shaun

    Hi
    Just check the G/L account assigned in the PO against the cost center, The G/L account assigned may not be the correct one, Check out if any validation is there for the combination, contact your FI-CO guy as there are always restrictions unknown to a MM guy.
    Regards

  • Blocking of Cost centre and activity type

    Dear all,
    Please tell me how to block cost centres and activity types which will no longer be used
    best rgds,
    Manoj

    Hi,
    There are two ways .
    If you wish to use the cost center number for any other cost center , then you need to delete the cost center by KS04 & you need to mention the future period for which the same should deleted, normally, starting would be 1st day of next year to 31.12.9999
    Keep in mind, cost center can only be deleted , if no data (Actual/Plan/reversal) is posted in it. You may do it , before starting next year's budget processing.
    If you wish to just block the same , lock Actual primary/Secondary & Plan primary/Secondary in the control tab.
    Regards,
    Deepak Kolwankar

  • IW41 using HR data (cost centre and activity type)

    Hi all,
    Does anyone know the steps required to make IW41 determine the Cost Centre and Activity Type from the HR master?
    We can change the Activity Type by user-exit CONFPM04, but not the Cost Centre.
    Also posted [here|http://www.sapfans.com/forums/viewtopic.php?f=7&t=329923].
    PeteA

    Hi Pete,
    Which cost center field are you using? SKOSTL (sender cost center) should be changeable in export structure AFRUD_EXP. It is this field that is written to the AFRU table (not KOSTL). I did a quick check through debug and it looks possible to set a value in the exit that gets written to AFRU-SKOSTL.
    -Paul

  • Delimiting Cost Centre and Delimiting Company Code

    Hi Team,
    There is a business scenario I want to discuss and get your opinions;
    A Country's Currency is changing from 01012009; I am getting stuck when I reach the cost Centres.
    When i come to Cost Centre, is there a way where I can modify the Currency in the cost Centre and retain the earlier record delimited. If this is not possible then I guess the only other way os to create new cost cnetres with similar master data with new currency getting defaulted from the Company code table and assigning them accordingly. Am I right ?
    A quick response will be highly appreciated.
    Thanks,
    Naveen
    +91 9900350350

    what is your controlling area currency type

  • Cannot submit expense report due to cost centre and location

    Hi,
    Has anybody faced the issue where you cannot submit your expense report?
    The system gives an error for every expense line...'cost centre - select a valid value and same for location'. However the values of the cost centre and location are valid in AP/GL, because previously you were able to successfully create expense reports...
    Thanks in advance for your reply.
    Regards,
    Chi Kei

    Hi,
    Check the cost center value from the Purchase Order Information tab in the Oracle HR Assignment form.
    Regards,
    Tanvi

  • Do we have a General Ledger report that combines both cost centers and WBS?

    Do we have a General Ledger report that combines both cost centers and WBS?

    Have you tried FAGLL03

  • Defferece between cost centre and Master Cost Centre

    Can any body explain defferece between cost centre and Master Cost Centre.
    Appreciate your help.
    Kavitha

    Hi kavitha
                     I dont think there is difference between Cost centre and master Cost Centre.
    It may be Possible that under Cost Centre Hirarchy One Cost Centre is at Top node and other is Child of that Cost Centre.
    Thank YOu.
    Thank YOU.

  • Difference between Cost Centre  and Cost Element.

    Hi Guru's,
    what is the difference between Cost Centre  and Cost Element.
    regards
    JK

    Hi,
    Cost elements:
    A cost element classifies the organization's valuated consumption of production factors within a controlling area
    Primary Element - costs that originate outside the company; relate directly to the income statement in FI and must be included in the FI Chart of Accounts
    Secondary Element - costs that result from internal allocation activities; NO relation to G/L accounts in FI. These accounts are exclusively for cost accounting and are only maintained in CO
    Cost centre :
    Organizational unit within a controlling area that represents a defined location of cost incurrence. The definition can be based on:
    Functional requirements
    Allocation criteria
    Physical location
    Responsibility for costs
    Defines the smallest area of responsibility within the company that causes and influences costs; the lowest level to which you can meaningfully assign direct and indirect costs
    If this meets your requirement, you may like to close the posting.
    Muraleedharan.R

  • Link between Cost centre and G/L Account

    Hi All,
    Please provide the Link between Cost centre.
    ie., Please provide me the T.code or Table where we will get link between Cost centre and G/L Account.
    Please let me know.
    Regards,
    Nagaraj S

    Hi,
    Please note that Cost Centers are maintained to capture costs, i.e. P & L items of GLs you have created.  These items would have been created as a Primary Cost element and the costs
    are passed to to the cost center through account assignments.  You can see these GL A/cs created as cost elements -  Cost Center-wise, period wise for which various standard  reports are available.
    Sadashivan

  • Regarding Cost Centre and plant combination.....

    Hi Experts,
                      I have created a PO with account assigenemtn cat F( for work order).
    When I am posting the GR for it , an error message is displayed " Combination of cross-plant XXXX and profit centre XXXXX is not allowed".
    How to resolve this issu?????
    Where od I check in the customization for combination of plant and cost centre.......
    Whwt is the hierarchy (relation between costcentre, profit centre and G\L account) ???????
    Regards,
    Nishant.

    Hi
    Company code is not active for the Profit center. You need to activate the same in KE52 - Change profit center
    In the Compnay codes tab you need to activate the Compnay code to whcih the Plant is assigned.
    Thanks & Regards
    Kishore

Maybe you are looking for

  • Syncing to 30GB Video Ipod causes windows to physical dump

    That's pretty much my problem. On my laptop(windows XP), I start to sync or even if I manually drag multiple songs onto my Ipod it starts doing it. Then about 5 or 10 songs in I get the dreaded blue Physical dump of memory screen. I've tried restorin

  • Simple question; Mac Server Setup for Mail, iCal and Address Book Services.

    Hi Guys; I'm new to the Mac Server world and need a few questions answered. I have purchased a new Mac mini Server for hosting File, Web, Mail, iCal and Address Book Services. I'm comfortable setting up File and Web Services however I'm a bit uneasy

  • Index is not using for this query

    I have this query and it doesn't use index. Can you put your suggestion please? SELECT /*+ ORDERED USE_HASH(IC_GSMRELATION) USE_HASH(IC_UTRANCELL) USE_HASH(IC_SECTOR) USE_HASH(bt) */ /* cp */ bt.value value, bt.tstamp tstamp, ic_GsmRelation.instance_

  • EJB3: What is the easiest way to handle the rapid change DB structure?

    Hi, I'm new in EJB, and it's the biggest leap to learn EJB3 without having strong fundamental in EJB 2.Currently, I'm facing the inefficient way to handle database rapid change on my Web Application. I choose JSP, Struts, and EJB3 with Oracle Databas

  • International Regional Format Inconsistent in IOS6

    In IOS5 Showing the correct behavior Steps to reproduce: 1. Go to Settings -> General -> International -> Regional Format -> (Select the desired Language (Below selected is Hindi)). Both the Numeric and Text is displayed in selected regional format.