Hi Everyone,
What is differecnce between MDVP  collective ATP check and MD12 ATP.
I am getting different result for the same planned order.
could you plase tell me why this so.
Thanks
Siddhesh

HI R.Brahmankar,
Thanks for your quick replay.
But I am getting different results for same materil in MDVP and MD12 Component Avail check.
I am not getting  the logic why the system is giving this results.
can you please tell me the same.
Thanks a lot in Advance.
Siddhesh

Similar Messages

  • Availability Check in planned Order & Production Order

    Dear All,
    How can I achieve the same Availability Check (missing Parts ) output in Planned Order & Production Order.
    Currently in Availability check in Planned Order is bit different in the sense, I have the Component in Stock without any reservation. But in Planned Order it shows in Missing part.
    But if I convert this Planned Order to Production Order, it is not visible in Missing parts which is correct.
    I want to have the same missing part report for both Planned Order & Production Order.
    Thanks
    Regards'
    Raghu

    Dear Brahmankar,
    Thanks for replay.
    Now i did, the said possibility, in OPJK is different from my Regular material master rule.
    When i see, availability in MD12 it shows the material available, and same as in Production Order check as well.
    But when, I use MDVP, for check. the same planned order shows the same component as missing.
    am i on the right track?
    Please suggest.
    Thanks
    Regards
    Raghu

  • Bapi or Function Module to do the availability check for Planned Orders

    Hi all,
    I need a Bapi or a Function Module to do the availability check for a Planned Orders. Anyone knows how?
    I will use it in an Exit.
    Thanks in advance
    Points will be given

    I think I found it.
    If anyone is searching for it too, we will use these one:
    CO_ZA_AVAIL_CHK_ORDER_MULTI

  • Availability Check during Planned Order Conversion to Production Order

    Hi PP Gurus,
        During Conversion it prompts that materials are not available or missing parts log, though in Stock Overview in that Storage Location it contains more quantity(in unrestricted use) that what is needed. Is the requirement date and GR date have some relevancy on this prompt??
    Thanks,
    Matildo, Edsel
    PP/QM Consultant

    Dear,
    You have tick Include Reservation in T.Code OPJJ Avaibility Check control in assign chcking rule to your order type.Please try without it.
    You Can also check collective avaibilty check through CO24,MDVP,COHVPI,CO09.
    Regards,
    R.Brahmankar

  • Availability check of sales order in planning strategy 40

    Dear friends,
    Kindly help me this query:
    From online SAP help in Demand Management, it said in planning strategy 40:
    "An accurate availability check is performed according to ATP (available to promise) logic during sales order processing. The system checks whether sufficient planned independent requirements have been planned to cover the sales order....  If there is insufficient coverage of components (the sales order quantities exceed the planned independent requirement quantities), the sales orders cannot be confirmed"
    According to above paragraph, I think that availability check of sales order is carried out against PIR, if PIR quantity cannot cover sales order quantity then order will not be confirmed, it also means stock on-hand will not be included in availability check. However, my testing reveal a different conclusion: sales order is confirmed against stock on-hand, not PIR. My questions are:
    1/ in planning strategy 40, how does system carry out availability check for sales order?
    2/ how to interpret above help from SAP?
    I got that help from this link: http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm
    Many thanks for your clear answers.
    Regards,
    Duc.

    Dear duc pb ,
    In 40 its only ATP that works.
    you can do another test ,
    Create PIR 15 quantity.
    Create a stock of 10 quantity.
    and now create a sales order firszt of quantity 30, as both of the above after combining cant fullfill this demand, save order run MRP.
    system will create orders against PIR (15)  and remainibnbg quantity of sales order (5)
    run one more test, by creating PIR 15 quantity , no stock and a sales order of with quantity 10.
    share your findings.
    Thanks
    Ritesh

  • Changing Availability Checks in Sales orders

    hi there,
    Can i easily change the Availability Check in a sales order?
    i have 5 sales orde rtypes, and I sometimes want to change the Availability Check, how can i manage this?
    thanks

    There are three types of availability checks
    1. Availability Check with ATP Logic or Against Planning
    2. Availability Check Against Product Allocation
    3. Rule-based Availability Check
    For ATP logic, the Checking group and Checking rule combination determines the availability check parameters. The checking group is maintained in the material master, and not to Sales order type. Hence you can control by having different groups attached to different materials.
    If you have Advanced Planner Optimiser (APO) then you can use the Rule based availability check. You can attach a Business transaction to a Sales document type and thus control the availability check in sales order level also.
    Refer the below extracts:
    <b>Define business transaction</b>
    Path : spro -- img -- sd -- BF -- Av chk and TOR --- Rule based availabilty check
    In this step you can define the business transactions. These transactions must also be available in the APO planning system. Here the availability check control is carried out for the transactions.You can find the business transactions in the APO planning system (Field BPROC) under:
    Global ATP -> Settings -> Rule-based ATP -> Conditions -> Assign rule strategy.
    <b>Assign business transaction to sales order type</b> t code VOV8
    In this IMG activity, you assign the actions you defined previously to the order types. This activates the availability check settings for this order type, that were maintained in the APO planning system.
    Regards,

