Automatically pick material master unit of measure conversion to routing
I maintain finish goods conversion factor in material master u201CAdditional Data: Unit of measureu201D as M to KG and basic unit of measure for finish good in material master is in KG.
I attached multiple operations for the finish goods material in routing.
Some operations base unit of measure is M and others its KG.
I want to pick material master unit of measure conversion automatically when Iu2019m creating routing for the finish good material in ca01. (Unit of measure conversion for header and operation of the operation)
Can anyone letme know the SAP configuration for this.
Hi!,
Please expalin about the purpose of this requirement, because when you will create a order using that routing, at that time system will definately do the unit conversion automatically.
Regards,
Uday
Similar Messages
-
Component material costing (Unit of Measure conversion) is not working at S
Hi,
Unit of Measure conversion factor (Value) is not working for component materials at Sales order level costing, but the same conversion factor is working fine at Standard cost estimation level.
Example:
Conversion Factor for Raw materials (Procurement in Tones, Consumption in Each)
1 Ton (Rs.1000) = 10 Each (per Each u2013 Rs.100)
For Manufacturing of 1 pc FG is required 1 each Raw material
Issue: At sales Order level - Raw material costing is calculated at u201CTonu201D price u2013 Rs.1000 instead of u201CEachu201D price u2013 Rs.100.
Regards
NageshHi,
Pricing (unit conversion) is done different for MM and SD process.
MM has decided to use the old process which determines the values out of T006. There you have the conversion factors which are used in PO. If you create a sales order or billing document the determination will be different as the material master will be read.
regards
Waman -
Material Master Unit Of Measurement Changes Clarification
Hi
We have a material master with base unit of measurement as FT in basic data 1 view.
For this we have already some purchsing documents like PO's and PR's
But currently we dont have any open PO (or) PR and stock in system.
Still we could not change the base unit of measurement from FT to M..
Why?
VijayHello All,
The error shows some of PR's and PO's numbers.
when i check the material in table MBEWH i can see some of the stocks for previous period like year 2009 and the period 06 and some of the previous year like 2008 and 2007 also having some stocks.
Now advise.
Vijay -
Report on material code, description and all unit of measure conversions
report on material code, description and all unit of measure conversions ?
any ideas?Material Number MATNR
with this key and SPRAS (the desired Language key)
from MAKT you can get the descriptions..
and with MATNR from MARM you can get alternative UOM and the conversion rates.
If you need help on MARM how to get the conversions please notify.
Hope it helped
Please reward if found useful
Best Regards -
Decimal in Unit of Measure conversion
Hi Gurus,
I want to enter decimals in Unit of Measure conversion. System is giving the error that "Decimal not permitted". Actually the scenario is we have a material with KG as a base unit of measure. The ordering unit is "L" litre and the conversion factor is:
1 Litre = 0.792 KG
But when I am going to enter the conversion the system is not allowing to enter decimal. What I need to do in the configuration to enable the decimal entry.
Earliest response will be highly appreciated.
Thanks>
Imran Khan wrote:
> I have entered 1000 Litre = 792 Kg, but when I order 1Kg, system is converting it into 12.62 Litres.
>
> Thanks
if 792 kg equal to 1000 ltr,
then 1 kg equals to 1,263 ltr.
when do you see this "conversion" to 12,62 litres? in ME21N after you entered 1 KG?
if yes, then your order unit is probably set to liter, further check if you have a rounding profile in material master or info record, that causes the switch from 1,26 to 12,62 -
Unit of measure conversion for CIN is not relevant for pricing
During creation of Ad item type order, when we enter the planned ad size e.g. A CO (Columns) x B IN (Inches), the system is showing a message "Unit of measure conversion for CIN is not relevant for pricing" and pricing is not determined in the Billing Data Set. However if the planned ad size is maintained as A CO (Columns) x B MM (Millimeters), there is no impact to pricing conditions.
Any light how to fix this issue?
Thanks,
Suseela. VDear Suseela,
You need to maintain Unit of conversion using transaction code JH51. You have to follow the path Logistics-Advertising Management-Master Data-Conditions-Order/Billing Document-UM for Pricing.
Here you can maintain combination using Booking Unit, Content Component, Design type and assign Unit of Measure to get relevant pricing into billing set conditions.
Hope it will help. Thanks!
