Availibity

HR guru's,
can anyone please tell me which Table and Extractor of HR module in R/3 give information about employee's available hours or availibility ??
thanks
akash.

I got the answer

Similar Messages

  • ME2o - availib.check - What is the solution?

    Hi Friends,
    can You help me to solve this problem:
    I create deliveries for subcontract orders with tarnsactions Me2o. An incorrect availib. check gives a massage that amount i want to delivered to subcontract is not available in stock althought i made PO and good receipt for this amount.
    I was looking for the right notes but none of them are corretct.
    Edited by: Molinski Roman on Dec 3, 2008 3:18 PM

    Hi,
    Check whether the GR date is early than the delivery date when creating delivery note via ME2O?

  • Availibity Confirmation

    Hi All ,
    We have process as we create a Factory order (ZFAC) and customer Order (ZCUS)for configurable material (Two different Sales Order) for a legacy Order . Factory Order goes to factory and follows below process
    PRu2014PO --- Inbound Delivery u2013Good Receipt
    After Goods Receipt for factory order we can able to do PGI for Customer order.
    Now my issues is that when i create ZCUS ,it created schedule line and gives me confirm delivery date ,though material that order is not in stock (Means I want confirmation of delivery depend upon the GR of Factory Order )
    I need ZCUS should always gives confirmation depends upon GR of ZFAC Factory Order
    Regards
    Ashish

    Hi Ashish,
    Please go to OVZ9 t- code according to your availablity check and checking rule defined in material master and in order to take into account purchase requisition, you need to check box " Inc. prch. requisitions ".
    Hope it will meet your requirement.
    Regards,
    Sinan

  • High Availibity solution for office web app server 2013 for Sharepoint 2013

    I have a scenario with the three nodes SP1 , SP2 and DR-SP with server 2012 standard, each running SharePoint 2013 enterprise, All of three nodes are members of single SharePoint farm that spans two data centers.Primary Data Center have two nodes SP1 , SP2
    and DR data center have one node DR-SP of share point 2013.
    For Office webapp server i have two nodes OWA1, and DR-OWA with server 2012 standard, that spans between two data centers.Primary Data Center have OWA1 and DR data center have one node DR-OWA of office web app server.
    Currently i have configured office web app on  primary data center node OWA .How i can enable high availability of office web app server in case of primary data center outage.Please guide.

    WAC servers on a single farm must be in the same data center. The WAC configuration you've proposed is unsupported. Build a separate WAC farm in the secondary data center and attach it to the SharePoint farm only in the event of a disaster.
    Trevor Seward
    Follow or contact me at...
    &nbsp&nbsp
    This post is my own opinion and does not necessarily reflect the opinion or view of Microsoft, its employees, or other MVPs.

  • High Availibity solution for Sharepoint Service Applications

    I have a scenario with the three nodes SP1 , SP2 and DR-SP with server 2012 standard, each running SharePoint 2013 enterprise, All of three nodes are members of single SharePoint farm that spans two data centers.Primary Data Center have two nodes SP1 , SP2
    and DR data center have one node DR-SP of share point 2013.
    For MS SQL i have three nodes DB1, DB2 and DR-DB3 with server 2012 standard, each running an instance of SQL Server 2012 enterprise, participate in a
    single Windows Server Fail-over Cluster (WSFC) that spans two data centers.Primary Data Center have two nodes DB1 ,DB2 and DR data center have one node DR-DB of SQL Server 2012 enterprise.
    Currently i have configured these service applications on  primary data center nodes SP1 .How i can enable high availability for different service Applications  of SharePoint 2013  like Profile service application, search service application,
    managed meta data application in case of primary data center outage.

    stretched farms are not supported unless the WAN provides sub-millisecond ping times.
    Scott Brickey
    MCTS, MCPD, MCITP
    www.sbrickey.com
    Strategic Data Systems - for all your SharePoint needs

