Hi to all;
I have one development system and two QUAs systems. If I release the order go to two QUAS systems.
I need for example if import manually the order in the first QUAS system, that automatic the order will be import in the second QUAS system.
It´s possible? any help or idea?
Best reagards

So in that case what you can do is change you STMS setting a little bit. So you setting would look something like this :
DEV -> QA1 -> PRD
           -> QA2
So DEV to QA1 and then once transport is imported into QA1 then it will be added to the queue of QA2 and PRD.
In this way untill and unless the transport is not imported to QA1 it will not be imported automatically to QA2 and for PRD you can always use whatever your process is.
Hope this helps.
Thanks,
Naveed

Similar Messages

  • Automatic Transport Mechanism to four systems in same landscape

    Hi,
    We have come across a requirement where we need to transport a request to four systems instead of traditional three.
    The systems involved are - DEV (Development), QAS (Quality), PRD (Production) and TRG Training).
    Currently the transport route is setup for three systems and we need to add the fourth one - Training system. The solution we are looking for is once the request is imported in Production it should be imported automatically in Training system, without any manual intervention.
    The version being used in ERP 5.0.
    Any input in this reagrd is much appreciated.
    Regards,
    Rajeev

    Hi,
    You can configure the transport route accordingly
    Then Click on the system where you want to schedule the auto import job (Training System ). Once you are in the import queue of that system (Tranining ), click on import all request (Big truck). After choose option - at start time and give a period say from today 7 AM and then choose the period option like (every 15 mins) and save this. It will release a periodic job running every 15 mins in your system with the name TMS_00000000XXTMS_TP_IMPORT.

  • Help needed on movement of transports between two production systems

    Hi All,    
    Our client is implementing SAP in US and Europe and it has separate production systems for both. It already went live in US and now started SAP implementation for Europe. They wanted to leverage the development & configuration done for US in Europe implementation and have taken the copy of US development box and started building on that. For Europe, they identified few changes to the existing custom objects from US,  few objects from US which are not required and also brand new objects. Going forward, they also decided to import all the defect fixes and changes from US into Europe system on a regular basis(monthly).
          If anybody has experience in an environment like above, please let us know the pros and cons with the approach highlighted above.

    Differentiate thru trasports requests and move the correspoding cofiles and Data files in required system and import as suggested earlier.
    Thanks

  • Process chain - Two source system issue

    Hi Experts,
    I face problem when i transport a process chain from BW DEV to Quality.
    I have two source systems in Quality ECI and EXS.EXS is a sandbox server(Source system) which we no longer use.
    When i transport the process chain from DEV to QA, i get two DTP's automatically added to Process chain in quality for two source systems ECI and EXS whereas i do not want the data to be loaded from EXS client.
    I checked the BW dev system, it has only one DTP in the process chain.
    Now I want to elminate the other DTP in the process chain in quality.
    Please suggest.
    Regards,
    Srini

    I Dont think so a DTP for EXS system has got created automatically when you transport the PC to QA (which actually doesn't exist in DEV).
    Please check you DEV system once again, there might a DTP from EXS system also.. other wise go the Release TR and then check the contents-->iif you find two DTP's there then it is there in the dev system..
    Any ways if you want to delete the other DTP from the PC in QA.. you can Delete it directly from the PC itself.. Goto change mode of the PC and then select the DTP which you want to delete-->then right click and hten Click on Remove Process -->then activate the PC..
    Note: You might have authorization to edit the PC in QA then only you will be able to do the changes..