Regards
Indra -
Error in units of measurement conversion "BOM"
hello gurus gudmorning everybody
i have problem in project regarding the units of measurement conversion BOM
this is the scenario: 1000 ft2( BASE UNIT MEASUREMENT) = 1ea ( SALES UNIT) ( 2bed room flat) it is a higher level item
sub items are in EA base unit measurement ex: like one sofa one air conditioner etc instead of taking sale unit measurement of higher level item , its taking base unit mesurement of higher level item , .i.e instead of taking 1EA 2bhk = 1AC, 1 SOFA, but is calculating 1000ft2( 2bhk) = 1000ac, 1000sofa , plz help out to rectify the conversion
thank you in advance
venkatDear Venkat,
Try with this
Please maintain the alternative unit of measure in sub itemes master data at Additional tab like this
in AC master data 1EA = 1AC and 1AC = 1EA 2BHK
in Sofa master data 1EA = 1 Sofa and 1Sofa = 1EA 2BHK
Now you try
I hope this will help you,
Regards,
Murali. -
Unit of Measure Conversions.
Hi All, I have Unit of Measure Conversion requirement in my reports, I would like to create a variable and user has an option to choose the Target UoM.
For this I have referred RSUOM T-Code and got an option to create Target UoM Variable (Specifying Target UoM using a variable) but here my proble is, have to do conversion across dimensions as below.
Unit of Measure conversions that I have across dimensions (all conversions both ways):
tonne to kilotonne
1000 GJoule to Million GJoule
kilotonne to Million tonne
tonne to Million tonne
kilogram to tonne
tonne to barrel
kg to liter (spill)
tonne to gallon
Could anyone tell me, is it possible to do conversion Across dimensions? (i.e Mass to Volume), if itu2019s possible where we need to maintain the conversion values.
I am not able to see any table which holds the values of Unit of Measure, I saw T006 but could not able tofind any info.
Thanks in Advance.Hi Kalyan,
To convert from kg to litres you need material specific information like relative density .
It can not be done with common values in UOM-conversions.
e.g. the relative density for lead (11.35 kg/ litre) is different from the relative density for water (1 kg/litre)
1 tonne = 1000 kgs for every material.
Udo -
Routing - decimal places for unit of measure conversion quantity
Hello all,
in the change routing screen in SAP (CA02), when going to a operation detail screen, a unit of measure conversation value can be defined. A value for header and operation can be made.
Currently we cannot set any decimal values for operations, I get the error message: "decimal places are not permitted."
Where in customizing can I change that?
Thanks
AnneHello,
thanks for the answers.
The UoM is LB.
I've already checked CUNI, but I can not find LB..?
Also I've noticed other places in SAP, for example the base quantity of some operations in the routing have a numbers with 3 decimal places and the same UoM LB, so this looks like the UoM is setup fine, maybe there are just problems with this special screen?
Thanks
Anne -
Routing unit of measure conversion
Dear guru ,
I have a different unit of measure for one operation of my routing.
Which is the problem if I maintain relation 1 to 1 in the routing unit of measure conversion ?
Thanks.Dear ,
One operation of my routing have a different unit of measure (EA for operation , KG for routing).
I don't know the exact conversion factor between operation and routing.
This factor is only known after the confermation of the production order.
Which problem occurs if i maintain relation 1 to 1 (numerator and denominator) in the routing unit of measure conversion.
Thanks. -
Detemine Profit center in PO automatically from Material Master
Dear All,
I would like to determine the cost center in SAP PO automatically from Material Master, Since we are putting the Profit center in Marterial master in Genernal Plant /Data 2 View.
And this Profit center is linked with the cost center with 1:1 relation.
So Please advice on this .
SukhvinderHi
there is no stander way to achieve this you may get by some enhancement
Yes,If you have profit center in material master then you will get your profit center display at time of MIGO, not in PO
and If you have account assignment categories in PO then you can get profit center display in PO on account assignment tab
for that you have to change setting in OME9 for your account assignment and for display profit center field in setting
Regards
Kailas ugale -
Material Ledger Unit Of Measurement different from Material Master
Dear Team,
In my client, there is a difference between unit visible in CKM3N and MM03. The base unit of measurement in MM03 is MT. Other than that, there are some other units maintained (not M3) in additional data tab in material master. In CKM3N, the visible unit is M3. M3 is not present anywhere in MM03.
Why would such unit flow in material ledger table? (CKMLPP has unit M3). Please advise.
