Dear All,
If i allow in the availability check to issue or make delivery of material under safety stock then is there any message available which can tell me that this issuing quantity is falling under safety stock.
regards,
qsm sap
Edited by: qsm sap on May 22, 2008 12:37 PM

Dear Qsm,
Availability check message is related to MRP cofiguration in Material Master.
Can you please check onece in Material Master -> MRP1,MRP2,MRP3 settings
I hope message of GI is coming thease settings only
Hope it will helps you
Prem

Similar Messages

  • Availability Checking Rule in Sales Order- Urgent....

    Hi Gurus,
    I m PP Consultant, I want to know How Checking rule is populated whilr creating Sales Order.
    e.g - I am creating sales order for the MTS material then availability checking rule A must be come. & same for MTO I think AE should come.
    please revert back soon. Hey Gurus Plz help me out its urgent ticket
    thanks & regards, points will be rewarded yaar...
    Anant.
    Edited by: anant joshi on May 29, 2008 8:17 AM
    Edited by: anant joshi on May 29, 2008 11:20 AM

    Availibility checking rule populates from the availibilty maitined in your material master.
    i.e 01 Daily requirements
         02 Individual requirements
    If you go to transaction OVZ9
    you will see the assignment of checking rule against 01 & 02.
    e.g  01 A SD order
          01 B SD Delivery
          01 AE Make to order Stock
    I Think This will clear your doubt.
    Reward If useful
    Regards
    Rasik

  • Error :- Availability check/information -- Urgent

    Hi Guys,
    When i create CRM sales order, I am getting the following error.
    "Availability check/information: ATP error log (display via long text)"
    and in long text error log message is:
    " Error Log ATP System:
    No customer master record exists for sold-to party "
    Pls revert with possible solution.
    regds,
    -gemini

    Hi,
    The sold to party that you can entered in the sales order is not created for any sales area in ECC.
    Please extend the customer to a particular sales area. The ATP profile is active at the item level which throws this error.
    Regards,
    PP

  • COHV (Availability check issue - Urgent)

    Dear All,
    In COHV, when i select the LIST - Operations, in the Mass Processing tab i am unable to select Material Availability check option in the Functions drop down box. Is there anyway i can get the function - Material Availability Check when i select Operations list?
    The reason for this is because, at the moment, the collective Av. Check run is taking place at the order header level & hence the materials are committed to orders which have earlier basic start date. There is no option for me to select based on operation date. This is a real problem as material required by orders having earlier requirement is not gettting the materials.
    If anyone has any alternative solution to overcome this problem, pleaset let me know. I want the Av. Check to be based on Operation date & not at order basic date.
    Hope my problem is clear, await inputs.
    Vivek

    Can anyone let me know how i can do an availability check based on Operation date using COMAC or any other transaction?
    Edited by: Vivek on Mar 11, 2008 1:34 PM

  • Stock confiramtion at sales order level for future date- Availability Check

    Hi all
    Here is the scenario
    This setting is available in the system:
    Stock is available
    Sales order created with Requested delivery date in future-> not confirmed
    Sales order created with Requested del date today -> confirmed
    The requirement :
    how and where to change this setting in IMG so that also orders with Requested Delivery Date in future are confirmed if stock is available.
    As this is urgent request to respond quickly.
    Regards
    Devender

    Hello Devender,
    You can achieve the mentioned scenario by configuring ATP. You can do ATP with RLT or ATP without RLT.
    In ATP with RLT, system will check and confirm the quantities from existing stock only and if quantities are insufficient then the system will consider inline POs or manufacturing time to confirm remaining quantitites.
    Else you will be getting schedule lines for only items in stock and remaining will be unconfirmed as ATP without RLT will be activated i.e., system will check and confirm the quantities from existing stock only.
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMGSDBasic fncsAvailability check and TORAvailability checkAvailability check with ATP logic or against planningDefine checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    Reward points if helpful.
    Regards,
    Priyanka