  • DEV- QAS : Obligatory transport target for business system not found

    Hi guys!
    I have read all the other threads about this subject, but since I still have no success, I´m feeling obligated to ask you for a help (deadline approaching fast!)
    I´m trying to transport a Communication Channel, from DEV environment to QAS. I'm having the 'usual' error:
    Import failed because of business system transfer of object Communication Channel * | SIGA | SOAP_SYNC_SENDER: Obligatory transport target for business system SIGA not found in System Landscape Directory
    Here were my steps:
    Keep in mind that in DEV, everything was up and running: Software Component, Product, Technical System and Business System for this name "SIGA".
    1 - In DEV, I created a new Technical System, named "SIGA_QAS", pointing to my QAS server. (Keeping in mind I already had a "SIGA" pointing to my DEV server.)
    2 - Still in DEV, I did create two groups: GROUP_DEV and GROUP_QAS, one points to INTEGRATION_SERVER_DX1 (DEV) and the other INTEGRATION_SERVER_QX1 (QAS).
    3 - Still in DEV, I created the Business System called "SIGA_QAS" also, pointing to my QAS server.
    4 - Still in DEV, I went inside both Business Systems and put: "SIGA_QAS" as TARGET BS of "SIGA" (which automatically puts "SIGA" as SOURCE BS of "SIGA_QAS")
    If I look at my QAS SLD, I can see all of these objects already there, since my BASIS team did activate the 'sync' between these two environments. So, I dont need to create anything 'new' in my QAS SLD, all the objects are there, same as DEV SLD.
    If I try to EXPORT/IMPORT a simple Communication Channel (using file system or even CTS - I tried both) I get the error mentioned above.
    But this is 'wierd' for me, since the error says: "business system SIGA not found in System Landscape Directory", but it is there, in both SLDs.
    Am I missing something here?
    Thanks!
    Ricardo Sancio Lóra
    Brazil

    Hi,
    If you not tried this then try it. Delete the Business System SIGA from Integration Directory in your QAS system and then again import the business system from SLD. Acitvate the changes and then import the CC from Dev to QAS.
    Regards,
    Sarvesh

  • Transfer Rules for two Source System in Production

    Hi All,
    I have a question.
    I have source system ECDCLNT230 (ECC Devlopment) which is connected to BIDCLNT200(BID Devlopment) I have two production source system ECPCLNT410 (ECP Pre Production Client) & ECPCLNT400 (ECP Production Client) which i want to connect with BIPCLNT400. when i transport my content from ECDCLNT230 to ECPCLNT410 and ECPCLNT400 , it works fine. i created 2 source system in BIPCLNT400 and replicated data source in to BIPCLNT400 so all data source has replicated.
    Now when i transport the request from BIDCLNT200 to BIPCLNT400, i need two transfer rules, two transformation one for each source system. for that what kind of settings are required.
    Thanks is advance.
    Regards,
    Komik Shah

    Hi,
    If I understand correctly, in your BW Production system, you want to connect / load data from your ECC Pre Production and Production system.
    In this case, to automate the transport needed for changes of transfer rules for both source system, you will need to have two tranfer rules in your BW Dev. You can either create two source system in Dev pointing to the same ECC Dev system, or one to ECC Dev and the second to ECC QA. Use different name for this two source system.
    In BW Production, you then then maintain the source system conversion of both source system.
    Thanks.

  • CTS+ : Error while importing transport into Portal QA system

    Hi All,
    we have configured CTS+ for Portal systesms, then we have created a
    test transport in Portal Development system (PD5). SOlution manager is the communication systesm. We are also able to release this transport from transport organizer web UI.
    This tranpsort is available in transport queue of Portal Qua system , but on importing this transport in PQ7 we are getting following
    error
    Problem during file access, stopping. Error is:'The file (/usr/sap/trans_SM/data/PD5K900003/Test_CTS_20110215_031956.epa) does
    not exist on the filesystem.'.
    We have checked in /usr/sap/trans_SM/data/PD5K900003/ file
    Test_CTS_20110215_031956.epa exist.
    CTSDEPLOY and sap.com/com.sap.tc.di.CTSserver connection are working fine.
    Kindly suggest.
    Regards,
    Akhilesh

    Error is
    puhi078:sp5adm 54> more PD5T900003.PQ7
    59y0C1 ETP199X######################################
    1 ETP189 DEPLOYMENT
    1 ETP101 transport order     : "PD5K900003"
    1 ETP102 system              : "PQ7"
    1 ETP108 tp path             : "tp"
    1 ETP109 version and release : "372.04.71" "701"
    1 ETP198
    2 EPU601X"CTS Import Service - Version 0.94" "04.04.2008" " " " "
    2 ETW000 ========================================================================
    2 EPU601 "Deploy web service destination =" "CTSDEPLOY" " " " "
    2 EPU601 "Directory =" "/usr/sap/trans_SM/data" " " " "
    2 EPU601 "SDM Deploy URL =" "http://cqhepad1.contact-energy.co.nz:50018" " " " "
    2 EPU601 "SLD Deploy URL =" " " " " " "
    2 EPU601 "XI Deploy URL =" " " " " " "
    4 EPU607 Non-ABAP system "PQ7" (communication system "SP5")
    1 ETW000 Start import with id:4D5ADEC1C8D6540AE10000000ACE01D3
    4 ETW000 DeployProxy (patch level:0) called with following parameters:
    4 ETW000 Deployable(0)
    4 ETW000 Deployable-Type:0
    4 ETW000 Deployable-Id:4D5A0D6A05111633E10000000ACE01D3
    4 ETW000 Deployable-TransportContainerId:PD5K900003
    4 ETW000 Deployable-ContentLocator:/usr/sap/trans_SM/data/PD5K900003/Test_CTS_20110215_031956.epa
    1EETW000 Problem during file access, stopping. Error is:'The file (/usr/sap/trans_SM/data/PD5K900003/Test_CTS_20110215_031956.epa) does not
    1EETW000 exist on the filesystem.'.
    3 ETW000 End import with returncode:'12'
    4AEPU601 "Highest Return Code =" "12" " " " "
    1 ETP189 DEPLOYMENT

