Availability check during production order creation - Missing parts details

Hai Gurus,
I have one problem during Availability check when converting Planned order to production order.
1) A- is the finished material, which has A1 to A7 components.
2) A2 is the procured item with safety stock and it has safety stock also.
3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
4) so when availability is checked during planned order stage , system says no missing parts, when planned order
     is converted to production order system says missing parts for component A2, which is stock and reserved against
     planned order
5) Checking rule for Production order is maintained as follows,
     a) Include safety stock.
     b) Include reservation.
     c) Include sales requirement
     d) Include deliveries.
     e) Include dependent reservations.(x)
     f) Include production orders.(X)
     g) Check release for stock transport orders only.( A)
So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
Waiting for your positive feed back.
Regards,
Sekar chand

Dear,
What checking rule you have maintained for planned order.???
As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
Regards,
Alok Tiwari

Similar Messages

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

  • Availability check during process order creation

    Hi all,
    can anyone tell me significance of availability check during creation /change of process order?? ( in terms of business)
    how is the usual processs?

    Hi,
    Availability check for a material is carried out only if the material is
    1. A stock item
    2. Not a phantom item
    3. Not a bulk material.
    This can be carried out
    1. during order creation
    2. during order release
    3. when a created order is saved
    Availability check can be triggered either manually or automatically.
    For this we need to define in checking control(opjk)
    First define a checking group(ovz2) and checking rule and this
    must be assigned to checking scope.(opjj)
    In the checking scope(opjj) we should define
    1. which Mrp elements are to be considered during check
    2. which inventory categories are to be taken into account
    3. whether Replinishment lead time is to be taken into account or not
    4. whether check is also to be carried at storage location level.
    This checking rule must be linked to checking control(opjk)in which you can say
    1.No availability check for the material
    2.Availability check when saving the order
    3.What type of check is to be carried
    whether ATP CHECK or Check against PIR quantities
    4. Whether order should be released or not if there is
    any missing parts.
    The checking group is assigned to material master MRP3 view.Please check whether checking gorup is assigned to all the components in the BOM.
    Regards,
    nandha

  • Component Availabity Check during production order creation

    Hi All,
    During production creation, I donu2019t want to include/ check the reserved stock of component (stock which has been assigned for other prod order)
    Where I required to make the changes in config.
    Regards,
    Shailendra

    Hi,
    Deactivate Include Reservation in T.Code OPJJ. But make it sure you are doing it for correct Checking Rule which you have maintain in your checking Control OPJK for Order Type and Plant Combination.
    Regards,
    Dhaval

  • Capacity availability check during prod order creation

    When i create many  production order for a particular material with different huge quantities , while doing capacity availability check system issues a message *" No reqmts/caps exists or not relevant to finite scheduling*
    Here as per the message i have checked all the possible errors and everything is fine.
    As per actual requirements, work centers are overloaded. But here system displays that all work centers are available.
    Any help regarding this.

    Dear Nandi,
    Please refer the below link,
    No reqmt/capacity exist or not relevnt for finite scheduling: Mesage: CY298
    Regards,
    Sundhu

  • Availability Check during Production Order (controlling side) change

    Dear Gurus,
    we run our COMAC run over all production order, but due the fact some controlling user is performing at the same time some settlement activity the job scheduled goes in DUMP and block all the chain of ATP scheduled for all Work Center, instead of provide an easy message log that advice the order processed bt the user has not taken into account?
    there is something that is wrongly set up?
    Regards.
    Gianluca

    Dear,
    It depends on when your background job started..if the background job is started before CO settlement, then system will give error in settlement. If the ATP checking background job has started after CO people started settlement, then you will have this problem.
    Hence to resolve the problem two possible solutions.
    1. You send a message through basis that Production order job will be starting from this time to this time and hence dodnot run settlement...hence system will give the message to all users.
    2. Schedule the activity in the night when no one uses the system.
    Pl come back if required.