  • Help regarding availability check

    hi gurus,
    SCENARIO 1:-
                my client is using IMS as a leagcy system , when the customer is giving  the order ,the order is taken in IMS and an interface is used to do the availability check in r/3 and confirms the schedule line for the customer.After confirming the Scedule line for the customer ,the same details which is saved in IMS is Sent to R/3 for processing (executing sales order ) , now i dont want to do the availabilty check again in the R/3 for the same sales order..what r the settings i have to do ?
    SCENARIO 2 :-
                    if a sales order is executed in sap R/3 i dont want the availability check at all ? what r the settings to be done ?
    NOTE :- IN both the scenarios the material is same and the plant is same.
                 please help me in solving the problem

    hi gurus,
               the orders r created and processed in the following way
        1) orders created in broad vision for web based orders -processed in sap-moved to  IMS.
        2) orders created in sap-processed in sap-moved to IMS.
         assume that there r two customers A and B.
          a ) if  the order from customer A is coming through Broad vision ie.internet an interface is  used to check the availability check in r/3 and the customer is given the schedule line and the order is confirmed.after confirming the order to the customer the same order is passed to r/3 for processing of further functions like PGI etc etc , now the client dont want to do availability check as the order is already confirmed. what r the settings to be done ?
        b) if the order from the customer B is coming it is created in sap and processed in sap, here the client dont want to do the availability check at all.one thing to note here is the material,plant and sales document is the same in both the cases only the customers r different.
           please give me some solution,its urgent.
    sujitha

  • Availability check & TOR

    hi
    can anyone   tell me whether availability check is first or TOR.  Explain in one scenario.
    please urgent
    regards
    murali

