Availability control on statistical WBS element

Hi everybody,
The issue deals with <i><b>availability control on statistical WBS element</b></i>.
<u>Part 1</u> : I released 25000 as budget (CJ32) for a <b>statistical WBS element</b>.
Availability control is active for this WBS element.
We made a good receipt (MIGO) for 20000 on an AUC (asset under
construction) - so we get the value as statistical value on the WBS
element -, then invoice verification (MIRO) and finally the asset
transfer (ABUMN) from asset under construction to fixed asset.
On this statistical WBS element we get +20000 (MIRO) and -20000 (ABUMN).
The problem is that the amount that is used for the availability check
is 0, instead of 20000 as you can check !!!
We set a budget on the statistical WBS element in order to have the
availability check ... and this is not working as the system in the described case shows 25000 as available but for me we should have only 5000 (= 25000 - 20000).
<u>Part 2</u> : This is working perfectly (I get the expected value for available) when we use a <b>"real" WBS element</b>, put an expense on it, then run the period end closing tranction CJ88 in order to transfer the cost on an AUC, and finally run CJ88 again in order to transfer from AUC to fixed asset.
Did anybody already encountered this problem with statistical WBS element ? How did you solve this (we would like to keep our statistical WBS element) ?
Thanks in advance for your help.
Benjamin

Hi Benjamin,
Pl go through the link below :
http://help.sap.com/saphelp_47x200/helpdata/en/3e/a98337dd34ca76e10000009b38f8cf/frameset.htm
I have not faced this but as far as I remeber for AUC Statistical assignments have some limitations.
Any specicfic reason for keeping the WBS Statistical? Are you able to see "0" zero on this WBS in CN41.
Regards,
Sudhanshu
PS: Assign points as a way to say thanks.
Cheers,
Sudhanshu

Similar Messages

  • Settlement to cost center posted for statistical WBS element

    We have the following scenario
    Statistical WBS elements with assigned Cost center posted for actual postings
    Network assigned to statistical WBSE and settlement rule on the same WBSE
    On settlement run CJ88  the network costs are transferred from network to Cost Center posted in the WBSE.
    Issue:
    While analysing the active availability control the assigned value is doubled. This happens only of the networks are settled. System considers the Actual values from network + Statistical value from WBSE to caculate the assigned values.
    Simulation details as under.
    SP-SET-02-3  (wbs element)
        COSS 2011 11 0007101000     0001240704 KOAO D INR                 100.00  INR
        NWA 500000002408 0010
            COSS 2011 04 0007101000     0001240704 KOAO O INR                 100.00- INR   S  -- does not contribute to assigned value
            COSP 2011 04 0007101000     0001240704 COIN D INR                 100.00  INR
            COSP 2011 01 0007101000     0001240704 KPPP D INR                 100.00  INR   M   -- does not contribute to assigned value
    Hence the assigned value gets doubled and eating up the budget.
    Anyone encountered similar issues pls share the possible solutions.

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • Statistical WBS elements-Budgeting and Use

    Hi Guys,
    Need some KT from you all regarding Statistical WBS Elements.My queries are
    1.Can a statistical WBS element be budgeted? If yes how are the Budget  distributed to those below.
    2..If a level 2 WBS is marked statistical and it has 3 WBS under it which are Acc asignment element then how is the budget distributed.
    3.can you provide some good example of the use of Statistical WBS element?
    Thanks in Advance
    ssk

    Hi Shourya,
    1. As mentioned above Statistical WBS can be budgeted like any operative project and the budget can further be divided into lower level WBS elements and Availaility Control can be activated on these.
    2. Again as stated above the budget distribution is normal. For ex- If a level 2 WBS is statistical and level 2's underneath that are real WBS.
    3. We can use the Statistical WBS for capital projects. For ex- We can assign a Statistical WBS in Master record of AUC for Availability control of budget for Capital spending. And then when we create a PO with Account Assignment category A with same AUC, budget control (Availability control) is activated through the statistical WBS.
    Someone might ask but why we want to use WBS for budget control why not I/O? It's because it provides more visibility over different departments (divided by structure). And via this process we can see all our PO's on AUC directly from Asset Explorer (AW01N).
    Hope it helps.
    Thanks,
    BS

  • Statistical WBS Element in Sales Order

    Hi,
    I tried to post a sales order with a statistical WBS element but the system shows me an error saying I can't open it because the WBS is statistical (Message CJ070).
    Could it be a problem of Controlling Area or Operating Cornern?
    Is there a setting that allow me to open a sales order on statistical WBS element?
    Thanks

    are u posting to some other cost object also. normally they wud have to be posted to a COPA also with the cost element being 11 category.
    the wbs will receive the statistical posting, so there needs to be a real object also.
    see whether the real object is getting derived.
    the system is nt finding the real object and trying to post with the WBS in real, but since its statistical, the error.
    any other calrifications. plz post.
    regards
    anantha

  • Open a Sales Order on statistical WBS element. How?