  • Transports - automatic transports

    Hi Friends,
    For automatic import of transports to QA , i have schedule the below job
    TMS_00000001IMP.ALL ,
    This job is finishing with the below  error
    Transport control program tp ended with error code 0212
    Diagnosis
    An error occurred when executing a tp command.
      Command: IMPORT ALL  pf=/usr/sap/trans/<SID>/bin/TP_DOMAIN
      Return code: 0212
      Error text: could not access file as supposed (see dev_tp or S
      Request: ALL
    System Response
    The function terminates.
    Procedure
    Correct the error and execute the command again if necessary
    I have checked the permissions and corrected the same. But still i am getting the same error. Hence the automatic transports to QA is not working.
    Please some one help me to correct the same.
    Thanks
    anup

    Hi,
    What the SAP system's TP system Log is telling ?
    (STMS->Overview->Imports-->click on Goto -> TP System log)
    Operating System ?
    Regards,
    Bhavik G. Shroff

  • Problem during import of 121 transport requests to productive system

    Hello
    We have problem during import of transport requests to productive system. Import of 121 transport requests stopped very soon in phase "N" (in TRBAT I have only one entry and in  TRJOB  as well).
    In sm50 there is an BGD running under user DDIC in client 000 now for 14453 seconds (program SAPLSDB2). This should be import.
    In SM37 I can see it as  job "RDDGEN0L" with  repport"RDDGENBB". Based on some literature it should perform "Converting all structure changes generated by the import and recorded in table TBATG, other than the structure changes to matchcode objects." Very interesting  that TBATG has only four entries related to 2 indexes in table "DFKKOPK" , one in table "DFKKREP06" and one" ENQU" for EFKKEXC". (only this last one has not status error)
    For fist two indexes I know they are not present  as objects "LIMU""INDX" in any transport request beeing imported.
    Also on productive system there is no"VOL" and "ZOL"indexes for table "DFKKOPK"(instead they are created on test system ie. not transported from development to test system)
    Last command for that process is "CREATE INDEX "DFKKOPK~HKO" ON "DFKKOPK" ("MANDT", "HKONT", "OPBEL") PCTFREE 10 INITRANS 002 TABLESPACE PSA
    PTR3 STORAGE (INITIAL 0000000016 K NEXT 0000000016 K MINEXTENTS 0000000001 MAXEXTENTS UNLIMITED PCTINCREAS"
    There is enaught space on disk and in tablespaces (it is an oracle/HPux server).
    Does anyone knows workaroun to solve production

    are you importing these transport requests simultaneously into production?
    I would suggest you try doing in smaller groups of 5 or 10 and then see whether you are able to import the requests
    Rohit

  • SLD: Pointing two business systems to the same client...

    Hi Guys,
       Is there anyway to make two business systems point to the same client(on the same r/3 technical system)? how about a work around?
    Thanks,
    Harsh

    Harsh,
    >><i>Finally all collapse to one client in production.</i>
    Even though you will have multiple Business Systems in every envrionment, the final transport will happen from only one environment.
    DEV --> QA --> PROD. In this case, objects are moved from dev to qa and then from QA to prod and so, all you will need is the trasnport target created in the QA business systems pointing to the Prod busines system and do the transport.
    ><i>While transporting to a new SLD(quality to prod) can I choose one transport target for multiple source business systems?</i>
    Take a look at this document for multiple SLD transports. Should answer all doubts,
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9e76e511-0d01-0010-5c9d-9f768d644808
    Regards,
    Bhavesh