    hi,
    Availability Check & TOR configuration is done hand in hand..
    To confirm the quantities for a particular line item in the sales order on particular day system carried out transfer of requirements (TOR) & AVAILABILITY check, so has to confirm the quantity on particular day as system should know what are there requirement of the sale order and delivery with MRP then system carries out availability check function, to confirm the quantity on particular day. Depending upon the IMG setting system carries out availability check function based on 3 methods:
    A) Availability Check with ATP logic or against planning:
    In ATP logic systems ATP Qty while carrying out availability check function for
    Particular line item (ATP qty=warehouse stock +planned receipts-planned issues)
    Planned Receipts: EX: - purchase requisitions, purchase orders, stock in transfer, stock at inspection etc.
    Planned Issues: - EX: - open sales order & open delivers
    B) Availability check against product allocation:
    Availability check can be carried out against product allocations in which system automatically restrict the user to confirm the quantity beyond reserved quantities per particular customer. EX: - Availability qty =100, existing orders=10, then system automatically distributes to items evenly to the sales order.
    C) Rule based Availability check:
    Rule based availability check can be carried out based on the business transaction.
    EX: - For normal sales order system has to carry out availability check for special sales order ex: - cash sales and rush order systems need not to be carry out availability check,
    In rule based availability check system in which system carried out Global availability to promise in all plants. In this check system transfers the requirements to APO system where GATP takes place and the result of the availability check transferred to R/3 system. This process takes place with the transaction code CIF(central inter face) inR/3.After carrying out availability check function system proposes(by using ATP logic) default values of ATP check result to the user in a dialog box, in which system gives the choice to the user to take the decision in contest of insufficient stock.
    a) One time delivery:
    If the user chooses one time delivery and the order Quantity is 100 units system confirms 50 units then systems automatically confirms as a zero. If the user saves the document with the zero confirm qty then system trace the sales order as aback order (V_RA), which can be confirmed later by RESCHEDULLING (V_V2).
    b) Complete Delivery:
    If order Qty=100, Availability stock = 50, system says that remaining can be given after one week. Then if the user selects this option then system push up existing confirmed qty to after one week and the total qty can be confirmed after one week only.
    c) Delivery Proposal:
    If order qty=100, system confirms 50, and remaining 50 can be confirmed after one week. If the user chooses this option then system confirms 50 Qty today allows the user to delivery 50 quantities today remaining 50 can be delivered after one week.
    CONFIGURATION SETTINGS FOR TOR:
    Define Requirement Class:
    Path:  SImg & Availability Check Basic functions D  & Transfer of  Define Requirement classes Transfer of requirements requirements
    Requirement classes control MRP, Requirement consumption, strategy, relevance for planned. It specifics whether the availability check & TOR to be Called out for transactions. Ex: Sales Order
    It determines whether requirements relevant for MRP or not, the allocation indicator from the sales view which controls the settlement of customers requirements with planned independent requirements. It determines the item b to be settled as an availability heck. Assignment, the settlement profiles the results analysis key. The TOR and Availability check functions are globally controlled using the requirement class for all the Sales documents. The values from the Requirements class are transferred to scheduled the of the sales documents class are transferred to scheduled the of the sales document default values and can be over written there.
    Define Requirements Classes:
    Requirement class defines whether the system has to carry out availability check based on the STP Qty. Ex:
    Define Requirement Types:
    Here we define requirement type, Ex: and Assign to Requirement class that we defined in the promote step.
    Determination of Requirement types using Transaction:
    Requirement type is going to be determined for sales document by following a search strategy. .
    First System checks strategy group in MRP3 view if it trend requirement type then system takes from it, otherwise.
    It will go to MRP group in MRP1 view, otherwise
    It will check to Material type, otherwise
    It will go to item Category + MRP type, otherwise
    It will go to Item category only, otherwise
    Finally system determines the transaction b not relevant for TOR & Availability check.
    Choose Item category TAN+MRP type PD=Requirement type =0
    Define Procedure for each schedule the category:
    Here we define respective schedule the category of the sales documents, whether an availability check and TOR should be carried out. This setting is relevant for sales documents only. It is fine tuning of availability check for sales documents TOR & Availability check function can be activated at sales order level those are proposed in to schedule line category level. If u wants to deactivate TOR availability check function at schedule the category level and want to deactivate at requirement class level it b impossible.
    Ex: If u wants to check availability w/o transferring the requirement we can use it.
    Choose schedule line category CP & Activate Availability check, requirement & Product Allocation
    Block Quantity confirmation in delivery Blocks:-
    When we transfer requirements to MRP then confirmed quantities is also reserved for confirmed sales documents, if transaction is blocked for delivery the reserved quantities are also blocked so that the conformed quantities cannot be used by any other purpose. So has to avoid this situation we can block the transfer of requirements(TOR) for delivery blocks, in this case requirements transferred to MRP but will not be reserved, that will be cleared once we save the documents then system shows confirmed qty as zero.
    When we remove the delivery block then system automatically carries out availability check & confirms the qty.
    A) Deliveries: Blocking region for sales Area:
    Here we define blocking regions for TOR ex:-credit limits
    B) Reasons for scope of delivery blocks: TOR. Block:
    Ex: - 01 credit limits-check confirmation block.
    Maintain Requirements for TOR:-
    Here we can define our own requirement with the help of ABAPer for TOR
    Ex: - a) 102- prevent reservation in the event of credit block
    b) 102-purchase requisitions.
    System doesn’t create purchase requisitions for sales order line items if it has a credit limit.
    Availability check:
    Configuration setting:-
    Availability check with ATP logic or against planning:-
    Define checking group:
    Checking group define what kind of requirement record system use to create when sales order & deliveries are processed for this material. We can create 2 kinds of requirements records
    Individual requirement records: that means system creates requirement record for each S&D document.
    Summarized requirement Records: That means system creates requirement records under certain condition in the material master record. There are 2 type of summarized requirement record:
    Summarized requirement records for each day.
    Summarized requirement records for each week
    Define checking Action;
    Here we define 01- daily requirement -B 02- Individual requirements -A
    Where b-total record per day
    A-single record per day
    B) Define material Block for other users:
    When 2 users tries to confirm the quantities for the sales order for same material at a time system will be confused to confirm the quantities both sales orders. So has to avoid this kind of situation we can block the materials from confirming the quantities for 2 users at a check, check block
    C) Define checking group default values:
    Checking group is going to be determined depending upon the material type & plant.
    -Go to new entries, specify material type, ex;-FERT
    & plant = checking group of availability check: 02
    D) Carry out for Availability check:
    Here we define checking rule for the Availability check & allocate them to the checking group. The checking rules specify the scope of the availability check. For a respective transaction, means which planned receipts & planned issues systems has to taken into consideration and also it determines whether system has to take RLT into consideration.
    Action:
    *Select checking group of availability check-02, checking rule=01
    *Go to details icon, & check which planned receipts & planned issues system has taken into consideration for availability check
    *save it, exit.
    E) Define procedure by Requirement class:
    Here we define requirement class whether on availability check & TOR should be carried out the setting that we carries out at requirement class level they are at global level. There settings automatically copied into define from of requirement class and vice versa.
    Action:
    *Choose requirement class: 041 & check availability check & TOR (requirement)
    F) Define procedure for each schedule line category:
    Here we carry out fine tuning setting for availability check at schedule line category level. Here we define whether system has to carry out Availability check for particular transaction.
    Ex:- if we want to implement a availability check w/o TOR for a particular transaction. According to settings at requirement class level TOR & availability check function activate & those setting will be copied into the schedule time category by default, so that at schedule line category level we deactivated TOR
    G) Determine procedure for each Delivery Item category:
    H) Checking group for updating back orders:
    CHAN

