Availability check issue in SD

Hello everyone
I am currently having some issues during the ATP in Sales Order in SD.
We are using Check Group 02 - A (Sales Order) with the following settings:
Stock Overview --- *all are unchecked*
Relenishment Lead Time -- *"Check without RLT" is checked*
Storage Location Inspection -- unchecked
In/Outward Movement --- the following are checked
Inc. Purchase Orders
Include Reservations
Include Sales Order req.
Include Deliveries
Rest all is unchecked
Now on a high level, what this does is that hard allocates the required Order Qty to the Sales Order if stock is available.
e.g. Material XYZ has 100 EA unrestricted stock
Order for 10 EA ... is allocated 10EA
Now if a second order comes in for 100EA .. it will allocate only 90EA
Now I was able to test this successfully with a newly created material in our development system.
Later I rejected all the Orders that I had created for this material in ECC.
Thus now MD04 for that material displayed no requirement.
Now again when I tried placing an order for this material ... it wouldn't confirm.
When I check the Availability Overview from the Sales Order, it shows the following details
Material -- XYZ
Plant -       WXYZ
Total Display
Receipts - 100
Issues -- 300                        Confirmed Issues - 100
ATP Situation
Date, MRP elm., MRP element Data,  Rec./reqd qty , Confirmed , ***. ATP
02/23/2011 , Stock  , BLANK , 100, BLANK , BLANK
02/23/2011 , SimReq , Simulated Requirement , (10-) , BLANK , 0
02/24/2011 , CusOrd , Totals record , (300 -) , 100 , 0
02/23/2011 , SLocSt ,  LOC1 , 0 , BLANK , 0       
02/23/2011 , SLocSt ,  LOC2 , 100 , BLANK , 100
Note:
I have put the dashes to allign them correctly. Also (10-) means negative 10
Plant WXYZ has 2 locations viz. LOC1 & LOC2
Currrently the stock of 100 EA is in LOC2.
ALso LOC1 is responsible to issue the stock to deliveries.
Question:
Why would the ATP confirm 0 qty inspite of the Orders placed for it have been rejected.
Note this material was never ever used before in Sales Orders.
Any thoughts
Thanks
Vin
Edited by: vinit parkar on Feb 23, 2011 8:38 PM
Edited by: vinit parkar on Feb 23, 2011 8:44 PM

Hey Shiva
That did not fix the problem.
I ran the program with Data Transfer checked .. but still the same issue
Any other thoughts ?

Similar Messages

  • Availability Check Issue

    We were using on similar batch ZZZZZ for all migration purpose so that all material will be received in ZZZZZ batch & sold from Z1000 batch whose date of production is 31.12.2008 and got expired on 29.06.2009.we have restricted Z1000 batch in MSC2N transaction.
    And some of the sales orders are incomplete due to stock issue and are reflecting in MD04 and these sales orders will be processed separately by loading the stock manually.
    Now the issue is that when the end users are creating sales order system undergoes availability check and quantity is not being confirmed. But when I make the batch ZZZZZ  unrestricted system confirms the stock provided ZZZZZ  batch should no contain any free stock. The bottleneck in making ZZZZZ  batch unrestricted is, if any of the free stock is available in ZZZZZ batch system confirms that quantity which is not supposed to be.
    I have checked in availability checking rule also u201CInclude restricted stocku201D is deactivated so system is not checking restricted stock.
    Kindly suggest any solution for this issue.

    Hello Jayant,
    Check out the material status in Stock/Requirement list (MD04), it will give you better picture about the open items.
    Hope this helps.
    Regards
    Arif Mansuri
    Reward if answer is helpful.

  • Availibility check issue in Production Order

    Hi Every one ,
    One of the user has issue while operating the production order for Material "A". He gets a pop up , "Error during the availibility check for order . Material A is of Material Type HALB.
    On checking the Log , we have description
    1.  "Maintain availibilty check for the material "X" in material master, (Order AERREB)
    2.  All checked materials are available (look in log)
    The status for the Order is "CLSD PRC  RELR SETC"
    I wish to add Material "X" is a  Material type ZDOC ( configured by company ) . ZDOC are reference materials which are not shipped with products . These materials are not main materials and are not valuated.
    When I check the material "X" to study the availibility check in material master. I do not see MRP view.
    How do I sort this out . Can anyone kindly suggest a solution? Many thanks in advance .
    Kind Regards
    Ayaz A Khan
    Edited by: Ayaz Alam Khan on Sep 1, 2010 1:04 AM
    Edited by: Ayaz Alam Khan on Sep 1, 2010 2:07 AM

    Hi,
        Pls check sales views for Availability check for the material master of X

  • Availability check issue Please help

    Hey Gurus,
    We created a bunch of sales order with material 8000379 with the availabilty check in the material master as "02".  We decided the change this to "KP" to no check and now we are not seeing a confirmation line for delivery in the sales order unless we delete the line item in the sales order and recreate.  This is causing us a massive problem.  We have almost 1000 sales order with this material that we woudl need to change.  Is there anyway to reread the master data for this material?
    Thing to note, this material is a subcontracted material and it has a PO against it so we can't just delete the line item and recreate it on the sales order.  Is there a better solution than deleting the line item?  We are desparate for a solution.
    Sincerely,
    Nina

