Automatic Stock replinshment using production order

Dear Experts
Our client wants to trigger Production order for material automatically once stock reaches below reordering point.
MRP TYPE : V1
Lot Size: FX { Reordering point 200 Fixed lot size 600}
My understanding is only MRP run creates Planned order and using PPBICO40 Production can be triggered automatically.
Clarification need on : Whether production order can be created once material stock reaches below reodering point regardless of Sale order or MRP run.
Please guide me
narayanan

hi,
Your perception is right, It is not possible to create the production order directly with MRP.
Regards
Shekhar

Similar Messages

  • Automatic Batch Determination   in Production order

    Dear All,
    We are using automatic batch determination is based on FIFO (first Mfg first out) for components..After releasing the order.
    I have maintained Batch Class in all the materials which are used as a all material special Characteristic LOBM_HSDAT as a one of the class characteristic. as we want batch determination  on GR date for few material and for few material LOBM_VFDAT for self life material and its class.
    Then create Sort Rule CU70 mainatained the same LOBM_HSDAT in it. and one with LOBM_VFDAT.
    Then create Batch serch Strategy (USE T.Code COB1- search strategy CO01the respective sort rule and selection critoria.for All ROH HALB and Finish material.
    In Material Master of all component in MRP 2 view select value 3 (Automatic Batch Determination) for BATCH ENTRY. All ROH HALB and Finish material
    After mainting above all prerequisite I should able to do the Automatic Batch Determination as per my selection Rule.
    But Automatic Batch Determination  in Production order after release is not working.
    Please need your help.
    Regards,
    Manish
    Edited by: manish gurnule on Dec 30, 2008 5:26 AM

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    Madhu

  • Valuated Sales order stock with CO Production Order

    Dear All,
    Our clinet is manifatcuring cables and having  2 plants, for one plant we have configured PP module so we are arriving valuated sales order stock, for another plant we didnt configured PP module so we planned CO production order, but where as we are not meeting our ultimate goal i.e; valuated sales order stock.
    So please guide me how to arrive valuated sales order stock  with CO Production Order.
    Thanks & Regards
    Narasimham T

    Valuated sales order stock is not dependent on PP, so you should be able to still to use it.  The requirements class associated with the sales order item determines whether the item is valuated sales order stock and it also determines the valuation method.  If you do not have Boms and routings in this plant you can still value the line item based on the material valuation in the material master. You can also value it based on a unit cost estimate that can be created seperately for the sales order item.  Justt make the desired settings in the requirement class.
    thanks,

  • Exclude stock reserved for production order from availability check

    Hi Experts,
    We have a problem in the availability check.
    There is a material used as selling product and components in the same time.
    When the material has been reserved completely for a production order, the new sales order still get confirmed despite there is no physical stock at all!
    Please advise how to exclude the stock reserved for production order from the availability check in sales order? Many thanks!
    Regards,
    Qiang

    Go to MM02 and check what availability check is maintained for that material.  Next go to OVZ9, select that available check with the combination "A" and maintain "X"  or  "F"  in the field  "Incl.production orders".
    thanks
    G. Lakshmipathi

  • CM25 : adjust setup time automatically when i dispatch production orders

    Dear guru ,
    I dispatch the production orders according to a specific sequence.
    After the dispatching I can adjust setup time automatically using setup matrix.
    Does exist a chance to adjust setup time automatically when i dispatch production orders ?
    Thanks.

    no replies

  • Automatic batch management for Production order receipt

    Hello ,
    I have a requirement to setup & activate Batch Management only for Production order Good Receipt . I am looking out for what all configuration / data setup will be required to complete this .
    To start with I have following questions .
    1. Whether such activation is possible only for Production order Good receipt - 101 mov.type
    2. IF yes , is Batch management activation status be at material or plant level .
    3. As I need automatic assignment , should I be selecting Internal batch management .
    4. What should be selected for valuation for Goods movement in Inventory management.
    5. Is it necessary to have batch determination by maintaining Condition tables / Access sequence
    6. What would be standard Class / characteristics to be maintained for automatic determination.
    Also I will have to work with the running system where Material are already active and have stock in system . What precautions will I have take if I have to activate the Batch Management in a running system.
    Appreciate all your expert advise.
    Regards,
    Lawrei

    Thanks Adler for your comments .
    With reference to your point , need further clarifications
    1. If batch management is selected to material , this means that it will be active for all movement types for Inventory and cannot be restricted to 101 mov.type .
    I see that in config node
    +Define Batch Creation for Goods Movements+
        +Using this function, you can define for each movement type whether a new+
        +batch is created for a goods receipt and how it is created.+
    Can I not restrict batch creation only for 101 movement , but again here I don't have options to select only for Good receipt for order - Tran/Ev type - WF .
    & what about below config node
    +Define Batch Creation for Production Order / Process Order+
        +In this step you can make the following settings in batch management for+
        +the existing production control profiles:+
    Is it possible in this node .
    Please advise.
    Regards.
    Lawrei