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Availability Check not working for Item Cat TANN or YG05 in Btch Split

    Currently working on implementing Automatic Batch Determination (BD) project and one fine piece is holding up the implementation (make or break for project).
    In our QA System:
      - In inventory we have a quantity of 2 for a material: 1 in one batch and 1 in another batch.
      - Create an order with 2 line items with the same material number for a quantity of 1 each.  Line item category is TANN
      - When you generate the delivery the batch determination causes the items to split (even though you have a quantity of 1 in the line item).
      - When you go into the delivery and open up the 1st line item and look at the 900001 line, BD chooses the 1st batch for a quantity of 1.  Line item category is YG05.
      - When you open up the 2nd line item and look at the 900002 line, BD chooses the 1st batch again, NOT the 2nd batch which it should.
    If I change the line item category on the Sales Order to TAN and generate the delivery, BD correctly assigns the 1st batch to the 900001 line item and the 2nd batch to the 900002 line item.  Which is correct.
    Now for the strange part.  The TANN item category and BD works find in our DEV Sandbox, but NOT in our QAS system.
    I have spent two days now trying to find out where Availability Check is assigned specifically to Item  Categories and any differences between our DEV Sandbox and our QA systems to no avail.
    Our customers need the ability to be able to put the same material number on multiple lines of a sales order due to special pricing per customer within an order.
    Can anyone direct me to some configuration or transaction that controls Availability Checking by Item Category.  I have checked the 0VLP transaction and they are identical between our DEV and QA system for the TANN and YG05 categories.
    Any help will be greatly appreciated.

    In VOV6 the 'CP' Schedule Line Cat. has the Availability flag check.  There were a few areas where I found an "Availability" flag and made sure there were all set.
    But, I did finally find out what the error was:
    Logistics Exec -> Shipping -> Basic Shipping Functions -> Avail Check and Transfer of Requirements -> Transfer of Requirements -> Determination Of Requirement Types Using  Transactions
    There are entries by Item Category.  For
    I/C = TANN
    MRP type = PD
    the Requirement Type was missing (if you look at the entry for TAN/PD you see an 11 in the RqTy column).
    So I entered a 11 (Delivery Requirement) into the field and now the Availability Check works and I am getting the correct Batches and quantities during Batch Determination.
    There is no entry for the YG05 batch split, so I guess the system just uses the Item Category of the main line item.
    Thanks for the responses.  Sorry to bother you I should have figured this out earlier.
    Scott.

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • Availability Check at Storage Location Level.

    Hi All,
    Currrently we have the availability check functionality happenin at the plant level. If the stock is available in the plant, then the sales order is getting confirmed. But, the requirement is if the stock is insufficient then system should check all storage locations attached to the plant. Can someone please guide as to how this can be achieved?
    Regards,
    Raghav

    Hi
    This is not a standard SAP functionality. Either you have to input the storage location manually in the sales order or to automate this,  you have to enhance the functionality using a userexit.
    Thanks,
    Ravi

  • Availibility check at Storage location level

    Dear all,
    we have implemented inventory management ( not wm and lean wm ) , my business scenerio is when i am creating the STO the availibility check is carried out which is considering all the storage locations of supplying site
    e.g  SL01 - Unrestritrd Use
           SL02 - Damage
           SL03 - Resrved
    My client requiremnt is when availibility check should carried out it should conside only one storage location i.e SL01 - Unrestricted use stock and should not considere Stock of other storage location except SL01.
    What configuration need to be done
    Thanks and Regards
    tara

    Dear,
    Check at: http://www.sap-img.com/sap-sd/configuring-availability-check-through-checking-groups.htm
    http://sap.ittoolbox.com/groups/technical-functional/sap-log-pp/availability-check-storage-location-1283776..
    Regards,
    Syed Hussain.