  • Availability check during Sales Order Creation

    Dear SD Gurus
    In our client sales orders are being created even if we don't have inventory. We want to disallow users from creating sales orders if stock is not there or if stock is less than the order quantity.
    example-
    Material code - M0001, Stock in Unrestriced use is 10 EA.
    System should allow to create sales order upto 10 EA only. If the sales order quantity is more than 10 EA , system should throw an error message and not allow him to create or save the sales order.
    kindly revert back.
    regards

    Hi
    This can be achieved by maintaining proper value in the customer master record for the filed 'Partial Delivery Indicator'. The different values for that field are.,
    "Blank"- Up to maximum number of partial deliveries permitted are allowed
    A -  One delivery attempt carried out on requested date
    B -  One delivery attempt carried out on any date
    C -  No partial deliveries allowed
    D -  Any number of subsequent deliveries allowed
    If we maintain A in that field, the system confirms the available stock for that requested delivery date and will not create extra schedule lines for the balance quantity. Please go through the below link of SAP help documentation on partial deliveries.
    http://help.sap.com/saphelp_crm40/helpdata/en/dd/5607f4545a11d1a7020000e829fd11/content.htm
    Thanks,
    Ravi

  • Batch no assigning during production order creation

    Sir,
    We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
    1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
    Kindly help
    Regards,
    PS

    Hi
    For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
    Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
    This is  easy  to handle.
    Please check and come back
    Regards,
    srihari

  • How to ignore Assembly Scrap of MRP during Production order Creation

    Hi All,
    We want to ignore the Assembly Scrap maintained in MRP View during production order creation.
    We are maintaining assembly Scrap for planning so we do not want to remove that.
    Please let us know if any User exit is there during Production Order Creation.
    Thanks,
    Amit

    Dear Amit,
    Assume in CO01,once after entering the total order quantity the system proposes the scrap quantity field separately,now
    remove this quantity for scrap field and press enter and once again adjust the total quantity and check for what quantity the
    system is proposing the BOM components.
    check whether this works for your requirement.
    Regards
    Mangalraj.S

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Reg: Error in availability check in production order

    Dear all,
    I am facing a problem during availability check. After creation of production order, when i am clicking 'Materials' it is showing a error message as 'Incorrect check'. When i click log, the error msg is "Order type xxxx, plant xxxx: Checking rule missing (see long text)".
    But in OPJK i checked it. Availabilty check is '2', checking rule is 01, Release material is '1'
    Please help me in this case.

    Hi krishnachandra,
    I think that you still don't assign any checking rule for your Order type.
    FIrst, please check what production order type is. (On production order header: CO03)
    Second, go to OPJK to create new entry and assign appropriate checking rule to that Order type.
    Then go to your production order and check Material to see the result.
    In case you just maintain one entry only with availability check 2 (check availability during order release). You have to release you production order to check material availability check.
    Hope it helpful for you.
    Edited by: dennydang on Jan 11, 2012 4:43 PM

  • Capacity check during sale order creation

    hi,
      i have the following doubts,
    1. During sale order creation i need capacity availability check for that i make settings, its working good,if i put the order in the evening time but system take the start time as morning shift starting time.can any one guide me to take the time as the order creation time. and also help me how the system check the capacity.
    2. During sale order creation , if suppose capacity is loaded means it will show a pop up with the name capacities with overload,
      Here i need the clarification how the system calculate the requirements and requirements order, capacity load, from where the system get the information for these calculation.
    Muthamil

    Hello, you are working with a make to order scenario, that means that a planned / production order must be created to address specifically your customer requirement ??
    By standard SAP you can have a capacity availabily check once the production order is in the creation phase....but this should be too late for you.....