  • Special stock indicator in production order

    Hi,
    We have a new business scenario from sales department.
    For example, A is a MTO item, it has component B & C. Now there is a sales order for A come in, and system create a production order, but there is no enough stock for B. They want to:
    1, Allocate C to the production order and other production order or sales order can not take it away via V_V2 or MRP run.
    2. Create another seperate purchase order for B and want this purchase order also allocate to this production order.
    3. They do not want to use WIP stock because it is difficult to display WIP stock in SAP you know.
    I trying to use the special stock indicator "E" for components in production order, and I move C to custom stock via 412 E with no issue.
    But when I create a purchase order for B with account assignment "F",  it goes to normal stock in MD04. After I post GR for the purchase order, the quantity goes to production order directly, does not show in MD04 and did not reduce the requirement quantity.
    If I create a purchase order for B with account assignment "E", it gives an error message "Sales document item is not defined for the transaction. I tried to change the requirement type from "KMFA" to "KE" in the sales order for A, and the production order disappeared, it is not accepted.
    How should I define and configure the process?
    Thank you so much.
    Albert

    Hi Albert
    I suggest you to take a look on the setting "individuall/collective" on the tab MRP4 of the material master.
    For both components, you should set the value 1 and system will always plan the components under the sales order special stock.
    BR
    Caetano

  • How to create the Batch Automatically during creation of Production order

    Hi All,
    I wanted to create the Batch Automatically for the Specific order type during creation.
    Not for all order type so OPKP transction will not work for me.
    Please suggest any way or user exit any production order.
    Thanks,
    Amit Shah

    Hi All,
    Thanks for your inputs.  
      1. Why we want create the Batch Auto -
          For Std Production Order type we want to generate Batch Automatically.
          For Re-work Production Order type we don't want Batch Created Auto.
          If you have better solution please let me know.
    2.  Scheduling profile.
          I think I misunderstood your solution.
          You want to say that mainatin the Schd profile in the SPRO with repect to Sub Schdler.
          Already client is maintaining the Schd Profile in the Material Master.
           please correct me if i am wrong.
    Thanks,
    Amit Shah

  • Purchase order for stock material in production order

    Hi
    does anybody know how to link a purchase request to production order in case of stock material ? When MRP runs aggregate all requirements for stock materials in one purchase request, and I wold like to find list of order that generated the request,
    thanks
    Gabriele

    Gabriele Montori wrote:
    >
    > 2) I would like to know if there is a way to bind purchase request to Production Order (not planned order) BEFORE the MRP runs and create a Purchase Order, because when creates a PO for stock it aggregates all requests in one order.
    I think I understand what you are trying to achieve -> this sounds like you would want to do what SAP standard would do with KD/E-requirements (customer specific) = every material=item=position in a SD-order will create it's PR or production order. In the same way you want to generate one PR-item per production-order component - wait! - Maybe you want to create a single PR for every component in the production order???
    Gabriele Montori wrote:
    >
    > I hit that road but for stock material, RESB-AUFNR is left empty in table..
    You will have to talk to your MM/PP-functional ... if you do not have RESB-entries I have no idea how this process is setup. You probably do not have components in those production orders, only one header-material (CAUFVD-MATNR).  Depending on what is configured in the material-master MRP views + what modifications/enhancements are installed around the complete process, you could have almost any setup. It's impossible to say without seeing it. Make sure s/he explains to you exactly, since even with different stock-materials there could be different setups for procurement.
    Edited by: Mylène Dorias on Jul 22, 2010 11:37 AM

  • Special stock indicator in Production Order Component overview

    Hi  Team,
    I have one finished product , for which i have created BOM . It has only one component in it .
    Now i am creating a Sales order , based on the definition and requirement set , system is creating a production order in background.
    When i go to production order and see components overview screen , there is one field special stock . This is getting filled with '1'  - Individual customer stock always. 
    Even though we have stock in storage location , it is expecting components to be in Sales order stock . 
    If i create a stand alone production order for same materials , there is no special stock indicator set in components .
    Can any body let me know how is this special stock field getting populated and what settings has to be reviewed in order to supress the same.
    Thanks,
    sudhakar

    Sudhakar,
    Check the MRP parameter 'Individual/Coll' in MRP4 view for the components. This should be set as 2 for collective planning. If this flag is left blank then planning will be based on the parent material (If the parent material is planned for special stock then the components will also be planned for special stock)
    Let me know if this helps.
    Thanks,
    Jaison

  • Changes not reflected in table CDHDR/CDPOS using production order(CO02)

    Hi experts..
    i want to extract all the changed\new entries from table RESB (reservation table). The object class for this table is ORDER. I m using CDHDR/CDPOS tables for retrieving the changes. But the changes reflected in RESB using Service Order transaction (iw32) only is getting updated in CDHDR/CDPOS, not through Production Order transaction (co02). Any idea about this problem ?