  • Reserve stock in availability check

    Dear Gurus
    I have one requirement. I have searched forum but I didn't get anything which helps me.
    I have a material A with 5 quantity in storage location 1064. When I create sale order of this material with 3 quantity system reserves this stock against this sale order.It will remain reserve until i reject this order. Thee are many open sale orders against which stock is reserved. I have to find out orders with VA05 and reject them. If i create new order of same material with 3 quantity system will only confirm 2.
    My requirement is that when i press availability check button system should only check available stock, no stock reserve. When i create delivery system should copy available stock. In short there must be only availability check, No stock reservation.

    Dear moazzamjii
    My requirement is that when i press availability check button system should only check available stock, no stock reserve.
    If this is your requirement you go to OVZ9 in that just flag the iinclude sales requirements in the in/out movements.
    Check and revert
    Thanks&Regards
    Raghu.k

  • Sales orders with availability check?

    Is there any transaction code to generate list of sales order /open orders with respect to availability check ( with the combination of organizational data)?.  will anyone share your expertise pl.

    Have you tried with VA05 where you can see tabs like
    -  Open Order quantity (quantity not yet despatched),
    -  Confirmed Quantity
    -  Status of the order (Partially delivered, Being processed etc)
    thanks
    G. Lakshmipathi

  • CRM Availability Check not working for certain Item Category

    Hi there,
    I have a situation where for certain order type/item category combinations, the availability check on the same material is not working.
    The check is set up to happen in SAP ECC.
    I have checked the config. under SPRO->CRM->Basic Functions->Availability Check->Availability Check using SAP ECC
    as per many SDN posts on this, and everything looks fine.
    The new item category, which was a copy of an existing one, works (i.e. gives availability) for certain order types, but not others.
    If I create the same order directly in ECC, it works correctly every time.
    I searched the code (from consultants who set it up originally) and can see nothing specific to the order type/ item category.
    I also put a breakpoint on AVAILABILTY_CHECK function module in SAP ECC - it is not being hit, in the case where check is not successful.
    Breakpoints in MV45AFZZ (Sales Order userexit) also not being hit, but they are hit for the Order/item category combination when it works successfully.
    Any suggestions on where else this could be configured would be appreciated!
    thanks,
    David

    Hi David,
    One 'simple' reason for this could be that the copied item category does not have the
    ATP Profile set up in the item category in the IMG. Make sure you have an ATP profile assigned in the area 'ATP Profile' in the item category.
    Please see as well the SCN Wiki link:
    Availability Check CRM-BTX-BF-ATP - CRM - SCN Wiki
    Best regards
    Christophe

Maybe you are looking for

  • Hide columns in database diagram

    Hello, I have a question that is not specific related to Visio 2010, but I hope someone can help. Is it possible to hide the columns in a database diagram ? Of course, I do not want to delete the columns, but only hide them. Thanks in advance, Best R

  • Extracting Extents from an Array Field seperated by semicolon

    Post Author: hopdaniel CA Forum: Formula We have a Field in our Database that looks like this.  15000;10000;50000;0;0;0;0;0;0;0;0;0;0;0;0;0; I need to extract the qty's in the first three extents without the semicolon. The field name is rfqitem.qty,

  • HELP! iPhone 4s is stuck in recovery mode after updating to ios 7.1 over wifi

    okay so today I updated my iphone to iOS 7.1 over wifi, and after it shut down to restart it went to recovery mode and now its stuck. Ive tried TinyUmbrella and DFU mode and nothing's working, and i need it fixed by TOMORROW. Any ideas?

  • Problem in SPRO

    Hi Experts! I have a requirement to create an IDOC. i am elaborating in details..... In VL09...i.e for can cellation of goods issued... when a cancellation is done....an OUTBOUND idoc will be triggered IDOC generation function module is created. to t

  • Bad graphic performance

    Hi all I've been working on an animation project (using Carrara), and initially thought that bad colour banding in shade areas was due to the program. Now I have tried a simple grey scale in Photoshop, and find that if I adjust the brightness, the sa