  • Availability Check  in production order

    hi everyone!
    there is a finished product A, whose compoent is B, and A:B=1:1. now, B's stock is 100PC. we created a production order which product A 80PC, and availability check is "all material is availability".
    then we created a new production order, which product A 70PC, and availability check is "all material is availability" too.
    but in fact, B is shortage.
    Therefore, please tell me how I do material availability check?
    thanks!
    DanDan

    Hi Dandan,
    Check RLT mark in OPJJ, (replenishment lead time)
    That use during availability check,during the availability check, the system checks the replenishment lead time.In your case B items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be available.
    Regards,
    R.Brahmankar

  • Availability Check during Sales Order and Inventory Adjustment

    Hi, I have a small doubt here regarding the availability check during the sales order creation. When a sales order is placed, the availability check is performed. If the material is available, then a confirmed sales order is recorded and sales order note is placed to the customer. If the material is not available, then a transfer of requirments is passed to MM for that material. Am I clear upto this point ? Apart from this, I have another confusion, when a customer places a sales order and it is confirmed, then are the stocks from the inventory get reduced that time itself ? Or the ordered stock is moved to restricted stock and while doing the PGI in delivery the actual stock is reduced from the inventory. Please confirm. Also add your knowledge here if you feel so. Thanks.

    Hi,
      The stock will not get reduce from the inventory till PGI is done.However, with respect to the availabillity check, we can control the system to take into consideration of the open orders and open delivery.If the system considers the open order of 5 quantity and the user create a order for 5 quantity for which stock available is 5.Then the system will give as no stock available while PGI even though if the stock are avaialble.
    Regards,
    Nithin.

  • Availability check on Sales order creation

    Dear Gurus,
    I'm trying to set the availablity check on Sales order creation VA01. I need to do this on saving the order. it there an SPRO for this. please help me out on this occation.
    many thanks..

    Hi
    If there is a stock of 1000 in unrestricted and if you have included sales requirements in OVZ9 (made a tick sales requirements in inward and outward movement) then if you create a order customer X with 100 quantities of that same material stock will be reserved for that customer X with 100 quantities
    But if you check in MMBE there wont be any reduction still it will be 1000 only
    If that order is delivered and pgi done then only In MMBE stocks will become 900
    To have a very proper reservation for that customer it is better to go to  t code MB1B movement type 412 E and that will reserve stocks for him with proper material document(reserving for sales order)
    If you do that unrestricted becomes 900 and sales order stocks become 100 in MMBE
    In case 1 there is chance of your 100 quantities can be reallocated to another customer thro back order processing
    In case 2 it is not possible it will be for that order only
    Or if you create delivery and dont do PGI then stocks will be reserved for that delivery
    But to have stocks reduced from MMBE you have to do PGI
    Regards
    Raja

Maybe you are looking for

  • Total, Subtotal of a hidden column in an ALV grid

    I have a requirement for an ALV grid where I have to use a custom formula for a column's total and subtotal. This value is a function of another column which is hidden (No_out = 'X'). I am unable to access the total and subtotal of this hidden column

  • Can you advise me?

    Hi, I have just recently purchased my first mac computer for my business (and love it) and am now in need of a laptop. I am new to this and need to make this purchase soon. I am wondering what the difference is between the MacBook Pro and the MacBook

  • Form layer disappears when I zoom in (mouse scroll...not actually changing anything)

    Beginning a brand new comp...using solid black layer and camera...apply Trapcode Form to solid layer. It appears. When I try to blow the comp up (just scrolling in with the mouse wheel to make it bigger), it disappears. No setting other than default.

  • Running debug on Device

    Flash Builder 4.5.1 Standard Windows 7 Ultimate & Home Premium Latest AIR 2.7.0.19530 on all devices Viewsonic GTablet, Android 2.3.3 Gingerbread Been developing an app for quite awhile and running the app on my tablet with no issues.  Then last week

  • HT1212 unable to enter passcode due to cracked screen

    unable to enter passcode due to cracked screen. anything i can do without losing all my media i.e photos, videos & music