  • SAP SD Availibality + Picking

    1. I have created a Sales Order 15009231 on 02.11.2010 for Material 391115 Quantity Two. Requested delivery date is 08.11.2010. Availability check is working fine and schedule lines confirmed for 08.11.2010.
    2. Created delivery 80106315 on 04.11.2010.
    Picking           06.11.2010
    Trans. Planning   06.11.2010
    Loading           06.11.2010
    Planned GI        06.11.2010
    Delivery Date     08.11.2010
    3. On 04.11.2010 EDI output (LAVA) has processed successfully from delivery 80106315 and updated delivery details (material and quantity) in third party wear house system (Mailway) for picking.
    4. Picking done in Mailway for delivery 80106315.
    5. On 05.11.2010 Mailway has updated the picked material and quantity in their system, which will update delivery through an IDOC.
    6. IDoc has filed in SAP with ERROR MESSAGE '' Only 1 CS from material 391115 are available''.
    Can you help me to understand why IDoc has failed?
    In the sales order 15009231, avaibability screen I could see Material 391115 and Quantity Two are allocated against the delivery 80106315.
    Any small suggestion even could help me. Pls suggest
    Thanks and Regrds,
    Satish

    Please feel free to NOT post this in these forums - they are for technical and functional people to discuss technical and functional issues, not to save you from doing your own recruitment work.

  • Is The Availibity Page

    always Correct? 100% of the time? and does it run by pacific time or by ur time?

    They are directly updated from the FedEx shipments that are going to each store, which they are aware of the night before.
    If it says there will be iPhones of certain GB and color, that is 100% correct for the following morning (given that FedEx planes don't get stuck on runways and things like that, which does sometimes happen)
    If it says there will not be iPhones available the next day, then there definately will not be.
    There was an article released tonight that indicated that 32 states have no iPhone stock and won't have any for a few days.

  • Not all JMS consumers are created equal

    Hi,
    I am experiencing a very strange problem with weblogic 9.2 JMS.
    I am using JMS as flow control in an application that allows our users to import data into our application.
    the data to be imported varies in size from 100's of records to many hundred thousands of records.
    JMS feed a MDB that takes the request and imports the data. The DD allows to 10 concurrent MDB's to service the requests.
    The problem arises when the 11'th and 12th request comes in. Instead of waiting for the first availibe MDB to service the requests they seems to be put into the queue of the MDB that was started first. If this MDB is in the process of importing a very large file request 11 and 12 will sit and wait until the large one is done even though there are other MDB's that are idle.
    I am hoping that there is an easy fix for this, but for the life of me, I cant seem to find it.
    The DD for the MDB looks as follows
    <weblogic-enterprise-bean>
    <ejb-name>RuleEngineMDB</ejb-name>
    <message-driven-descriptor>
    <pool>
    <max-beans-in-free-pool>10</max-beans-in-free-pool>
    <initial-beans-in-free-pool>10</initial-beans-in-free-pool>
    </pool>
    <destination-jndi-name>com.company.product.RuleEngineRequestQueue</destination-jndi-name>
    </message-driven-descriptor>
    </weblogic-enterprise-bean>
    the queue is defined in Weblog as
    <queue name="RuleEngineReque
    stQueue">
    <sub-deployment-name>MyJMSServer</sub-deployment-name>
    <delivery-params-overrides>
    <delivery-mode>Non-Persistent</delivery-mode>
    </delivery-params-overrides>
    <message-logging-params>
    <message-logging-enabled>true</message-logging-enabled>
    <message-logging-format>%header%,%properties%,%body%</message-logging-format>
    </message-logging-params>
    <jndi-name>com.company.product.RuleEngineRequestQueue</jndi-name>
    </queue>
    regards,
    Lars Hansson
    CTO Compost Marketing AB.

    A little more detail: You will need to configure and target a custom conection factory with "message maximum" set to 1 (the default is 10), and then modify the MDB descriptor to reference the JNDI name of the custom connection factory. The connection factory should be targeted to the entire cluster, and must be targeted to the same cluster that hosts distributed queue. If the MDB is transactional, ensure that that the custom connection factory is also "xa enabled".
    Edited by: TomB on Mar 2, 2010 2:44 PM

  • Delivery cannot be created (only 0 qty of material available )