    Hi,
    Refer this wiki code ALV Grid Display with checkbox to process selected records at runtime, it will definitely help you:-
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/snippets/alv%252bgrid%252bdisplay%252bwith%252bcheckbox%252bto%252bprocess%252bselected%252brecords%252bat%252bruntime
    Regards,
    Tarun

  • Automatic GR Problem for Production Order - Missing PARTS

    Hello
    Stocks are available in the QA stock, The Availability check is considering this stock also, but during Production order confirmation,( CO11N)  we are getting error  message missing parts , we have two problem
    1) we don't want to consider the different storage location / QA stock for availability check
    2) Once we transfered the stock to Unrest stock , we can't do CO11N , we have to do manual GR / GI , how to overcome this.
    Thanks
    Ni

    Hy Nick,
    For your First Qustion,
    For this go to OPJJ - Avaibility Check Control
    Select Chcking Group which you have assign to your Order type
    (OPJK) and remove tick from Incl. QI stock.And for Storage location don't tick No Storage Location after doing system will check Material availability in only production storage location (Which you have maintain in MRP - 2 view of Material Master) .
    For pop up option, go to T.Code OPJK Slect your Plant , Order type and option 1 or 2 (At the time order Creation or Release).
    Material Availability checks,
    Don't tick No check option,
    This setting will give the option of Pop up screen with Massage of Missing Parts.
    For your Second Question
    Sorry still I still don't under stand your Problm.
    But I guess you want to restrict the GR until GI is not done due to Missing parts.Correct or not?
    If yes then do the below settings,
    go  to t.code OPK4 (Parameters for Order Confirmation):-
    Go to second tab General Individual Entry,
    Tick Goods Movement selecttion and then also tick Terminate for Incorrect Goods movement.
    This setting will help to terminate any confirmation for which goods movement containes any error.
    Hope it will help to solve your problem.
    Regards,
    Dhaval

  • Automatic TECO of a Production order

    Dear All,
    Once i do confirmation of last operation ie Goods movement as Final confirmation then
    Production order status should change from REL to TECO automatically.
    Pls guide me how to achieve this?
    Thanks

    Dear Mangalraj & Sabrine,
    Tried with BADI Workorder_cofirm order workorder_save.
    After final conf while clicking SAVE system is not returning
    DLV before saving. DLV comes after saving.
    ABAPer says no return code of DLV.
    Pls suggest some other USEREXIT or BADI
    It's urgent req of my Client
    Thanks

  • Stock determination for production order

    Stock determination is not carried out during production order release.  I checked config (OSPX) and it looks fine.  Any clue where else I should look inorder to correct this issue.
    Thanks

    Hi,
    After checking all the necessary configurations in OSPX, check following also.
    SPRO > MM > Inventory Management and Physical Inventory > Stock Determination > Assign Stock Determination Rule in the Applications > Production Order > here Enter the plant, order category and business operation and Enter the type of check (no check, checking rule).
    here select the operation as;
    5 - Check during batch determination
    And in CO01 (Production Order), go to "Components" overview and here click on "Batch Determination" button and then check.

  • Automatically Create Hyperlink Using Product Name in Document Text

    Hi,
    I've recently been told that all the product names in our PDF documents from here on out have to link to their product pages on our web site. This is a problem because any given document could contain dozens or a hundred references to products. Before I try my first attempt at creating an Indesign Script (on something that sounds kind of complicated for a novice like me) I was wondering if there any existing scripts out there that do something like the following:
    Find all instances in the text of product names beginning in AD and ending in either a number (digit) or the lowercase letter "x."
    Style those instances in a predefined URL character style (basically styling it in blue).
    Create a hyperlink to the product page using the product name found in the text. Taking the product name--AD4056, for instance--and creating a hyperlink by adding http://www.corpsite.com/ to the front of the URL and adding the product name to the end.
    So the end result, for example, would be that a product name like AD4056 would be set in the URL character style, and would have hyperlink added that, when in the exported PDF, would take you to the product page, http://www.corpsite.com/ad4056.
    It seems like it might be a relatively common problem, so I'm hoping that someone out there may have a resource already available. Oh, I'm on Indesign CS5 on a PC. Would prefer Javascript so our vendors could use it on a Mac, but PC-centric is OK too. If not, I'll get to crackin' on making it myself.
    Thanks in advance for any pointers!

    Here you are. As you see, it's quite complicated -- InDesign needs a destination URL, a virtual hyperlink, and an instance of this virtual hyperlink. All in all it took me a couple of tries before I got it right. (It didn't help your example URLs don't exist yet )
    d = app.activeDocument;
    url_style = d.characterStyles.item("URL style name");
    app.findGrepPreferences = null;
    app.findGrepPreferences.findWhat = "\\<AD\\w+[\\dx]\\>";
    sourceList = d.findGrep();
    for (l=0; l<sourceList.length; l++)
         link = d.hyperlinkURLDestinations.add ( "http://www.corpsite.com/"+sourceList[l].contents);
         d.hyperlinks.add ( d.hyperlinkTextSources.add (sourceList[l]), link ).name = sourceList[l].contents+" ("+l+")";
         sourceList[l].appliedCharacterStyle = url_style;

Maybe you are looking for