  • Disable Availability Check on Sales Order  But Activate on Outbound Delv

    Greetings all experts !
    Currently, there's a new request to create a new processes whereby during the sales order creation, no availability check will be in place but material will still be posted to production planning ( TOR ).
    Availability check instead should be activated  during the creation of outbound delivery.
    I have already configured in such a way that the relevant sch line item ( VOV6 ) - availability check is unchecked and TOR is checked.
    But during creation of sales order, availability check is still in place for material specified.
    I have check on the necessary requirement class and requirement type settings. Fyi, requirement class used - availability check is ticked. Could this be the reason even though i have disabled availability check on sch line ?
    I have tried to untick the availability check setting in requirement class  ( OVZG ), and while this can disable the availability check in Sales order, but that configuration will also disable availability check in outbound delivery.
    My queries :
    1 ) What are the configurations that I need to look into to cater to the above request. To disable availabilty in sales order but instead, run availability in outbound delivery ?
    2 ) Is there any way I can disable the availability check on based on sales order type using userexit or function module ?
    3 ) Is there any additional function module/bapi/userexit that i can implement to force outbound delivery to run availability check ?
    My apologies for such lenghty message here but really really need some valuable feedback here as I'm totally at lost with the new requirement for now.
    Many thanks in advance.
    Warmest Regards,
    Edie O

    In SPRO
    goto SD>Schedule line>Define schedule line categories
    here check if the schedule line category associated with your mentioned order has a flag ticked for Availability.
    Availability check for sales
    You must carry out an availability check for the following transaction.
    The indicator is determined as a proposal in conjunction with the respective requirements type. It can be changed in individual shipping transactions. However, only one restriction is effective.
    Example
    You do not set an indicator for maintaining the requirements type. In this case, no availability check is carried out. This is independent of the selection in the respective transaction.
    You set an indicator for maintaining the requirements type. In this case you can decide whether or not you require an availability check for the relevant transaction.
    reward points if it helps
    regards
    Biju

  • Availability check during production order creation - Missing parts details

    Hai Gurus,
    I have one problem during Availability check when converting Planned order to production order.
    1) A- is the finished material, which has A1 to A7 components.
    2) A2 is the procured item with safety stock and it has safety stock also.
    3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
    4) so when availability is checked during planned order stage , system says no missing parts, when planned order
         is converted to production order system says missing parts for component A2, which is stock and reserved against
         planned order
    5) Checking rule for Production order is maintained as follows,
         a) Include safety stock.
         b) Include reservation.
         c) Include sales requirement
         d) Include deliveries.
         e) Include dependent reservations.(x)
         f) Include production orders.(X)
         g) Check release for stock transport orders only.( A)
    So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
    Waiting for your positive feed back.
    Regards,
    Sekar chand

    Dear,
    What checking rule you have maintained for planned order.???
    As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
    Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

  • Availability check at Sales Order Create

    Dear Experts,
    I want to do availability check at sales order creation stage (VA01). My requirement is, the system should check the sales order line qty against the unrestricted stock. And if sufficient stocks not available it should prompt an error message.
    In more detail; unrestricted stock of material X is 100 PCs. I put a sales order for the same material for 101 PCs. Then systems should block me from saving the order.
    Can some please provide me detailed step-by-step action for configuration of above scenario. Thanks in advance for your support
    Regards,
    Ramindu

    HI,
    User exits in program FV45VFZZ
    USEREXIT_ADD_FIELD_TO_HEADER
    USEREXIT_ADD_FIELD_TO_LINE
    User exits in program FV45VFZY
    USEREXIT_DELIVERY_GROUPS
    USEREXIT_MVERF_INIT
    USEREXIT_QUOTA_KEY_VALUE
    User exits in program RV03VFZZ
    USEREXIT_AVAILABILITY_IN
    USEREXIT_AVAILABILITY_OUT
    USEREXIT_DARA_REFRESH
    USEREXIT_PLANT_SELECTION
    Check these user exits also very helpful to you.
    Regards,
    kishore.

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Availability check in sales order for DIEN materials.

    Hello,
    Is it possible to make availability check in sales orders for a service material e.g.: type DIEN? How can i customize it?