    Hello All,
    I have created a sales order for material A on plant B for  one qty. The delivery date is 29.12.10 but the system has confirmed the schedule line with a delivery date of 3.1.11. The material availibilty date is  28.12.10.
    But when I create the delivery, the system gives message, "Delivery cannot be created (only 0 qty of material available )".
    I have checked MMBE and CO09 , there is a stock of qty 2 for material A for plant B. Also there is no other sales order consuming the stock in CO09 for material A in plant B.
    The schedule line catergory is CN(not relevant for MRP)  in sales order and that is why I cannot see sales order requirement in Md04/Co09. But in any case since the stock is available, the system confirmed the schedule line for 3.1.11 in sales order as said above.
    While creating delivery, we are giving a delivery date of 28.12.10 (equal to material availibity date ). I have not checked the availibilty check group but even if checking group= no check, still I think ,the system will confirm schedule line since stock is available and it has confirmed stock in sales order as said above
    But still we cannot create delivery and receives the error, "Delivery cannot be created (only 0 qty of material available )"
    Pls help.
    regds
    Pamela

    Hi Pamela,
    It seems that material A is not available in plant B on 28.12.2010 even if the stock is shown as 2 qty in MMBE
    Please go to MMBE place the cursor on storage location and the check the Warehouse stock for that material.
    It may be that material qty 2 which is currently shown in stock overview is lying in interim storage type 916 against some goods movement (601) issued against some other sales order.
    Also check whether negative stock are allowed in that storage type. In your case , I think they are not allowed.
    I hope this helps
    Br,
    Tushar

  • Problem in creating sales order in Make TO Order

    Hi all,
    We are trying to test the strategy 50 (Make to Order strategy) . To begin with we are trying to create the Sales order. However , we are getting the message "NO availibity check can be carried out for Material " we have assigned the checking group and checking rule .
    What can be the possible causes for this problem . Please help me . I will be very grateful . Thanking you.
    Kind Regards
    Ayaz

    Dear ,
    Planning startegy 50 , Requirement Type of Customer KEV , in -OVZG -can you please chek the following : Select the Requirement Class for Planning Startgey 50 based on the Requirement Type : KEV
    1.Did you mark the Indicator Requirement Transfer in Requiremet Tab
    2.Did you mark the Availablity Check marked ?
    Goto SPRO-Define Planning Statgey and Comapre the same because it will be copied from OVZG
    Hope it is clear
    Regards
    JH

  • Firmware upgrade Nokia 5230 - SLOW device!

    I see that the device 5233 had an firmware upgrade availibe from 12.1.089 to 12.1.092. This upgrade is now not availible for the nokia 5230. This device is much slower than the 5233 and 5800.
    Is there a way to make this upgrade also soon availible for the nokia 5230? Because this device has now only the firmware version 12.1.089

    try to uninstall them and re-install on memory card not phone memory
    it's the reason if you installed these apps on phone memory
    + change the messages to be stored on memory card not phone memory
    -you can show appreciation to my posts if it helped or useful by pressing the green Kudo star beside my post that hepled
    -if my answer was the solution , so click accept as solution button
    Started From Nokia 3310 , Now with Nokia N97 v.22.0.110 + N900 PR1.2

  • Can't get LR5 tethered capture to work for 70D - EOS utility won't install

    I am attempting to setup tethered capture on a macbook pro with Mavericks, Lightroom 5 and a Canon 70D.
    Lightroom 5 tethered capture alternates between "no camera detected" to "Canon EOS 70D" a few times and then posts the following error:
    "Tethered Capture is not able to connect with the camera Canon EOS 70D (error code Canon EOS 70D). Please try restarting Tethered Capture or relaunching Adobe Photoshop Lightroom."
    After browing for a solution, some have suggested that need to install the latest EOS utility software.
    The EOS utility CD (ver. 28.2) that came with the camera will not install. I can browse the CD, see the files, etc. but when riunning the installation the installer appears on the dock for a split second, disappears and no error is given.
    I downloaded the latest software from the Canon website, but it is upgrade only software.
    I found an old EOS utility CD and it installed fine on the laptop.
    I then attempted to upgrade the software by using the new CD as well as the upgrade file from the Canon website.
    No matter what method I use, I still get the same results. I click on the installer, it appears on the dock for a second, disappears and nothing is installed.
    If anybody has any advice, I would greatly appreciate it. Do I need the EOS utility software installed to perform tethered capture in LR5 with a 70D? If so, why won't it install?
    Thank you,
    Larry

