Available Capacity in LTP
Hi,
During creation of a planning scenario during LTP, we have a facility of assigning the Available capacity versions. Imagine, that a few versions have been defined with '01' as the active version and some Simulative what if scenrio versions. This active version has been maintained in the relevant WC/Resource.
Now during the creation, I would like to assing one of the what if scenario available capacity version. But I am really not sure how the system is supposed to behave since this version is not attached to any capacities in the work centres.
Now in case i would need to analyse the what if scenario capacities, what is it that needs to be done.
I have tried digging in some of the SAP material but came up with nothing.
Any pointers on how to use the Available capacity versions and what settings needs to be done will be much appreciated.
Regards
Kiki
1. SAP has given this facitliy so that we can do a simulation based on different capacities.
2. For this first you have to maintain different version of capcity in the workcentre level
3. in the workcentre in the capacity tab you can see version , so can create different version of capacity here .
4. Later when you create a planning scenario then you can plan with different version and do simulation.
kindly let me know if this resolves,else will explain in detail.
reg
Similar Messages
-
Hi Gurus,
we are using Active version : 01 of work center capacity for detailed planning. Now we want to use Capacity vesion : 04 - constrained capacity for LT scenario. Can any one explain me how to create a master data for capacity through work center?
Thanks in advance
RajaRamHi,
Have you created already Capacity Version: 4?
If not follow th procedure:
SPRO--> Production --> Basic data --> Work center --> Capacity Planning --> Avilable CApacity --> Define Version of available capacity.
After that, In the capacity header details of the work center, intervals and shifts, there you select your Version :4
Change the Default values, Start, end, length of break etc..
Change the Valid from date, to date shifts etc.
With this you have created your Available capacity version : 4.
Still your Active Version is 1.
Now you can use this in LTP - Planning Scenario.
Hope this helps..
Regards,
Siva -
Standard available capacity Vs actual capacity used in W/C
Hi Gurus
Can some tell me the tcode for a report which will give me the "Standard available capacity Vs Actual capacity used" for a Work Center?
regards
HRHR,
It is unclear to me how this report falls short of your requirements.
CM01 displays Capacity requirements (load), Capacity available, and percentage of requirements vs available.
http://help.sap.com/erp2005_ehp_06/helpdata/EN/89/a41dd8461e11d182b50000e829fbfe/frameset.htm
Other ways of evaluating the same data: CM02, CM03, CM04, CM05, CM07, CM50.
I suggest you work with the standard reports for a while before you consider changing them. However, you can alter the standard cap evaluations in many ways. Review
http://help.sap.com/erp2005_ehp_06/helpdata/EN/91/dcac7377be11d183b30000e83235ee/frameset.htm
Config starts at IMG > Production > CRP > Evaluation. Work downward from there.
Best Regards,
DB49 -
Changing colour of Available capacity Line Graph in DIMSPPB_BARCHART_DEMO5
Hi all experts,
I am facing a problem in changing the colour of Available capacity Line Graph in program DIMSPPB_BARCHART_DEMO5. Currently it appears as a blue line. Can someone please help me in changing the colour of this graph to any colour I want.
Thanks in advance,
Mitrajit Debroy -
Workforce planning- issue with available capacity
Hi All,
I have an issue in workforce planning. I have created a workcentre and have entered the required details in capacity tab to arrive at available capacity. The available capacity for this workcentre is visible in transaction CM01.
I have done the workforce palnning using worcentre view in transaction CMP3, but for some reason I am unable to see the workcentre avaliabile capacity. I only see the distributed total requirements.
Would appreciate any pointers on this.
Regards
PradeeshRegarding the availablity of CMP3, it refers the availability of assigned persons rather than the work centers.
Please check the involved person with transaction PA30 using infotype 007
(see details in consultant note 543362).
Kind regards,
Zhenbo -
FM for checking Available Capacity of Work Center
Dear All,
I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it). It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process. Any inputs would be appreciated.
Thanks in advance.Dear
Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
If you are stick to FM : Help about available capacity
Hope this will address you issue
Regards
JH
Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM -
Hi PP Experts,
Can anybody please explain me,
What is difference between Standard Available capacity,Available capacity & Pooled capacity.
Please explain with giving simple example if possible.Don't define.Please helpout.
Edited by: Raja S on Oct 17, 2008 8:11 AMDear,
We assign the Standard available capacity at capacity header (capacity view)of Workcenter (CR02).
In the work centre - capacity header overview give the following data in std available capacity sub heading
start :08:00:00
Finish:12:00:00
break:00:00:00
Capacity utlization - 100
No of ind capacity = 1
Hence the capacity of 16 hrs is fixed for this WC. This your standard avilable capacity.
OP37 Maintain Available Capacity Version
You can use it as Normal available capacity or maxnium avilable capacity. The active version of available capacity is used as a basis for scheduling.
Pooled capacity is nothing but an available capacity that can be used by several work centers.