    The DIEN material type is not stock managed, so it does not make sense to check the availability. If you need to do something similar you could use material type UNBW, this material is quantity managed but not valuated, so maybe this can help you !
    Regards
    Roberto Mazzali

  • Availability check in service order quotation in SAP CRM

    Hello Experts,
    I am trying to establish an availability check for service order quotations in CRM
    Could somebody please guide me through the steps to solve this problem.
    Thanks in advance,
    Itisha

    Hello
    For quotations, only an availability information is triggered and that shows only confirmation when creating but not after
    save. You can find the logic in our standard function module CRM_CONFIRM_DEL_T_SCHEDLIN_EC
    You can also find information in [ online documentation|http://help.sap.com/saphelp_crm70/helpdata/en/45/b67bba228747f5e10000000a114a6b/frameset.htm]
    Regards
    Joaquin

  • Availability Check in Sales Order

    Hi,
    We had configured MRP Area for a Storage Location. In MTO Scenario (Strategy Group 20) we had enabled 'Automatic Planning' indicator in 'Define Requirements Class' 040.
    We then created a Sales Order (Order Type OR) specifying the above Storage Location. The Storage Location has sufficient Unrestricted Stock also.
    After saving the Sales Order, PR is getting created automatically despite Stock availability in this Storage Location.
    Is there a way to perform Availability check on Unrestricted Stock in the above scenario ? Request any other way to handle this requirement.
    Thanks.
    Raj

    Hi rajkumar
    1st of all , in MTO scenario  , we need a special stock and not a unresticted use stock . bcoz in MTO , 1st sd condultant will raise the sales order then they will send it to MRP controller then they will send to PP consultants and if any material is to be procured externally then  PO is raised and then finally a special stock is created
    secondly , the scenario what you said may be applicable in MTS. scenario. so check the requirement class for MTS , weather the automatic planning is on or not. and the strategy group for MTS is 10 or 11and the requirement class is 41.
    Regards
    Srinath

  • Availablity Check and Planned order

    Hi,
    In Material Master Record in MRP3 view , we have a field for "Availablity Check".
    Whether it is required for MRP run ?
    As we are not doing any stock transfer orders , as SD module is not implemented.
    So my Question is :
    1) Whether "Availablity Check"field is required for MRP run?
    2) While running MD03 Transaction we see Planned order getting generated....What is the use of it and Can we avoid this Planned orders to get generated?
    Utsav

    Hi,
    Availabilty check will check the available stock of the material as per its defiunition .
    When the material is MRP material if there exists a requirement for the material either in the form of a sale order or planned independant require ments, SAP checks these requirements anb compares with the available qty and generates the requirements like planned orders , which in turn will get converted into either PRs or Orders depending upon the procurement type of the material in MRP view.
    If your material is not related to MRP this data need not be maintained
    For more details please refer to the link
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d327a44af11d182b40000e829fbfe/content.htm
    and
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d326d44af11d182b40000e829fbfe/content.htm
    and
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d315744af11d182b40000e829fbfe/content.htm
    ansewe to your first question yes
    second question:Planned order is a requirement generated for the short fall of the material when checked with the avauilability check.It can be converted into either PR or Order depending upon the procurement type.
    If do not want the planned order to get generated means material need not be maintained with MRP.Means you does not want the shortfall requirement to get generated(if this is your criteria)
    Please reply back if you are not satisfied with the answer.
    Regards,

Maybe you are looking for

  • HR-ABAP using Table Control Wizard

    My requirements is to customize an infotype which is customer specific. After creating the infotype in PM01, I also create the screen(2000) for the infotype. The issue is in the table control. I create a table control using  table control wizard, get

  • WL 7.0 sp4 session replication problem

              These are the configuration:           * BEA WebLogic Server 7.0 SP4           * Domain : mydomain           * Machine:           machine1 (Windows 2003)           machine2 (Windows 2000)           * Admin Server :           myserver (on "m

  • For those who have the GoogleAd issue

    Well I the problem of ads not showing up for a few weeks now and miraculously i republished my pages today and now all the ads work! it seems that the servers are in working order. just letting people know who i know were really frustrated

  • Avoiding lenghty fsck

    our DB version: 11.2 our OS: SLES11 our fs: ext3 My question: with the FRA residing on ext3, how can I avoid lengthy fsck runs on server reboots: even with clean shutdowns, Linux will eventually trigger forced fsck runs after a period of time (see al

  • Installing problems when Firefox

    Why everytime I try to install newest Flash Player, it informs me that my browser is open (Firefox), when it is not...? Then, when I have finally succeed, it doesn´t work at all. When I check the details-box (after so called installing), there is sev