Automatice settlement at activity level

Dear All,
In my project, i am getting a problem related to automatic settlment rule created at activity. By default system created settlment rule to above WBS based on strategy. In my case system is creating settlement rule but when i save the project, system open settlement rule screen for confirmation. Now in my project if 25 activities are there i need to press back button 25 times. This is happening only in one client while other clients are working fine.
Please let me know if any of face same problem and got solution on that.
Regards
Abhishek Sinha

Hi Kishore,
You are right, but in my system if i maintain PS1 with strategy 03 (Default) than system is not creating any rule at activity at all. If i make it 02 with PS1 than its creating rule with reciever WBS but again in this case i am getting problem is sytem proposal of settlement rule.
Kindly suggest.
Regards
Abhishek Sinha

Similar Messages

  • Function modules to get wbs level budgets and activity level cost

    hai gurus can any one tell me the function modules or any other bapis to get the wbs level budgets and activity level costs
    thanx in advance
    afzal

    ok

  • CJ20N, auto-defaulted storage location at activity level

    Hi all,
    we have this problem at CJ20N (PS) screen.
    At activity level, componenent overview, if user keys in the material no, a storage location is auto-defaulted
    later we found out that if the material is extended to only 1 storage location,  the storage will be auto-defaulted at componenet overwview, is there any setting to prevent the auto-defaulted storage .. pls advice

    Hi,
    Carry out these IMG steps:
    SPRO 
    Logistic Execution 
    Basic Shipping Functions
    Shipping Point and Goods Receiving Point Determination
    Set Up Storage-Location Dependent Shipping Point Determination
    Assign Shipping Points According to Storage Location,,,,,,,,
    Put in your combination of Shipping Conditions / Loading Group/ Plant/ Storage Location/ Proposed shipping point
    Next time you create a Delivery document,, the system will pick up the above values from the Material/Customer master records and propose a Storage Location at line item number.
    I just tried it and it works, let me know if this works.
    Cheers,
    Mohammed
    Edited by: Mohammed Raheel on Jun 5, 2009 1:09 PM
    Edited by: Mohammed Raheel on Jun 5, 2009 1:11 PM

  • Config for Cost & budgeting at activity level and WBS element level in PS

    Dear GURU's,
    please suggest me how to do the spro configuration for budgeting and costing, here my requirement is I need to do cost planning and budgeting at WBS element level and Activity level. We two deferent types of projects.
    Regards,
    Bha

    Hi Bhanu,
    Cost planning in projects can be done through two techinques:
    I.  Manual cost planning (at WBS level)
    1.  Overall planning (Struture-oreiented planning)
    2.  Detailed planning (Cost element planning)
    3.  Unit costing
    4.  Easy cost planning form
    II.  Automatic cost planning using networks and assigned orders
    For customizing:  Use transaction OPUV  and enter the required entries for cost planning.
    Budget can do only at WBS level.  For configuration do the following steps:
    1.  Create Budget profile - OPS9
    2.  Assign Budget profile in Project profile - OPSA
    3.  Then allot budget to your project - CJ30
    hope it will be very clear.  Appreciate with point if it useful.
    Thanks and Regards
    vetrivelan

  • How to do budgeting at activity level and WBS element level in project syst

    Dear GURU's,
    Can any one please suggest me how to do budgeting at activity level and WBS element level in project systems, friends please I required set by step process.
    I need how to do this configuration to map this scenario.
    Regards,
    Bhanu

    Hi Bhanu,
    Use this link :
    http://help.sap.com/saphelp_45b/helpdata/en/86/98853478616434e10000009b38f83b/frameset.htm
    after page opens , click on BUDGET MANAGEMENT , There you will find each and every step you want .
    Thanks ,
    Dhruv Kumar Malhotra

  • Long Text at Activity Level in CJ20N

    Hi all,
    So, I have a typical newbie question. But somehow Im unable to find an answer to this query even by searching.
    I need to print the Long Text Tab at the Activity Level (not at Project/WBS/Network level)  in CJ20N using the Read_Text Function Module.
    Just need info on what's the ID, Object, Name etc.
    pk

    Dzed,
    Thanks for that valuable tip. That was exactly what i was looking for.
    But unfortunately, my internal table is not getting updated even though im able to input the right parameters to the Function Module.
    Here's what I've done:
    DATA: BEGIN OF ist_lines OCCURS 0.
    INCLUDE STRUCTURE TLINE.
    DATA: END OF ist_lines.
    select mandt
           aufpl
           aplzl
           ltxa1
           vornr
           objnr
           projn
           from afvc into corresponding fields of table ist_afvc
           for all entries in ist_prps
           where projn = ist_prps-pspnr.
    loop at ist_afvc into wa_afvc.
    concatenate wa_afvc-mandt wa_afvc-aufpl wa_afvc-aplzl into wa_afvc-con3.
    modify ist_afvc from wa_afvc.
    endloop.
    break br_abap1.
    loop at ist_afvc into wa_afvc.
    CALL FUNCTION 'READ_TEXT'
      EXPORTING
    *   CLIENT                        = SY-MANDT
        ID                            = 'AVOT'
        LANGUAGE                      = 'E'
        NAME                          = 'WA_AFVC-CON3'
        OBJECT                        = 'AUFK'
    *   ARCHIVE_HANDLE                = 0
    *   LOCAL_CAT                     = ' '
    * IMPORTING
    *   HEADER                        =
      TABLES
        LINES                         = ist_lines
    EXCEPTIONS
       ID                            = 1
       LANGUAGE                      = 2
       NAME                          = 3
       NOT_FOUND                     = 4
       OBJECT                        = 5
       REFERENCE_CHECK               = 6
       WRONG_ACCESS_TO_ARCHIVE       = 7
       OTHERS                        = 8
    IF SY-SUBRC <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    endloop.
    Im able to pass the right value for the variable 'WA_AFVC-CON3', but unfortunately the Internal table is not updated.
    I know Im missing something here, but obviously Im too blind to notice that.
    pk