An example of a pooled capacity is a group of setup personnel who perform setups for many work centers.
Pooled capacity
A pooled capacity can be assigned to several work centers. It is created and edited independently of the work center. This is useful if, for instance, a group of employees works in several work centers.
Capacities can be entered and changed in work centers, but also independently. The system distinguishes between.
For working with CR11 ,I think first the pooled capacity should be included in SPRO.
Just check out in SPRO-Production -BAsic Data-Work center-Capacity Planning-Define Capacity categories
Hope clears to you.
Regards,
R.Brahmankar -
Fields for Available capacity in SAP
We are trying to generate Z report on Availabile capacity
Under normal transaction : by going in CR03 we can have Start time / Finish Time based on which we get operating time in hours, we need to capture the Avaialble capacity we are not getting this field in any SAP table
Max we go in KAKO by capacity ID of resource and get Start time, Finish Time , Breaktime in Seconds & % utilization how do i convert this in Hours,i have tried various combinations but it does not matches in CR03
Can anyone suggest how to convert this seconds or any other table from which i can get Availability Capacity in hrsDear Bhavesh,
Check this logic,
Available Capacity = From table KAKO take the fields BEGZT(shift start), ENDZT(shift end) and PAUSE(break time),divide this
value by 3600 and you will get it hours.
For example if BEGZT - 25200,then 25200/3600 = 07:00:00 start time.
ENDZT - 54000,then 54000/3600 = 15:00:00 end time.
Check this logic a.capacity = {(BEGZT - ENDZT) - PAUSE}NGRADAGNOR /100
Regards
Mangalraj.S -
Incorrect size & quantity of photos and available capacity
Hi,
Recently, I imported and subsequently deleted many photos on my iPad. There're only 17 photos left (and as indicated in "General" under Settings). However, under iTunes Summary, it shows a total of 678 photos on my iPad. More strangely,
- iPad: the 17 photos add up to 4.68MB in size, with 8.7GB available in capacity;
- iTunes: the 678 photos add up to 3.6GB, with 12.3GB free space.
How do I locate the rest of the 661 (678-17) photos that iTunes detected? I want to get rid of these "hidden" files as they're eating up my free space. I did a restoration to my iPad but the size of the photos and available capacity are still not showing right.
Please help~~ I would greatly appreciate any advice given. Thanks!!Welcome to the Apple Discussions. It appears to be a bug. Be sure to report it to Apple via http://www.apple.com/feedback/iphoto.html. I get varied results when selecting multiple events or photos, deselecting and then adding them back. iPhoto then tells me the disk is full even though I've not selected enough to fill it.
But we have to remember that there's a lot of overhead when burning via the Share->Burn option. In addition to the original files we also get the thumbnail, modified and many database files. That adds up fast. It's just not clear what's happening.
Even though you get those screwy numbers does the burned disk contain the correct number of photos? -
CProjects - "Available Capacity" for resources
Dear Experts,
We are on cProjects 4.0, Support Pack 11.
We have a requirement by which we use a four-day-per-week calendar. Also, this calendar is required to have some holidays which are specific to our business. And this works good in our calendar.
However, we notice that the "Available Capacity" for resources (Under Resources > Staffing) does not caluclate the available hours based on this calendar. So to say, the available capacity for resources is calculated on the basis of some different calendar. We can make changes to the availability of a resource per day (from 8 to, say, 10 hours per day). But what we have not been able to do is to have the availablity calculated on the basis of the working days available in the project calendar.
How can we do this?
Summary
How can we get the application to calculate "Available Capacity" for resources on the basis of a calendar of our liking and not the system's?
Thanks in advance.
Regards,
BittuHi Vivek,
This helped and you get 6 points!!
I could make the settings as per your suggestion and see that the 'Available' capacity for resources is now governed by the 'factory calendar' and 'hours' per day that I specify.
However, we have a requirement by which this 'Available Capapcity' may not be governed by the the same calendar for every resource. For e.g., resource R1 may have 'Available capacity' based on calendar C1 and Resource R2 may have an 'Available Capcity' based on calendar C2. How do I make allowance for this?
What I mean is, the settings that I have done works good but the same rule applies to all the resources. Is there a way I can make one setting applicable to one resource and another setting applicable to another resource??
Thanks in advance.
Regards,
Bittu. -
Shift sequence in available capacity
hi, all SAP experts,
my question is as follows
I created grouping in which shift sequences are defined and i assign this group to work center in capacity header. So work center should have to select shift sequence in capacity tab but i enter manually start time and finish time in capacity header.So why systm can't show interval of available capacity daywise automatically through grouping or is there any setting for this?
thanks in advance
i will look for points also
regards
Nitin NerkarDear,
In work center change transaction capacity view
assign this grouping no XX.