  • Two source system in RSA1

    Hello All,
    I have the following scenario.
    I have two source system ECDCLNT200 and ECDCLNT230 and one BI system BIDCLNT200. client 200 is used for configuration and  client 230 is used for data loading and validation.now firstly  i created source system ECDCLNT230 in RSA1  then it comes under SAP menu but when i try to create ECDCLNT200 in SAP Menu it comes automatically under BI menu. i deleted it and tried again but the same problem is there.
    if i remain the same configuration means ECDCLNT200 under BI menu then will it create any problem in future ? or if i want to create ECDCLNT200 under SAP menu what is the otheroption ?
    I tried both the way. first i rightclick on main node and selected create source system and second time i right click on SAP and select create source system but couldn't create it.
    Please let me know the solution.
    Regards,
    Komik Shah

    Thanks vincent,
    i got the solution through SAP note.
    I have assigned the points.
    Thank you again
    Regards,
    Komik Shah

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Automatic transport not working

    Hello,
    Could you please help me.
    after the offline backup, the automatic transport from DEV to QAS not working.
    when i check the tools transport on STMS , i tak this error.
    DB Connect ==> Link to database failed.
    Offline call ==> connect failed
    Best Regards,
    nana

    Have you automated the import process in DEV 005 ?
    Then the job will be running in the system.
    TMS_0000000003TMS_TP_IMPORT.
    Regards,
    Raja. G

  • How to synchronize two applications system

    HI,
    I work witj Designer 9i, in a Non-versioned Repository. I create a copy of an application system on the same repository.
    I would like to know if there is some mechanism that will synchronize the two application system copies. What i want is how to automate the replication of any modification I made to the copy, in the original application.
    Thanks for your help,
    Malika

    Hi Roel,
    I want to do this because in our organization the repository is non versioned, and we want to make copies for the application system in purpose to sure that only Data modeler and DBA will access it. The developers can't update it. In the original application system we will replicate the changes and then developers go on with their Treatment modules.
    Thanks for your reply ,
    Malika

  • Integration Directory Objects Transport Using the File System

    Hi
    I am trying to do the IR and ID Objects Transport Using the File system... I am able to Transport the IR Objects and IMport in to QA ... but when i try to Import ID objects its giving me the error...bcoz all the ID objects pointing to theSAP R/3 DEV system ( Interface Detremination, receiver determination ...)... do i have to config something in SLD ..so when i import the ID objects in to QA system it points to correct SAP R/3 QAS system...
    and we are using single SLD for all the DEV , QAS and PRD system
    SV
    Edited by: S V on Oct 15, 2008 4:08 AM

    Hi,
    You will have to configure transport targets like for different business systems in your dev environment, there shouls be corresponding Business systems in QUA environment. For more details refer the link
    http://help.sap.com/saphelp_nw2004s/helpdata/en/ef/a21e3e0987760be10000000a114084/frameset.htm
    Thanks!

Maybe you are looking for

  • Windows slide under Menu Bar

    I've noticed recently that I can make application windows slide under the Menu Bar.  Some slide under then 'snap' back into view when I release the mouse button holding the window down.  Others that don't display the grey bar at the top of the window

  • Sales Order in ATP in ECC

    Hi All, While executing Sale order in the R/3 system we are getting this message. Error in calling up function 'BAPI_APOATP_CHECK' in APO server 'xxxx': Exception condition "OM_ERROR" raised. In SMQ1 in ECC -- Outbound Queue blocked the 3 Queues for

  • Selection screen issue with hierarchy variable, due to compounding

    Hello people, I'm having this odd effect with a Hierarchy variable in the selection screen of a query,  the IObject is 0PROFIT_CTR. When I display the hierarchy values and pick up one of them, it returns ok to the sel.screen in this format: CO_AREA +

  • ECS and SECess in J1IIN

    Dear Experts, For Domestic sales Value of ECS and SECess is captured in J1IIN. But only for Export Sales ECS and SECess is not reflected in J1IIN. Kindly advice. Regards, Prashant.

  • [SOLVED] No internet after fresh install on laptop

    After working mostly on windows and a little on some linux distributions like Mint and Ubuntu I wanted to move on to Arch Linux after a lot of discussions about it with colleagues and my gf. I managed to install it succesfully on my desktop and every