    Hi,
    PLease go through the link below. hope this help.
    http://www.sap-img.com/sap-sd/configuring-availability-check-through-checking-groups.htm
    http://www.sap-img.com/sd028.htm

  • COHV (Availability check issue - Urgent)

    Dear All,
    In COHV, when i select the LIST - Operations, in the Mass Processing tab i am unable to select Material Availability check option in the Functions drop down box. Is there anyway i can get the function - Material Availability Check when i select Operations list?
    The reason for this is because, at the moment, the collective Av. Check run is taking place at the order header level & hence the materials are committed to orders which have earlier basic start date. There is no option for me to select based on operation date. This is a real problem as material required by orders having earlier requirement is not gettting the materials.
    If anyone has any alternative solution to overcome this problem, pleaset let me know. I want the Av. Check to be based on Operation date & not at order basic date.
    Hope my problem is clear, await inputs.
    Vivek

    Can anyone let me know how i can do an availability check based on Operation date using COMAC or any other transaction?
    Edited by: Vivek on Mar 11, 2008 1:34 PM

  • CNS0 - Material availability check

    Hi Experts,
    Now, we have some problem for material availability check.
    For example :
    Stock : 10 pce
    1. we create outbound delivery for 6 pce for Network / Activity : A / A000
    2. we create outbound delivery for 4 pce for Network / Activity : B / B000
    3. Now we create outbound delivery for 5 pce for Network / Activity : C / C000 , what we expected is there is an error message to tell us " only 0 PCE of material XX available " , but now, there is no message, outbound can be generate without any message.
    Could you pls help me to know where might be problem ? where I should check ?
    Best regards
    Shubin

    Hi Nitin,
    thanks, but seems the problem is not here, I guess it is a material availability check issue.
    BR , Shubin

  • Dynamic Availability Check for Goods Issue,Transfer Posting

    Dear All,
    Can anyone explain the Dynamic Availability Check??
    I mean the relevance on setting this indicator for a mov.type?
    In OMCM & OMCP I have defined a Checking Rule & also assigned the same to a Mov.type as well the transaction code?
    whether the Dynamic Availability Check concept is same in case of sales ie Say I have a Stock of 100 qtys for a material in a plant & in the availability Scope of Check I have ticked the include safety stock.
    In my material master I have a safety stock of 500 qtys.
    So when I do a transfer posting for this material with Qty as 200, System should allow me do proceed as in my availability check I have enabled the safety stock option.
    But this is not happening & I am getting an error message as deficit of stock 100 nos. Also what is use of setting the dynamic availability check indicator for my mov.type as A - Warning message , B - Error Message etc..
    Kindly suggest valuable inputs.
    Thanks & Regards,

    For e.g. there is Available Stock = 1000 qty and safety stock in material master = 500 qty then system will allow you to use 1000 qty only not 1500 qty
    This is only used for availability check purpose whether system it should be considered or not?
    And following indicators means;
    A  W mess. only issued in the case of non-availability
    B  E mess. only issued in the case of non-availability
    E  Message in any case: W mess. for non-avail., otherw. S mess.
    F  Message in any case: E mess. for non-avail., otherw. S mess.
    S  Availability check only with simulation
    The above indicators indicate whether the system is to check for existing material requirements.
    Award appropriately once the thread is answered.

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • Availability check during goods issue

    Dear All
    We have a scenerio where SAP change the GI quantity during  GI posting . Even though quantity is confirmed in SO and delivery .
    we are not having WM , picking and packing happen in external WH .
    Please let me know any setting in customizing which force system to do availability check during GI again , as availability check is already done during SO and delivery creation .
    Many Thanks
    Kaustubh

    Hi,
    When you do PGI, you can't issue stock that you don't have (in that SL/Plant). ATP can be done in some cases without SL, and that could lead to such problems.
    Alternatively (not recommended!) you can allow negative stocks, so PGI goes through with any quantity, and you reconcile stocks later.
    Regards,
    Mario

  • Issue with availability check

    Hi,
    We are creating delivery for stock transfer order using customised transactions via ATP check. During ATP check, the system is indeed creating outbound delivery, but with zero quantity.
    I checked the stock in MMBE, it is showing stock. Also in MB5B, the stock was available on posting date. Why the system, then created outbound delivery with zero quantity.
    Can anyone please suggest?
    Thanks in Advance,
    Nisha

    Hi Nisha,
    Check the following
    IMG>>MM>>Purchasing>>PO>>Setup STO>>Define Checking Rule and select the one you are using (Use avail check 02 with checking rule 01)
    Next in Assign Delivery type and checking rule check for proper assignmnets for..
    Doc Type-Supply Plant-Del Type-Chk rule-check box ticked for Shipment scheduling
    Your delivery type should be NL for Intra company STO and NLCC for cross company STO.
    Make the ATP check in the STO PO and confirm things working.
    Chk n revert
    Regards
    Shiva

  • Issue with sales order when doing the availability check.