Enter active version = 1
Then Click on interval and shift push button (left top)
follow the menu path Edit>insert>insert interval
enter
valid from and valid from field
enter shift sequence and remove the data if there in any other filed and click on ENTER. all the days in week are defaulted with the shift seq you defined.
It will work for you.
Regards,
R.Brahmankar -
Rotating Off-Days in PM Work Center Available Capacity
Good Day!
Background:
Each Maintenance person is represented by a PM Work Center.
Maintenance person have a rotating off-days which cycle repeats after 21 days.
Requirement:
We want to reflect rotating off-days to PM Work Center Available Capacity.
Options tried but did not worked;
Shift Definition Grouping: Off-days is in HR's Period Work Schedule but only Daily Work Schedule can be pulled into Shift Definition Grouping and then into Work Center
Reference Available Capacity: Can be achieved via Shift Sequence Key in interval of available capacity but needs to maintain for each week with on-going maintenance
Do anyone has implemented this similar requirement that we can reapply/build on?
Your valuable inputs are deeply appreciated.
Thanks!In work center capacity header
click change intervals
click insert
Enter manually
valid from and valid to dates
No of ind capacity - 0 -
SNP Resource available capacity variance
Hi friends,
need your help??
I am using an SNP resource with capacity 500 min per day(Bucket). but after thew SNP run when i download the optimizer log data( Transaction:/SAPAPO/SNPOPLOG) the available capacity derived from the log is for the particular day is different than the actual capacity of the resource(i.e. it is less than the actual available capacity).
How can be this issue resolved.??
please revert back urgentlyHi kiran ,
Check for the following possible reasons :
Try this resource in SNP Heuristic and check the capacity and do levelling.
Check the Time zone and the calenders for this resource and plant.
Check the overload % and min load % rounding & down times.
See oss note 510339.
Optimizer gives the results based on the settiing you have entered,and you will only be able to analyse it better .
Regds // Digs... -
CMP2 work force planning available capacity shows less
In CMP2 workforce planning : The available capacity for a person (assigned to activity) shows 7.5 Hrs each day although Capacity for that one resours is 8 Hrs (=Operating time). There is only 1 capacity in the work center.
Can some one give any idea why this descrepancy ?
Thanks.Hi,
Also check the formula used in the capacities tab of the workcenter.
BR
Anjali -
100GB HDD - 'Available' Capacity Issue
Apple forgot to put a disclaimer about the available capacity issue on its 12 inch and 15 inch G4 powerbooks that come loaded with a 100 gig hard drive and 1 gig of ram. Check the outside of your box, it is not on there. I also have a imac G5 and it comes with this disclaimer, as does every other Apple computer. Thinking they solved the available capacity issue, I then opened the box, turned on the computer, went up to the blue apple in the upper left hand corner of the screen, clicked on about this mac, then clicked on more info, then went to the hard drive info, only to find, I had less capacity then I was led to believe I had purchased. Any one out there with this same issue?
MIR --
Thinking they solved the available capacity issue....
There is no "available capacity issue" to be solved. The difference between the stated capacity of your 100GB hard drive and it's actual 93.13GB capacity is simply the result of how drives are marketed. See: http://en.wikipedia.org/wiki/Hard_disk (discussion under the heading "The Difference Between 'Marketing Capacity' and Actual Capacity").
But you already know this, as that's what RD told you just earlier, and what others have told you on five separate occasions in response to your previous five posts on this exact same subject. See:
http://discussions.apple.com/message.jspa?messageID=2031695#2031695
http://discussions.apple.com/message.jspa?messageID=2031671#2031671
http://discussions.apple.com/message.jspa?messageID=2031662#2031662
http://discussions.apple.com/message.jspa?messageID=2031638#2031638
http://discussions.apple.com/message.jspa?messageID=2031594#2031594
Your question's been answered over and over; please stop this senseless clutter. Thanks.
Maybe you are looking for
-
Learn Julieanne's top 5 favorite features in Photoshop 13.1 including refinements to the Crop Tool, nondestructive editing with Blur Gallery and Liquify, increased efficiency with Conditional Actions, practical default Type Styles and support for Ret
-
Hp D7360 photo prints are all too dark or red tinged
every single photo we print we have to manually adjust settings to get it to look like the camera took it and the monitor shows it. they are always too dark or red toned. we do most of our printing in kodak easy share, i've changed color management f
-
Upgraded my 2009 iMac with ssd drive
Hello I wanted to share my experience with upgrading my late 2009 iMac replacing the DVD drive with a 240GB SSD drive and upgrading the hard drive to a 3TB hard drive. Back a year ago I upgraded the factory 1TB with a seagate 2TB which was the main i
-
Customized web page for web authentication.
Hi, can any one share a working "customized webpage for web authenticaiton", Virtual IP address of the WLC is 5.5.5.5. Thanks.
-
Is it possible to run a java application/program forever?
Hi, Is it possible to run a java program forever? if so please reply how it is possible thanks in advanced.