    Hi,
    I tried to open a sales order on a statistical WBS element but the system shows me an error saying I can't open it because the WBS is statistical.
    Could it be a problem of Controlling Area or Operating Cornern?
    Is there a setting that allow me to open a sales order on statistical WBS element?
    Thanks,
    Diego

    To best of my knowledge, WBS is only a search criteria if u wish u take a doc as ref. in sales order. this ref. will happen only if the previous doc is prepared with ref to WBS. may be at header or item level. but i wonder how will it track the doc if there are multiple WBS in previous doc. u can assign WBS in account assignment tab page.
    I wonder if i have helped u with my answer.

  • Statistical WBS Element - do we need to set as Account Assignment Element?

    Hi,
    I would like to know if I define the WBS element to be statistical (statistical ticked in Control tab) and would want to have posting.  Do I need to set it as account assignment element?  (I noticed system is not allowing me to post if I do not set it as account assignment element).  I want to make sure the actual cost would be be posted to the WBS element as the WBS element should just be statistical in nature.
    Please also confirm if I always need to specify actual cost center posted if the statistical field is ticked PRPS-KOSTL.
    Thanks!

    Yes, so the account assignment should always be ticked if I want to post actual to STATISTICAL WBS Element.  Now I would like to confirm if I always need to specify actual cost center posted if the statistical field is ticked PRPS-KOSTL.
    Also, I understand that if I run CJI3, for statistical Actuals posted, its value type will be 11 - Statistical Actual instead of 4 - Actual.
    Thanks!
    Vivian

  • How to set Statistical wbs element?

    hi,everyone. i'm a green hand in PS.
    i know Statistical wbs element is different from normal wbs element from you guys.
    but i don't know how to set a Statistical wbs element, i mean how to make a normal wbs element  become a Statistical wbs element?
    regards,
    tiger wu

    Yes, if you choose this (in which the Statistical check box is ticked) to create a project, all the WBS will be statistical.
    To create a project in which some of the WBS are statistical and some are not, you don't need to configure this (check Box) in Project profile. You can create a project (CJ20N) and for WBS elements on control tab, you can check this or leave it.
    Hope it helps.
    Arya
    Edited by: Arya Singh on Aug 30, 2008 8:09 PM

  • Reports to see cost in statistical WBS elements

    Hi,
    Is there any standard SAP report available to see cost in statistical WBS element?
    Aman

    Closing the thread. Got answer.

  • Line item report on Statistical WBS element.

    Hi All,
    I need to extract Line report on statistical WBS element. I tried CJI3 and end up with the message No costs, revenues or finances were selected.
    can some one help me on this.
    Thanks and Regards,
    Vinod

    Hi,
    Please check below:
    Table PRPS: Select OBJNR and pass to RPSCO and check if any value exists there. Note down the Value type, Year.
    While in CJI3, please check if any dynamic Selection is active, remove all.
    if mutliple selection shows any exclusions, remove all.
    Posting Data: Remove the values. (Or put from 01.01.1900 to 31.12.9999)
    Select the standard SAP Layout (Starting with 1SAP)
    Value type=11 should be selected by default (Ensure it is checked)
    Hope it helps!
    Thank you and Regards,
    Varshal Kachole

  • Project System Cash Management in combination with statistical WBS element

    Hi,
    within  a customer project, we have to solve the following issue:
    Customer runs projects and statistical projects in combination with internal orders.
    We want to use the PS Cash Management for planned and actual payments.
    With statistical projects we have the following problem:
    Invoice and actual payments will be processed with the transaction CJFN.
    Actual payments are shown only on the internal order (transaction CJIA), but not on the statistical WBS element.
    We want the information about the actual payments with in the project system reporting (S_ALR_87013574).
    Projects, not flagged as statistical will deliver the expected results.
    Many thanks for your ideas, to solve this problem.
    Steffen

    are u posting to some other cost object also. normally they wud have to be posted to a COPA also with the cost element being 11 category.
    the wbs will receive the statistical posting, so there needs to be a real object also.
    see whether the real object is getting derived.
    the system is nt finding the real object and trying to post with the WBS in real, but since its statistical, the error.
    any other calrifications. plz post.
    regards
    anantha

  • Change WBS's statistical WBS element

    Hello;
    We use the SAP PS module. I create the WBS and WBS's statistical WBS element (XSTAT) set the true.
    I need the change WBS's statistical WBS element and set the false. But WBS's statistical WBS element read only on the screen.
    How is change WBS's statistical WBS element?
    Thanks.