One more observation is that when there is some price change document in Material Ledger, the proper UoM (MT) is being captured. Only in the basic price determination structure visible unit for each head is M3. Please check the attached screen shot.
Any help would be appreciated.
Thanks.
Jay Shah.Hi..
Refer to Data Inconsistency of BUOM in Material Ledger Tables -
Material's Unit of Measurment differentin Con & Rec due to Prd Process ?
Hi
We got some byproduct due to the production. So we are planned we will take qty in m2 & stock maintain in kg, because this is child material of another one product, so that time we consumption book in kg wise only u2026.
Finally we want:
Received: M2
Stock Maintain & Consumed: kg
If u have any solution, kindly explain step by stepu2026
I hope defiantly u resolved my problemu2026..
Regards
PorseeDear Porselvan ,
You can resolved it by using alternate unit of measurement.
Now there is two way:-
1. Take KG as Base Unit Of Measurement then Go to work scheduling View & take unit of issue as M2 as well as you put it asks conversion with KG (How much m2 in one KG) and it will make all movement posting By M2 but stock will be keep in KG which will be your Base unit of measurement. For consuming in kG u can put Unit KG in BOM of respective article.
2. Take KG as Base Unit Of Measurement then Go to work scheduling View & take Production unit as M2 as soon as you put it asks conversion with KG (How much m2 in one KG) and due to it Production will happen in M2 remaining all things happen in KG.
For both these condition you can make movement any of unit which both you given by manual changing but automatically it propose unit as i explained.
Regards.........Rakesh Saxena -
Unit of measure conversion during backflushing
Dear All,
The BUOM for one component in our industry is in KG whereas in Bom it is defined in G(grams) due to very low consumption qty & I have maintained conversion in material master additional data tab already but on backflushing the system is putting this item in COGI such as .350g(which becomes .00035KG in base unit because as per std only 3 decimal places are allowed in BOM ) so the error text qty in stock keeping unit is zero in COGI is generating & the system is not posting this qty in consumption pls. help to resolve this because i can not change my base unit from KG to G.
Regards
Rakesh SehgalHi Sehgal,
As the KG and Grams belong to same Unit, you need not maintain the alternate unit of measure in Material Master, additional tab screen.
Only thing which is required to maintain is In Basic View maintain the BUOM as "KG" anh in Work scheduling view maintain the Issue Unit as "G". and Also in BOM you maintain the UOM as "G".
Your issue will be resolved.
Do the above and check and let us know
Regards
radhak mk -
Hello All
could you please explain me how unit of measure ( sales unit and base UOM) works and their conversions in matrial master and in purchase info record?
My scenario is this
base UOM is pc (piece)
sales unit ( KG)
while creating sales order it is taking as KG .after that PO is created auatomatically for this sales order. PO is also having KG as UOM.
After goods receipt happens and while updating confirmed quantity of schedule line in sales order it is updating in pieces.
eventhough sales unit is KG , why its converting into pieces ( waht is the need)
Points to note are the conversion in material master is 1pc= 1p and 1kg=2pc
thanks for the early reply.Stock is managed in BUOM, so in case you have a transaction in an alternative UOM, system will convert to BUOM.
It is my opinion, that in cases a material has both non-dimentional UOM, like PC, and (numeric) ISO UOM like KG, it is better to have the ISO UOM as BUOM; the other way around may lead to unwanted rounding issues.
Maybe you are looking for
-
Gmail will not load in Firefox browser. I can get it in IE. I have disabled add-ons, extensions, reset theme to default, renamed extensions.?? files, re-started in safe mode, and a few other options, but it still won't load. Get "The connection was i
-
I am using SBO 2004 2b. In reconciliation how to import external bank statement in sbo. in pdf file of help on reconciliation it is shown that import button is there on "Process External Bank Statement". but in the version which i am using that butto
-
Using windows 7 on my G61-632NR Notebook connected to Sanyo TV
The HDMI is showing as not plugged in. Video works fine but no sound from TV. I've tried uninstalling and installing and about everything else suggested in the forums.
-
Hi, I am finding one purchase order blocked , and thats because in the accounting doc, the vendor line item is blocked with blocking Reason R . How can I find , why this block was put. Regards Rudra
-
hallo i am pretty sure that once i could use the snapshot tool to copy vector format into the clipboard (emf, wmf) when i had vector information in the pdf file. now with acrobat reader X i always end up with pixels. i found the option to increase re