    In MD04 we have a material avail date of 12.05.2011.    The order was then changed to 13.05.2011 delivery date to reflect this availability,  but then delivery time was added e.g GI time and route time which then showed the sales order in MD04 as 18.05.2011.    However,  if we run the availability and take the 18.05.2011  and key this in the delivery date,  it shows in MD04 as 13.05.2011.  It seems like the availability check is only looking backwards,  and I can't find a setting in ATP relating to this.  In MM they have foward and back consumption in days on MRP3.  Do these fields impact this.
    regards
    Kylie

    Check in OVLY what is maintained to your sale order type
    thanks
    G. Lakshmipathi

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • How to execute availability check against delivery date in purchase order

    Hi all
    In MD04, I know that "available date = delivery date in purchase order + GR processing time" & "GR date = delivery date in purchase order". When I execute availability check in production order, I will get material's committed date = available date. But I hope to get material's committed date = GR date in purchase order.
    For example. delivery date in purchase order is 2012/02/06 and GR processing time is 2 days. After ATP in production order, I will get committed date 2012/02/08. But I hope it show 2012/02/06. How to customize it.
    (The GR processing time must be set 2 days for MRP calculation. it can be changed to 0.) Thanks!!

    Hi Rita,
    One Doubt, If you say that material commited has to be the GR date and you do not wish to wait for GR processing time, then why do you have the GR processing time in first place.
    For ex. My client, we get the stock as per GR in Quality inspection and so we have GR processing time considered for available time in MD04. But since the business considers the Inspection stock as avialble, The stock gets reflected in avialibility check the moment GR is done.
    So please explain your requirement in detail. There could some way to do so. If not the raise an issue with SAP.

  • Schedule lines in Availability Check Delivery Proposal screen

    Hi,
    This is in continuation to an earlier thread that I had created about Sales Orders not getting CIFfed across to APO. I have a situation in a different system where this is being configured for data transfer. The problem here is not about CIF. All issues pertaining to CIF were addressed in the earlier thread.
    This question is primarily about schedule lines of the sales order not opening up for confirmation in 'APO Availability Check: Delivery Proposal' screen as in this link: https://docs.google.com/leaf?id=0B78qjSKXsqbeNDFjMzlkM2MtMDNlOS00ODFmLWJmYjktYmU0ZDU5Zjk0ZDlh&sort=name&layout=list&num=50&authkey=CO2E0ZYN
    It is perhaps some config that is changed or missing that is causing this problem.
    Kind regards,
    Srikanth

    Srikanth,
    This is what the screen looks like when the ATP you have configured cannot confirm anything.  The only button available to you is to proceed without confirming the order. 
    An example of the types of reasons would be no allocation available, no stock available, no supply elements available, too many existing requirements, etc etc.  Improper or incomplete APO GATP configuration could unfortunately also be the culprit.
    You have two icons at the top, check instructions and Allocation.  Click on these buttons, and they may give you clues as to what is causing your problems. 
    Best Regards,
    DB49

  • Material Availability Check for material launched in the future

    This is the requirement;
    We are launching a product in the future. Lets use August 19th as our launch date This means that on August 19th our material can be goods issued. It cannot be shipped before then. There is no loading time etc. so our GI date usually = our material availability date
    Our production & procurement activities are executed allowing us to build our stocks so we have on hand stock of the material. We are receiving customer orders. Availability check is run and it is being confirmed for dates before the GI date (As we have stock in the system). For example, a sales order is created with a requested delivery date = 19th August; Would be acceptable if there was no transit time. But what if there is a route determined with a transit time for 2 days. This brings us to a material availability date of 17th August (And therefore a GI date of 17th August) which is before our product launch date. This needs to be avoided; the earliest material availability date must be 19th August as this will then be the earliest GI date.
    Therefore, the requirement is that availability is not confirmed for a date before our launch date. But is confirmed for the launch date.
    For example, how do Apple launch their products (like iPads)in future dates but entertain customer orders well before the date & then confirm the future dates to end customers? At the time when they receive the orders from end customers, I am sure that they would be holding stock of sufficient iPads for future deliveries.

    There may be more than one way you can fulfill the requirement. First is use of user exit. In enhancement ATP00001 (User exits in the availabity check), you can try using EXIT_SAPLATPC_002 (processing results of actual check). Here you can add logic that if the system date is less than Aug 19th 2011, then propse confirm date (material available date) as 19th of August 2011.
    The second option would be use of Replishment time (RLT) in the material master MRP3 view. You can maintain certains days to match August 19th (of course you need to reduct one day when the days go-by). At the same time in t.code OVZ9, you need to uncheck the box check without RLT for the combination of availability check rule and availabity check group. After August 19th, you can check the box again after removing the RLT time in material master. My preference is to go with first option.
    Regards,