    Hello
    Set a substitution rule for a particilar proj profile/type, to set the WBS as statistical on saving.
    Sarang

  • No costs visible statistical WBS element

    Hi,
    The followin steps are the setup:
    - Project with a statistical WBS element and a network below
    - Create a PO with Account category "Fixed Asset"
    - Fill in a fixed asset, but also a (statistical) WBS element (put fields 'project' and 'network' optional in customizing)
    - execute a MIGO to book costs
    Now when I run the cost report for this project using transaction CJI3 then I do NOT get the costs visible on this statistical WBS element.
    HOWEVER when I do the same steps, but instead of putting a statistical WBS element I put the network (next to the fixed asset) then I do get the costs visible.
    Is this normal or do I have to change something in order to get the costs visible for my statistical WBS element?
    kindest regards
    bert

    It is normal

  • PM Budget - Statistical WBS element

    Hello,
    My intention is monitoring the PM budget for a plant by linking every PM order to a statistical WBS element.
    After posting on the PM order and performing costplanning via CJ40 i get a overview in transaction: S_ALR_87013543 - Actual/Plan/Variance Absolute/Variance %.
    However. Not every PM order shows up in the report. I thought it had something to do with the moment you assign the WBS element to the PM order but this didn't prove to be a valid statement (before or after actual postings on PM order).
    I can probably find out by extensive testing, but i was wondering if anybody knows if there are specific rules regaring the usage of statistical WBS elements in PM orders? More specificaly, when the assignment will NOT work and the actual costs will not show up in S_ALR_87013543.
    Kind regards,
    Peter Hageman

    Settling was done towards a Costcenter. The WBS element used is a statistical WBS element, that only can be used for reporting purpose. how the settlement rule is set up doesn't matter in this case.
    Issue no longer exists.
    Solution was evident. WBS element in the order was stored on the location tab, and in order to use CJI3, you have to link it on the additional data tab...

  • Change the PYP's statistical WBS element

    Hello;
    We use the SAP PS module. I create the PYP and PYP's statistical WBS element (XSTAT) set the true.
    I need the change PYP's statistical WBS element and set the false.  But PYP's statistical WBS element read only on the screen.
    How is change PYP's statistical WBS element?
    Thanks.

    Thanks

  • No costs visible for statistical WBS element

    Hi,
    The followin steps are the setup:
    - Project with a statistical WBS element and a network below
    - Create a PO with Account category "Fixed Asset"
    - Fill in a fixed asset, but also a (statistical) WBS element (put field 'project' optional in customizing)
    - execute a MIGO to book costs
    Now when I run the cost report for this project using transaction CJI3 then I do NOT get the costs visible on this statistical WBS element.
    HOWEVER when I do the same steps, but instead of putting a statistical WBS element I put the network (next to the fixed asset) then I do get the costs visible.
    Is this normal or do I have to change something in order to get the costs visible for my statistical WBS element?
    kindest regards
    bert

    Is this necessary?
    Because in the end I want to book these costs as actual costs on my fixed asset...

Maybe you are looking for

  • How to reset or change "what should firefox do with this file" option in Firefox 3.6.6

    How to reset or change "what should firefox do with this file" in Firefox 3.6.6. Accidentally I changed it to save file for .pdf files and now I want to reset it to default asking whether to open or save. any help please Thanks, raj

  • How to unload/relaod a cube ?

    Hello everyone ! I would like to do the following : - unload a cube. - delete whole data of the cube - reload the cube. May you explain how to do it properly ? Much thanks ! Fred

  • Powerbook g4 vs

    I am thinking of getting a new computer but there is nothing wrong with my powerbook g4. Can anyone advise? I was thinking of getting a new macbook or maybe getting the new iMac. or I could update the powerbook with leopard and get the new iMac. I do

  • How to Find Companies Using SAP CRM in Australia ??

    Hello mate, Could you please tell me how to find out the companies list which are currently using SAP CRM in their organization and located in australia Thanks David

  • IMac Finder crawling, unusable even after troubleshooting. help!

    Torturously slow Finder in my Intel iMac 2.16ghz OS 10.4.11. It can take it over a minute to load basic Finder windows. It can take five minutes to get from command- print to actually printing a photo from iPhoto, running the Spinning Beachball of De