  • Commitments at activity level in report S_ALR_87013533 - Plan/Actual/Commit

    Hi All,
    When i executed the report S_ALR_87013533 - Plan/Actual/Commitment/Rem.Plan/Assigned, the commitments are shown at WBS level but not at activity level. Is there any setting required to see the commitments at the activity level?
    Where as the planned costs are shown against the activity in the same report.
    Please suggest the required settings if any?
    Regards,
    Ramana.

    HI Rifaee/Martina,
    In CJI5 the line items are shown under the WBS. But i would like to see the line items in the report.
    Even after running the report cjen the database is not updated for line itemwise commitment in the report.
    How to assign the PR/PO as account assignments to activity? Where do i need to do this setting? Please inform.
    Regards,
    Ramana

  • Material at activity level

    Hi,
    I created an automatic project with a material which having two child material.
    After that i run order BOM. I maintained reference point at activity level and same in BOM transfer.
    When we open the project in project builder , child materials should be attached to the activity. But it is not happening.
    Please suggest the solution.
    Vikas

    Gokul,
    Yes I'm using CN33. I assigned reference point to child material also.
    But still materials are not attached to the activity.
    One more thing, System Status  is  CRTD. Should i have to release it first ?
    Vikas

  • ECP at activity level not triggered

    Hi All, we are on EHP4 and we activated ECP at activity level in config "view to activate  .  Would appreciate any solution/inputs..

    i tried both the paths you mentioned, but they aren't available in EHP4.  the only option that's available at this path is 'Define CO versions for ECP'
    Besides, we made some progress where we heard from SAP that we need to activate enhancement EA-PLM in SFW5.  However, we are still weighing our options whether to go ahead with it as you can't revert back on this once activated.  so, need more study on this to ensure there are no side effects by implementing this function.
    thanks a lot for your involvement/inputs..
    PSPM

  • How to check plan line items for plan cost at network activity level?

    Dear all,
    How to check plan line items for plan cost at network activity level? The plan cost is done in network activity in CJ20N.
    I am not able to check using CJI4 or CJI9 report.
    Kindly advise.
    Thanks and regards,
    Jessie

    Hi Jess,
    Have you checked the navigation part which is being displayed on left hand side of report S_ALR_87013565 and S_ALR_87013533.? There you have option to check transaction currency and object currency when you double click on it.
    In case if it is not being displayed under navigation. Then you can bring them on from transaction code CJE2. For eg: Report group for S_ALR_87013533 is 12KST1C. Double click on it and it will open up to do changes in report layout and many more. There you also have options to bring on transaction currency too. Similarly, you can check for other report groups as well just by checking the report description.
    But I am not sure if suits your requirements. Wait for other experts to comment on this.
    Regards,
    Amit

  • Fetching conditions at service purchase order activity level.

    Hi All,
    I have a service PO which has activities. At the activity level, there are discount condition types. I would like to know how to read those conditions.
    Is there any function module for the same?
    Thanks in advance.

    All conditions are present in KONP but if u are checking something based on External services u can find the tables in SE11 with ES*

  • Assign company code for subsequent settlement at Plany level

    Hi
    I am configuring "MM Subsequent settlement" in IMG
    In the step - Assign company code for subsequent settlement at Plany level" , i can not add my purchasing organisation and assign to company code. There is no option for "New entry" in the change mode.
    Could you please suggest?
    Best regards
    Vijay

    Hi,
    Assignment is only possible or necessary for purchasing organizations to which a company code is not assigned.
    SAM

  • EASY COST PLANNING at Network Activity Level

    Hi All
    I am using EHP4 system. I want to do easy cost planning at NWA level for this I already activate ECP for NWA in configuration setting and other necessary settings but still when I create ECP from CJ20N or CJ9ECP I can not able to do ECP on NWA activity level. Please give your inputs on same.
    Regards

    Hi Gokul
    All basic settings for ECP have been maintain. It allow me for ECP on WBS level but it not show me any activity or Network in ECP as I activate Planning for Network Activities with Easy Cost Plan in configuration.
    Regards

  • Planned and Actual costs at the Activity level

    Hi all,
          Can you tell me if there is a R/3 report which lists out the planned and actual costs for a project and displays it for each network and activity? I want these values at the activity level.
          I found a report which lists out these values for each network, but I cannot drilldown to the activity level. Please help.
    Thanks,
    Satyajit.

    Hi,
    There is setting in network type. Please go through transaction OPUV  i.e.
    Change view- Network type paramaeters : overview " Overview.
    Uner Network type parameters there is one radio button in front of ActvtyAcctAssgn. Just activate it.
    Hope this helps.
    Regards
    Tushar

  • Create Inspection lot at 'Network - Activity' level

    hi all,
    We are having a requirement to see if there's a possibility to Create inspection lot at 'Network - Activity' level for activities that are "In-house" processing. So that the user can record the Inspection information against a Network - Activity.
    Ex - Network Activity:
    1)Plate cuttingu2014 Inspect cut edges 
    2)Welding - Inspect Weld joint 
    3)Rolled tube - Check Inner diameter

    Any suggestions plz!!.