    "Do I need the EOS utility software installed to perform tethered capture in LR5 with a 70D?"
    The answer to this question is, no.  However I am not a Mac user but many of my Mac friends complain of problems with Mavericks and LR and possibly EOS Utility.  Canon has full d/l availibe for you instead of just the upgrade. They are also on the site. (at least for Win machines)
    You may need to find a Mac site to help you with this.  Sorry I am of little help.
    EOS 1Ds Mk III, EOS 1D Mk IV EF 50mm f1.2 L, EF 24-70mm f2.8 L,
    EF 70-200mm f2.8 L IS II, Sigma 120-300mm f2.8 EX APO
    Photoshop CS6, ACR 9, Lightroom 6

  • Stock Availablity of a Material in A Plant

    Hi friends,
    For then entered Line items in Quotaion Display transaction(VA23),We can view the availablity of the Stock.
    This can be viewed using the following the Menu path.
    Select the line item go to Schdule lines->Edit->Item availablity.
    Then in the screen we find like Confirmed quantity against the date,Delivery proposal with the quantity against the propsal date.
    I am trying to create Quotaion in ABAP webdynpro,Client wants to have same kind of functionality in ABAP webdynpro.
    When they enter the Material,and the quantity and they press enter key,then want see the availibity of the Materials and the dates.
    Could you please where do I get the these information of the Quantity entered at the line item level?
    Regards,
    Xavier.P

    Hi,
    you i am able to find the Stock for a material, but VA21 transaction after entering the Material number and the quanity and press enter,if the Quanity is more than what is in the storage location,it will take you to Item availablity screen where you will see the Confirmed quantity and the date,same way delivery proposal date and the Quantity
    I am trying to get the those delivery propsal dates information and the quantities.
    Regards,
    Xavier.P

  • Report node and reports repository

    what is the difference between report node and reports repository. I know that Process schedular picks the report from report repository in order to show in process monitor. Does report node and reports repository are same??

    After a report runs to success in runstatusYeah, but the files are send to the report repository even if it is not successful terminated (run status is not sucess). If the files are not sent to the report repository, then the problem doesn't come from the process itself, but from the definition, space availibity...
    When a report has been posted sucessfully (transfered from the process scheduler report repository - on the other hands the log_output dir, to the report repository defined into the report node), the status of the distribution status is Posted.
    The run status and distribution status are independant eachother.
    Nicolas.

  • High Availability - 7.0.116

    Hi all
    The high availibity feature that gets configured on the AP for primary/sec/tertiary controllers, do both the hostname and IP need to be entered? If you only enter the hostname of a pri/sec controller but do not enter an IP, does the AP try to resolve the hostname via DNS or does this feature fail completely and the AP begins its typical WLC discovery process?
    Thanks
    AB

    Entering an IP address for  the backup controller is optional. If the backup controller is outside  the mobility group to which the access point is connected (the primary  controller), then you need to provide the IP address of the primary,  secondary, or tertiary controller, respectively. The controller name and  IP address must belong to the same primary, secondary, or tertiary  controller. Otherwise, the access point cannot join the backup  controller.
    http://www.cisco.com/en/US/docs/wireless/controller/7.0MR1/configuration/guide/cg_lwap.html

Maybe you are looking for

  • Log in error using Discover 3i

    I have a singe machine installation of Discover 3i with the following components installed. - Win NT4 (service pack 4) - MS IIS as the web server - Discover locator, server, preference components installed. All the components registered successfully.

  • Line reconnected after fault can I get my IP Profi...

    Have had a fault/disconnect on my line for the past week and a half preceeded by a lot of disconnects which forced down the IP profile. Openreach engineer reconnected the line this morning and I was hoping the IP profile would be reset but it is at 0

  • Why blank browser or Live View?

    I am creating a home page with an interactive object using JQuery and Dreamweaver. I am following a tutorial and I know that the html code is correct. The problem comes when I add a CSS rule. When I add that rule, I cannot see the page displayed in L

  • Interpreting the DBMS_PROFILER total_time column...

    Hi , the dbms_profiler package gives the opportunity to find out the total time the db server has executed each line of a pl/sql program.... However , is it right to add all the total_time period of one run and the total_time period of the second run

  • Photoshop CS3 Keeps crashing when making brushes.

    I'm not sure what keeps happening, but, When I try to save my brushes as an .abr file, Photoshop crashes, every single time. It works on my laptop which has XP. I'm currently using Windows Vista Ultimate. 32bit. 2047MB of ram.. I have an Intel premiu